UST Inspection Report Standing Rock Housing Authority
Date of Report: Inspection Date & Time: Weather: Facility Owner: Facility Owner Address:
Facility Address:
Facility Phone: Facility Representative: EPA Facility ID Number: Reason for Inspection: Inspector(s):
October 26, 2023 September 27, 2023, at 12:30 p.m. Central Daylight Time (CDT) Partly sunny Standing Rock Housing Authority - Standing Rock Sioux Tribe 1333 92nd Street Ft. Yates, North Dakota 58538 2000 W. 5th Street McLaughlin, South Dakota 57642
4040007 Routine compliance inspection Marta Grabowski, EPA Andy Woodward, EPA
UST System Description The Standing Rock Housing Authority maintenance shop in McLaughlin (Facility) is a Tribally-owned Facility with one underground storage tank (UST) for fueling housing authority maintenance vehicles. It is located on the Standing Rock Reservation in McLaughlin, South Dakota. The fuel at this Facility is not sold to the public. The EPA's Facility records indicate that the Facility has one single-walled STI-P3 UST, which was installed in 1998. The tank is 560 gallons and contains unleaded gasoline. Facility piping is single-walled steel and operates with safe suction.
Inspection Narrative On September 27, 2023, the EPA UST program personnel conducted an inspection at Standing Rock Housing Authority in McLaughlin, North Dakota. The EPA last inspected the Facility on November 3, 2020, and they selected it for routine re-inspection. Ms. Grabowski spoke with a Facility representative, on September 13, 2023, to schedule the inspection. She also sent a follow-up email (see Attachment A).
4040007-SRHA McLaughlin
Page 1 of 3
9/27/2023 UST Inspection
The EPA inspection team arrived at the Facility at 12:30 p.m. CDT. The Facility was closed, and no Facility representative came to meet the EPA inspectors. Ms. Grabowski filled out a Notice of Inspection (NOI) (see Attachment B) but was not able to get a signature from a Facility representative. One photograph was taken from the outside of the Facility (see Attachment C). Copies of operation and maintenance records obtained during the September 26, 2023, inspection at Ft. Yates Housing Authority are in Attachment D.
Tank Leak Detection According to EPA knowledge of the Facility, tank leak detection is conducted by Franklin Fueling Systems EVO 200 automatic tank gauge (ATG), which was installed in approximately October 2022. Documentation of annual operability testing of the ATG system was not provided during the inspection.
Piping Leak Detection EPA records indicate that the Facility piping operates with a safe suction system, therefore no release detection is required.
Cathodic Protection Cathodic protection of the steel tank and piping is provided by a galvanic (sacrificial anode) system. Copies of the last two CP tests, dated July 7, 2022, and May 1, 2017, were obtained by the EPA during the September 26, 2023, inspection at the housing authority facility in Ft. Yates.
Periodic Testing/Inspection of Spill and Overfill Prevention Equipment A record of passing spill bucket test results dated December 4, 2020, was obtained during the Ft. Yates inspection. An overfill prevention device test record was not provided; however, a high-level alarm was installed in approximately October 2022, according to a service provider invoice that was maintained at the Ft. Yates facility.
Periodic Operation & Maintenance (O&M) Walkthrough Inspections Records of walkthrough inspections were not provided.
Operator Training Proof of Class A operator training was provided during the Ft. Yates inspection; however, it is unclear whether the same individual operates both locations. No other operator certification was provided for the Facility.
Financial Responsibility The Facility uses the South Dakota DANR Petroleum Release Compensation Fund as its financial responsibility mechanism.
Physical Observations The inspection team was not able to enter the Facility to observe the equipment.
4040007-SRHA McLaughlin
Page 2 of 3
9/27/2023 UST Inspection
Inspection Conclusions and Recommendations An inspection checklist is included in Attachment E. Ms. Grabowski kept all copies of the NOI form for recordkeeping.
Inspection Report Attachments A. Record of communication for scheduling the inspection B. Notice of Inspection C. Photo log D. Facility O&M Documents E. Inspection checklist
Signature Lead Inspector
MARTA GRABOWSKI Date: 2023.10.26 10:44:05 -06'00' Digitally signed by MARTA GRABOWSKI
Marta Grabowski
Date of signature
4040007-SRHA McLaughlin
Page 3 of 3
9/27/2023 UST Inspection