Document 3Qayon0NjzqzyNJDp9JdnJN6E
UCC 103111
REQUIRED PROJECTS AT S. CHARLESTON PLANT (PC-381) TO MEET EPA AND OSHA VCM REGULATIONS
PROJECT
I . VC Rectifying Col . Mod Ificat ions
2. VC Vent Col 1ection System
3. Modify VC Feed System
4. VC Vapor Recovery System @ N . C .
5- Portable Vacuum Compressor
6. Replace 4 VCM Transfer Pumps
7- Vent 'Compressor for 2640 Col. Vent
8. Scrubber Vent Line to Powerhouse
ENG. ORDER NO. (SHOP ORDER NO.)
938-5708 (79511) 938-5728 (79507) 933-5753 (74388)
938-5374 (20753)
9. Vent Line from VCM Compressor to Scrubber
10. Revise Packing of Autoclave Piston Pumps
11. Determine Need for Back-up VCM Compressor a. Double distance pieces for existing compressor (not installed)
ESTIMATED COST, $ 110,000 (1976$)
500,000
300,000
300,000
48,000 (1976$) 24,000 (1976$) 24,000 0 976$)
60,000
1 ,000 0976$)
STATUS
Process Study in progress
Nothing being done Nothing being done
Nothing being done
Nothing being done
Nothing being done
Nothing being done
Eng. S Constr. in progress
Nothing being done
REMARKS Estimated to be required in about 3 yrs(?)to meet proposed EPA regulations. Same as itern 1.
Same as itern 1.
Same as item 1.
Same as itern 1.
Same as itern 1.
Same as item 1.
Estimated completion date 3/15/76. Required to meet OSHA regulations effective 4/1/76, and proposed EPA regulations. Same as item 1.
In progress
Presently evaluating revisions in B-5 and B-6 pumps. B-1 and B-2 need to be done. Required for OSHA and pro posed EPA regulations.
5,000 (1976$)
Nothing being done
Same as itern 1.
(Con 11)
PROJECT
ENG. ORDER NO. (SHOP ORDER NO.)
b. New reciprocating compressor (not installed)
c. Hew si iding vane compressor (not in stall ed)
12. 2708 Tank Vent (Wash Acetone) with Compressor
13- Revise Packing of Dilution Tank Pump and Spare.
lit. Portable Vacuum Compressor for N.C.
15- Install Line from VCM Sphere to Tank Car for Venting back to car at N.C.
.16 Install Valves in VCM
Transfer Line from T/C to Sphere to Unit to be Able to isloate Line in 50-gal. segments
17- Install Rupture Disks Under All Safety Valves in VC Service.
18. Replace Dilution Tank Agitator Packing with Double Mechanical Seal
19- Dynatrols for Autoclaves
20. Venti1 at ion System on Bldg. 153
21. Replace Liquid Fi lied Pressure leads wi th transmit ter.
ESTIMATED COST, $ 150,000 (1976$)
65,000 (1976$)
18,000 (1976$)
13,500 (1976$)
13,500 (1976$)
STATUS Nothing being done Nothing being done
Nothing being done
Nothing being done
Nothing being done Noth i ng being done
Nothing being done
REMARKS
Same as Item 1 .
Same as itern 1.
Same as itern I. Project hasn't been scoped. Required for OSHA and proposed EPA regulat ions Same as itern 1. Same as item 1.
Same as itern 1.
UCC 103112
In progress In progress
Same as itern 1.
Same as itern 1.
2 installed and calibrated 2 being calibra ted 1 on strip, varnish not complete Required for OSHA Essentially complete Required for OSHA Required for OSHA
UCC 103113
(CON'T)
PROJECT________________ __________
22. Install Vent Hoods Over Sampling Stations
23 Install Dumpster Loading for R S D
2k. Install Two VC Micro
Computer - Gas Chronatograph Monitor Systems
ENG. ORDER NO. (SHOP ORDER NO.)
ESTIMATED COST, $
STATUS Complete
In progress
In progress
REMARKS Required for OSHA
R S D project. Required for OSHA
Required for OSHA
AJR
2/26/76
/gf