Th'.s manual contains recommended roofing soecifications and procedures
sed on accepted good roofing P actices and Koppers years of experience. They are intended to provide the architect, engineer, general contractor, and roofer with the proper information to plan and construct the best roof systems with the most time-proven materials available today.
The availability of a Koppers guarantee for roofing and flashing constructed according to the information contained in this manual under Koppers guarantee procedure, and the publishing of these specifications and information shall not be construed as creating any warranty, expressed or implied, with regard to any roofing or flashing for which a guarantee has not been issued.
This roofing manual supersedes all previous roofing manuals published by Koppers in Sweets Catalogs.
ie specifications and details contained in this manual have been determined to cover the proper procedure for long lasting roofing systems for most areas of our . country.
In certain locations, minor variations in details and specifications may be appropriate due to unusual local conditions, such as wind, temperature, humidity, etc. To assure the best application of the proper specifications and details for your area we recommend you consult your Koppers representative.
Notice:
This roofing specification manual mtains the latest and best .ailable information as derived
from Koppers long experience in the roofing industry. The design criteria and details contained herein have been compiled and are offered
Table of Contents 1984
3 Preface
4-5 Product Guide
6 Guaranteed Roofing Program
BUILT-UP ROOFING SYSTEMS
7 Koppers Coal Tar Built-Up Roofing Material and System Discussion
8-12 13-14
General Requirements & Special Conditions Coal Tar Built-Up Roofing
Roof Specifications Coal Tar Built-Up Roofing
15 Special Applications Water Retaining Roof
16 Flashing Specifications Built-Up Roof Applications
SINGLE-PLY ROOFING SYSTEMS
21-26
KMM Membrane Roofing Systems Materials and System Discussion Terminology Application
.
27-29
KMM Roofing Specifications Specifications No. 610-620 Specification No. 630 Specification No. 630 HI Specification No. 690
30-32
KMM Flashing Specification Specification No. 710
Specifications No. 720-730 Specification No. 760 Flashing Details
WATERPROOFING AND DAMPPROOFING SYSTEMS
33-36
Waterproofing and Dampproofing Systems Coal Tar Membrane Waterproofing KMM Membrane Waterproofing Specifications No. 640-650
36 Liquid and Mastic Applied Waterproofing and Dampproofing Systems
Hydroshield Mastic 451 Liquid Asphalt 480
ROOF INSULATION
37-40 Exeltherm Xtra Roof Insulation
REINFORCEMENT FABRICS
41-43 Specification and Technical Data
ROOF MAINTENANCE PRODUCTS AND SYSTEMS
44-47
Roof Maintenance Products and Systems Roof Resaturants Heavy Duty Roof Shield System Koppers Aluminum Roof Coatings
as a guide for consideration to assist the architect, owner and roofer in an attempt to provide the best roof possible. Responsibility, however, for design of any roofing system, remains with the architect or engineer and building owner.
The contents of the manual are subject to change at the discretion of Koppers Company, Inc. as future developments and experience are achieved.
Product Guide
The products listed below are manufactured to meet the highest quality standards set by Koppers Company. Inc. They are formulated spor'ifically for use in roof and roof
'nance and waterproofing applications.
Additional information on these products may be obtained in other sections of this manual or by contacting your Koppers representative.
The products listed below are manufactured to meet applicable Federal and ASTM specifications. If a certification Is required on any of these products. It must be requested at the time of order placement
Products
Bitumens Coal Tar Bitumen
Description Coal Tar based roofing and waterproofing bitumen
Federal Spec.
Asphalt Type III
Felts #15 Tarred Felt
Petroleum derived asphalt suitable for roofing applications (Type III -- Steep asphalt)
Coal Tar Saturated Organic Fiber Felt
#15 Asphalt Felt Glass Fiber Felt
Reinforced Base Flashing Vented Base Sheet
Asphalt saturated organic fell Bituminous resin coated, inorganic, ply sheet
Asphalt coated -- Fabric reinforced, base flashing Perforated asphalt saturated and surface coated organic fiber felt.
HH-R-595 8 Type 15C Style A HH-R-595B
*
#43 Coated Base Sheet
Asphalt Saturated and Surface Coated Organic Fiber Felt
Single-Ply Membrane systems
KMMo Aluminum
Aluminum Surface -- Single Ply -- Five layer laminated
Membrane
roofing membrane
k'MM* Standard nbrane
Single Ply -- Five layer laminated roofing and waterproofing membrane
bituminous Aggregate Binder (BAT)
For use with the KMM BAT Topping only
KMM Adhesive
A tenacious asphalt adhesive formulated specifically for adhenng KMM membrane
Insulations . Exeltherm Xtra*
.
Closed cell phenolic foam with integrally bonded faces
Fabrics Tar or Asphalt Saturated Cotton (Std. Grade) Tar or Asphalt Saturated Cotton (Spec. Grade) Glasfabe
Glascoat* Jute
U.F. Mat (White)
U.F. Mat (Coated) Standard Mesh
Heavy Duty Mesh Patcning Glass Stonemat
A woven cotton fabric saturated with tar or asphalt
A woven cotton fabric with higher thread count than above grade
A woven glass membrane available in 20 x 10 or 20 x 20 threads per inch -- asphalt or tar coated
Same as above, except coated with white resin
Asphalt saturated Jute, commonly referred to as treated burtap
*
A white, lightweight mat comprised of the glass filaments in a random arrangement reinforced with a swirl pattern
Same as above, coated with asphalt
Medium weight, white glass strands bound together in a random pattern
Heavy asphalt saturated glass fibers in jackstraw pattern
Same as heavy duty mesh -- cut into convenient size rolls
A polyester undertayment for KMM loose aggregate topping
* *
SS-C-450A HH-C-4660 * HH-B-00600 *
*
ASTM Spec.
D-450-78 Type III D-312-78 Type III
D-227
D-226 D-2178 Type IV * D-2626 Except for perforations D-2626
-
*
*
*
D-173
D-1668
D-1668 D-1327
Page No.
12 12
12
8 14 16 11
12
21 21 26 21
37
42 42 42 42 42 43 43 43 43 43 21
4
KOPPERS 7 1,'KOP Architectural and Construction Materials
Products Roof cements Flash-on #441
Flashing Cement
Hydroshield
Tar Roof Cement
Roof coatings Emulsions Liquid Asphalt
Description
Flashing cement formulated for weathering and flow resistance Not as heavy consistency as Flash-on #441
Asphalt cutback. Formulated for application in all weather. Readily bonds to wet surface. Trowel or brush grades. Tar based plastic cement
Federal Spec.
SS-C-153 Type 1 SS-C-153 Type 1
SS-C-153 Type II
Asphalt emulsion. Will not alligator if property applied. Heavy bodied, exceptionally high quality, non-fibrated clay emulsion.
Liquid Asphalt 472
Liquid Asphalt 484 Cutbacks Asphalt Roof Coating 454
Asphalt emulsion. High quality asbestos fibrated medium body, clay emulsion Fiber glass reinforced, asphalt emulsion
Medium body, asbestos fibrated cutback coating
SS-R-1781 Type 1
SS-A-694D
Fiber Coating 415
'turants . .1 Resaturant 425
Roof Resaturant L.O. 410 Roof Resaturant 410
Primers High-Pen Primer 452
Coal Tar Concrete Pnmmg Oil Adhesives CP Adhesive
Reflective roof coatings Alum. Roof Coating 434
Tar cutback. Penetrates and resaturates tar and gravel roofs SS-C-540b
Asphalt Cutback. Combines maximum penetration and coating properties
High quality low odor resaturant.
Highest quality tar resaturant available. Excellent penetration and softening qualities.
*
Thin asphalt cutback primer with maximum penetrating capabilities' Coal tar based primer for roofing and waterproofing applications
Superior asphalt cutback adhesive for asphalt felt applications
SS-A-701
Contains 3 lbs. aluminum paste per gallon. Non-fibrated.
TT-C-00493
Alum. Roof Coating 435
Alum. Roof Coating 444 Alum. Roof Coating 445
Colored Roof Coating (White)
Reinforced with asbestos fibers. Contains 3 Ibe. aluminum paste per gallon.
Contains 2 Ibe. aluminum paste per gallon. Non-fibrated.
Contains 2 lbs. aluminum paste per gallon. Reinforced with asbestos fibers.
White acrylic emulsion decorative coating. To be used over new Liquid Asphalt 480.
CauNdngs Acrylic #400
One part, gunnable, acrylic caulking.
' icatote Federal and/or ASTM Guide SpecMcattone are not available for Me product
TT-C-496B * * *
`
ASTM Spec.
0-2822 Type 0-2822 Type!
*
D-1227 Type III D-1187 Type A D-1227 Type 1 *
D-2823 Type l N/A
`
D-41
D-43
D-2824 Type 1 D-2824 Type II *
*
Page No. -- 36 --
36
-- 45 45 -- 45
16 34
-
47 47 47 47 --
--
5
Koppers Roof Guarantee Program
K'opers Guarantees are available for those ng specifications listed in this manual. To
s _,,fy for a Koppers Roofing Guarantee, roofing and flashing must be constructed in accordance with Koppers Specifications, with Koppers materials, and by a roofing contractor authorized by Koppers.
Prior to the beginning of any guaranteed roof application, tne contractor must apply for the required document in accordance with Koppers standard procedures.
General requirements for guaranteed roof applications:
1. All roofing to be guaranteed must be constructed in conformance with Koppers specifications.
2. Koppers guarantees are not available for residential roofing.
3. Koppers guarantees are transferable upon timely written notice of change of property ownership.
4. Koppers guarantees are available within the Continental United States in all areas except those areas where Koppers does not presently provide inspection service.
5. Approved flashings may be guaranteed for terms up to but not exceeding the term for which the roof is guaranteed.
6. Charges for roofing guarantees are made on a per square (100 sq. ft.) basis of the roofing membrane.
Coverage:
Koppers roof guarantees provide for repairs of leaks to the roofing not occasioned by defects in the building abuse or extreme weather conditions during the term of the guarantee up to the monetary limit specified in the guarantee. Coal Tar Bitumen and KMM Standard Roof System Guarantees do not make exception to roof areas with standing water.
Roof guarantees DO NOT cover the repair, installation or replacement cost of the following:
1. Decking Materials.
2. Vapor retarders.
3. Insulation products (except KMM IRMA and Gold Seal Guarantee systems).
4. Metal work.
5. Products in the roof assembly furnished by others.
C. Damage to the guaranteed roofing or flashing caused by the use of the products listed in 1 through 5 above, their installation or attachment
7. Vandalism or owner abuse.
Koppers reserves the nght to cancel any guarantee if the roof is damaged due to causes not covered by the guarantee if it is determined that the roofs satisfactory performance for the remaining term of the guarantee is impaired. Cancellation due to damage of this type does not provide for any refund of the original cost
GOLD SEAL GUARANTEE
Koppers offers its Gold Seal guarantee on certain roofing systems that inciude the use of Exeltherm Xtra (Koppers phenolic insulation
rd.) The Gold Seal Guarantee is a limited ility guarantee offered for a period of ten years. It provides the building owner coverage against leaks directly caused by the roof membrane, composition or KMM base flashing, or Exeltherm Xtra roof insulation.
The Gold Seal guarantee program is applicable for KMM Membrane and Coal Tar systems only. Coverage includes both materials and workmanship.
OTHER GUARANTEES
Built-Up Roof Guarantees
Koppers guarantees are available for 5,10, IS or 20 year terms, and only cover coal tar builtup roofing and flashings where approved. The 5 and 10 year guarantees carry a renewable option provided Koppers standard procedures are followed.
Single-Ply KMM Guarantees
a five-year guarantee with a five-year renewal 'ion. KMM membrane applications only.
KMM IRMA Guarantee
A ten-year guarantee covering watertightness and insulation efficiency (80% of the original thermal resistance).
6
BUILT-UP ROOFING SYSTEMS
Coal Tar Bitumen Built-Up Roofing Materials and System Discussion
KOPPERS 7 1/KOP Architectural and Construction Materials
r -cription
Koppers Coal Tar Bitumen built-up roofing systems consist of alternate layers of Koppers Coal Tar Bitumen and Koppers tarred felt, surfaced with a heavy top pouring of Koppers Coal Tar Bitumen into which is embedded an aggregate.
Koppers Coal Tar Bitumen built-up roofing systems are used whenever a roof is exposed to water and/or corrosion, and on all level or low sloped roofs where minimum maintenance is required.
Features
Coal Tar Bitumen built-up roofing provides one the most durable roofing systems known due to its inherent superior waterproofing and weathering characteristics. This is THE time proven roofing system for level and low sloped roofs.
Coal Tar Bitumen provides numerous advantages to an owner. The superior performance of coal tar roofing systems in the areas listed below make coal tar roofing systems unique in the roofing industry.
1. Coal Tar Bitumen has natural resistance to water, air and water vapor penetration.
A tight molecular structure enables Coal Tar Bitumen to resist water penetration and oxidation of the roof surface.
2 'ther unique feature of coal tar roofing Is Iti -healing ability.
Alligatoring and hairline cracks common to most materials, eventually cause damage to the roofing membrane. Coal Tar Bitumen has a
property known as "cold flow" which automatically corrects these conditions before serious damage takes place. This "cold flow" feature heals small mechanical fractures at normal temperatures.
3. Application improvements.
Because Koppers has expertise in the chemistry of aromatic coal tars. Coal Tar Bitumen was developed with the beneficial features of low fume evolution at application temperatures, thus reducing potential irntation during application.
These features represent significant improvements which are in consort with the aims of government, labor, and industry in the areas of reduced air pollution and improved worker conditions.
USM
1. All 'dead1 level roofs
2. All water cooled roofs
*'
3. Low sloped roofs with occasional ponding
4. Low sloped roofs with retarded drainage
5. All buildings with level or low sloped roofs that are built for long sen/ice life
6. Roofs in most highly corrosive atmospheres
Slopes
Koppers recommends that the maximum roof slope be one-hall ('4) inch per foot tor all builtup Coal Tar Bitumen roof systems. Koppers does, however, permit slopes up to two (2) inches per foot at flashings that incorporate tapered cants and for short run crickets or saddles for drainage, provided there are
provisions for adequate back nailing, and these crickets or saddles do not cover more than 15% of the roof area.
All felts must be back nailed on slopes over one-half C<4) inch per foot. For recommendations on roofing procedures for slopes over 'h inch per foot, consult your Koppers representative.
Underwriters Laboratories
The current Underwriters Laboratories Building Materials Directory under the heading "Built-Up Roof Covering Materials" lists Koppers Coal Tar Bitumen and Tarred Felt for use in construction of Class A and B built-up roof coverings.
"Roof Deck Constructions" and "Roof Deck Construction Materials" such as "Foamed Plastic" insulation board are listed under their appropriate headings or under Koppers in the . index of Companies.
Guarantees
Koppers Guaranteeq^re available for 5.10,15,
and 20 year termaftBbof guarantees cover
ONLY the built-up roofing and Hashing
membrane. (Except Gold Seal Guarantee
which includes- Exeltherm Xtra roof
insulation.)
-
For further details. pteaeMRarto Page 6ofthis manual.
Note: Due to varying architectural designs, koppers built-up roofing products should not be used on single family residential construction.
7
Buiit-Up Roofing Systems (Cont.)
General Requirements and Special Conditions
Hoof Structure System
In any building the performance of the BuiltUp Roofing will be affected to some degree by
all of the parts of the roof structure system as well as the inside and outside atmospheric environment. Each component should be investigated for its compatibility with each of the others. The roof structure system may include any or all of the following:
Outside Atmospheric Conditions Roofing System Peripheral Details (Flashings) Insulation (if present) Vapor Retarder (if present) Structural Deck including sub
purlins (supports) Structural Framing Air Space (if present) Ceiling (if present) Interior Air Conditions
You will find information in this manual pertaining to materials and application methods other than for built-up roofing. They are offered to assist the designer in establishing their normal position in the roof structure system. They should not be construed as part of the built-up roofing system, as endorsement, nor as part of the designated specifications other than to establish a suitable roofing base in the roof structure system.
proper design, specification and pusitioning of the various components of the roof structure system is the responsibility of the buildng owner or his designer. Any subsequent failures, due to either the installation or lack of installation will not be Koppers responsibility
Decks
(
The deck is the base over which the built-up roofing, or insulation and built-up roofing is applied. Where the term deck is used in this manual without reference to insulation, it shall designate the surface over which roofing is to be applied. All decks shall be clean, smooth, dry. rigid and free of debris. Any deck defect shall be corrected before applicatin of roofing. All decks shall be installed in accordance with the deck' manufacturer's specifications and shall be in compliance with Koppers General
Requirements.
In approving any deck as eallalacloty to receive a Koppers roof, only the deck surface Is accepted. It is the responsibility of the building designer and the deck manufacturer to provide for expansion and contraction in a manner that will provide a stable base for the roofing; for support of maximum anticipated loads: secure attachments vertically and laterally, and the selection of the deck material and construction details including their ability to contain bitumens.
3PERS WILL NOT ASSUME RE SPONSIBILITY FOR DECK DEFECTS OR BITUMEN SEEPAGE.)
The placing of conduits, bolt heads, etc., above the roof deck and below the roofing membrane is not recommended.
All projections or openings in the deck should be completed prior to the application of the roofing.
Optimum adhesion to the deck is necessary lor good roof performance. Where Koppers Bitumen or steep asphalt is used as an adhesive, questionable decks may be tested for dryness and adhesion by pouring one pint of the bitumen, heated to application temperature, over a representative area or areas of the deck. The deck is not satisfactory it the bitumen foams or bubbles, or upon cooling to ambient temperature may be stripped clean of the deck.
When decks can not be sufficiently cleaned to permit adequate adhesion a primer is required.
Metal Decks
Metal Decks: Decks of this type must be clean, smooth, and properly anchored to the steel purlins and all joints correctly lapped and fastened.
It is absolutely necessary to install board type insulation on a metal deck before the Koppers roofing is applied.
Type of metal deck, flute opening and various other factors determine the type and thickness of insulation required. Consult your Koppers representative for recommendations.
Metal roof decks shall be designed so that they will not have a deflection exceeding 1/240 of clear span under ail types of loads (live & dead) when subjected to 300 lbs. concentrated on a 1 sq. ft. area at mid-span. Designer should take into account roof traffic conditions including mechanical equipment used for roof application.
Note: When applying insulation and roofing over a perforated or acoustical type metal deck, it is required that a vapor retarder be installed prior to the application of the insulation or that a base sheet set in steep asphalt be utilized as the first ply of Built-Up Roofing. This is to reduce the possibility of Bitumen dnppage.
If two layers of insulation are specified, it's important that the joints in the top layer do not coincide with the joints of the bottom layer.
>.
Note: In areas that exceed the 1/2" per foot maximum slope requirements (short run crickets, saddles or cants), all plies or tarred felt must be back nailed. Wood nailing strips must be provided when the substrate is not considered capable of retaining nails.
Application of Vapor Retarder and
.
Board-Type Insulation
*
(Felt Type Vapor Retarder)
1. Coat the ribs of the metal deck with Steep
Asphalt and then install two (2) full
thicknesses of Koppers No. IS Asphalt Felt,
lapping each sheet nineteen (19) inches over
the preceding sheet mopping with Steep
Asphalt the full width of the nineteen (19) inch
lap. Extend and adhere all felt up vertical
surfaces to a height 6" above the plane of the
insulation surface.
2. Mop the entire surface with a uniform coating of Steep Asphalt, into which, while hot. firmly embed the insulation.
3. Complete the system in accordance with Specification No. 220.
Application of Board-Type Insulation (Without Vapor Retarder) 1. Install insulation with FM approved mechanical fasteners or Steep Asphalt. When attachment is made with steep asphalt it shall be applied to deck at the rate of 12 to i S lbs. per 100 sq. ft., place insulation while steep asphalt is still molten to provide good adhesion (See "Attachment" Page 10.)
2. Complete the system in -accordance with Specification No. 220.
Poured Portland Cement Concrete
The deck surface must be smooth, dry, and free of dirt, dust and debns. Projections should be removed, low points filled with cement grout or other suitable material, and ail cracks pointed up. Roof deck shall' be properly graded to outlets.
Note: In areas that exceed the 1/2" per foot maximum slope requirement (short run cnckets. saddles or cants), all plies ot tarred felt must be back nailed. Wood nailing strips must be provided when the substrate is not considered capable ot retaining nails.
Application of Vapor Retarder and Board-Type Insulation 1. Apply a uniform coating of Coal Tar Bitumen to the deck.
2. Lay over the entire surface two (2) full thicknesses ot Koppers Tarred Felt, lapping each sheet nineteen (19) inches over the preceding sheet -- mopping with Coal Tar Bitumen the full nineteen (19) inches so that in no place shall felt touch felt.
3. Extend and adhere all plies of felt to vertical surfaces to a height 6" above the plane of the insulation surface.
4. Apply a uniform coating of Coal Tar Bitumen over the entire surface into wmch, while hot. embed the insulation. If there are two (2) layers of insulaton mop the entire surface of the first layer with Coal Tar Bitumen into which, while hot. embed the second layer of insulation.
5. Complete the system in accordance with Specification No. 220.
Application ot Board-Type Insulation (Without Vapor Retarder) 1. Apply a uniform coating of Coal Tar Bitumen over the entire surface into which, while hot, embed the insulation.
2. Complete the system in accordance with Specification No. 220.
AppBcetton ot Root Membrane to Deck (Without Insulation) Install the roof in accordance with Specification No. 220, mopping directly to the deck.
B
Built-Up Roofing Systems (Cont.)
KOPPERS 7 KOP Architectural and Construction Materials
Piv.~ast Structural Concrete Sections
Precast concrete structural sections demand the same recommendations as poured concrete decks, although the presence ol moisture, due to insufficient drying time, is not likely. If the contractor finds one or more slaps resting unevenly, with edges projecting above the surface, this should be corrected by resetting or leveling off. Leveling off should be gradual and smooth to permit insulation full contact with the substrate. All insulation joints must be even and smooth. Open-cell aggregate concrete is not acceptable for filling or leveling low areas. All joints must be grouted, and ss wall, must bs caulked with trowsl-gradsd asphaltic plastic csmsnt As additional projection from bitumen drfppage centered on the joint, an 8 Inch wide (min.) felt stripping must be totally embedded In the troweling of plastic cement Sides and ends of deck sections should be square, rest firmly and evenly on supporting members, and be installed to prevent lateral and vertical movement.
Note: In areas that exceed the 1/2" per foot maximum slope requirement (short run crickets, saddles or cants), all plies of tarred felt must be back nailed. Wood nailing strips must be provided when the substrate is not considered capable of retaining nails.
,, lion of Vapor Retarder and Board-Type Insulation 1. On precast concrete decks, solid mop the entire deck surface with Coal Tar Bitumen.
2. Lay over the entire surface two (2) full thicknesses of Koppers Tarred Felt, lapping each sheet nineteen (19)'inches over the preceding sheet -- mopping with Coal Tar Bitumen the full nineteen (19) inches so that in no place shall felt touch felt.
3. Extend and adhere all plies of felt up vertical surfaces to a height 6" above the plane of the insulation surface.
4. Apply a uniform coating of Coal Tar Bitumen over the entire surface. While hot. embed the insulation. It there are two (2) layers of insulation mop the entire surface of the first layer with Coal Tar Bitumen. While hot embed the second layer of insulation.
5. Complete the system in accordance with Specification No. 220.
Application of Board-Type Insulation (Without Vapor Retarder) 1. Over precast concrete, solid mop with Coal Tar Bitumen. While the bitumen is still hot. embed the insulation. See insulation section, Page 11. Insulation joints shall not coincide with joints of the precast units.
2. Complete the system in accordance with Specification No. 220.
`np of Roof Membrane to Deck thu~> Insulation) On precast concrete, solid mop with Coal
Tar Bitumen.
2. Complete the system in accordance with Specification No. 220.
Lightweight Decks
Poured Insulation Gypsum -- Poured/Pfank
Lightweight insulating decks include lightweight aggregate concrete (20 to 40 lbs. per cu. ft. oven dry density): foamed concrete, gypsum and thermosetting asphaltic decks.
Poured Decks: Except for Koppers Dycone Concrete, poured lightweight insulating deck systems must be capable of venting excess water vapor to the underside. Koppers will not accept these poured lightweight insulating decks to be placed over vapor retarders, poured concrete substrates, unvented metals, or any type of base which will not permit these materials to vent from the underside. This is necessary to prevent a water vapor pressure buildup under the bunt-up roofing. Occasional or spot vents through the roofing as the only venting method is not sufficient.
Provisions should be made wherever possible to provide additional venting such as notched wood perimeter nailers, etc., in conjunction with the venting from the underside of the deck. If board type insulation is to be applied over a lightweight insulating deck, provisions must be made between the fill and the board insulation to prevent fill moisture from affecting the insulation and roofing.
Application of Board-Type Insulation (Without Vapor Retarder) 1. Apply over entire surface one (1) ply of Koppers coated base sheet, lapping each sheet four (4) inches over preceding sheet and nailing at lap no less than nine (9) inches, and stagger-nailed down the center of each sheet on nine (9) inch centers. (This is approximately 100 nails per 100 sq. ft.).
2. Mop the entire surface with a uniform coating of Coal Tar Bitumen into which, while hot. firmly embed the insulation.
3. Complete me system in accordance with Specification No. 220.
Application of Roof Membrane to Deck (Without Insulation) 1. Apply over entire surface one (1) ply of Koppers coated base sheet, lapping each sheet four (4) inches over preceding sheet and nailing at lap no less man nine (9) inches and stagger nailed down center of each sheet on nine (9) inch centers. (This is approximately 100 nails per 100 sq. ft.).
2. Complete the system in accordance with Specification No. 210.
Thermosetting Asphaltic Fll When applying the roofing membrane directly over a thermosetting asphaltic fill, follow Specification 210 except the first ply of the roofing membrane must be a base sheet set in a solid mopping of steep asphalt.
Precast Panels: On precast gypsum panels, all joints must be grouted, and as well, must be caulked with
trowel-grade asphaltic plastic cement. As additional protection from bitumen dnppage centered on the joint, an 8 inch wide (min.) felt stripping must be totally embedded in the troweling of plastic cement.
Wood Plank/Plywood
Wood shall be well seasoned, dry and preferably treated. End joints shall have adequate bearing. Loose or void knot holes, large cracks, etc., shall be covered with sheet metal.
Note: in areas that exceed the 1/2" per foot maximum slope requirement (short run crickets, saddles or cants), all plies of tarred felt must be back nailed. Wood nailing strips must be provided when the substrate is not considered capable of retaining nails.
AppBcabon of Vapor Retarded and Board-Type Insulation 1. Apply over entire surface one (1) ply of Koppers coated base sheet, lapping each sheet four (4) inches over preceding sheet and nailing at lap no lest than nine (9) inchgj) and stagger nailed down center of each sheet on nine (9) inch centers. (This is approximately 100 nails per 100 sq. ft).
2. Lay over the entire surface two (2) full thicknesses of Koppers Tarred Felt, lapping each sheet nineteen (19) inches over the preceding sheet -- mopping with Coal Tar Bitumen the full nineteen (19) inches so mat in no place shall felt touch felt.
3. Extend and adhere all plies to vertical surfaces to a height 6" above the plane of the insulation surface.
4. Mop the entire surface with a uniform coating of Coal Tar Bitumen into which, while hot. firmly embed the insulation.
5. Complete the system in accordance with Specification No. 220.
Lumber shall be a minimum of 1" nominal thickness.
Plywood (exterior grade) shall be a minimum of 1/2" thickness. Hot Coal Tar Bitumen should never be applied directly to a wood deck. Sandwiched between the heat from above and the heat from below, such material finds its way through me boards into the building. Good roofing practice demands me cushioning and blotting effect ol a layer of sheathing paper followed by one ply of base sheet nailed to the deck. Shipiap and square edge boards should be avoided and tongueand grooved lumber used where possible
Preparsfon to Deck Surface -- (Mandatory on all Wood Decks)
The wood roof deck shall be covered with one (1) layer of approved rosin-sized sheathing paper weighing approximately five (5) pounds per one hundred (100) square feet The sheathing paper shall be lapped two (2) inches and secured to the deck by occasional nailing.
Note: In areas that exceed the 1/2" per foot maximum slope requirement (short run crickets, saddles or cants), all plies of tarred felt must be beck nailed. Wood nailing strips must be provided when the-substrate is not considered capable of retaining nails.
9
Built-Up Roofing Systems (Cont.)
AppllcaUon ot Vapof Retarder and
Board-Type Intulalion 1 Apply over entire surface one (1) ply of
iers coated base sheet, tapping each . at four (4) inches over preceding sheet and
nailing at lap no less than nine (9) inches and stagger nailed down center of each sheet on
nine (9) inch centers. (This is approximately 100 nails per 100 sq. ft.).
2. Lay over the entire surface two (2) full thicknesses ol Koppers Tarred Felt, lapping each sheet nineteen' (19) inches Over the preceding sheet -- mopping with Coal Tar Bitumen the full nineteen (19) inches so that in
no place shall felt touch felt.
3. Mop the entire surface with a uniform coating of Coal Tar Bitumen into which, while hot. firmly embed the insulation.
4. Complete the system in accordance with
Specification No. 220.
.~
. -f?
Application of Board-Type Insulation `
(Without Vapor Retarder)
1. Apply over entire surface one (1) ply of
Koppers coated base sneet. lapping each
sheet four (4) inches ovefpreceoing sheet and
nailing at lap no less than nine (9) inches and
stagger nailed down center of each sheet on
nine (9) inch centers. (This is approximately
100 nails per 100 sq. ft.).
2. Apply a uniform coating of Coal Tar
Bitumen over the entire surface into which,
while hot. embed the insulation.
"
3. Complete the system ireaccordance withSpecification No. 220.
i: When the roof insulation is to be naited
a vapor retarder is flOt-acuiraflURa one ply of base sheet mey be onMbi hovijMr. the' sheathing paper is required.
All deck |Oints of these types must be grouted, higher uplift resistance than our minimum and as wed. must be caulked with Koppers requirement, additional fasteners or adhesive
Flashing Cement which shall be applied so will be required over and above me quantities
that the top surface is level and smooth. Felt described in the ensuing specifications
stripping four (4) to six (6) inches wide set in a troweling of the cement is required to assist in leveling uneven joints-and bridge the jomt openings thus providing a better surface for the roofing materials.
When asphalts are to be used to adhere insulations to concrete decks, the dack shall first be pnmed with an asphalt primer at a rate of one gallon par 100 square feat.
Caution: care must be taken to avoid bitumen drippaga.
When nails or fasteners are used, they must be nailed through disks or have sufficiently large heads to prevent fracture or puncture through
Note: In areas that exceed the 1/2" per foot the roofing felts.
maximum slope requirement (short run
crickets, saddles or cants), all plies of tarred felt must Mhback nailed. Wood nailing strips must be provided when the substrate is not considered capable of retaining nails.
Mechanical fastening of Insulation ie the preferred method of attachment Beginning in 1964. Factory Mutual has announced that mechanical fastening of the first layer ot board type insulation to a metal deck will be the only
Applications of Vapor Retardar and
acceptable method lor attachment.
Board-Type Insulation 1. Install two (2) plies of No. IS asphalt felt lapped nineteen (19) inches in Type ill steep
Contact the insulation manufacturers' literature for requirements.
asphalt. Plies shall be mopped solidly so that in Cold applied adhesives are not acceptable lor
no place shall felt touch felt
attaching Insulation or vapor retarders.
2. Mop the entire surface with a uniform coaling of Type III steep asphalt into which, while hot. embed the insulation.
3. Complete the system, in accordance with
Koppers wtH not be leeponelbte for any damage caused by or ^ths result ol
unsatisfactory attachment, '
Specification No. 220.
- For further information contact your Koppers
Application of Board-Type million
representative.
,
(without Vapor Retarder) 1. Mop the entire;.surface with
a
` uniform
Efpanslort
Joints
(Building)
Coating of Type Ul steep aspnatf into which, Sineeail metadata expend and contract due to
while hot. embed the insulation.'
tainftoture and/otjjfa'oisture. the use.
2. Instatt-roofing In accordance with locafkXT. and designer building expansion Specification No. 220except that a base' sheet, joints, especially in the roof structure system. set in staep asphalt', mustbe substitutedasiff. . shoutd'brWen lnto consideration at the time first ply. See "Base Sheet Alternate" Page 12. of original building design.
Application of Roof Msmbrane to Deck (Without Insulation) 1, Apply over entire surface one (1) ply of Koppers coated base' sheet, lapping each sheet four (4) inches over preceding sheet and nailng at lap no less tnan nine (9) inches and stagger nailed down center ot each sheet on nine (9) inch centers. (This is approximately 100 nails per 100 sq. ft.).
Application ol Roof Membrane to Deck (Without Insulation) 1. Install root membrane directly lo deck in accordance with Specification No. 220 except that a base sheet, set in Type III steep asphalt, must be substituted as the first ply. See "Base Sheet Alternate" Page 12.
Material Protection
Although provisions for adequate expansion joints are the responsibility of the building designer, Koppers offers the following recommendations lor the protection of the roofing system against splits caused by expansion and contraction of the building. Building expansion joints should be installed.
1. On roof areas larger than 200 feel in each direction
2. Complete the system in accordance with Specification No. 210.
Structural Wood Fiber
All decking must be installed in strict accordance with the particular deck manufacturer's recommendations. Deck material must be protected during shipment, lob site storage and prior to roofing application. No planks which have become structurally weakened due to moisture, fractures or mutilated edges may be used. All joints must be level and preferably grouted full and level with plank surfaces as recommended by the deck manufacturer. All planks must be well anchored to supporting members to resist movement in a fashion recommended by the deck manufacturer. Any planks which bow or
'ect or do not seat securely must be *ced. Responsibility for me selection ol a particular type of wood fiber deck, its installation, provision for expansion and contraction, its suitability to job requirements, and its ability to support anticipated loads mils environment rests with the designer and deck manufacturer.
it is the responsibility of the roofing contractor to protect all roll roofing materials and roof insulation from ground or construction moisture and weather before and during construction of the roof membrane.
Roof insulation boards are often shipped from the manufacturing plant with plastic sheets wrapped around the boards securing them on the pallets. These ire generally not acceptable tor job site protection as they do not "breathe" and therefora can trap moisture. Removing these plastic shipping protection sheets and replacing them with "breathable" type tarpaulins such as canvas is recommended.
Attachment
Maximum adhesion or secure attachment of all components in the roofing assembly is necessary for satisfactory long tarm performance ol the roofing membrane. Bitumen adhesive and/or fastener quantities specified by the manufacturer must be capable of passing a minimum uplift resistance of 40 pounds per square foot (psf).
When Building Code requirements dictate a
2. At all places where the structural supports and roof assembly change direction
3. Where type of adjoining deck materials change
Where control or expansion-contraction joints are provided in the structural steel, deck material, or deck system, provisions must be made for continuation of th relief through the built-up roofing system. Koppers realizes that in a climate controlled building there may be little or no expansion AFTER the building is in use, however, building expansion joints are still recommended based upon the following
points:
1. During construction the building will not be under a steady state temperature/humidity condition so that thermal and moisture movement can be sufficient to fracture the
roofing.
2. If no building expansion joint is provided,
the owner must kssp the building at the steady
silts temperature and humidity condition at all
times, as holiday shut-downs can fracture ths
roofing due to the movement of the roof system resulting trom temperature/humidity
variation.
'
,
10
Built-Up Roofing Systems (Cont.)
3. II the occupancy is fairly large, the sudden entrance on a rainy day of many rain-soaked
m-' iees may cause moisture movement in i. structure system which can fracture the luofing.
Water Stops (Temporary Protection)
Water stops consisting of two (2) plies of tarred felt and mopping of Coal Tar Bitumen extending onto the deck and insulation at least 6" and 4". shall be applied at the end of each day s work over exposed edges of insulation. These temporary protective measures must be removed cleanly from the Insulation (top surface and vertical Joint) and from the deck to ensure tight insulation joints and level insulation surfaces. Improperly removed water stops have been determined as a cause of roof splits and have prevented moisture vapor movement to vented edge datails.
Cut Offs (Permanent Installation)
Venting of roof insulation at walls, curbs, eaves, etc. is recommended for all but a few special roof structures. Therefore, cut-offs should not be installed at edges of insulation ad|oinmg these areas for venting purposes.
Cut-offs may be installed however, provided they are constructed to run in one direction continuously to vented edges and provided no section of the roofing is isolated or blocked from venting.
ar Retarders
Vapor retarders are normally used where the heat flow direction and/or humidity within the building, during any climate or occupancy cycle, might cause the dew point or condensation to occur under the built-up roofing within the insulation chamber. It is important that the vapor retarder, when installed, provide a continuous seal, (including ventilators, skylights, peripheral walls, and other terminations) from the source of the water vapor.
insulation
Insulations come in varying thicknesses and sizes. Should the manner of attachment as suggested conflict with that specified by the individual insulation manufacturer, the insulation manufacturers specifications shall be followed and in addition, shall be in compliance with Koppers General Requirements.
Good roofing practice dictates that the following points be considered when specifying board type roof insulation.
1. The roofing insulation must be kept dry at all times. It must be of a type approved by Koppers tor use with a Koppers built-up roof. It should only be applied over a deck complying with all of Koppers General Requirements.
2. If " roof deck slope is one-half (Vi) inch oert r more, the insulation must be able to
tain ..ails or wood nailers must be installed -rpendicular to the slope at each course of insulation.
Spacing of nailers must be such that the insulation fits snugly with the nailers but must not be force fitted.
3. No more insulation snail be laid at any one time than can be protected by bitumen and felt in case of sudden weather changes.
4. Edges of insulation shall be brought closely together and shall not be forced into place. Where insulation joins vertical surfaces, the insulation shall be cut in a neat manner allowing approximately one-half ('.4) inch clearance.
5. When more than one (1) layer of insulation is used, joints in each layer shall not coincide. All layers shall be parallel to preceding layers.
Note: When urethane, urethane composite or isocyanurate roof insulation is specified, it must be installed in a double layer application. The appropriate insulation product must be Installed direct to the roof deck and a second layer of ftberboard, perlite board or glass fiber roof insulation Installed over top. The Joints of the second layer must not correspond with that of the first In lieu of the second layer of insulation, a Koppers vented baae sheet may be used es the first ply of the membrane. Consult the manufacturers' literature for specific information.
Wood Nailing Strips
All non-nailable decks require wood nailing strips at eaves, edges, walls, roof-openings, etc. for proper securement of metal flanges. Nailers must be securely and firmly attached to the deck or through to its supporting members. Nailers shall extend not less than 1" beyond the apron or flange.
Roofing felts for all deck areas having a slope of Vi" per foot or more must be back nailed and therefore non-nailable decks must be furnished with treated wood nailing stops' treated with a material compatible with bituminous roofing.
Cold Storage and Freezer Buildings
Koppers will not bond its built-up roofing over these structures if insulation or insulation and vapor retarder is installed over the deck unless there is an adequately ventilated air space between the deck and insulated refrigerated area.
For procedures on non-guaranteed built-up roofing applications, consult a Koppers representative. When a guaranteed system is required, refer to KMM Specifications^j^ege 24.
Water Retaining and Retarded Drainage
When the roofing system is subjected to common standing water or retarded drainage refer to the Special Applications Section. Page 15.
Temporary Roofing
Temporary roofing specifications are available for all Koppers Coal Tar Bitumen Built-Up Roofing Systems. Consult your Koppers representative for recommended specifi cations over various type decks for temporary roof construction.
Reroofing Design Considerations:
During the reroof design and specification phase, and prior to commencement of reroofing work, it is the building owner's responsibility to have his architectural or consulting representative ascertain if the existing roof structure, with the new roof system installed, will meet all local building structural codes.
If additional insulation is to be a part of the new roof system, an evaluation of the dew point and its effect on the roofing system should be determined.
Reroofing application can be complicated since many factors must be considered. For more specific information pertaining to special situations, contact your Koppers representative.
Note: Koppers will not be responsible for any damage caused by excess loads on structural systems or damage due to rate or change m location of new dew point.
General Application Procedure
Application of Bitumens Recommended Weights per 100 sq. ft. (for estimating purposes only)
Koppers Coal Tar Bitumen
Steep Asphalt
Average Interpiy
25 lbs. 23 lbs.
Top Coating
75 lbs. 60 lbs.
Average mterply weights are based on many years of experience of good roofing practice, and take into account a reasonable vanation in the amount of bitumen absorbed in different substrates, and the type of specification. Moppings of bitumen between felts shall be continuous.
Felt ShaN Not Touch Felt It is generally agreed that maximum strength between layers of felt is achieved by the thinnest practical glue line of bitumen. Too thin a layer starves the lap. whereas an excessive layer can permit mterply movement on sloped roofs.
Care should be taken by all parties to provide thin but continuous moppings of interpiy bitumen.-Too heavy of mterply moppings can result in felt slippage.
Flood Coat
'
The top pouring is most important, it must be
thorough and uniformly covered with
specification aggregate embedded into the
bitumen while the bitumen is (bit hoi
Recommended Temperature Limitations:
.
Koootfs Coil Tar Bitumen Steep Asphalt
Point of Maximum Application
Kettle Temp. Temp.
-
42S*F
350-4WF
479*F
400-45CTF
Uas manufacturers recom
mended *EVT" Temperature
when listed ____
11
Built-Up Roofing Systems (Cont.)
Whan roofing bitumens arc axcaaahraly -xerhaalad and/or hafd for tong parioda of
a, thair watarprooting quaUUaa ara graatty
.ducqd, and at tha uma lima tha vofuma of fuming it incraatad. In ordar to achieve Ih# maximum banafift of low fuming and unequaled watarprooting performance, H la imparativa that Koppara Coal Tar Bftuman ba haatad within tha tamparatura limitatlona litlad abova. Close supervision of heating is aiso good rooting practice for all bitumens.
If heat is desired during a holding period at the jobsite while material is not being drawn off and replenished as under normal usage, kettle temperature should be reduced and not permitted to exceed 350" F for Koppers Coal Tar Bitumen or 425"F for steep asphalt. The
kettle should be full lid closed. These temperatures are applicable to job conditions and do not apply to holding or storage in kettles in excess of 4 hours. If bitumen is not to be used for periods over 4 hours, the kettle
should be shut off.
Koppers Coal Tar Bitumen may be contained in 1000 gal. or greater capacity heated and automatically controlled closed vessel tankers at 375* F for periods not exceeding 96 hours.
Application of Felt PIlet of left must be laid shingle fashion. Where a water flow direction exists, felts should be applied so that the direction of flow is not against the laps. Broom or press all plies of felt into the hot bitumen and lay without wrinkles, buckles or kinks, so that the finished
iof is free of pockets or blisters. Each felt ply .mall be completely covered with a complete mopping of bitumen.
The number of plies are controlled by varying
widths of the edge laps. Four-ply (4) roofing,
for example, is achieved by lapping each ply
approximately twenty-seven and one-half
(2714) inches.
Koppers felts are marked at the factory with lap lines for this purpose. Except as specifically provided for in Koppers specifications, application of felt lapping methods other than shingle fashion will not be
permitted.
When beginning a membrane roofing
installation, appropriate width starting stripeof felt shall be used at the starting point to
achieve the specification pty build-up at that point so that successive felt applications will produce the ply requirements. Overlap ends of all connecting plies of felt (end laps) not leas than 10 inches. End stripping or taping of these laps is not permitted.
5. Fire protection from burning brands.
6. Protect bitumen from the actinic rays of the sun.
7. Most important -- by using an aggregate surface, an additional 75 lb./sq. of Coal Tar Bitumen (the waterproofing agent) is included in the installation.
The application of Koppers Coal Tar Bitumen and aggregate must be done at the time the felts are applied: except in periods of hot. dry weather, when morning dew is not expected, the top surfacing may be delayed overnight.
When the specifier desires glaze coating and/or all work to be completed the same working day. he shall be responsible to so state this requirement in his specifications.
The aggregate surfacing must be applied into thetoppouringwhiiethebitumemsstiilhotso that a uniform layer will be embedded and adhered. The completed roof assembly will have a uniform aggregate surface. Depending on slag weights in certain parts of the country 400 lbs. of slag per square may be required. Occasionally on well applied roofs, small black globes known as "raspberries" or "blackberries" will form in the roof surface. These are not detrimental to the roof.
Aggregate Surfacing The aggregate-to be used should meet the ASTM Specification D1863-80. The basic requirements for this aggregate are as follows:
Do not heat bitumens above the maximum temperature limit listed above to compensate for rapid chilling. Insulated containers along with carelully timed material delivery methods, must be employed.
Note: Bitumen temperatures below those recommended at the "point of application" can result in heavy interply quantities which in turn can potentially contribute to the cause of membrane slippage.
Base Sheet Alternate When substituted for the first ply in a solid mop application specification, the Base Sheet shall be embedded in a solid mopping of Koppers Steep Asphalt followed by thorough brooming to eliminate air pockets, wrinkles, fish mouths, buckles, etc. The remaining three (3) plies ol tarred felt shall be solidly mopped with Coal Tar Bitumen in accordance with the specification.
When rosin sized or sheathing paper is a part of the original specification it shall remain and be applied beneath the Base Sheet. Edge laps shall be 4" and end laps shall be 6". The nailing pattern for the Base Sheet shall be 9" on center through the lap and 2" from the edge lap and stagger-nailed down the center of each sheet on 9" centers. (Note: This is approximately 100 nails per square.)
After applying a base sheet as the first ply on the four (4) ply roofing membrane, three (3) additional plies must be installed at once.
Gradation Requirements
When applying the additional three (3) plies of
Sieve
Amounts Finer then Sieve
tarred felt, lap each ply shingle fashion 24-2/3
Specified, man *___________in__c_h_e__s. Each ply must be solidly mopped with
Size No. 67 Size No. 7 12.5 Coal Tar Bitumen.
19.0 to 4.75-mm to 4.75-mm ('4(V.-in, to No. 4) in. to No. 4) When specifying the Base Sheet alternate, use
25 mm (1 in.) 19 mm (Ve in.) 12.5 mm (V* in.)
100 90 to 100
...
100 90 to 100
the designation BS as a subscript to the specification number. 2f08S'(structurai wood
fiber deck).
9.5 mm (H in.) 4 75 mm (No. 4) 2.36 mm (No. 8)
20 to 55 0 to 10 0 to 5
40 to 70 0 to 15 0 to 5
Note: If Koppers Asphalt Coated Base Sheet (ASTM D-2626) Is substituted forthe firstpty of
Sire nymor and requirements data are from the Coal Tar Bitumen roofing specifications. It
Specification C 33 and D 446.
must not bo left expoeed or used as a work
surface or temporary root prior to roof
mymcm rropwim
Moisture, mm. toCrushed stone snd gravel
2.0
completion. Good roofing practice dictates that the total roofing membrane be completed
the same day.
Crushed roofing slag
5.0
Unit mass (loose), min. kg/m1 (Ib/tt1) Dust max, ft Hardness, max. percentage passing a
3.36-mm (No. 6) neve
960 (60) 2.0 20
A higher moisture content is pefmitted for slag
9
because of moisture entrapment in the internal pores
of the pieces of tiag.
Application of Koppers Bitumen and Aggregate Surface The final application of Koppers Roofing is a tnple weight application of Koppers Coal Tar Bitumen (approximately 75 IbaVsq.) into which is distributed an approved aggregate while the Bitumen is still hot
Benefits of aggregate surfacing 1. Protection from foot traffic of other trades dunng construction and afterwards for routine roof maintenance.
2. Weight as additional protection for wind uplift.
3. Reduced surface temperature.
4. Even flow ol water to the drains.
12
Cotd Weather Application When roofing is applied at temperatures below 45* F. special precautions must be taken to insure the satisfactory performance of the finished roof. Before applying roofing, moisture, ice. snow, surface water, etc., must be removed from the deck.
Hot applied bitumens tend to congeal rapidly
in cold weather. Extra care must be taken to eat
insulation or roofing as quickly as possible
while the bitumen is still hot
When temperature is below 45* F..felt must be embedded in bitumen while it is still hot and broomed-ln Immediately with solid pressure to ensure necessary embedment into bitumen.
Built-Up Roofing Systems (Cont.)
Koppers Tarred Felt Systems
KOPPERS 7 1/KOP Architectural and Construction Materials
Specification No. 210
Msterfels Required per 100 sq. of roof area (for estimating purpoaas)
Rosin Sheatnmg Paper (1 ply) Coaled Base Sheet " (i ply) Tarred Fell (Mopped in Bitumen) (3 plies) Roofing Bitumen {3 moppings @ 25 lbs. each)
5 lbs. 43 lbs. 45 Ibc. 7S lbs.
5 lbs. 43 lbs. 45 Ibx 75 lbs.
Top Pour Coat Surfacing: Slag
Gravel
75 lbs. 300 lbs.
--
75 Ibx --
400 tbs.
Approximate Total Weight 'Wood Decks only. *'Unless otherwise indicated.
543 lbs. 643 lbs.
Nailable decks without Insulation:
Ptywood. wood pwtt. hghtwwgnt insulating concrata. poufad and pracast gypsum
Slope requirement*;
vr par foot maximum.
Procedure
1. Qanarai Requirements on Psgaa t through 12 and Flwhmg Oatail Soactficattont on Pagaa 16 through 20 are a pan of this spaoficakon and must Pa adharad to wham applicable
Z Whan a vapor ratardar and/or roof insulation art required. mstaM m accordanca with tha manufacturer s instructon and comply wait Koppart Qanarai Aaouaamams and Special Conditions. Follow Spacifieation No. 220 lor roofing mttonah apptad to insulation.
Appdcaban af roofing dhert la roof daatc
t. {Wood oacks only) Ovar tha aurtaca of tha roof dack mataU ooa layar Roam Shaathmg
Pspar wa*ghtng approximataly 6 ipa. par 100 ag. ft Lap aach shaat at laast two (2) mchaa
and nail suftioaotty to hold in place.
'
2. Apply ovar entire surtaca ona {1) pty of Koppars coaled oaaa snaat. lappmg aach shaat four (4) mcnas ovar pracaomg shaac and nailing at lap no last than mna (01 mchaa and staggar nailed down center of each sheet on ntna (9) inch earners.
Note {This a approximately 100nuts par 100sq.ft) Nadshanksareto Paofraquwadlength
tor maxmum holding power.
X Ovar tha entire roof area, apply three (3) pMaa of Koppers Tamed Fait lapping pbee twenty-tour and two-thirds (24-2/3) menee. AN tape than be mopped with Cow Tar Bauman the fuN twenty-tour and rwo-arvros (24-2/3) mchaa. so that m no place shall fen touch fax
4. On short run slopes, such aa on enckasi and aaodtoa, one-hert inch par foot or more,nail each shaat of fait six (6) inches from tna pack adga on twenty lour (24) Inch earners.
5. Pour ovar tha enure surtaca of tha roofing membrane, a uniform coating of Coal Tar Brtuman, and. while hot embed not leas than four hundred (400) pounds of gravel or three hundred (300) pounce of slag for each ona rumored (100) square feat
Specification No. 220
Non-naHabi* daefca
Precast Csncmr Pound Concrete Structural Wood FiMr*.
Roof insulations:
Various Dacca.
Slop* requirement*:
V par foot maximum.
Materials ReqUted per 100 aq. ft. o< rool are* (tor estimating purpoaas)
Rosin Shtathing Paper * (1 ply) Coated Beae Sheet " (1 ply) Tarred Felt (Mopped in Bitumen) (3 pine) Pooling Bitumen (3 moppings @ 25 lbs. each)
5 ibx 43 Ibx 45 Ibx 75 ibx
5 ibx 43 ibx 45 ibx 75 ibe.
Top Pour Coal Surfacing: Slag
Gravel
75 Ibe. 30011m.
--
75 Ibe. --
400 ibe.
Approximate Total Weight Wood Dock* only. "Unless otherwise indicated.
543 Ibe. 643 ibe.
Procedure
General ftaqwramenta on Pagaa 6 though 12 and Detail Specrticatooneon Pagaa 16through 20 are a part of th specification and must be adharad to wham applicable.
Whan a vapor reftier and/or roof meuiadon ere required. mataU m accordanca with the manufacturers makuceone and oompiy w*h Koppars Qanarai naqueemann and Special Condtoona.*
t. Mop deck (or mauiabon -- aa appkeabia) compffy wah Coal Tar Bauman.
Z Apply coer the entire surface lour (4) pkae of KoppersTarred Felt laopmgphae twenty seven and one half (27M) mchaa. Mop aokdfy oatwaan aach 27H men tap wan Coal Tar Bitumen so (hat m no piaca anas fait touch tea.
X On short run siopse of ona-naif <<*) mch par foot or more, such as on cnckets and saddles, and when tha dack parmas (lading, nad along back of upper adga of each she* on twenty-tour (24) mch centers. Where deck does not permit nailing. naiUng npe are required and each shaat muai be naiad along Pace or upper edge at spaemga to assure penetration of nailers.
4. Pour ovar tna anw aurfaoa of tna roofing marahrana a uniform coaMng of Coal Tar Bitumen, and. wnaa hot embed not Mae Mm tour hundred (403) pounds of gravel or data hundred (300) pounds of ag lor each ona hundred 0*0) square faac
*NOTt: On skweiural weed at at a aad mapping af ah
13
Built-up Roofing Systems (Cont.) Koppers Glass Fiber Felt Systems
Gtnenl Information
* *'ng with rt* co*i uf oo tsrrsd felt reef systems. Koppers offers built-up roof membrine* mg Co*i T*r Bitumen and Gist* Fiber Felt. These *y*isms offer me superior proofing characteristic* of Coal Tar and the unique features of Glass Fiber Felts This
combination ol coaJ tar bitumen tnd glass fiber feft ha* demonstrated outstanding roof memorane p#rtorm*>cs in me most demanding climate conditions
The General Reduirememj published on Pages 8 tnrough 12 and Detail Specifications on Pages 16 through 20 of tnis manual are a part of this specification and must be adhered to where applicable
Application of Vepor ftetardsr and Ineutattcn When a vapor retaroer and/or roof insulation ere required, install in accordance with the manutacturer s instructions end comply with Koppers General Requirement* and Special Conditions
Product Guido
Coat Tar Human Coat Tar based roofing and waterproofing bitumen
ASTM Spec. 0450-75 Type HI
Gtaea Fed Koppers glass fiber roofing (eh is an excactional quality inorganic ply sheet impregnated with a bituminous resin coating compatible with coal tar bitumen
Specitication: ASTM D-2178 Type IV
Specification No. 310*3
Nailable decks without insulation:
Plywood, wood pttnk, lightweight insulating
concrete, poured and precast gypsum.
Specification No. 310-4
Slope requirements: v` per foot maximum.
Rosm Sheathing Paper (Wood Decks Only) Costed Bass Sheet (Nailed) Gin* Felts Roofing Bitumen (3 Mopptnga @ 25 lbs. eech)
Top Pour Coal Surfacing
Slag Gravel
1 piy t P*y 3 pitoe 75 ibe
75 lb*. 300 lb*. 400 IB*
Application of Roofing Mekrtt Id Deck
i Over the surface of the roof decs install one layer Roam Sheathing Paper weighing approximately 5 lbs. per 100 so ft Lap eech sheet at leael two (2) inches tnd nail sufficiently <o hold tn place. (Wood Pecks onty)
Appty over entire surface one (1) pty of Koppers coeted base sheet, tapping each sheet ,ur (4) inches over the preceding sheet naihng at the tap on nine (0) men centers and stagger nail down tn# center of each sheet on rune (9) inch censers.
3 Apply over me entire suface three (3) pftes of Koppers Glaae Felt, toppmg plies twenty four and two-third (24-2/3) inches Mop solidly between each 24-2/3 mch tapwith Coat Tar Bitumen so that in no place snail feft touch feft
4 AiaM areas reqmnng memorane edge enveioptng. a standard organic tarred feft must be used as the snvefopwvg membrane.
5, Pour over the.entnv surface of tne roofcng membrane, a uniform coetmg of Coal Tar Bitumen, and. white hot embed not lees than four hundred (400) pounds of gravel or three hundred (300) pound* of stag for each one hundred (100) square feet.
per 100 eg. ft of roof area (for estimating purposes)
Rosm Sheethmg Paper (Wood Decks Only) Costed Base Sheet (Nailed) Glass Felt* Roofing Bitumen (2 Mopptnga 25 Ibe. eech)
i P<y 1 Piy 2 plies
50 lbs
Top Pour Coat Surfacing:
Slag Gravel
75 lbs. 300 lbs. 400it*.
1. Over the surface of the roof deck mstal one layer Roam Sheathmg Paper weighing approiumatafy5lbs.per100SQ.ft Up each sheet at leset two (2) inches and narieuificiandy to hold m place. (Wood decks only.)
2. Apply over entw* surface one (t) ply of Koppers coated base sheet, lapping each sheet four (4) riches over the preceding sheet nwkng at the lap on nine (9) men centers and stagger nail down the center of each tfteet on nine (9) inch centers.
3. Apply over the entire eufacs two (2) pies of Koppers Glaae Feft. lapping pkes nineteen (19) men**. Mop solidly between eech nineteen etch lap with Coal Tar Bitumen sothatm no place tfiati left touch feft
4 At an trees rsqmnng membraneedge enveloping, a standard organic tarred left must be
5. Pour over the mmm eurface of the roofing memorane. a uniform costing of Coal Tar Bitumen, and. whfletiot, embed not lees man tour hundred (400) pounds of gravel ortnre# hundred (300) pounds of flag for each one hundred (100) square feet
Specification No. 320-3
Specification No. 320-4
Non-nallabie decks: Pound Conent*.
Rool Insulations: Various Deck*.
Slope requirements: %" par tool maximum.
MatedMs Required per 100 so. ft of roof area (for seeming purpoaae)
Glass Felt* (Mopped m Bitumen) Rooing Bitumen (3 Mopptnga 9 25 ton eech)
3 pi 75 tbs.
Top Pour Coat Surfacing:
Stag Gravel
75 the.
300 Ibe. 400 toe.
Appeceken ef Membrane
1 Mop deck (or insulation -- as sppfccabto) comptotofy with Coal Tar Bitumen.
2. On the enure root area, apply three (3) phee of Koppers QtoeeFeft tappmgphe* twenty ur and two-mims (24*2/3) tnenee. AM iape shaft be mopped wait Coal Tar Bauman ihetuM sntytour and two-tferds (24-2/3) mcnes. so that m no piece am left touch lek.
5 At aM areas requiring membrane edge smfopmg. e standard organteried ten muet be used as the enveloping membrane.
4 Pour over the entire surface of the roofing membrane, a uniform costing of Coal Ter Brtumen, end. while hot embed not teas then lour hundred (400) pounds of gravel orthree hundred (300) pound* of stag for eech one hundred (100) square feet.
Metadata Begeired per 100 sq. ft. of roof area (for seaming purposes)
Glees Feft (Mopped m Bitumen) Roofng Bftunen (4 Mopping* < 25 Ibe. each)
4 pie 100 tbs.
Top Pour Coto Surfacing:
Slag Gravel
75 lb*. 300 to*. 400 toe.
'
1. Mop deck (or mention -- as applicable) comptotofy w*h Coal Tar Bitumen.
2. Over me enure roof area.***?four (4) pit of Koppers Qtoee Fed topping pie twenty seven ana mftaM (27-1/3) inch**. AM tope Ml bo mopped wdh Coal Tar Bauman the ft* twenty seven and onheM (27-1/2) men**, so that m no pi a MU felt touch left
S. At Si areas requmwq membrane edge envetopmg, a standard orgenc tarred fell mu be
used as the anvatopmg membrane.
.r
4 Pour over the entire surface of the rookng membrane, a uniform coating of Coal Ter Bitumen, and. wtuie hoi embed not toee then tour hundred (400) pounds of gravel or three
hundred (300) pound* of stag tor eech one huvdred (100) square teat.
14
Built-Up Roofing Systems (Cont.)
Water Retaining Roofs
KOPPERS 7 1,KOP Architectural and Construction Materials
Water Cooled Roofs
Spray Systems Ponded Systems .
,
Water Retaining Roofs
Process Water
Retarded Drainage Systems
Controlled Flow
Discussion
Oue to Coal Tar Bitumen's natural resistance to water, it may be utilized in trie construction of built-up roofing memOranes that will ba expected to hold water over long periods of time. When applying a .-membrane that it required to hold water, follow Specification 220 for applications over non-nailable decks (four plies of No. IS Tarred Felt set in solid moppings of Coal Tar Bitumen).
Note; The bate sheet alternate she! not be used.
m the roof is water cooled or haa been igned to be continuously wet the top surfacing of bitumen and gravel must be applied as follows:
1. Pour over the entire surface of the roofing membrane a uniform coating of Coal Tar
Bitumen. While hot. embed not less than four hundred (400) pounds of gravel or three hundred (300) pounds of slag for each one hundred (100) square feet.
2. All loose gravel or slag shall be swept from surface and a second uniform pouring of approximately eighty-five (85) pounds of Coal Tar Bitumen shall be applied over the gravel or slag, into which while hot. shall be applied a second layer of three hundred (300) pounds of gravel or two hundred (200) pounds of slag for each too square feet The entire surface shall than be thoroughly broomed free from all loosa gravel or slag. It is advisabls to roll the finished surface with a light roller so that aggregate is thoroughly embedded.
3. All flashings will be KMM membranesimilar to Specification No. 710 on Page*90 except that a layer of Standard Grade KMM membrane must be installed totally substrata fused prior to the application of the KMM Aluminum membrane top ply.
NOTE: Roots equipped vrith contraMed flow drainage systems do not require the extra top pour and gravel application.
Design consideration
When designing a water cooled, water retaining or retardad drainage root aaaembly, certain design criterion must be considered.
Note: 1. Due to the extremely heavy weight loada
normally associated with retained water, poured and precast concrete or other heavy load bearing decks must be specified. Wood or metal decks should only be considered where ponded or standing water is at a minimum.
Note: Decks requiring a base sheet as the first ply of the roofing system are not permitted lor this application.
Z Roof Structure design live loads for this application shall ba a minimum ot 50 psf and deflection shall not exceed 1/360 ot the span, both in addition to the anticipated weight of the water. Insulation joints must be taped in single layer applications. Vapor retarders must be two ply and solid mopped. Use steep asphalt over metal decks. Wood must be treated to prevent warping (see "wood nailing strips').
3. At points where water pressure from a spray
system may ba excaasfve. ths roof surface should be protected with treated board platforms or other suitable construction to break force of the water. These platforms should ba laid on top of the roof surface and not fastened to the deck.
4. Insulation under a Water Cooled Roof should be a type which is rigid, dimensionally stable with high compressive strength.
5. IT IS MANDATORY THAT THE WATER COOLING SYSTEM BE CLOSED DOWN AND THE ROOF DRAINED PRIOR TO COLD WEATHER. Neither roofing nor the structure will withstand the expansion caused by ice formation.
15
Built-Up Roofing Systems (Cont.) *
Flashing Specifications
v_-neral
Flashings are the terminal closures ot a roofing system which perform a waterproofing, and in some systems, a decorative function. Flashings must be installed at all intersections formed by vertical surfaces. Their importance cannot be stressed too strongly. Water entering me roofing system through Hashings can result in water vapor forces which will destroy me effectiveness of the roofing.
Koppers flashings are an integral part of a Koppers roof. Designed for flexibility so that stignt movements do not dislodge them and fastened securely to the wall, they give many years ol service.
It is particularly important that the top edge of the flashing be protected by counter Hashing, which will insure a diversion of the water away from any opening which might develop between flashing and wall.
NOTE* In any case where the design or anchoring system of metal counter flashing is difficult, the top of the flashing system should be stripped with Koppers KMM Aluminum Membrane IB" wide mm.) centered and totally heat fused over the top edge of the flashing system,
Metal work is only useful tor decorative, water snedding. or protection against mechanical damage, and is not a waterproofing part ot the flashing system. Because of the high coefficient of expansion of sheet metals and the large temperature changes experienced on a roof, sheet metal or exposed metal components must be isolated from the waterproofing components of the roofing and flashing system as efficiently as possible to prevent the metal from splitting the membrane.
Flashing should be installed as roofing progresses to prevent water damage to insulation or deck under the roofing. It this is not possible water cut-offs must be installed and fater removed when flashing is installed. Metal counter flashing or a top seal of KMM Aluminum Membrane must be installed as flashing progresses.
NOTE: 1. If guaranteed flashing is required, it must be installed in conjunction with a Koppers guaranteed roof and can be guaranteed tor standard periods up to but not greater than the penod for which the roofing is guaranteed. To be guaranteed, composition flashings must be set at least TV above the roofing base.
2. Metal Cap flashings are not included under any flashing guarantee.
3. Metal work of any description used as flashing or a part of a flashing system is not included under any flashing guarantee.
The basic Koppers flashings require a metal cap flashing to be inserted in the raggle immediately upon completion of base flashing. The cap flashing is to have not less than a four (4) inch exjNfead apron extending ' down over the base flonhg.
NOTE: Koppers KMM Flashing Systems are
also available for use with Koppers Built-Up
Roofing Systems. Specie details, and
specifications can be found on Pages 30 and
31 of this manual., __
.iifc
Application
.
Extend plies of roofing felts and bitumen
moppings up all walls, parapets and curbs fora
ance of two (2) inches above cant strip,
raggle not less than seven and one-half
(//?) inches or more than twelve (12) inches
above the roof deck is to be provided.
1 Prime all masonry wall* from top of roofing
felts to raggle with Koppers Asphalt Pnmer.
Allow to dry thoroughly.
2. In a uniform coating of Koppers Flashing Cement,' install one (1) ply of Koppers Glass Fiber Felt extending from the raggle to not less than four (4) inches from the base of the cant
onto the roof.
3. On top of this apply a second uniform coat of Koppers Flashing Cement into which embed one (1) ply of Koppers Reinforced Base Flashing (reinforced fabric side down).
Care shall be taken to assure that all flashing
membrane end laps ara futty .ambedded in
flashing cement. Firmly trowel aS and laps in
place to assure good adhesion.
-
4. Nail with one and one-half (11*) inch masonry roofing nails through flat tin discs along upper edge eight (8) inches o.c. makimum into mortar joint*. For concrete construction, nail to treated ;|vood nailing strips set in Hush with the' surface with appropriate nail through Hat tin discs.
End laps for each ply shall be not less than three (3) inches. End laps between plies shall be staggered not less than twenty-four (24) inches.
5. The top edge of the flashing felts are to be led with Hashing cement. (Stripping of this
.j edge with Koppers Gtasfab Fabnc. sat in the cement is preferred, but remains optional.)
6. Coal entire surface of flashing with Koppers Aluminum Coating 44S applied at a rate of 2 gal/100 sq. ft. (including nail cap* along top edge of Hashing as well as top edge* of felts).
16
Specification No. 108
Application OataM
- Raggle to be Seeled
-Metal Counter Fleshing--Extend Downward*". , Seel off Edgee of Piles with Koppers Flashing Cement
. 1 Pty of Koppers Reinforced Bate Flashing set in Koppers Flashing Cement
. 11V Barbed Roofing Nails through Tin Discs on 8" Centers--Max.
- CementKtoue Type Was
7. interply cement shall be troweled uniformly, full height and continuously approximately one-eighth ('*) inch thick. Fliee mutt be laid in smoothly with no pockets, wrinkles or buckles.
Install metal cap Hashing.
'NOTE: Koppers sleep asphalt may be used a* an aHamate to the two (2) Interpty troweling* of aephaMc pteettc cement.
AM other requirement* o Me apecMcadon muet be adhered to.
Built-Up Roofing Systems (Cont.)
KOPPERS 7 1/KOP Architectural and Construction Materials
sneral information
i nere are numerous flashing details that have been proven by experience over the years. There are normally a number of acceptable construction details for accomplishing one purpose. The architect should select a detail that best serves the purpose under the various and different conditions concerned with the specific job at hand. In certain cases, slight modifications are necessary to adjust a proven detail to job conditions or one method may serve better than another.
The details shown in this manual are some suggestions based on experience. Space limitations prohibit listing many others.
Design or selection is a responsibility of the architect.
Koppers representatives are available to review flashing details to assist the architect in providing the best details for specific jobs.
Raised Edge
Metal Cap Set in Koppers Flashing Cement
Nails spaced T from
dge of metal stnp and 3" apart through neo prene washer*.
Parapet/Precast or Poured Concrete
Matal Counter Flashing, to De Sealed and Tightened with Leaded Wedges
Treated Wood Nailer Cast-in-Piace
Cant Koppers Roofing
Min. 7V
fllUUUl UIIUIA/MIUI
Jack
Poured-m-Placs Concrete Well Note: Well Shell be Prepared to Eliminate Water Penetration Through Concrete to Underside of Rooting
4" x 6" Wood Cant
Flashing Spec. *108 Koppers Roofing
Parapet/Metal Curtain Wall
Decorative Well Cap
2 Plies ol Membrane Set in Koppers Flashing Cement. Turn Down over Edge
Treeted Wood Nailer
Fasteners Spaced 1" from edge ot Metal Stnp and 3" Apert through Neoprene Warners
Relief Joint
Provide Slope wnere Possicle
Treated Wood Nailer
2 Plies ot Membrane Set in Koppers Flashing Cement. Turn Down over Edge
Flesrung Nailed 10" O.C.
Min. 7V"
Flashing Specs. 108
x 10" Mm. (Nom.)
Treeted Wood Naner Fastened to Deck Wood Cant 4" x 4-
Equipment Support
2 Plies of Membrane in Fleshing Cement Turned Down Over Edge
Fleshing Specs 4108
Lag Screw Neoprene Pad Sheet Metal
Parapet/Wall Cap
Metal Counterflashing (When Required)
Extend Downward 4" Set in
2 Plies of Membrane Set in Koppers
Fleshing Cement
Flashmg Cement Turned Down over
.Well Cep
Edges, wttem possible.
Treated Wood Nailers
Treraed Wood Nailer 'Note: When compoettion flashing does not extend up to was cm or we4 cep does not provide water egress protection, s metal countsmashing___ must be installed eccordetg to procedures found in Itatsng specifications.
17
t I
Built-Up Roofing Systems (Cont.)
Flashing Details (continued)
Structural Atiacnment with Water Seal (eg bolt through Neoprene Washer)
Neoprene Paa
2 Plies of Membrane m Flashing Cement Turned Down
Over Edge
Flashing Specs 108
Koppers Roofing
Structural Section Weld Plate Watertight
Cantr "7 Treated Wood Nailer
surrounding column
Stub Column Attached to Structural Framing
Future Columns, Sign Supports and Angle Irons
At all locations where stub or future columns, sign.supports and
angle irons are to penetrate built-up roofing. Koppers recom mends wooden curbed base units with cant strips to be installed to accept KMM flashing systems. Where structural steel section
extends beyond "stub" height, metal cap flashing with tight fit to the structural section must be fabricated and continuously welded to the projection to assure a watertight metal'cap.
Onp Flashing Set in Koppers Flashing Cement Turned Down
over Edges
Metal Cap and Cleats (Sloped it Reqd.)
4 * Min. Lead Flashing Flange (8- Min.) Set in Flashing Cement
Stramar Plashing Clamp Koppars
Device and
Roofing
Trested Wood Nailers Deck
Treated Wood Nailers
- Loose Insulation
V
Dec*
Matai Roof
Curbed Expansion Joint
Curb expansion joints are to b flashed in accordance with Koppers specifications for parapet walls. Matai cap must be designed to expand so as not to disturb flashing.
It is the responsibility of the designer of the building to provide for adequate expansion joints.
For the protection of the roofing system against splits caused by expansion and contraction, Koppers recommends that an expan sion joint be installed: (1) on roof area* larger than 200 feet in each direction. (2) at all place* where the structural supports and roof assembly change direction, (3) where type of adjoining deck materials change.
Where control, expansion, or contraction joint* are provided in structural steel, deck material, or deck system, provisions must be made for continuation through the roofing system. See (Expansion Joint*) Page 11.
Roof Drain
All roof drains shall be provided with metal roof drain flashing flangesjyhich extend at least 12' beyond drain opening and shall be stripped with felt in accordance with drain detail. All drain* should be provided with expansion joint sleeves.
The sheet metal flange furnished with the drain must be cemented to the surface of the felt with hot Coal Tar Bitumen or flashing cement. Over the flange apply, with alternate mopping* or troweling*, two (2) reinforcing plies of felt so that the first extends not less than three (3) inches beyond the outer edge of the flange, and the second not lets than six (6) inches.
Roof drains must be of a type provided with a wide lead or copper flange. Strainer construction should provide adjustment for meeting variation* in roof level or slope.
To obtain proper drainage, roof drains should be located at point* of lowest expected deflection in roof deck.
Note: Special car* must be taken to prevent bitumen migration
into drain opening*.
18
Built-Up Roofing Systems (Cont.)
KOPPERS 7 1 ,'KOP Architectural and Construction Materials
Roof Vent with 5" Flange Set m KooDers Flashing Cement
Two Plies of Felt Set in Bitumen
Foi Wood Decks Fill About 1" Deep with Cement Mortar Balora Pouring Bituman
Koppers Built-up Pooling
Ootionsl. For added protection a metal cap flashing may be inaehed and waled to the protection
Metal Pan Sat in Bitumen and Fillao witn Bitumen
or Koppers Tar Baaed Cement
*
. * M# '' * :* # i 4
4, > |
^ *>*
Loose Insulation
Roof Vent
Koppers does not recommend occasional or spot vents through the roof as the only venting method or a substitute for underside or continuous vented systems. There may be certain instances where spot or mushroom type vents might be deemed advisable by the designer for a new building (eg. at expansion joints for vent relief on long run underside continuous venting systems, etc.)
Walkways (Treated Wood Walkway)
Treated Woodan Tr.xtad PlanK >l#pers in Bitumen Walkway
"!.T?r*n* Plu* 2 Pty Stripping Coal Tar
Bitumen and Aggravate
Pitch Pocket
Although controversial, the "Pitch Pocket" is one of the most frequently used design details.
The sheet metal flange must be cemented to the surface of the felt with hot coal-tar-bitumen or flashing cement. Over the flange apply, with alternate moooings, two (2) reinforcing plies of tamed felt so that the first extends not less than three (3) inches beyond the outer edge of the flange and the second no less than six (6) inches.
Fill metal pan with hot coat-tar-bitumen or flashing cement. Paint exposed sections of all reinforcing rods with dampproofing paint.
Traffic Pad
Koppprt Roofing
Caranue Qrinula
.
Surfaead Protaction Awrg*t
i
Non Wall Support Flashing
Raggla to ba SmM
mm Ragtal inssrt tor ramovaMa countarflaahing
Faatansn approx. 24" O.C.
Ramovabta countarflaahing
FlaxiWa vapor ratardar to tarva as insulation ratamar. CompraisiMa insulation
Flashing Specification No. 106
Cant stnp sat in bituman or mantic rootway system.
Roof Opening
Curbs extending a nominal 10 inches to 14 inches above roof surface shaB be provided at all openings for skylight*, ventilators, expansion joiata, etc., to provide for insulation of KMM flashing.
Skylight
Coodanaxta Q uttar.
Flashing Nailsd 10* O.C.
Flwhing Space 1106
Treated wood nailer (Fasten to Oecx only)
Note Suggested detail where possibility exists that OiHaremial movement will occur between deck and vertical surface. Title detail is intended as a guide only.
19
Built-Up Roofing Systems (Cont.) Flashing Details (continued)
apered Cant
Tapered Cant
Flang width 4" minimum
Gravel Stop Minimum -- 1" Height Metal Gravet Stop Set m Kopoers ` Flashing Cement
Felt Envelope
Nails spaced 1M from edge of metal strip and 3" apart m treated wood nailing strip
" Two Plies of Felt Feathered f over Flange m Coal Tar Bitumen or Tar Base Cement
Tapered Cant Max incline T per foot
Roofing Memdrane
System
Fijngt width
Graval StOO Minimum 1" Height
Mt*l Gravel Stop, S! in Kocoera Flaahmg Cinnt
Metal PitctfSam
Set in Koooars Flaahmg Cement
Nails apaced V' from eoje ot matai strip and 3" apart in traatad wood
nailing strip.
Two Plies o* FaltFaatnarad r over Fianga in Coal Tar
Bitumen or Tar Basa Camant Taoarad Cant Max inchna 2" par loot
Rooting Mambrana `' System
Treated Wood Nailer
Traatad Wood Nailar
Hanging Gutter
Vented Edge
Koppars Rooting
Appropriate Nails and Length
For Maximum Anchorage
Matai Gravel Stop With 4" Fianga
p Embedded in Koppera
frjia Flashing Camant
Fall Envelope Sat in
Mm 4* Wide Troweling
-- ot Koppars Flaming |
' Cement
ri Mwrin.
EdgaStrip.NailadS'OD..CC)j
Hangars. 30" O.C.
Gutter .
-Matai Braces 30* O.C.
3k
Gravel Stop nailed 1* from inner edge ot Fianga and 3* OC.
-Fianga width 4* minimum rKdppan Rooting
Two Pllee ot Fait Feathered Over Flange in Coal Tar Bitumen or Tar Baaa Camant
TaoaradCant Maximum par toot
FlsngeSetin Kppoars Flashing Camant
Felt Envelope
Insulation Vapor Samar
Traatad Wood Nailar Yt' Vent Hate Openings lS*to24`O.C.
Vent Pipes, Stacks, Flagpoles, and Other Projections
Lead Sleeve with Fianga set in Koooars-- Flashing Camant
r^
Mats! Hood
Lead Sleeve with Fianga sat in Koooars Flashing Camant
Koooars Rooting
finMilMlW w d* V f T n. o Ap O \
Mats! Bitumen Dam Sat m Koppars Flashing Camant
:
All vent pipes, stacks, flagpoles, or other projections penetrating the built-up roofing, whether indicated on drawings or not, must have a proper metal sleeve flashing with flange, pan flashing with flange or other flanged flashing installed.
Behind metal sleeves and beneath the roofing membrane next to deck install a metal bitumen dam as shown in detail. The sheet
Matati fBtihtumeann DDamm
_____
Sat m Koppars Fleshing Camant
metal flange must be demented to the surface of the felt with a mopping of hot Coal Tar Bitumen. Over flange apply, with alternate moppings, two (2) reinforcing pllee of felt so that the first extends not less than three (3) inches beyond the outer edge of the flange and the second not less than six (6) inches.
20
SINGLE-PLY ROOFING SYSTEMS
KMM* Membrane Systems
r'"ription
, .Mk jmbrane is a versatile, prefabneated sheet of cold-applied roofing and waterproofing material. It is designed for application in rooting, reroofing, maintenance roofing, foundations, plazas and various other areas ot construction where effective waterproofing is required.
KMM membrane is supplied in two types.
KMM Standard Membrane
KMM* Standard membrane is a five-layer laminate composed of a strong, flexible plastic core protected on each surface by a layer ot modified bitumen and an outer film of polyethylene.
KOPPERS 7 1/KOP Architectural and Construction Materials
KMM Aluminum Membrane
KMM* Aluminum membrane is a five-layer laminate composed of a strong, flexible plastic core which is protected on. each side with a layer of modified bitumen. The top surface is a heavy, embossed aluminum sheet and the bottom surface is a film ol polyethylene.
KMM Standard membrane is appropriate for use in vertically as well as horizontally applied waterproofing systems where surface protection is specified.
KMM Aluminum membrane is always adhered in KMM Adhesive or steep asphalt. It is ideally used in roofing systems in which the roof slope is too steep to permit aggregate surfacing. It is also employed in flashing systems.
KMM membrane has good elongation properties to withstand normal structural movement, when acceptable architectural practices are followed. It is suitable for
application over most decks and commonly used insulating matenals which provide continuous support for the KMM membrane.
KMM membrane is simple to install. It results in a completely waterproof system. It is factory-made and provides a factory-assured quality material of uniform thickness and composition.
The function of the bitumen covering is to serve as a earner and protector of the central plastic core, and to provide the basis for the heat fusion between the sheet*whileadding to tne water resistance Of the laminate.
KMM Aluminum Membrane
EAlummamocmutas'
Sheet y/
Biiumen
Product Information KMM Membrane
Roll Size
Thickness (nominal) Weight (nominal)
KMM Standard Membrane 43" x 33 L.F. 118 sq. ft. 107 sq. ft. coverage
160 mils''*
99 lb*./roll (includes packaging & core)
KMM MUnfeM* Memhrana 43" *33 LP. 118 sq. ft 107 sq. ft coverage
120 mH*
76 ibeTrotl (includes packaging 6 core)
KMM Membranes
Both versions of KMM membrane are supplied in the ' n of compact, ready-to-apply rolls.
M .--uidard membrane, loosely leid. is nally used in roofing systems which incorporate an aggregatt surface or where protection from the atmospheric elements it afforded to the KMM surface by other means.
KMM Adhesive
An asphalt base adhesive that bonds KMM Membrane to most surfaces.
Package Size: 5 and 55 gal. containers.
Weight Approx. 55 lbs. per 5 gallon container and 600 lbs. per 55 gallon drum.
Stonemat
A 3 oz. polyester mat of high burst strength used under stone topping. Rolls are 8' x 450'.
Color Coatings for " KMM Aluminum Membrane
Field applied coatings teiFsgMM Aluminum membrane are available in 14colors. For color selection' consult Koppers Master Color Selection Chart 560-L under Koppers Acrylic Emulsion No's. 600 and 610. . .
. &r-
Single-Ply Roofing Systems (Cont.)
KMM Roofing Systems
w^neral Requirements
The data contained herein is primarily oriented designated specifications, other than to For precast concrete, strip all joints with 6"
toward rooting systems. However, much of the establish a suitable roofing base in the roof wide felt stripping set in Koppers Flashing
information is also applicable tor structure system.
Cement, or 6" wide KMM Standard membrane
waterproofing systems. Contact your Koppers representative (or specific dale concerning KMM waterproofing and/or further information pertaining to KMM roofing systems.
All decks shall be installed in accordance with
KMM Membrane is not intended to offer chemical mistsnce and must nol be used on roofs subjected to corrosive or otherwise damaging solutions, vapors, ate.
Guarantee
substrate-fused.
WOOD FIBER DECKS
KMM Aluminum Membrane should not be applied directly over wood fioer decks. A glass base sheet set in steep asphalt must be applied
the deck manufacturer's specifications, and shall be in compliance with Koppers General Requirements.
All surfaces must be dry, frost free, reasonably
A guarantee is available on KMM Membrane roofs when applied by a KMM Qualified Applicator. See page 6 for lurther information.
prior to the application of KMM Aluminum
Membrane. The base sheet shall be laid unattached prior to KMM Standard application.
smooth, clean, rigid and free from debris, KMM Membrane Systems
GYPSUM DECKS
loose materials, projections, holes, release agents or other contaminants which might cause rupture of the membrane and/or adversely affect the KMM membrane application and performance. Dust shall be removed from the surface immediately before application of the KMM membrane system, especially from those which incorporated the use of KMM Adhesive to adherethe membrane to ns substrate.
meet these codes
FM Class 1, 1-60, 1-90 e UL Class A ICBO SBC e CMHC Contact your Koppers representative for information on the KMM Membrane System that meets your specific code requirements.
Deck Requirements
Decks must be cleared of dirt and debris and all other foreign matter and all holes, cracks or other voids must be filled (lush with the surface.
Poured gypsum decks sometimes cause trouble because the roofing is laid before the deck is thoroughly dry. When this happens the result is a blistered and buckled membrane, or. just as serious, insulation curfs and makes an
The placing of conduits, bolt head*, etc., above the roof deck and below the roofing
membrane is not recommended.
METAL DECKS Board insulations are necessary over this type of deck. Surface must be free of loose rust and
unsatisfactory job. The roofing contractor, backed by the architect, must insist on a thoroughly dry deck before beginning work.
All projections or openings in the deck should -e completed prior to the application of the jofmg. insulate all hot water and steam pipes which project through or are near the surface to be roofed or waterproofed. This is to prevent possible damage to the KMM system.
oily substances. Deflection should not exceed 1/240 of the span.
STRUCTURAL CONCRETE (POURED PRECAST) Whera insulation is specified on concrete
All joints must ba .grouted smooth and level with the deck Surface. Slab surfaces must be even with the adjacent slab surface or the edges must be gradually and smoothly tapered to the adjacent stefi,
KMM Standard may be llnsrggd directly over
The proper design, specification and slopes exceeding 2" pat foot, insulation slope the deck surface.
positioning of the various components of the roof structure system, are the responsibility of the building owner or his designer. Any subsequent failures due to either the installation or lack of installation will not be
shall be installed to retain insulation in place. Treated wood insulation stops 2" (nom.) wide, and equal to the thickness of the insulation, shall be installed to the top of the surface of the
deck by means of bolts, screws, or other
Prior to the application of KMM Aluminum, nail a glass base sheet terminating at the base of the cant or at the perimeter ot the deck under metal edges.
Koppers responsibility.
acceptable fastener, countersunk to be flush WOOO DECKS with surface of insulation stop.
In approving any deck a* satisfactory to
Plywood shall be exterior grade. All wood shall
recafve a KMM system, only ttia decksurface la All coneret* and masonry surfaces must be be well seasoned, dry, and preferably treated.
acctptotL
cured, dry end free of loose - material. All End joints shall have adequate bearing. Loose
It Is the respcntMUty of the bufckng designer and the deck manufacturer to provide for expansion and contraction In a mamar that
cracks, holes, voids and open areas shall be or void knot hotee. targe cracks, etc., shall be wetted with water and than carefully filled with covered with appropriate material. All nail Portland Cement Mortar struck flush, 'and' hatoj>.must be flush with surface of wood
will provide e stable bate lor lha KMM membrana, lor support of maximum Whan KMM Adhesive or steep asphalt is tobe KMM Standard Membrane; When applied over
anticipated loads, tar secure attachments applied directly to the concrete surface, the wood decks, lay a base sheet unattached over
vertically and laterally, and lor Me aalactlon of concrete must be cured, freeotenoisture. dust the deck surfice, lapping 4" on side and Sjjon
the deck material and conaPuctlen details and other contaminants including curing end tape.
'
including their ability to contain bMumane or adhesives used for attachments of Pw KMM
membrane or other components ot thesystanv
agant and form release agents.
Whera a curing agent has bean used, apply a glass base sheet, solid mopped in steep
KMM Aluminum: Not to be applied directly to wood decking. Where specified over wood decks, the wood surface shall be covered as
asphalt (18-23 Ibs./sq.) or mechanically follows:
Koooftn wffl not usumc niofimMttv for deck defects, or the effect of deck
fastened with approved fasteners, prior to the Nail glass bass sheet with approximately 100
application of KMM Adhesive.
acceptable nails (capable ol developing a
defects on Koppers roofa.
The information in thia manual pertaining to material* and application methods other than for KMM rooting, is offered to assist the
Concrete surfaces to which KMM Adhesive or steep asphalt will be directly applied must be primed with Koppers High-Pan Primer 452 at the rate ol 1/2-3/4 gal. per square.
All joints must be grouted smooth and (aval
minimum 40 pound nail pull-out strength) followed by e glee* base sheet solid mopped in steep asphalt.
LIGHTWEIGHT INSULATING DECKS
designer in establishing thair normal position with the deck surface. All slab surfaces mutt Lightweight insulating decka includ#
in the roof structure system. They should not be even with the surface of the adjacent slab, lightweight aggregate concrete (20 to 40 lbs.
be construed as part ol the KMM roofing or edges must be gradually and smoothly per cu. ft. oven dry density); foamed concrete,
system, as endorsement or as part ol the taperad to adjacent slab.
gypeum and thermosetting asphaltic decks.
22
Smgie-Ply Roofing Systems (Cont.)
KOPPERS 7 1/KOP Architectural and Construction Materials
KMivi Standard may be loosely laid directly over (he deck surtace.
When KMM Aluminum is specified the following requirements must be met. prior to application of the KMM:
1. Except lor Dycon Concrete, lightweight insulating deck systems must be capable of venting excess water vapor to the underside.
Koppers will not accept lightweight insulating decks when placed over vapor barriers, poured concrete substrates, unvented metals, or any type of base which will not permit these materials to vent from the underside. This is necessary to prevent a water vapor pressure build-up under the built-up roofing.
Occasional or spot vents through the roofing as the only venting method are not satisfactory substitutes for underside venting.
2. Nailable decks' must be capable of developing at the very minimum, a 40 pound nail pull-out or withdrawal strength.
3. A glass base sheet must be nailed terminating the base sheet at the base of the cant or at the perimeter of the deck under metal edges. (100 nails per sq. min.)
4. Koppers will not be responsible for failure of the insulating deck to remain integral or for disbonding of the roofing from the surface of the deck.
'ard type insulation is to be applied over .. _ .weight insulating deck, provisions must be made between the fill and the board insulation to prevent fill moisture from affecting the insulation and roofing.
Vapor Retarder
Recommendation of a vapor retarder Is the responsibility of the design' professional, including selection of compatible materials and installation method.
Expansion Joints (Building)
KMM roofs, especially those employing the loose laid membrane concept, are able to withstand building movement to a gratter degree than conventional materials, but good design practices dictate that spaneIon Joints should be employed for protection of the overall roofing system. The use, location and design of building expansion )ointa should be taken into consideration at the time of the original building design.
Although provisions for adequate expansion joints are the responsibility of the building designer. Koppers pffers the following recommendations for tne protection of the roofing system due to stresses caused by expansion and contraction of the building. Building expansion joints should be installed:
1. 'arge roof areas install expansion joints at .ool intervals.
t At all places where the structural supports and roof assembly change direction,
a Where types of adjoining deck materials changes.
KMM TYPICAL DIMENSIONAL PROPERTIES
STANDARD GRADE
Width.................................................................... Length.................................................................. ... Thickness (overall).............................................. ...
Top Layer, nominal ......................................... ... Bitumen Layer, nominal ................................. ...
Central Core, nominal..................................... ... Bitumen Layer, nominal ................................. ...
Bottom Layer, nominal ................................... ...
Gross Area per Roll............................................ ... Normal Joint Overlap........................................... ... Net Coverage per Roll Weight per Roll......... .......................................... ...
Weight of Core Mandrel
ALUMINUM GRADE Width overall ....................................................... ... Width of Aluminum Foil ..................................... ... Length..................................................................
Thickness (Overall).............................................. ... Top Aluminum Foil, nommai.......................... ... Bitumen Layer, nominal ................................. ... Central Core, nominal..................................... ... Bitumen Layer, nominal ................................. ... Bottom Layer, nominal ................................... ...
Gross Ana per Roll -___ .VI...>vi...
Normal Joint Overtap- T
` .
Net Coverage par Roll............. ........................ ;
Weight per Roll............... ... ................................
Weight of Core Mandreter^.............................
METRIC
10.1 m 4 mm 0.013 mm 1.93 mm 0.09 mm 1.93 mm 0.013 mm
11.11 sq m 10 cm 10 sq m 44 no 1.0 kg
110 cm 100.3 cm
m
3 mm 0.09 mm 1.4 mm 0.09 mm 1.4 mm 0.013 mMgk
10 -
sq m cm sq m
kg kg
ENGLISH 43.3 in 33.1 ft 0.157 in. 0.0005 in 0.076 in 0.0035 in 0.076 m 0.0005 in
119 sq ft 3.9 in 107 sq ft 97 lb 22 lb
43.3 * in 39.5 in 33.1 0.118 in 0.0035 in 0.055 in 0.0035 in 0.055 in 0.0005 in
119 sq ft 3.9 in 107 sq ft 74 lb 2.25 lb
TYPICAL MEMBRANE PROPERTIES
STANDARD GRADE
.. -
Strength of Joints..............................!...............................
Water Vapor Permeability (ASTM E 96 -- Method B) a. g/h/m3.................... .......................................................
b. grains/tvtt3.................................................................. Permeance -- Perms (grams/h/ft-'/in. Hg.......................... Pliability at -20* C (ASTM D 228)....................................... Water Absorption (ASTM D 570:5 at 50* CJ. g................... Dimensional Stability (ASTM O 570:5 d at 50*0. %....... Sag Resistance (ASTM D 1855 (modified) :85*C) cm. ... Thermal Conductance (Btu -- in/h/ft.'/*F) ......................
Exceeds strength of membrsne
0.0288 0.00007 0.0001 Passes 0.06 0.5 0.1 1.06
Where control, expansion or contraction joints insulation shall be brought closely together
are provided in structural steel, deck matenals and shall not be forced into place. Where
or deck system, provisions must be made for insulation joins vertical surfaces, the
their continuation through the roofing system. insulation shall be cut in a neat manner,
allowing at least Vi" clearance. Insulation
joints mutt be staggered.
Board Insulations
When more than one layer of insulation is
These insulations come in varying thicknesses used, joints in each layer ahalf not coincide. All '
and sizes. The insulation manufacturer's layers shall be parallel to preceding Myers.
specifications shsii be followed and. In
addition, shall be in compliance with Koppers' UndeMooee laid KMM Standard Membrane
General Requirements.
insulation other than urethane, urethane
composite, and isocyanurate may be laid
Roofing equipment must be of a type which iooae if the thickness of the board is mtnimun
will not damage the insulation used. Broken or 374". Care must be exercised to insure snug j
damaged insulation sheets can only be used joints.
`
when the damaged portion is cut out_ . Where attachment of insulation is required in
No more insulation shall be laidln a day than these specilicatione, steep asphalt and/or
can be protected by KMM membrane m case fasteners must possess a minimum uplift
of sudden weather changes. Edges of resistance o< 40 pounds per square foot (PSF).
23
Single-Ply Roofing Systems (Cont.)
Suitability ot the kind of attachment is dependent upon the type of insulation and its substrate This should be investigated by the specifier along with the various requirements, including wind uplift resistance, as described in the local building code and/or policies of the insurance agencies involved.
Koppers will accept the use of mechanical fasteners providing insulation manufacturer recommendations are followed, and they are approved by FM.
FM Approved fasteners may be used providing a glass base sheet is solid mopped in asphalt to cover all insulation.
Exeltherm Xtra -- is acceptable loose laid under KMM Standard. May be used under KMM Aluminum when set in steep asphalt or mechanically fastened and covered with a glass felt base sheet set in steep asphalt. (Use of Exeltherm Xtra under KMM qualifies for a Gold Seal Guarantee).
Perlite, Fiber Glass, and Flberboard -- insulations may be used under KMM Aluminum only when a glass base sheet is firmly attached to the insulation with steep asphalt, prior to the application of KMM Aluminum. KMM Standard may be loose laid directly over these insulations.
Polystyrene it not acceptable under KMM Aluminum. Polystyrene with minimum 1.5 lb. density is acceptable under KMM Standard when the polystyrene is covered with a loose laid base sheet.
Wood Nailing Strips
All non-nailable decks require wood nailing strips at eaves, edges, walls, roof openings, etc., for proper securing of metal flanges. Nailers must be securely and firmly attached to the deck or through to its supporting members. Nailers shall extend not less than 1" beyond the apron or flange.
Nailers should be treated to preserve their condition and hence their nail retentive power for the expected fife of the roofing. Creosote or oilbom preservatives may affect the roofing they contact and should not be used. Nailers should be pressure-treated with a waterbom preservative such as Wolman* salts or with penta applied in a liquified petroleum gas carrier such as the Cellon* process.
Wolmane and Celione are registered trademarks of Koppers Company, Inc.-
Traffic Surface
-
Where heavy traffic is anticipated over KMM Membrane, a suitable traffic surface such as Careytred* should be provided. Traffic pads shall be set in place over an additional ply of KMM membrane -- fused to the KMM roof.
Inspection and Patching
All KMM membrane must be carefully inspected for construction damage and
imperfect heat fusion prior to the installation ot the protective topping. It is advisable to inspect lap fusions at the end ol each work day. Any holes or tears must be patched with the appropriate KMM membrane. The patch must extend at least 4" in all directions from the edges of the tear or puncture. Seal into position with interpty fusion and top sealing for Standard KMM membrane. Seal Aluminum KMM membrane by interply fusion. Streaks or seams of bitumen on Aluminum KMM membrane may be touched up by high quality aluminum paint.
Cold Storage and Freezer Buildings
KMM Standard roofing systems may be used in cold storage and freezer building applications; with or without a ventilated air space between the deck and the insulated refrigerated area. For specific recom mendations. consult your local Koppers representative.
Materials Protection
Although KMM membrane is waterproof in the roll, good practice dictates that it should be protected when stored outside by raised platforms and adequate cover.
Urethane and Urethane Composite insulation boards over metal decks must be mechanically tastened with 5 approved fasteners per 3' x 4' board. Fasteners must be located at each corner and in the center of the board. For double layer applications, it is acceptable to fasten the first layer and solid mop the second layer in steep asphalt at the rate of 30 lbs. per square. Qn other, decks and other existing smooth surfaces, urethane and urethane composite boards may be mechanically fastened as stated above, or solid mopped in steep asphalt at the minimum rate of approximately 30 lbs. of asphalt but of sufficient quantity to insure total attachment Over these insulations a glass base sheet must be applied in a solid mopping of steep asphalt prior to the application of KMM Aluminum membrane.
Consult your Koppers Representative for uae ot other types of insulation.
Waterstops (Temporary Protection)
At the end of each day's work, waterstops must be installed to protect the insulation or substrate against water penetration. Waterstops consist of a single ply of KMM membrane (Standard or Aluminum Grade) extending a minimum of 6" beyond the terminal edge of the insulation. The leading edge of the membrane is then substrate-fused to the deck and top-sealed. Waterstops should <e continuous and tight.
These temporary protective measures must be detached cleanly when work is resumed. KMM Membrane must be removed from the deck back to the top of the insulation.
24
Single-Ply Roofing Systems (Cont.)
General Terminology and Reroofing Application Information
KOPPERS 7 1/KOP Architectural and Construction Materials
. .roofing Information
Reroofing Design Considerations: During the reroof design and specification phase, and prior to commencement of roofing work, it is the responsibility of the building owner to have his architectural and/or structural consultant ascertain if the existing roof structure with the new roof installed will meet all local building codes, including structural limitations, if additional insulation is to be part of the reroof, an evaluation of the dew point location and its effect on the roofing system shall be determined by the owner.
Note: Koppers will not be responsible for any damage caused by excess loads on structural systems or damage due to rate or change in location of dew point.
Condition of Surface to Receive KMM Membrane
a. Gravel Surfaced Roofs: Remove loose gravel, surface irregularities, and repair any existing blisters, buckles, etc. Apply a minimum V" approved insulation, mechanically fastened or set in steep asphalt prior to application of KMM.Membrane.
b. Smooth Surfaced Roofs: Remove or repair, as necessary, any blisters or other abnormality of the existing membrane to give a surface which is free of sharp edges prior to the application of KMM membrane. Repairs must ' made with layer of Standard KMM
tbrane substrate-fused and top sealed at ti.ti edges.
Prior to applying KMM Adhesive for KMM Aluminum Membrane application, prime roof surface with High-Pen Primer 452 at the rate of approx. % gallon per 100 ft.2, allow to dry.
c. Moisture In the Existing Roof: KMM Aluminum membrane (Specification No. 630) is always adhered to the substrate. It is not recommended for application directly over roofs which contain moisture.
KMM Standard membrane (Specification Nos. 610. 620 and 690) is loosely laid and ballasted by an aggregate topping. This system will tolerate dampness in the substrate and, depending upon the existing situation, extra precautions may be required such as spot and perimeter venting.
Note: For recommendation* regarding specific precautions to be taken, sa* your local Koppers sales representativa.
KMM Terminology
Heat fusion is a general term used to describ* specific methods of adhesion of one layer of KMM membrane to another surface. In the process of heat fusion, the bitumen of the membrane is heated fvith a direct flam* until it is plastic enough to flow under pressure. Whan n'*ssure is immediately exerted to this
tned bitumen, it fuses to the surface to .ch it is applied. Specific types of heat fusion are described below. It should be noted that the external plastic film present will break and draw apart with the proper application of the flame.
Substrata fusion is the specific type of heat fusion used to secure the KMM membrane to a
substrate. The underside of the KMM membrane is heated until plastic. The heated
underside is then quickly pressed or forced against the substrate surface so that a slight
"run-out" of bitumen from beneath the edge of the membrane is observed. A fused seal is to
be obtained.
*
interply fusion is the specific type of heat fusion used to obtain a waterproof seal between two overlapping sections of KMM
membrane. In practice, the flame is applied simultaneously to both surface* of KMM membrane until each becomes plastic. For KMM membrane end and side laps, heat the
bottom of the overlapping section, and the upper surface of the lower sheet until it become* plastic. The two surfaces are pressed together to form a fused lap or seam of at least 4" in width. A slight "run-out* ol bitumen from the lap joint is to be obtained.
Top seeling is the specific type of heat fusion used to make the second seal at substratefused and interpiy-fused joints. It Is applicable only to KMM Standard membrane. Top sealing
is accomplished by heating a T to 3" section at the edge of the top sheet until plastic. To develop a smooth, continuous filled joint move the softened bitumen from the top sheet over the joint and onto the overlapped membrane with a roundnosed trowel.
Heal fusion equipment The recommended torch equipment for fusing KMM laps is the KMM Torch Tip attached to the Goss AP-6 or Ap-12 handle. A roundnosed KMM Trowel is recommended for substrate fusion, interply fusion and top sealing.
KMM Aluminum Interply Fusion The watertight lap is obtained on Aluminum KMM membrane by the heat-fusion attachment of the upper sheet to the exposed 4" selvage edge of the lower sheet. Overlapping membrane must eatand over the
selvage edge and approximately V onto the aluminum surface. During interply fusion of this lap, a bitumen bead shall be forced from between the mated edge*. A slight heating of the edge of the upper aluminum surface while pressing with a trowel will also be beneficial in obtaining a uniform waterproof bond.
25
Single-Ply Roofing Systems (Cont.)
KMM Ballasted System No. 610 "'ituminous Aggregate Topping (BAT) System No. 620
Materials
per 100 sq. ft. of roof
KMM Membrane (Standard)
1 ply
Stonemat or No. IS Non-Perforated
Asphalt Felt
1 ply
Surfacings
Loose Aggregate
1.000 lbs. min.
BAT System
650 lbs. min.
Paver Stones
1,000 lbs. min.
Top layer of
graval aggregate
Slope Requirements
1" per foot maximum with loose aggregate topping, 1V4" per foot maximum with BAT topping, 1" per foot maximum with Paver Stones.
8. Any KMM Standard membrane which will not otherwise be covered by a topping shall be protected with a layer of Aluminum KMM membrane extending a minimum of 4" beyond the edges of the unprotected membrane and substrate-fused around its perimeter. Specific details of the installation must be agreed upon between the architect and Koppers prior to installation.
9. Install KMM Aluminum flashings in accordance with flashing specification desenbed on Pages 30 to 32.
10. At the end of each day's work, temporary waterstops must be installed to prevent water penetration. Waterstops must be completely removed before continuation of application. See Page 24.
11. The contractor shall thoroughly inspect completed KMM membrane at the end of each day's work as well as just before top sealing, and ballasting.
12. When the flashings have been completed, lay Stonemat to completely cover KMM that will receive loose aggregate or No. IS nonperforated asphalt felt when BAT is used. Install a loose aggregate over Stonemat or bituminous aggregate topping over No. 15 non-perforated asphalt felt. Refer to Page 27.
13. In accordance with good roofing practices, it is necessary to protect the roof membrane from damage by the trades and wind uplift A8 KMM Standard membrane shall be covered with Stonemat and ballasted within 48 hours following Its installation.
14. For reroofing information, refer to Page 25.
General Information
General Requirements on Page 22 through 25 and Flashing Detail/Specifications on pages 30 through 32 are a part of this specification and must be adhered to where applicable.
Prior to beginning installation of the KMM roofing system substrates shall be inspected by the roofing contractor for drynesa, smoothness, rigidity and freedom from debris. All projections and holes which might cause rupture of the membrane are to be repaired. Review "Deck Requirements', Page 22.
Procedure
1. Pnor to starting the application of the roofing membrane, cushioning or stripping layers of Standard Grade KMM membrane shall be applied in areas of potentially high stress or sharp edges. These areas include intenor and extenor comers, major changes in directions of slope, metal flanges, etc. Cushioning layers shall be applied prior to the main KMM membrane system and shall be used in place, and then top-sealed to form a
100th transition surface.
*. Prime new and existing metal, masonry walls and wood surfaces with High Pen Primer 452 at rate of VHV gal/square. Allow to dry pnor to fusion of KMM.
3. Coat fa^s of fiber cant strip with KMM Adhesive (approximately 2 gals/square) and
allow to dry before fusing KMM roofing membrane to cant.
4. Determine the direction of water drainage and the low point of the deck. Beginning at the low point of the roof slope, install one ply of KMM Standard membrane. The direction of laps shall be such that the water flow is not against the laps. The direction of the overlap shall be changed as the direction of the water How changes.
5. Each sheet of KMM membrane shall be set in place for 30 minutes and shall be stretched to remove any wrinkles prior to fusion. Extend the KMM Standard roofing membrane a minimum of 4" above all cants.
6. All side and end laps shall be 4' and interpty-fused and top sealed. Pressure shall be applied with a steel roller (minimum 6 inches wide) immediately behind torch while bitumen is still molten. End laps of KMM Standard membrane shall be staggered a minimum of 6". Interply fusion of side lap shall be completed before fusing end lap of the same sheet
7. Extend the KMM Standard roofing membrane a minimum of 4' above all cants. Substrate-fuse to face of cant and wall, and top-seal along the upper terminal edge. When fusing KMM to wood or other materials that easily bum. apply torch to KMM only and press KMM into place.
26
Single-Ply Roofing Systems (Cont.)
Loose Aggregate Topping and RAT Installation Information
KOPPERS 7 1/KOP Architectural and Construction Materials
Loose Aggregate Top Surfacing for System 610
A. Aggregate: Washed round river gravel graded to %" nominal size (S.P. No. 57 -- U S. Department of Commerce Simplified Practice Recommendation R-163--). See "Aggregate Size Table" below. Where washed round river gravel is not available, aggregate samples must be submitted to Koppers Technical Department for approval. Slag fa not a permissible aggregate.
B. Application 1. Stonemat must be installed prior to aggregate surfacing, overlapping i" minimum at end and side laps. Stonemat must extend at least 2" beyond edge of aggregate at perimeter of roof but in no case should it extend beyond outside edge of gravel stop. Stonemat must completely cover KMM Standard.
2. Over the Stonemat. apply loose aggregate at the rate of 1000 lbs. min. per square.
3. Aggregate application by gravel buggy is recommended.
Koppers Bituminous Aqgregate Topping (BAT) --
/p Surfacing for System 620
B. General Application Instruction* Preparation: 1. BAT is applied when the KMM roofing and flashing applications are complete. First application of stone must be applied within 48 hours of membrane application.
2. Roof surface must be free of ponded water.
3. Lay No. 15 non-perforated asphalt felt loosely over KMM Membrane prior to BAT topping, overlapping 4" minimum at end and side laps.
Application of BAT Topping: BAT is applied in three steps resulting in a protective topping weighing 650-700 pounds per square. The steps are as follows:
1. Gravel aggregate is applied at the rate of 450-475 lbs. per 100 sq. ft. on the No. 15 felt. Aggregate application by gravel buggy is recommended.
2. KMM Aggregate Binder should be stirred thoroughly until the material is of uniform consistency. KMM Aggregate Binder is sprayed on the aggregate at the rate of approximately 3 gallons per 100 sq. ft. using suitable spray equipment. Keep KMM Aggregate Binder at room temperature prior to pumping during cold weather.
3. An additional layer of aggregate is then applied over the binder at the rate of 200-225
lbs. per 100 sq. ft. to achieve a finished surface. Aggregate application by gravel buggy is recommended. Heavy accumulations of aggregate should be evenly distributed. Aggregate should be applied immediately after applying KMM Aggregate Binder.
Paver Stones
Paver stones are acceptable ballast as long as minimum weight is 1000 lbs. per square.
A. Application 1. Pavers must be set on pedestals such as Terring Rings. Pavers must fit snugly against spacers.
2. As an alternative to above-mentioned pedestals pavers may be set on 6" squares of %" thick traffic pad such as Careytred. Corners of pavers must be centered on 6" squares allowing an approximate '/" gap between pavers.
B. Maintenance: Regular inspections (twice annually) must be made to ascertain that pavers and pedestals remain intact. Deteriorated and broken pavers and pedestals must be replaced to pretwnt damage to the KMM membrane. If deteriorated or broken pavers and/or pedestals are discovered, inspect KMM for damage.
BAT topping consists of graded gravel and KMM Aggregate Binder.
The BAT is applied to the roof as topping atthe rate of 650' to 700 lbs. per square (approximately V. to 1" thickness).
A. Materials KMM Aggregate Binder was formulated for binding the specified aggregate applied over KMM Standard roof systems to protect the KMM membrane. KMM Aggregate Binder is not intended for use as an adhesive or repair material. Binder should be kept in warm storage during cold weather.
Aggregate: The gravel aggregate is to be dean and size graded to nominal H" round gravel. (This is equivalent to S.P. No. 8 -- U.S. Department of Commerce Simplified Practice Recommendation R-163.)
Aggregate Size Table
Grading Requirements for Coarse Aggregates from ASTM Standard C 33 -- Standard Specification for Concrete Aggregate Use Size #8 in making Bituminous Aggregate Topping (BAT). Use Size 457 for Loose Aggregate Topping.
Amounts Finer than Each Laboratory Slav* (Square Opening*), Weigh! Percent
Nominal Size (Sieve*
1'Aln.
1 In.
% Ik
'A Ik
NO. 4
No.
No. 16
\
Size umber
with Square Openings)
(373 mm)
(2S3 mm)
(193 mm)
(123 mm)
(93 mm)
(4.75 mm)
(238 mm)
(1.11 mm)
57 1 in. to No. 4
(25.0 to 4.75 mm)
100 95 to 100
25 to 60
Oto 10
Oto 5
_
8 H in. to No. 8
(9.5 to 2.36 mm)
--
--
-- 100 85 to 100 10 to 30 Oto 10 0 to 5
27
Single-Ply Roofing Systems (Cont.)
KMM Aluminum Adhesive Bonded System No. 630
Hot Mopped System No. 630-IU
KMM Adhesive or steep asphalt over Deck or insulation
2. Subsequent courses are to be laid with 4" end and 4V4" side laps, from the first course progressing to the high point. Allow laps to remain open as long as possible before fusing. Side laps shall be interply fused pnor to interply fusing of the end lap of the same sheet. Pressure shall be applied on the top ot the lap to insure solid contact.
Overlap of side laps'must extend Vi" onto aluminum surface.
X End tape of KMM Aluminum membrane shaft be staggered a minimum of 6". Interply fusion of side lap shall be completed before fusing and lap Of the same sheet.
4. Leave tope Of KMM Aluminum membrane open and detoy fusion as long as possible. Be certain that all laps are fused before leaving job for the day.
Materials
per 100 sq. h. of roof
KMM Adhesive (630) KMM Membrane (Aluminum) Steep Aspnalt Type III (630-ID)
Slope Requirements
A" per foot with positive drainage. Koppers will not be responsible lor damage caused by ponding water.
General Information
General Requirements of Pages 22 through 25 Flashing Detail/Specifications on Pages 30 to 32 are a part of this specification and must be adhered to where applicable.
vertical surfaces. Laps shall be 4" at side and end laps. KMM Standard shefetse interply fused and top sealed..
5. Determine the direction of water drainage and the low point of the deck.
rior to beginning installation of the KMM roofing system, substrates shall be inspected by the roofing contractor for dryness, smoothness, rigidity and freedom Irom debris. All projections and holes which might cause rupture of the membrane are to be repaired. Review deck requirements Page 22.
Beginning at the low point of the roof slope, install one ply of KMM Aluminum membrane.
The selvage edge of the Aluminum KMM membrane shall be positioned on the high side so that the direction of the flow of water is not against the laps.
Procedure
1
1, Prior to starting the application of the roofing membrane, cushioning or stripping layers o( Standard Grade KMM membrane shall be applied in areas of potentially high stress or sharp edges. These areas include interior and extenor comers, major changes in directions of slope, matal flanges, etc. Cushioning layers shall be applied prior to the main KMM membrana *ysterr\ and shall be fused in place and top-sealed toform a smooth transition surface.
2. Prime new and existing metal, masonry walls and wood surfaces with High Pen Primer 452 at rate of vy-% gal/square. Allow to dry prior to fusion of KMM.
3. Coat face of fiber cam strips with KMM Adhesive (approximately 2 gals/square) and allow to dry befors fusing KMM roofing membrane to cant.
installation
la. (No. 630) Set the KMM Aluminum Membrane into a full bad ot KMM Adhesive, applied at the rate of 1-1V4 gals/square. (Sae Adhasive Alerts) While adhesive is still wet. usa
linoleum roller thoroughly, rofflpg from center to edges of membrane to obtain total adnation, and to remove all entrapped airfrom under membrane. On steep sloped surfaces use of a stiff broom is also acceptable.
lb. (No 630-BD. Sat the KMM Aluminum membrane into a solid mopping of steep Asphalt Type III at the rate of 16-236/aquare. and immediately broom into the sffeep asphalt Leave top of sheet including selvage, and termination areas free of asphalt to allow tor interply and substrata fusion.
5. Extend the KMM Aluminum roofing membrane a minimum of 4" above all cants. Substrate fuse to fece ot cant and wan. When fusing KMM-'to wood or other materials that bum easily, apply torch to KMM only and press KMM into place.
6. Install KMM Aluminum Flashings in accordance with flashing specifications descried on Pages 30 to 32.
7. At the end Of.each day's work, temporary waterstope muet be installed to protect from water penetration. Waterstops must be completely removed before continuation ol application. See Page 24.
X The contractor shall thoroughly inspect the completed KMM membrane at the end of each day's work and when the job is finished.
X After completion of the Aluminum KMM roof and flashing system, a high quality "chroma" paint may be applied to any exposed streaks or teams of bitumen.
IX For reroofing information, refer to Page 25.
Adhesive Alerts
Adhesive should be stored at room temperatura to facilitate application. Do not apply to frosty or moist surfaces.
KMM Adhesive can ba applied by brush,
rottor, or squeegee. Do not Mnadhesive.
Mix thoroughly.
'
i- Adhesive application to porous surfaces will requite approximately 50* more then specified amount adhesive.
4. Valleys ot roots sloped 1" per toot or more
shall be protected as follows: a. (No. 630) -- A layer of KMM Standard hall be set in KMM Adhesive 1 Vi-2 gals/squere .id top sealed.
b. (No. 630-10) -- A layer of Glass Bass Sheet shall be solid mopped in steep Asphalt Type III at 18-23/square.
KMM Standard and/or Base Sheet shall extend a minimum of 12" up the roof slope and 6" up
28
I
Single-Ply Roofing Systems (Cont.)
KMM Insulated Roof Membrane Assembly System No. 690
B. Wood and wood fiber decks shall have a base sneet laid over deck unattached to (he dock.
C. Steel Decks shall be no lighter than 22 gauge. Install a rigid board of Vi" min. gypsum or min. mineral board. Be certain thickness of insulation board is adequate for flute span. 'A" gypsum board shall be firmly attached to deck with steep asphalt at the rate of 15 lbs. per square, or mechanical fasteners approved by Koppers. Minimum of four fasteners per board is required and shall be located at the corners. 12" from the edges. Rigid board y<" or thicker. shall be attached with steep asphalt, or two approved fasteners per board.
Z KMM* Standard Membrane Application KMM* Standard Membrane shall be applied as per KMM Roofing System Specification No.010 . Flashing shall be in accordance with appropriate KMM Flashing Specification.
X tnstataton of Styrofoam RM* Brand Plaeiie Foam It is recommended that STYROFOAM RM brand plastic foam be placed on the membrane as the membrane is completed.
Materials
per 100 sq. ft. of roof
KMM Standard Styrofoam RM* Stonemat Aggregate
1 ply Desired Thickness
1 ply 1000 lbs. minimum
Slope Requirements
1" Maximum Positive drainage is required.
General Information
General Requirements on Pages 22 to 25 are a part of this specification and must be adhered to where applicable.
Roofs must be designed and constructed to drain completely free of water within 48 hours following a rain. Due to the deflection of steel decks, it is almost always necessary to provide slopes to properly placed drains.
Prior to beginning installation of the KMM roofing system substrates shall be inspected by the roofing contractor for dryness, smoothness, rigidity and freedom from debris. All protections and holes which might cause rupture of the membrane are to be repaired. Review Page 22.
(Thermal value of STYROFOAM brand plastic foam insulation.) Average values based on five year aging of one inch samples at 75* F when tested by ASTM C177 and/or CS18.
Trademark of fb* Dow Chtmieal Company.
Thickness
1 1'/. 1'A iy.
2 2Vi
3 3Vi
"fi*
5.00 6.25 7.50 8.75 10.00 12.50 15.00 17.50
*C*
0.20 0.16
0.133 0.114 0.10 0.06 0.067 0.057
The drain must be set directly on the deck so that the clamping nng is not higher than the rigid'board. Sumps are recommended.
All flashing must be completed in each area prior to installing STYROFOAM RM.
Because the stone is not applied in bitumen it need not be dry and installation can occur in any weather.
The wood or plywood deck must be property attached to supporting members and must be of sufficient thickness to prevent excessive deflection between supporting Jfhembers. Wood roof decks shall consist - of wetlseeaoned lumber, and edges of the board shall be tongued and grooved, ship-lapped or splined to prevent differential flexing of the boards. Any significant voids shall be covered with sheet metal.
Note: The following general specification is intended only as a guide. For more specific information, consult your Koppers representative.
exposed STYROFOAM RM is subject to
yellowing due to direct radiation of sunlight. If
STYROFOAM RM is exposed for longer than 3 weeks it is necessary for a Koppers
representative Jo authorize continuing the installation.
Procedure
1. Decks A. Poured and precast concrete, gypsum and lightweight concrete decks shall have KMM Standard Membrane laid directly on the deck following guidelines on pages 22 and 23.
Install the boards CHANNELED SIDE DOWN with closed joints: stagger end joints. The maximum acceptable opening on a random basis is H~. Install the foam to within '/" to y" of projection and cant strips.
4* AQQWQshi Surfacing After placement of STYROFOAM RM, install Stonemat over insulation overlapping 12" and immediately place aggregate over Stonemat. At roof perimeter, Stonemat shall extend a minimum of 2"-3" beyond edge of foam. An additional 4" piece of fabric is required around projections. Full widths of Stonemat should always be used.
Aggregate shall comply with ASTM C-33 Size Number 57 or W crushed stone. Apply the aggregate at the rate of 1000 lbs. per square
(10 PSF). As a general rule, y" stone at 1000
lb*. per square will be approximately 1'A" thick. Place 2000 Ibs/square of ballast or 17 ibs/ft1 paved around perimeter, drains, and large penetrations.
Concrete pavers may be substituted for the stone to provide added usefulness to the roof area and to provide resistance to extreme winds. Pavers must sit on pedestals. Decorativa stone top sufacing of the correct gradation can be used for architectural impact
WARNING: STYROFOAM brand insulation is combustible and may constitute a fire hazard if improperly used or installed. It should be adequately protected. Use only as directed by the specific instructions for this product. STYROFOAM brand insulation contains a
flame retardant additive to inhibit accidental ignition from small fire sources. During shipping, storage, installation and use. this material should not be exposed to open flames or other ignition sources.
For proper protection of STYROFOAM
brand plastic foam in storage, consult the
National Fir* Protection Association
(NFPA) standard* or the authority having
jurisdiction.
-
29
Singie-Ply Roofing Systems (Cont.)
KMM Flashing Systems
ascription
Flashings are the terminal closures of a roofing system which perform a waterproofing function. Flashings must be installed at ail intersections formed by vertical surfaces to prevent water from entenng the root system.
Koppers flashings are an integral part of a Koppers roof. Designed for flexibility. KMM Aluminum flashings will provide many years of service.
Flashings must be installed as roofing progresses to prevent possible water damage to insulation and/or deck under the roofing.
General Requirements
2. if guaranteed flashing is required, it must be installed in conjunction with a Koppers guaranteed roof and can be guaranteed for standard penods up to but not greater than the penod for which the roofing is guaranteed. To be guaranteed, flashings must be set at least 12" above the roofing surface.
3. Metal Cap flashings are not guaranteeable and are not included under any flashing guarantee.
4. Metal work of any description used as flashing or a part of a flashing system is not guaranteeable and is not included under any flashing guarantee.
1. All surfaces must be dry. frost free, 5. Vertical flashing that terminates without
reasonably smooth, clean, rigid and free from use of metal counterflashing, must be stripped
debris, loose materials, projections, holes, with 8" wide KMM Aluminum Membrane
release agents or other contaminants which totally fused 4" onto the wall and 4" onto the
might cause rupture of the membrane and/or KMM Aluminum Membrane.
adversely affect the KMM membrane
application and performance. Dust shall be 6. Cant strips shall be set firmly into place with
removed from the surface immediately before mastic or hot bitumen prior to laying roof
application of the KMM Flashing system.
membrane.
7. Porous walls including wood must be primed with High Pen Primer 452 at a rate of V V< gal.square. Allow primer to dry. (Minimum 4 hours).
8. Comers shall be lapped a minimum of 6" in each direction.
9. All metal and wood to which KMM membrane will be fused shall be coated with High Pen Primer 452 or KMM Adhesive and -allowed to dry before fusion of KMM membrane.
10. Where KMM flashing is to be installed on a building with a non-wall-supported deck (tilt slab precast masonry, curtain wall, etc.) refer to Non-Wall Support flashing detail on page 32.
11. Copper must not come in direct contact with the aluminum surface of KMM. When there is a possibility of such contact, coat the underside of the copper with Koppers Asphalt Roofing Coating 454 or KMM Adhesive.
Flashing System No. 710 Base Flashing
For flashing with maximum height of 14" from roof surface pplication Detail
Procedure
1. KMM Aluminum membrane shall be unrolled and cut to desired width and maximum length of 11 feet Note; KMM Aluminum membrane is available in precut rolls 9", 12" and 18" wide by 33' long.
n No. 710 Base Flashing shall be fused in ice so that it extends a minimum 4" onto
.jrtace of roof and a minimum of 4" above termination of roofing membrane on wall.
3. Apply pressure to KMM Aluminum membrane to obtain maximum contact to surface to which it is applied. There shall be no voids under the Base Flashing membrane. It is
imperative that complete attachment be obtained to roof surface, roofing membrane over cant and the wail. A small bead of bitumen should be squeezed out at edges.
4. Subsequent stripeof Base Flashing shall be fused in piece in the same fashion overlapping preceding strip 4". Overlap shall be irrterpty fused to preceding strip. Pressure shall be applied to surface of lap to insure adhesion.
5. There shall be no adhesive used in No. 710 Base Flashing application.
t. The flashing must not remain open at the end of the work day.
7. The contractor shall thoroughly inspect the completed flashing system at the end of each day's work.
. A high quality "chrome" paint may be
applied to any exposed streaks or seams of
bitumen.
.
t. InetsU metal counterflaahings asjrequired.
10. Complate the top surfacing of the tooting membrane to the base of the cant strip as may
be specified.
30
Single-Ply Roofing Systems (Cont.)
Flashing System No. 720 Wail Flashing
For Flashing with maximum height of 28" from surface of roof
Procedure
1. Apply Base Flashing in accordance with Note; KMM Aluminum membrane is available
Flashing Specification No. 710.
in precut rolls of 9", 12" and 18" wide by 33'
2. KMM Aluminum membrane used in No. 720 long.
Wall Flashing specification shall be unrolled 3. KMM Aluminum membrane strips shall be
and cut to a maximum length of 6'-6" and fused into place, overlapping Base Flashing
maximum width of 18 inches. Selvage edge 4". Total substrate fusion to the wall must be
should not be used.
achieved.
'
4. Apply pressure to the fused KMM Aluminum membrane to obtain maximum contact to the wall. There snail be no voids under the Wall Flashing membrane. It is imperative that the membrane is completely and tightly fused to the wall. A small bead of bitumen should be squeezed out at edges.
5. A 4" overlap shall be interply fused to the Base Flashing, applying pressure to the surface of the lap to insure adhesion.
6. Subsequent strips of KMM Aluminum membrane shall be fused into place overlapping the preceding Wall Flashing 4". Overlap shall be interply fused and pressure applied to the surface of the lap to insure adhesion.
7. The contractor shall thoroughly inspect the complete flashing system at the end of each day's work.
8. A high quality "chrome" paint may be applied to any exposed streaks or seems of bitumen.
9. Install metal counterflashing as required.
10. Complete the top surfacing of the roofing membrane to the base of the cant strip as may be specified.
Flashing System No. 730 High Wall Flashing
For flashing with a height in excess of 28" from surface of roof
Procedure
'oply Base Flashing in accordance with mg Specification No. 710.
2. KMM Aluminum membrane used lor High Wall Flashing shall be unrolled and cut into lengths not exceeding 48". Remove the selvage edge, Ipavinga maximum width of 39".
3. Totally substrate fuse KMM Aluminum Membrane to the wall in pieces not to exceed 39" wide by 48" high with 4" overlaps on base flashing and previously applied pieces.
4. Each piece of KMM Aluminum membrane shall be applied with the 48" maximum length extending vertically up the wall. It shall overlap the previously applied course of Base Flashing or High Wall Flashing a minimum of 4".
5. Rub, brush or roll thoroughly to obtain proper adhesion and to remove all entrapped air from under the flashing membrane.
8. The contractor shall thoroughly inspect the
completed flashing system at the end of each day's work.
7. A high quality "chrome" paint may be applied to any exposed streaks or seams of bitumen.
9. Install metal counterflashing as required.
9. Complete the top surfacing of the roofing
membrane to the base of the cant atrip as may
be specified.
-
31
Single-Ply Roofing Systems (Cont.)
Flashing System No. 760 Horizontal Flashing
Procedure
1. All metal to be covered with KMM Membrane shall be coated with High Pen Primer 452 or KMM Adhesive. Allow to dry thoroughly.
2. Strip metal flanges using 4" minimum widths of KMM Standard membrane as a cushioning strip centered along the length of the entire edge of the flange. The cushioning must cover the edge of the metal where it meets the roofing membrane a minimum of 2" and must cover all nail heads. The balance of the width of the cushioning strip must extend a minimum of 2" onto the roofing membrane. Cushioning stnp shall be fused to the roofing membrane and the metal flange and top sealed at edges.
3. Fuse a strip of KMM Aluminum membrane (approximately 10" wide) to the cushioning strip, roofing membrane, and metal flange so that it extends 4" beyond edge of cushioning strip onto roof membrane and to the outer edge of metal flange.
4. Apply pressure to surface of fused KMM membrane to insure adhesion and solid fusion.
5. Apply surfacing to roof membrane as may be required.
Hanging Gutter
Refer to Specification No. 760
KMM Aluminum Membrane
KMM Standard Mambrana
KMM
Asonait
Standard Roof mastic
Cushioning
SubatrauMusad
30" O.C.
Non-Wall Support Flashing
Haggle to be Sealed Metal Raglat ineertfor removable coumarflashing -Faalaton - approx. 24" O.C.
Roof Drain
L Treated wood nadara
Inlsrpty-fused Cushion Stnp KMM Aluminum I
Lsad flashing sat in mastic
Trwtwj wood nl#f (Ftt*n lo OK* only)
Not.: Suggm'sd detail wtm. powOihty xs mat dlttarantel movwrwnt will occur fe.tw.wi Me* and wtal turtle. The MmlmnisndMtsipuiMonry.
. 32
/
Intarpty-fuesd Note: Do not appty ttame directly to lead flashing
Koppers Waterproofing and Dampproofing Systems
KOPPERS 7 1/KOP Architectural and Construction Materials
OB DESIGN ASSISTANCE...
S. the majority of projects present such a wide variety of conditions, the specifier must take precautions in the preparation of
waterproofing specifications and related details 1o maximize the possibilities of a permanently watertight application.
Koppers has had many years expenence in the
waterproofing field and offers the specifier
design assistance in achieving the best possible waterproofing systems.
Coal tar membrane waterproofing systems
The function of waterproofing and dampproofing is to prevent the entry or passage of water through masonry or concrete structures. The most important property that must be possessed by any waterproofing or dampproofing material is its ability to resist prolonged contact with water.
Because of coal tar's natural resistance to moisture, bacteria and acid, it has proven to be the most effective hot applied waterproofing system available today.
KMM membrane waterproofing systems
Koppers KMM Membrane is a cold applied, prefabricated waterproofing sheet designed f 'xceptional waterproofing protection.
a cold applied sheet membrane is desired, ease of application, dependability, and economy make KMM the system you can rely on for your most critical waterproofing requirements.
Cold-applied mastic and liquid waterproofing and dampproofing systems
Many projects require the advantage* of coM applied liquid or mastic motstureproofing matenals. Koppers manufacturaa a wide variety of quality dampproofing compounds. Applied by themselves or in combination with reinforcing fabrics, Koppers dampproofing products will assure you of dependable moisture protection.
33
Waterproofing and Dampproofing Systems (Cont.)
Coal tar plaza deck and wall waterproofing systems
Membrane Waterproofing
.(rills
a. Coal Tar Waterproofing Bitumen A.S.T.M. D-450 Type III.
b. Membrane (Select one or combination). GLASFAB -- A.S.T.M. D-1668.
Tar Saturated Cotton Fabric -- A.S.T.M. F-173 Tarred felt -- A.S.T.M. D-227.
c. Concrete Priming Oil -- A.S.T.M. D-43-41.
General Requirements
a. Preparation of surfaces: Surfaces to be waterproofed shall be reasonably smooth and free from holes or projections which might
cause puncture of the membrane. The surface shall be dry and thoroughly cleaned to remove
dust and loose materials immediately before application of the waterproofing. Do not apply waterproofing where effects of freezing or moisture will adversely affect the waterproofing application.
b. Applicator: All membrane waterproofing
shall be applied by an expenenced roofing and
waterproofing contractor.
*
Application Precautions
a. Waterproofing bitumen shall not be heated above 425 F.
b. Roll or press firmly all plies of membrane into the hot bitumen and apply without wrinkles, buckles or kinks.
- On vertical walls apply hot bitumen with on roller mops or by other suitable
.^plication techniques.
d. Apply membranes on vertical surfaces in courses not exceeding ten feet in length where immediate and careful backfilling is not possible. After each course of the waterproofing system is completed and before the top mopping is applied, nail each course at the upper edge before the next course is applied. Nail each succeeding course end lapping not less than to inches.
e. Reinforce wall angles, corners or any place the waterproofing membrane course may be subject to unusual stresses with not less than 2 additional plies of fabric or GLASFAB reinforcement and moppings of bitumen.
f. insulate and protect all hot water and steam pipes which protect through or are near the surfaces to be waterproofed. Take the necessary precautions to prevent water from getting between the waterproofing and the waterproofed surface at all points where the membrane is penetrated by drains, pipes, etc. Apply extra plies of reinforcing membrane and bitumen moppings in these areas.
g. Carefully examine laps which have been exposed for any length of time, such as at the junction of a vertical wall and a slab, for defects and insufficient lap areas and repair as necessary before proceeding with further application.
h. Apply all membrane waterproofing systems in a workmanlike manner and use wood nailers treated with a water-borne preservative for all vertical wall waterproofing.
I. Protect the membrane from damage by other trades after installation to maintain the integrity of the waterproofing throughout the structure.
j. Ventilation should be provided in enclosed spaces during application.
1. If deck is sloped to interior drains, specify Waterproofing Bitumen conforming to ASTM Specification D-450 Type III.
2. Before the pouring or placing of pedestals supporting precast finish slabs, additional reinforcement shall be installed under each pedestal over existing membrane.
3. Extreme care should be taken to protect the finished waterproofing from damage by other trades during construction of towers, etc. Place a protective course over the finished membrane until the wearing surface is placed.
4. On precast concrete systems all joints should be grouted with flashing cement and stripped with a reinforcement fabric.
Horizontal waterproofing applications:
1. Beginning at the low point of the slab mop the surface with hot Koppers Waterproofing Bitumen and immediately apply the reinforcing membrane over the entire area.
2. Be sure that each ply is solidly mopped and adhered.
3. For the various waterproofing systems lap
the reinforcing plies as follows: (a) Two Pty
System -- lap 19 inches, (b) Three Ply System
-- lap 24-2/3 inches, (c) Four Ply System--lap
27V4 inches.
,
4. Mop the entire top surface with Koppers Waterproofing Bitumen. The completed
waterproofing forms a finely bonded system and the reinforcement shall not be exposed at any place.
5. As soon as any portion of the waterproofing has been completed, cover it with the protection course specified, such as brick, tile, concrete, rigid insulation or other specified material.
Plaza deck waterproofing applications:
When membrane waterproofing is used in plaza construction with interior drains and the finish stab does not rest immediately on the waterproofing, but on concrete pedestals, the following additional precautions shall be taken:
Below grade wall waterproofing application:
1. Apply a uniform brush coat of Koppers Concrete Priming Oil over the entire surface to be waterproofed (approximately 1 gallon for each 100 square feet).
2. Mop wall completely with Koppers Waterproofing Bitumen.
1 Starting at the most practical place, install the desired number of plies lapping them as follows: (a) Four Ply -- lap 27V4". (b) Three Pty -- lap 24-2/3 inches, (c) Two Ply -- lap 19 incha. (d) When more than 4 plies are used in a membrane, it is recommended that they be installed In at least two operations, i.e., 2 plies over three, 3 plies over three, etc. maintaining the shingle fashion method in each operation.
4. Nail membrane with concrete nails 8 inches on camera through flat tin discs at the end lap horizontally acroaa the membrane. If wood nailers are installed, nail membrane to nailer with TV4 Inch roofing nails through flat tin discs 8 inches on centers.
5. Mop the entire surface with Koppers Waterproofing Bitumen. The completed waterproofing forms a firmly bonded system and the reinforcement shall not be exposed at any place.
8. As soon as any portion of the waterproofing has been completed, cover it with a protection course and backfill.
Typical Subgrade Waterproofing Application
34
KMM Membrane Waterproofing Systems
Materials and stem Discussion
KMM waterproofing specifications are categorized as vertical and honzontal to differentiate between slight differences in application procedures dictated by the orientation of the surface to be waterproofed.
The vertical specification is written for foundation wall waterproofing, but may be modified for other vertical or steep surfaces to be waterproofed. The horizontal specification is written for split-slab or plaza deck applications but can also be modified for other low slope or flat surfaces. Consult your local Koppers sales representative for assistance with these modifications.
Vertical KMM Waterproofing System No. 640
General Requirements
1. Surface to which KMM or KMM Adhesive is to be applied must be free of all dirt, debris, release agents, oils, or other contaminants that would impair the proper application and performance of KMM. Cracks or other deficiencies must be corrected before starting application.
2. All surfaces that receive KMM adhesive and/or substrate fusion must be primed with Koppers High-Pen Primer 452 at the rate of V4V* gallon per 100 square feet. Primer must be allowed to dry completely before proceeding.
3. Inside and outside corners must have a double thickness of KMM. This can be
tmplished by t) installing cushion strips of 4 that extend at least 4" in each direction from the comer, or 2) lapping each course of KMM around comer 4" in each direction.
4. Courses may be run horizontally or
vertically; however, the top edge of each
course must be substrate fused 4" onto the
wall.
..
5. All exposed edges must be top sealed prior to leaving the job overnight.
6. Protection board must be placed as soon as possible to protect KMM membrane.
7. Horizontal waterproofing system must begin at the low point in the deck and layed up the slope.
8. KMM membrane applied vertically in lengths exceeding 6'-6" may be difficult to hold in place. It is for the discretion of the applicator to determine the appropriate length for his particular application
The general requirements and appticatton proceduree on title page era part el Me specification and must be adhered to where applicable.
Procedures
1. If cushioning strips are used they must be applied prior to the installation of the KMM waterproofing membrane.
2. Apply adhesive at the rate of 2 to 3 gal. per
square after primer has dried.
3. Starting at the low point, set thetiret course
of KMM Standard membrane into a full bed of
KMM Adhesive while the adhesive is still
slightly wet. Rub and/or bruah thoroughly to
remove all entrapped air from undar the
membrane. End and side tape shaN be 4". All
end and side laps shall be interpiy-fused and
top eealed. Bottom of first course shall be
substrate fused 4".
.
4. Subetrate-fuse the KMM membrane at all
projection.
.
5. Subsequent sheets shall be set in a full bed at adhesive, from the first course to the high
point of the area to be waterproofed. Each course shall end tap the lower course 4" and side lape shall be 4". -The top ends of each sheet of KMM membrane shall be substratefused and top-sealed.
(. The contractor shell thoroughly inspect the completed KMM membrane at the end of each day's work as welt as before the backfilling phase.
7. To eliminate potential abrasions, breaks and puncturaa, it is strongty recommended that the completed KMM waterproofing system be completely covered immediately, with a %" minimum thickness protective board. It should then be permanently backfilled, tamping the backfill as required. Protective board can be installed in KMM Adhesive^
t. Any KMM waterprootij|gt*membrane left exposed after backfilling shall be protected with KMM Aluminum membrane or other suitable sunlight-protective materials.
9. When any portion of themembrane is to be permanently expoeed. it must tjgeovered with KMM Aluminum Flashing, Specification No. 710 for protaction. _ . .. '
Description
Koppers Vertical Waterproofing Specification No. 640 consists of KMM Standard membrane applied to a vertical surface in a full bed of KMM Adhesive. The KMM membrane forms a waterproof system through the use of joint heat fusion, a unique process whereby all contiguous joints are affixed together to develop a monolithic waterproof membrane. In addition, the entire system is completely ' 'red to the vertical surface to eliminate any
> which might permit collection of water between the surface and membrane.
This system is applicable for use with any vertical structural surface which providee continuous support for the KMM membrane.
35
Horizontal KMM Waterproofing System No. 650
OvtrltO >ft'rO*HuMC
*no loo-seaied Hign # Primer *52
Description
Koppers Horizontal Waterproofing Specification No. 650 consists of KMM Standard membrane applied to a plaza deck or horizontal surface in a full bed of KMM Adhesive. The KMM membrane forms a waterproof system through the use of joint heat fusion, a unique process whereby all contiguous joints are affixed together to develop a monolithic waterproof membrane.
This system is applicable over any structural deck and/or approved rigid board insulation where the substrate provides continuous
`pport for the KMM membrane. It Is ideally ted for application directly to poured .iructural concrete decks.
Slope
Applicable for deck slopes of 0" to 4" per foot. When slope exceeds 4" per foot see Specification No. 640 on Page 35.
General Requirements
The general requirements and application procedures on the preceding page are part of this specification and must be adhered to where applicable.
Procedures
1. If cushioning strips are used, they must be applied prior to the installation of the KMM waterproofing membrane. 2. Apply adhesive at the rate of 2 to 3 gal. per square after primer has dned.
6. Extend the KMM waterproofing membrane, as flashing, up vertical surfaces to a height above the water level expected at the wearing slab. The top of the KMM membrane shall be substrate-fused and top-sealed to the wall. All side laps shall be interply-fused and topsealed. When vertical waterproofing is required, continue the upturn a minimum of 6" above the height of the wearing surface and substrate-fuse to the wall. Vertical waterproofing membrane shall overlap upturn 4".
7. The contractor shall thoroughly inspect completed KMM membrane at the end of each day's worit as well as before application of protective board.
tr Proceed with application of the remaining phase of the horizontal system. Care must be taken to eliminate any puncture or damage of the KMMWaterproofing membrane system by other trades.
3. Starting at thetow point of the deck, set the first course of KMM Standard membrane into a full bed of KMM Adhesive while the adhesive is still slightly wet Rub and/or brush thoroughly to obtain proper adhesion and to remove ail entrapped air from under the membrane. End
9. It is required that a suitable protective layer be placed over the entire membrane on both horizontal-and verticalsurfaces, to- provide puncture resistance during construction and during ,placement at the wearing.surface as soon as possible.
and side lape shall be 4". All end and sidelaps 1tL
^ portion oHhe membrane is to
shall be intarpiyfused and top-espied. . ..be permanently exposed.* must be covered
4. Substrate-fuse the KMM mertibrane at all with KMM: Aluminum Fleshing, Specification
projections.
- - 4710 for prceection. ....
5. Subsequent sheets shall be set in a fub bed^r .i .
of adhesive, from the first course to the high
point of the area to be waterproofed. Side laps
-
and end lape shall be 4".
fss1
Liquid and Mastic Applied Waterproofing and
Dampproofing Systems
?
Hydroshield Mastic 451 AHweather cold process mastic membrane systenr
Hydroshield Mastic 451 is a solvent based asphalt mastic which is unaffected by immersion in water either before or after curing. It will adhere tightly to damp or even wet surfaces. Hydroshield is not damaged by soil alkilimty, acidity or minerals. This unique mastic may be applied under an extreme range ol weather and temperatura condition*
Application Gulds
I iydroshield Mastic for Dampproofing.
HvdrothMd UagHe for WrtforooflncL
When applied to masonry or concrate When a permanent vapor barrier to prevent the
construction, Hydroshield Mastic serves as an entrance of water under a head of pressure is
effective dampproofing barrier to prevent the required. Hydroshield Mastic, combined with
entrance of moisture by capillarity. Usually Koppers Heavy Duty Glass Fiber Mesh,
only one coat is necessary for dampproofing. produces a tough, durable waterproofing
Hydroshield Mastic goes on cold and may be membrane that cannot rot or detenorate at
applied to a wet or dry surface.
sub-grade levels. For details of waterproofing
applications, consult your Koppers
representative.
Dampproofing Waterproofing
452 Primer Par 100 fL> (When Needed)
v. to Vi get. % to Vi gal.
1 tydroshfcid First Cost Per 100 ft*
2 gal. 5 gal.
Koppers Heavy Duty Gleet
None 1 or more plies
HydroehMd Top Coat Per 100 It*
None 3 gal.
Liquid Asphalt 480 A cold applied asphalt emulsion dampproofing.
Liquid Asphalt 460 is a filled, cold-applied, high-quality asphalt emulsion containing Bentonita clay.
sn applied to masonry or concrete
Application Guide
construction. Liquid Asphalt 440 serves as an
effective dampproofing barrier to help prevent the entrance of moisture by capillarity. Usually two coats are necessary for dampproofing.
Liquid Asphalt 480 goes on cold and may be
applied to a wet or dry surface. For detailed
specifications consult your Koppers
representative.
'
Dampproofing
452 Primer Per 100 ft* % to Vi gal.
Liquid Asphalt 400 Par 100 ft* (2 coals) 3 gal.
36
ROOF INSULATION
EXELTHERM XTRA* Insulation
The thermally efflcent roof insulation with fire resistant properties
general Description
Exeltherm Xtra Roof insulation is a closed cell thermoset phenolic base foam. Compared to olher type foams used In the construction of roofing systems. Exeltherm Xtra demonstrates
supenor physical characteristics, exceptional fire resistance with minimal smoke development .
The following information is provided to specifiers and purchasers in order to assist
them in utilizing this product in a proven and recommended manner. If additional information is required or special assistance is necessary, contact the Koppers regional office closest to you. Their locations are listed on tne back page of this manual.
Typical Physical Properties
Compressive strength 10% consolidation, psi Water vapor permeability, perm inches Dimensional stability (7 days 158* F/95H R.H.). %
Thermal conductivity (k-value)
-
Water absorption, increase
by volume (two-hour immersion), %
Density lb/ft.5 (nominal)
Coefficient of linear thermal expansion, per *F
Fire resistance (3* thickness bare foam)
,
Flame spread
'
Smoke development
Teat Method
25 ASTM D 1621
8.19 <1.0 (length)
ASTM C 355
.
ASTM D 2128-75 *
<1.0 (width)
< 1.0 (thickness)
0.12 _
ASTM C 518 _
1.8 ASTM C 272
. *2.4 min.-
- ASTM D.1622
13 x 1jJ-* ~i. .
ASTM O 696 ASTM E 84
. -r
20-25
5-15
*
The physical properties listed above are subject to normal manufacturing variations, notice. All information can be confirmed by
presented as typical average values as This data is offered as a service to our contacting the Koppers RegionaiSatas Office..
determined by accepted test methods and are customers and are subject to change without near you.
"
Thermal Performance
One of the most important features of any insulation product is its ability to retain it* thermal characteristics for an extended period
' 'ime. Several factors such as moisture and .1 soaking can affect the performance of
product during its life. The roof insulation industry through the efforts of the Thermal Insulation Manufacturers Association, Roof Insulation Committee (RIC/TIMA), are currently evaluating methods and procedures for determining long-term insulation value. However, until such procedures' are proven. Koppers continues to support and follow the ASTM C S18 test method of determining
RICTIA
THERMAL CONDITIONING
PROCEDURE CERTIFICATION
THa (SrttM MMf
thermal values: after samples have been conditioned in accordance with the RIC/TIMA method as described in their Bulletin 281-1.
The data presented for Exeltherm Xtra in the following chart has been determined by the procedure described above. For comparison purposes this chart offers data on various types of foamed roof insulation. The data
'presented on these product*^* baaed ori*.
ASHRAE's recommendation that aged
urethane be calculated using a k-value of .16.
Koppers along with the reel of the insulation
industry is striving to remain current with state
of the art procedure, at the same time
continuing to investigate new procedures in
order to provide our customers with the mget
accurate product data.
"
`Aged* Thermal Value Comparison (inches)
-c-
Vak
0.1000 0 0657 ooeoo 0.0606 0.0600 0.0500 0,0400
-w Veka
10.00 11.67 12.50 14.58 16 67 20.00 25.00
*EuMnn Xtl
12 . 1,4 1.5 1.75 2.0 24 3.0
"pUr*
Conpwftt
2.0 2.2 2.4 2.7 3.1 3.6 44
`Urrthem
1.6 1.8 20 -23 2.7 3.2 40
'UmimviIv
1.6 1.8 2.0 23 2.7 32 40
()
2.6 3.1 33 3.6 4.3 5.2 65
'The thermal value was determined by ASTM-C518. All test specimens were conditioned in accordance with the procedure as outlined in the RIC/TIMA Bulletin 281-1. Eaaitherm Xtra thermal calculations are based on a k-value of 0.12 *ln the ASHRAE Handbook of Fundamentals 1981, a "k" value of .16 has been established for rigid urethane foams. 'Valuta based on thermal conductivity (k) of 0.26 at 75*F mean teat temperature for nominal 1.0 pci density EPS.
Product Compliance
Exeltherm Xtra Roof Insulation meets the following requirements:
F.M. Approvals: Class I Insulated Steel Root Deck Construction with both 1-60 and 1-90 Windstorm Classifications.
UJ_ Ctassfflcationa:
' Insulated Metal Deck Construction . .amblies, Construction Numbers 120 and 123.
(2) UL Class A Roofing Covering with Coal Tar Built-Up Roof.
(3) UL Class A with Asphalt Built-Up Root.
(4) UL Class A with KMM Standard.
(5) UL Class A with KMM Aluminum.
Federal Specification: Exeltherm Xtra is a phenolic foam insulation board with physical properties which meet or exceed performance criteria in Federal Specification HH-M972, a specification covering polyurethane or isocyanurate roof insulation.
accordance with Section 1319.3.5 of BOCA Basic Building Code -- 1961 Edition and 1983 Supplement
Uniform BuNdbig Codr ICBO -- Research Report *4086 -- Exeltherm Xtra installed over wood decks with fire retardant roof classification, whan installed in accordance with Research Report *3844.
BOCA BuMbig Code: Exeltherm Xtra mutt be
installed in accordance with Koppers
Company instructions.
'
Must be separated from interior of building by minimum 1/2* plywood sheathing in
ft--*arch Report *4066 -- Exeltherm Xtra installed on steal decks applied with hot asphalt or mechanical fasteners, in accordance with Koppers instructions, and covered with fire retardant roof covering complying with Risearch Report *3844.
37
W.l|WWUB^ W
'I!
|,|Win. AI.1I1HM.6WWHIWLMI
Roof Insulation (Cont.)
Typical Exeltherm Xtra Application Requirements
This chan is ottered as a reference guide to For specific detailed installation procedures,
r ate methods ot proper application lor consult the Insulation Application section of
l ierm Xtra roof insulation.
this manual. (See note below).
Theae requirements are based on experience end are subject to change. To confirm the application requirements for your project, contact the Koppers Regional
Office nearest you.
Deck Type Metal
Concrete
Gypsum
Wood Plank/ Plywood Structural Wood Fiber
Koppers Membrane Systems
Coal Tar Bitumen
KMM Aluminum
KMM Standard
1 lb 1 33
4
1 3b 1
23 34
3a lab
1
3ab 3a
4
1 1b 1 3a 3ab 3a
4
1 1C 1
3d Sab 3a 4
Asphalt Built-Up Roofing Systems
Single-Ply Membrane System*
Reflective Smooth Surface Loott LaM Aggregate Non-Reflective Ballasted
Fully Adhered
Semi-Attached
1 1b 1 1C lb 33
4
1 lb 1 lC lb
3 3b 3 3c 3b 4
3a 3ab i 3ac 3ab 3a 4
1 1b 1 1C lb 3a 3a
4
1 lb i 1c 1b
3a 3ab 3a 3ac '3ab 4
Methods ot Attachment
1. Mechanical Fasteners 2. Coal Tar Bitumen
3. Asphalt (ASTM D312 Type III) 4. Loose Laid
Special Application Requirements: a. A base ply must be first nailed to the deck using the approved number and type fasteners
prior to installing the insulation board.
b. An overlay board of wood fiber or perlite (1/2" mm. thickness) must be installed over the Exeltherm Xtra.
c. An overlay board of wood fiber or perlite (1" min. thickness) must be installed over the Exeltherm Xtra.
d. A base ply must first be mopped to the deck using Type III asphalt prior to installing the insulation board.
NOTE: These requirements apply to the installation of Exeltherm Xtra as described above. It is also recommended that the specifier consult the ' irane manufacturer's literature and specifications in order to determine if additional requirements or restrictions apply.
Important Application Considerations
Introduction
Roof insulation plays a major part in the conservation of our nation's energy resources. As well it has become an important part of a building owner's energy saving package.
Of equal importance to an insulation's thermal performance is the product's ability to become a compatible pan of the roofing assembly.
Exeltherm Xtra has been laboratory tested and field evaluated to determine its in-place performance within various roofing systems. As with any product. Exeltherm Xtra must be installed properly in order to perform ss if has previously demonstrated.
The following information is offered as a guide to the proper specification and basic application of Exeltherm Xtra Roof Insulation.
If you have an unusual situation or desire further clarification of these recommendations, contact your Koppers representative through one of the offices listed on the back page of this booklet
Roof Deck Requirements
T oof deck is the foundation for the msuiation and membrane roof assembly. The success of that assembly will in part depend on the integnty ot that foundation.
Although special application requirements may be required for some decks, Exettherm
38
Xtra can be installed over moet types of root decks in the conventional manner.
Metal roof decks shall be designed so that they will not have a deflection exceeding 1/240 of
clear span under ail types of loads (live & dead) when subjected to 300 lbs. concentrated on a 1 sq. ft. area at mid-span. Designer must take into account roof traffic conditions, all roof mounted mechanical equipment as well as equipment used in the application of the roof.
Koppers acceptance of any deck as
satisfactory to receive Exeltherm Xtra roof
insulation involves the deck surface only. It is
the responsibility of the building designer and
the deck manufacturer to establish the
requirements for
*
a. Expansion and contraction in a manner that will create a stable base for the roof insulation.
b. Support of maximum anticipated loads.
c. Acceptable deck deflection.
d. Etc.
Koppers wUt not assume reeponalMNy for
deck defects, bitumen drippege. or the placement of conduits, bolt heads, ekL. above
MITMuI mFOOnTt frlMtPrCfaX.
Surface Preparation
Decks must be rigid, well attached, dry. smooth, clean, free of defacts and be installed in accordance with the manufacturer's recommendations.
All projections or openings in the deck should be completed before the application of the insulation and roofing.
Insulation Stops
At all roof edgse and openings, treated wood nailers shall be installed. The treatment of the wood shall be a waterborne type such ss in the Wolmanned* process. The thickness of the nailer must correspond to the thickness of the insulation and bs approximately 6" wide.
On decks with slopes grsater than two inches per foot, wood insulation stops should be used. They should be treated with a waterbased preservative and should be the same thickness as the insulation. They must be securely fastened to the deck perpendicular to the slope line of roof. The maximum spacing of the stops should be 48-1/B inches from face to face.
Vapor Retarder*
Vapor retarders are used to control the flow of water vapor from the interior ot the building into the roof assembly. Vapor ratarders ara located between the deck and the roof insulation in roof aasembilaa..
The use of a vapor retarder within the roofing assembly usually depends upon: the occupancy conditions, whether the outside mean January temperature is below 40* and If the imanor winter conditions are expected to be above 45% relative humidity.
Roof Insulation (Cont.)
Since the architects and building designers are aware of the actual conditions ot the specific installation, they have the responsibility tor delerming if a vapor retarder should be used.
i plication of the vapor retarder should oe .. accordance with the recommendations of the manufacturer of the vapor retarder specified and be compatible with Koppers installation and attachment requirements.
When FM Class I construction requires a vapor retarder it must De an FM approved vapor retarder system installed in accordance with FM Loss Prevention Data Sheet 1-28.
Insulation Application
Built-up roofing and fully-adhered single-ply systems require maximum adhesion of the roof insulation to assure optimum membrane performance. Root insulation as well can be exposed to unusual stress or even damaged when poorly or partially attached.
Good attachment is a mutt for success. Koppers will not be responsible tor any damage caused by or the result of unsatisfactory attachment e MECHANICAL ATTACHMENT Insulation by mechanical fastening is the recommended method of attachment whenever possible. In 1984 Factory Mutual will require total mechanical fastening for steel deck construction.
Exeltherm Xtra currently requires a minimum of 4 fasteners per 3' x 4' board (3 sq. fl./fastener) for an FM 1-60 approval and a tv* im ol 5 fasteners per 3' x 4' board (2.4
( astener) for an 1-90 approval.
Exeltherm Xtra insulation board with a 4' x 8' dimension must be installed using 11 fasteners per board for FM 1-60 approval or 14 fasteners per board for FM 1-90 approval.
All fasteners must be FM approved and installed as prescribed by FM. The placement of the fasteners must be as illustrated below.
Factory Mutual 1-90
Special Note: It h 'ong been recognized that the broader me ne temperature changes experienced
ith ,,,nooth and/or rton-reflective surface* an sometime* create stress within the roofing assembly which can cause, premature roof problems, particularly if any on* or more
components of the system is poorly installed. To avoid potential problems, when a smooth surface and/or non-reflective root is specified. Exeltherm Xtra must be mechanically fastened in tne required manner to the deck.
(Also see the membrane application section of this manual.)
insulation chamber all temporary water cut offs must oe totally removed when the application continues.
Install the roofing system in strict accordance with the manufacturer's specifications and recommendations.
SPECIAL REQUIREMENTS
BITUMEN ATTACHMENT
BUILT-UP ROOFING SYSTEMS
When mechanical fastening is not preferred or Gravel Surfaced Membranes:
is not practical, such as on concrete decks, hot The application of Exeltherm Xtra requires no
applied coal tar or asphalt may be used. When special installation provisions. Install the
using asphalt on concrete decks priming is membrane in strict accordance with the
usually necessary. When using hot applied manufacturer's published specifications.
bitumen for attachment, care must be taken to apply the material in sufficient quantity to totally cover the available deck surface.
Smooth and/or Non-Reflecthr* Membranes: With the exception ot applications noted on the Typical Application Requirements Chart
The temperature ot the bitumen is impor$SS; It must be hot enough at the moment the board is installed to allow TOTAL embedment of the board. To assure total embedment the board must also be stepped on at several points.
It is recommended that attachment be checked from time to time by removing and inspecting a recently installed board.
Cold adhesives are not acceptable for the installation of Exeltherm Xtra.
presented on page 38 of this manual. Exeltherm Xtra must be mechanically fastened to the deck and overlaid with a minimum ot 1/2" fiber, pertite or equivalent insulation board. The overlay must be attached either by mechanical fastening or not bitumen. Install the membrane in strict accordance with the manufacturer's published specifications.
SINGLE-PLY ROOFING SYSTEMS
Loose Laid Ballasted Membrane Systems: Exeltherm Xtra can be attached either by
a LOOSE LAID APPLICATIONS
mechanical fastening, hot bitumen or loose
Manufacturers of certain loose laid and laid as may be required, instattthe membrane
ballasted single-ply membrane systems allow in stnct. accordance with the membrane
the insulation to be installed without manufacturer's published specifications.
attachment.
Semt-AftadISftlembcan* Systems:
Linder such conditions Exeltherm Xtra may b* With the exception of applications noted on installed without attachment: however, ail the Typical Application Requirements Chart
other recommendations specified in this presented on -jnge 38 of this manual.
manual must be followed.
Exeltherm Xtra must be mechanically fastened
in the required manner to the deck and
overlaid with a minimum of 1/2" fiber, pertite or
Whether attached by mechanical fastening, hot bitumen or loose laid the insulation board shall be installed in parallel courses, butted
equivalent insulation board. The overlay may be mechanically fastened, set in hotiitumen
or laid loose if permitted.
firmly, with the cross joints broken.
Install the membrane in strict accordance with
On metal decks the long dimension of the board shall run parallel to. with the edge
the membrane manufacturer's published specifications.
resting firmly on the top of, a flute.
Fully Adhered Membrane Systems:
When possible the insulation boards should be laid perpendicular to the direction ol the roof membrane.
With the exception of applications noted on the Typical Application Requirements Chart presented on page 38 ol this manual. Exeltherm Xtra must be mechanically fastened
As the insulation is being installed and checked tor proper attachment the roofing membrane application must closely follow.
to the deck and overlaid with a minimum of 1" fiber, perlite or equivalent insulation board. Due to the unique characteristics of these type systems special application procedures are
Roof Membrane Application
often required. When specifying Exeltherm Xtra along with a fully adhered single-ply
No more insulation is to be installed than can system consult your Koppers representative be covered by the COMPLETED roofing for special application requirements.
system in the same day. Experience indicates and most manufacturers require that when gravel surfacing is specified it should also be applied at the same time the membrane is installed.
Temporary Roof*
The application of an insulated roof membrane system prior to the building structure being ready to accept the system has
Koppers does not recommend the practice of been recognized as a major cause of
phase construction.
premature roof failure. All work, such as vent
At the completion of each day's work all exposed edges of the uncompleted insulated roof membrane system must be sealed by
pipes, nailers, curbs, perimeter wall, drains, etc., must be in place prior to the installation of the insulated roofing system.
means of a temporary water cut-off. It is ' If such work cannot be completed prior to the
extremely important that moisture not be need for weather protection, Koppers
allowed to enter the completed system. To recommends a temporary roofing system avoid localizing conditions within the which can be removed and replaced by the
Roof Insulation (Cont.)
permanent system when the structure is ready. No roof insulation should be applied until the permanent roofing system is installed.
eroofing
When reroofing, complete removal of the old roof membrane and insulation is the preferred procedure. This allows the deck to be checked for structure integrity and a new insulated.roof assembly to be installed in accordance with state of tne art standards.
When it is not possible to remove the old roofing system, certain factors must be considered.
All existing insulation must be dry, well attached and structurally sound.
The existing roof membrane must also be dry. smooth and well attached.
Any. wet and/or damaged areas must be removed and replaced with material of equal thickness, leaving a level substrate to receive the new insulation.
For greater assurance it is recommended, when possible, that the new layer of insulation be mechanically fastened. When attaching the new insulation to the existing roof or insulation with hot bitumen, extreme care must be taken that a sufficient quantity of bitumen is used in order to obtain total adhesion of the new board.
insure satisfactory performance of the finished roof.
The deck surface must be dry and free from all traces of ice. snow and moisture before applying roof insulation. Any moisture present on the deck at the time the roof insulation is applied may result in poor adhesion of materials to the deck and blistering of the membrane.
Although mechanical fastening is the preferred method of attachment, if hot bitumens are used it is recommended that their point of application temperatures be not less than 375* F for coal tar bitumens: and 425 F for steep asphalt. Special insulated equipment is often required dunng cold weather conditions in order to assure these point of application temperatures without exceeding the bitumen manufacturer's maximum heat limitations.
Special Applications Due to the lack of application experience Koppers does not at this time recommend the use of its Exeltherm Xtra root insulation in cold storage, plaza deck or vertical and horizontal subgrade waterproofing applications.
Health & Safety Issues
Exeltherm Xtra has not only exhibited excellent thermal values, fire resistance properties and high dimensional stability, but it has also been tested for toxicity, mutagenicity and combustion product toxicity. It has been shown to have a very limited potential for adverse health effects. Exeltherm Xtra has demonstrated no short term health effects except 'for the dust generated dunng cutting of the board which may cause eye irritation. Based on acute toxicity tests done according to protocols developed by the Consumer Product Safety Commission in the Federal Hazardous Substances Act (FHSA), a powder made from the board resin is less than Toxic" (FHSA definition) by ingestion or skin penetration and does not causa skin irritation. The powder from the board ratin also gave negative results in the bacterial mutagenicity assay, the Ames test. Ls. no ganatic offsets wars observed in this test Under flaming and non-flaming conditions, this insulation is "no mors toxic than wood* (Douglas fir-standard) based on the results ot a combustion toxicity test developed by the National Bureau of Standards.
Precautions
Protection of Material
"epmg insulation dry and undamaged is ,ential to assure maximum thermal and
structural performance of the roofing insulation membrane assembly.
Exeltherm Xtra is shipped covered with plastic shrouds which are intended to temporarily protect the material while in transit. Due to the potential of moisture condensing on the inside of the plastic'surface on cool humid mornings causing moisture build-up on the edges of the insulation boards in contact with the plastic, it is recommended that the shrouds be removed during storage at the job site and the material be covered with a breathable type weatherproof covering such as tarpaulins.
Exeltherm Xtra roof -insulation must be protected from the wither at all times. No more insulation should be laid than can be. completely covered with roofing mambcarie system the same day. Atthe end of eech day's work, or in the event wor^iastopped abruptly, temporary watertight cut-offs must be installed at all exposed insulation edgas. Cut offs must be removed when work- is started again.
Root insulation which has become wet and/or damaged must be removed and replaced by solid dry insulation.
Cold Weather Applcation Roofing systems installed it temperatures niow 45*F require,special precautions to
Addhkmai Product Information
3* * 4* Initiation boards
Nominal thickness (inches)
P*T pellet
S0.fl Appro*.
per Weight fee. pdM Per So- PL
12 72 664 0.42# ~ 1.4 64 768 0.48 1.5 60 720 060 1.75 48 578 0.56 2.0 42 504 0.62 2.4 36 432 0.72 3.0 28 336 0.88
4* a 8* IrtMtialion boards
rIKII
P PAM
Sq.fl
per patiet
Appro* ww- p>iv Uu Per Sq. Ft
72
2304
0.42#
64
2046
0.46
60
1820
050
48
1536
058
44
1406
0.62
38
1152
0.72 .
28 686 0.88
*FMe spanattitity
(Inchai)
1.75 1.75 1.75 2.75 2.75 2.75 2.75
For fluts spans greater than 2.75 inches special provisione may be necessary.
For specific information consult your Koppers representative.
'
40
REINFORCEMENT FABRICS
The extra strength needed for all rooting and waterproofing systems
Reinforcement Fabrics are necessary for waterproofing and roofing systems because the waterproofing agents (bitumens) have practically no strength by themsetvee. Koppers Reinforcement Fabrics provide this extra strength in a manner similar to that of reinforcing rods in concrete. Sometimes called membranes, these fabrics serve as mechanical reinforcement for hot or cold applied bituminous coatings In roofing and waterproofing systems. They also provide the framework to build up coating thicknesses, achieving longer lasting waterproofing systems. Once applied, they form stretsresistent pliable sheets mat withstand strains caused by wind, vibration, and expansion or contraction due to temperature changes.
A complete range of reinforcement lah' -s la available from Koppers:
. per* Asphalt Or Coal Tar Saturated Jotton Fabrics are available in both standard and specification grads. The primary difference between the two grades is weight. Cotton Fabric has the longest successful
application record. Specijtcaticn grade cotton
compiles with specifications from the federal
government, the American Society tor Testing
Materials (ASTM), the American Railroad and
Engineering Association (AREA) and the
American Association of State Highway
Officials (AASHO).
a.
Qlasfabd and Olaacof Woven Glass Fabrics are bom well-known and widely accepted in the construction industry. Glasfab. an asphalt or tar coated fabric, and Glaacoat a whits resin-coated fabric are inorganic woven glass membranes which will not rot. are lightweight and will conform to irregular surfaces. The tensile strength of glass fabric is greater than cotton fabric or juts.
Koppers Jute (Burtap) Fabric is asphalt saturatad. Commonly known as traatad
burtap, it la a coarse fabric which tends to hold more bituminous roof coating matshal. resulting In heavier build-up of coating in fewer applications. It is quits often specified
for roofing and waterproofing. Juts is also
used for protection of newly seeded areas, emhankmant erosion control and ditch liners for bolding planted materials in place until
growth starts.
Koppers Glass Mats are widely used with
cold-applied roofing products. They are non
shrinking, possets excellent embedment
quafttiee and conform to irregular surface*.
The U.F. Glass Mat i* white, lightweight,
comprised of fine glass filaments in a random
swirt arrangement, reinforced with glass
strands at the edges and bonded with
polymeric ream. An asphalt coatad U.F. Mat is
alto available.
Standard Glass Fiber Mesh consists of
chopped monofilaments formed into a random
pattern and bonded with a resinous binder.
Heavy Duty Glass Fiber Mesh is constructed
of heavy glass yam, chopped in two inch
lengths and formed into a jackstraw pattern. It
is bonded and coatad with a pliable asphalt
The open pattern permits excellent bleed-
through of the asphalt into which it it
embedded.
-
41
Reinforcement Fabrics (Cont.) The perfect material for every application.
Application* of Koppaf* Ralnforeamant Fabric* are extensive, most used in conjunction with hot or cold applied
bituminous coatings in roofing and waterprooling.
Other applications include bridge deck waterproofing and (lashings, foundations,
slabs, tunnels, subways, pipeline wrapping, pipeline |Oint wrap, parapet wall treatment, asphalt paving repair and protection,
driveways, parking areas and tennis courts. Many ol the reinforcement fabric systems
installed over 25 years ago are still in us* today. In large construction projects such as highway bridges, their applications have ensured complete protection against the moisture penetration tljat ultimately leads to corrosion and weakening of the structure.
Bridge Deck Waterproofing effectively
protects bridge surfaces and substrates from premature deterioration. Koppers
Reinforcement Fabric, used in conjunction with coal-tar coatings, repels the adverse effects of weather, salt, gasoline end oil spillage, tn addition, the waterproofing prevents spalling of concrete and the corrosion of bridge reinforcing rods (caused by penetration of moisture and de-icing chemicals). The woven glass reinforcsment fabric serves a function similar to that ot steel mesh in concrete. Forming a stress-resistant pliable sheet, the supporting memBrahe adds strength and serviceability to the inherent water resistance ot the coal-tar emulsion.
Foundation Waterproofing And Damp proofing at the time of construction can Eliminate the problems of damaging leaks, .rchitects and engineers have long realized the advantages of waterproofing compounds in preventing or retarding the pessage of water. Reinforcement fabric enables waterproofing compounds to remain stationary while being built-up to the specific quantities oesired. thus allowing the depth of material necessary to resist existing hydrostatic pressure.
Plaza Deck Waterproofing provides
subterranean structures with needed
protection against moisture. Whether used as
office space, classrooms, storage or a parking garage, all below-ground facilitiea must be watertight, including walls and top surface*.
Roof Repairs are long lasting whan Koppers Other uses for Koppers Reinforcement
Reinforcement Fabric is used. Quick repairs to Fabrics exist wherever waterproofing systems
roofing and Dashing membrants are possible are required:.
'
_
Landscaped plazas are often constructed on. these top surfaces. It is her* tbit Glesfab used as the reinforcing membrane in the'
waterprooling systems placed ud*r th* plaza surface.
H a ply of fabric is embeddsd in th* first application of roof coating. A second application then completely seats the area whara blister* and cracks once appeared.
Tennis courts can batter maintain thairtight, smooth playing surfaces with applications of Glasfab membranes coeted'with bituminous or .synthetic sealers. This waterproofing
Giaslab is available with a coding of asphalt Roof Roeurfadng with reinforcement fabhf combination eliminates the recurrence of or tar. to be compatible wtthth* specified adds strength to existing built-up roofs. Sinco cracks, thereby preventing water from seeping bitumen. Possessing th* highest t*n*H* it is important to select the membrane that undsrths asphalt and gradually breaking up
strength of any reinforcing membrane performs best with a particular coating, the base.
currently in use. Glastab provide* a strong Koppers manufactures fabrics that can be Tunnels are effectively protect*^ against
waterproofing system. It strengthens and utilized with cold-applied product* or hot water seepsgs into and through the concrete
secures the waterproofing agent between bitumen. Coated glass fabrics are available as shell with--Koppers Reinforcement Fabric
slabs and on wills under th* plaza deck, wsfi as glass mats and saturated cotton embedded in a bituminous compound. A
sealing and protecting them from water and fabric*. Glass membrane's non-rotting. proper)|Slnstall*d tunnel waterproofing
chemical penetration. When a r*intoretng feature, its' ability to conform to irregular system - prevents rapid deterioration of
membrane is required that is not coatad with surfacaa. and its high tansil* strength make it a reinforcing rode, heaving of concrete and th*
asphalt or tar, Koppers fills th* n*d with highly desirable reinforcement. Cotton-tfiphc formation of icicleeon the underside. '
"'iscoat. Lik* Gltsfab. Glascoat is a wovan it often used for stripping-in end covering Pipeline protection ha* been achieved
ss fabric, but is coatad with whits r*sin. corrugated metal roofs.
through an appfjMJiion consisting ot a
uiass mats and cotton fabrics may beneeded
in specific casas. Koppers meSfethet*
products also available as wateipToofing membranes.
When selecting the proper roof resurfacing bituminous coating (Koppers Coal Tar
reinforcement, it is important to also use the Enamel) and a reinforcement fabric (Glastab
proper amount of coating to assure a long membrane*) tosuccessfully prevent corrosion
service life.
and toil stress.
-
42
Specifications and Technical Data
KOPPERS 7 1/KOP Architectural and Construction Materials
Product Specification Cotton Fabric
Standard Cotton Fabric
Glasfab
Applicable Specifications
Breaking
Roll Width
Nominal Sq.
Sg.Yd.
Strength of
Nominal
|I50'Long) Rolls per Carton
Yd. Ory Weight Saturated Wt Saturated Fabric Thread Count Coating Color Nominal Carton Weights
Fed. Spec. SS-C-450A ASTMD-173-80 AREA and AASHO for various states.
3.5 oz.
lOoz. minimum 50 Warp 50 Fill
Minimum
26 to 32 Warp Asphalt Black 24 to 32 Fill or
Tar
36" 24" 18" 12" 9" 6" 4" 3"
1 40# 1 26# 2 40# 3 40# 4 40# 6 40# 9 40# 12 40#
None
2.0 oz.
6.5 oz.
40 Warp
27 warp Asphalt Black 36"
1 22#
Typical
20 Fill
15 Fill
or
24" 1 14#
Analysis
Typical
Typical
Tar
18" 2 22#
Analysis
Analysis
12" 4 30#
9" 4 22#
6" 8 30#
4" "12 30#
3* 16 30#
Fed. Spec. HH-C-466b ASTM 0-1668-80 Type 1 & II
1.2oz.to2.0oz. 1.5 oz. to2.6oz. 1.4 oz. min. 2oz. to3oz.
75 Warp 75 Fill Minimum
20x10 or
20x20
Asphalt Black or Tar
48" 36" 24" 18" 12" 9" 6" 4"
3"
4 48# 6 56# 8 48# 12 56# 18 56# 24 56# 36 56# 54 56# 72 56#
:oaP Juti
White
1.2oz.to2.0oz. 1.6oz.to2.6oz.
ASTM D-1668-80
Type III
75 Warp 75 Fill Minimum
Fed. Spec." HH-8-00600
ASTM
D-1327-78
7.5 oz.
9.8 minimum Typical Analysis
50 Warp 50 Fill Typical Analysis
20x10 or
20x20
9 Warp 9 Fill Typical Analysis
Resin White Asphalt Black
36" 24' 18" 12" 9" 6" 4" 3"
36" 24" 18" 12" 9" 6" 4" 3" .
6 8 12 18 24 36 54 72
1 1 2 3 4 6 9 12
42# 37# 42# 42# 42# 42# 42# 42#
44# 28# 44# 44# 44# 44# 44# 44#
Product U.F. MatWhite
U.F. MatAsphalt
dardMesh
Heavy Duty Mesh
o Polymeric
Polymeric Resin Asphalt
490* ft. .9 ibr..
.9 lbs. 1.39 lbs. 222 lbs.
Total Weight 100tg.IL
1.0 lbs.
Tmsilaftnnith Width 4 lbs.
TsnriitSbniW Ijngth 13 lbs.
ra*1n1 UwUrtuh Nfepv Cvtan Carlin ffiipil
36"x18ff 1
7#
2.5 lbs.
31 lbs.
47 lbs.
36" x 1817 1
16#
1.44 lbs.
10 lbs.
. 18 lbs.
36" x 180 1
11#
4.5 lbs.
25 lbs.
34 lbs.
27"x 96" 4 40#
43
ROOF MAINTENANCE PRODUCTS AND SYSTEMS
Ml roofs require preventive maintenance.
As soon as the roofing system is first applied, the degradation process begins. If the roof is allowed to age unattended, you may be faced with the high cost of replacing the entire roof.
The materials needed to repair or maintain the common built-up roof depends upon the construction and condition of the roof and the nature of the problem. Maintenance or repair isn t merely a matter of adding more bitumen. Each roof responds to the ravages of time and weather in different ways. Each needs specific materials to combat deterioration.
Then there are the flashings, counter flashings. parapet walls, pitch pans, and possible wet insulation to be considered. Each of these areas is susceptible to deterioration and damage. Each requires particular materials for maintenance and repair.
Koppers has all the materials necessary to keep your roof in top condition. Our Roof Shield System, for instance, can add years of extra life to smooth surface asphalt roots and our resaturant applications have extended the life of many built-up gravel roofs 50% or more.
Koppers Early Warning System is a program which will provide you with a complete and thorough roof-top survey determining the actual conditions throughout the roof system. \n analysis of suspect areas and all roof data is
ntered into one of our many word processing computers offering uniform and comprehensive maintenance specifications tailored to'your needs. Koppers will be pleased to put a preventive roof maintenance program together for you.
Roof conditions
Dry Fett* & Bara Spots are caused by the oxidation of surface bitumen on gravel roofs. Roof Felts become exposed to attack by the sun's ultra violet rays, and rapid deterioration follows. Koppers roof resaturants help avoid this situation.
Blisters: usually are formed by the presence of moisture resulting in vapor pressure that has been trapped between plies of felt on either gravel or smooth surface roofs. Koppers roof cements and membranes can solve this problem.
Alligatortng: is a condition almost universal to smooth surface hot asphalt roofs. Attack from the sun starts immediately and progresses to the formation ol deep roof alligators as time goesr'by. The appropnate Koppers asphalt emulsions will provide a smooth top surface that will not alligator in the future.
SpHtr are the result of excessive movement in the roof system. Freeze-thaw cycles and expansion and contraction may cause roof splits if proper expansion joints
have not been provided. Koppers Stnpshieid and other systems can help control this condition.
Wet Insulatiore will greatly effect the performance of any built-up roof. Hydrostatic
pressure trapped within the roofing system must be released. Certain types of
insulation can be successfully vented. This can help eliminate costly membrane
deterioration.
-
Worn Flashings: can lead to a total roof failure. Koppers cements and membranes offer a system to restore worn flashings to "like new" condition. If damage is more severe, our KMM aluminum flashing system offers an approach that will provide a completely new flashing with a durable aluminum top surface.
44
Roof Maintenance Products and Systems (Cont.)
Koppers Aluminum Roof Coatings
KOPPERS 7 1/KOP Architectural and Construction Materials
Asphalt base active coatings
Koppers asphalt base aluminum coatings contain pure aluminum paste consisting of millions of tiny pigment flakes. When the coating is applied, these Hakes rise to the surface ana arrange themselves into many sningle-like layers Of aluminum. The result is a reflective metal surface that protects the substrate Irom the elements. With Koppers aluminum coatings, there is no peeling or separating because the asphalt base securely bonds the aluminum to the protected surface.
There is an aluminum coating to suit your needs:
Aluminum Coating 434 contains three pounds of extra quality aluminum paste per gallon of high grade, non-fibrated asphalt base.
Aluminum Coating 435 contains three pounds of extra quality aluminum paste per gallon. This coating is reinforced with asbestos fibers for a thicker, tougher coating and extra life.
Aluminum Coating 444 contains two pounds of extra quality aluminum paste per gallon of high grade non-fibrated asphalt base.
Aluminum Coating 445 contains two pounds of extra quality aluminum paste per gallon, reinforced with asbestos fibers.
Application:
1. Preparation -- The surface to be coated should be cleaned of all loose matenal such as gravel, dirt. dust, rust or scale. All breaks, cracks, holes and other structural deficiencies should be repaired prior to applying the Aluminum Coating.
Z Priming -- Before applying Aluminum Coatings to roofs, dry or dusty felts should be primed with Koppers High-Penetration Primer 452 at the'rata of approximately V< gallon per 100 square feet. This preliminary step insures proper adhesion of the Aluminum Coating.
Z Coating -- Stir thoroughly before and occasionally during application. Apply with spray or brush.
4. Curing -- Allow one month curing time before applicaton over new asphalt emulsion coated roofs. Allow three months curing time before application over new asphalt or solvent type coated roofs. Do not apply over "dead level" surfaces subject to standing water.
Quants against moisture penetration
The asphalt base in Koppers aluminum roof coatings provides excellent adhesion to the existing surface. The result is a reflective surface that guards the substrate against moisture penetration.
COVERING CAPACITY
Type ot
434 and 444
435 and 445
SurfaceNoo-FIbrrted AluminumFibwted Aluminum
(Per 100 iq. ft.)
Metal
'/< to 14 gallon
1 to 1'A gallons
__ ____________________________________ Composition__________________________ Vt to 1 gallon_________________________ 2 lo 3 gallons
Root Maintenance Products and Systems (Cont.)
Koppers Heavy Duty Roof Shield System
Description
Koppers Heavy Duty Roof Shield System combines two Koppers roofing materials. Heavy Duty Glass Fiber Mesh and Liquid Asphalt 480.
Liquid Asphalt 480 is a filled, cold applied, high-quality asphalt emulsion containing Bentonite clay. It is the waterproofing component of the Heavy Duty Roof Shield System. The unique gel structure of Liquid Asphalt 480 will not alligator, blister, or flow in hot weather.
Heavy Duty Glass Fiber Mesh is a patented reinforcing mat of a non-woven jackstraw pattern of short cable strands of glass fiber. Each strand is composed of more than 200 glass monofilaments and is completely surrounded with the Liquid Asphalt 480. thereby eliminating water wicking by capillarity into the waterproofed surface.
Application
1. Surface Preparation. If there isa question to the soundness of the existing roof and insulation, a core cut should be made. All minor repairs must be made prior to priming. ANY blister containing moisture must be allowed to DRY before repair is made.
Z Priming. Every effort should be made to remove dust from the surface. If the dust cannot be completely removed, Koppers High Penetration Primer #452 should be applied at the rate of approximately V< gallon per 100 sq. ft.
If a primer is used, it must be allowed to dry thoroughly before proceeding with Roof Shield application.
3. Flashing. Flashing areas shall be examined, repaired and primed as required. Roof Shield should be applied first to flashing areas.
4. Application. Brush or spray-on an embedding coat of Liquid Asphalt 480 at the rate of 4 gallons per 100 sq. ft. Do not apply if temperatures below 40* F. are expected within 8 hours or if ram is expected before the emulsion has time to dry.
While the emulsion is wet, embed Heavy Duty Glass Fiber Mesh into it with firm brush pressure forcing the emulsion through and around the glass stands. Each succeeding glass strip should overlap the preceding one by 2 inches. Roll ends of Heavy Duty Glass Fiber Mesh should overlap 6 inches. Do not allow dry or starved laps. Permit Liquid Asphalt 480 and Heavy Duty Glass Fiber Mesh to dry sufficiently to permit foot traffic.
After the embedding coat is dry, a top coat of Liquid Asphalt 480 is sprayed or brushed on at the rate of 3 gallons per 100 sq. ft
information eomamed to tfta buMatm preeentad to 9000 tart*, but N d not to be totanred that by put*cafrtto hereot by fcoppera Company, toe., nor by the uaa or tmptoytwtni ay me reader at any luyjeeanna or memod contained hereto, met Koppera Company, toe., hea --urnad any liability tor infringement ot any paftant. tormgn or