Document 3QmooxvZEZM0aV5LxKLazx48E

/ To--Name l> Ooeonmont R. L. Sutcr Plant Manawcr W. D. Watt Industrial iivqicne uktoci: PERIODIC h.'JBF.ETOS SURVEY Inter company uorresponoci^e Phone No. Ooto P<lo Co4o Division Decarl.or 2. 1Qn 1 iont/L;ieo ClMS Nwmoor Power Train 0'vit`On Toieco . .Machir.inu Pitm/Oflico 4 74-0 C-- CIUS Numoor .ersonnel i Adi..in.Cf f icc Chrysler Center 417-tiS.r. Summary: Measurable exposures continue to occur on the west brake line pad unloauing and stacking operation. Depart ment 9047. Affected employees must be provided annual physical exams. All exposures are below the Permissible Exposure Limit (PEL). Discussions On Wednesday, September 23, 1901, and on Tuesday, October 13, 1981,employee exposure to airborne asbestos fibers in the Lrake assembly operation, Department 9847 was investigated by the writer on 9/23/81 and L. Redmond on 10/13/01. E. A. Kolacki, Labor Relations and Safety and P. Runion, Union Member of the Local health and Safety Committee were aware of the investigation. The investiga tion was in compliance with the OShA General Industry Standard, 29CFR1010.1001 (f)(2ii). ' . Results of the survey indicate that asbestos exposure in Department 9847 is well within the OSllA PEL. Exposure on the east brake line is less than tne detectable limit of the -- procedure (0.1 fiber/cc). Although most of tue west brake line lias asLestos exposure below the detectable limit, the brake pad unloading and stacking operation continues to have a measurable exposure to asbestos. Consequently F. HoffbauerrH/T/At/i. .. $S#278-40-8106 and W. Williams, S5#280-34-9232; and any other JZ-t'* /2worker v/no performs or nas performed that operation, must receive annual physical exams, in accordance with the General Industry Standard 29C1'R191Q.1001 (j). Effort should be made to keep the area as free of asbestos as possible, through frequent cleaning. hm Attachments PLAINTIFF'S EXHIBIT (a!K - William D. Watt Industrial Hygienist CHRYSLER 002400 TF-202 ALL-STATE LEGAL* Data Sheet Toleao Machining Plant September 23, 19S1 Asbestos Location Permissible Exposure Limit Department 9847rWest Brake line, F. Hoffbauer #278-40-8106 Unloads and stacks pads and loads finished brake assemblies Repeat F. Hoffbauer time-weighted average W. Williams #280-34-9232 Unloads and stacks pads and loads finished brake assemblies repeat W. Williams time-weighted average Concentration fibers/cc 2.0 1.0 0.1 0.4 . J- 1.7 0.4 0.9 J. Kurek #279-44-5699 Boot machine operator - last operation on west brake line before turn, before pads < 0.1 J. Little #275-34-1206 2nd position on assembly line after introduction of pads < 0.1 Samples were collected on cellulose ester filters and counted using phase contrast microscopy. CHRYSLER eS24S1