Document 3QNyY93von87JrBkj5Bk21J2a

DATE August 25# 1971 subject = Aroclor Incineration REFERENCE M.P. memo to P.H. 8/19/71 TO : A. E. Leisy CC: P. Heisler C. Buckley M., Foresman <' WV Engman . . , .- As stated In the reference memo some 38 samples of scrubber effluent were analyzed for PCB's. The average PCB was calculated at 44.56 ppb# however only 7 samples exceeded 50 ppb. The following comments are observations for these specific periods have beenextracted from our start up log: Log NOc . Date Total ppb PCB Comments 6 5/27 (11:30-1:30PM) 85 High quench pot temperature shutdown at 11:30 AM# startup. 8 5/27 (3:30-5:30PM) 80 Waste line plugging; causing waste surging and drop off of incinerator temperature. /12 HAT 5/29 -^ (11:30-1:30 PM)1 211 Waste off due to relief valve failure; attempted startup aborted due to leak in waste line; started cooling unit down. 43 6/16 (4-12 M) 28l Low city water flow shutdown at 5:10 pm; startup.. 51 6/18 (7-3 PM) Id 64 6/20 t (8-3 PM) 102 Waste line plugged 9:40 AM; waste gun plugged and required .steaming out. 215 Waste gun plugged# incinerator temperature fell off; gun required steaming out. 76 6/22 (7-3 PM) 269 Waste off until 9:15 A.M. due to repairs to venturi piping; start-up DSW 296180 ^cm\ STLCOPCB4066124 > ' / A. E. Leisy Aroclor Incineration Page 2 WGK Thus* each of the excessively high samples correlates to a known upset condition. As I have said before, the systems seem, to be abnormally sensitive to even minor upsets. Consequently smooth operations and close monitoring become doubly important. A. L. Rasmussen Mfg. Rep. ap STLCOPCB4066125