Document 3a0aGw636q7JY8xjaz9JvMNa
PRESS RELEASE FOR IMMEDIATE RELEASE
CONTACT: SCOTT E. FORE (812) 333-0081
Bloomington, IN -- Top officials of the City of Bloomington
and Westinghouse Electric Corporation announced today that they
have reached conceptual agreement to destroy polychlorinated
biphenyl (PCB) contaminated soils and other PCB materials using
proven destruction techniques in a cooperative arrangement. The
agreement would resolve the City's federal court lawsuit against
Westinghouse.
The conceptual agreement, which still must be worked out in
detail, calls for Westinghouse to construct a high-temperature
incinerator which will be used to destroy PCB-contaminated
materials.
.
The preliminary agreement came after months of discussions
between the parties. The preliminary agreement contemplates,
among other things, that:
- Westinghouse will remove and incinerate designated
PCB-contaminated soils and materials from area landfills now in
litigation and the Winston-Thomas Sewage Treatment plant;
. - The City will provide an acceptable site for the
construction and operation of the incinerator;
- The incinerator will be fully licensed and permitted by
the appropriate local, state and federal authorities and both
parties will cooperate in obtaining the necessary permits;
PCB-ARCH-EXT0378317
PRESS RELEASE
FOR IMMEDIATE RELEASE
PAGE TWO
- A major fuel source for the incinerator will be garbage,
refuse and solid waste -- which has a high energy value. In
effect, the joint Bloomington/Westinghouse effort will use > one
environmental concern -- municipal garbage -- to destroy another
environmental concern -- PCBs.
- Once the PCB-contaminated materials are destroyed, the
incinerator will be available for possible long-term use as a
highly efficient means of refuse disposal for the City of
Bloomington.
- The incinerator will be designed, located, constructed and
operated to generate both steam and electricity which can be used
by both Bloomington and local industries.
Bloomington Mayor Tomi Allison and Robert Pugliese, Vice
President and General Counsel for Westinghouse, stressed that the
parties' agreement has not been formalized and that several
important matters, including state and EPA approvals of various
aspects of the program must still be negotiated. Indiana Attorney
General Lindley Pearson and. the federal Environmental Protection
Agency have been advised of the discussions and what is hoped to
be achieved is a cooperative effort between Westinghouse, the City
of Bloomington, the State of Indiana and the U.S. Environmental
Protection Agency.
PCB-ARCH-EXT0378318
PRESS RELEASE
FOR IMMEDIATE RELEASE
.
PAGE THREE
Speaking for the City, Mayor Allison, City Council President
Kathy Dilcher and Utilities Service Board President Gary Kent
voiced strong enthusiasm for the conceptual agreement.
"We
believe that the construction of an incinerator by Westinghouse on
City property, to be fueled in part by refuse, represents a
dramatic example of how environmental problems can be solved
through close cooperation between government and industry. This
prospective partnership to destroy PCBs was accomplished at the
initiative and with the leadership of Westinghouse. The City is
now anxious to work with the Company to bring it about," Mayor
Allison said. .
.
Mayor Allison said representatives of the City and
Westinghouse will continue to work on the technical and legal
details of the conceptual agreement with the hope of finalizing
the settlement before the end of this year.
-30-
10/11/83 . .
..
.
>
PCB-ARCH-EXT0378319