RE: ALCOA BUILDING ENVIRONMENTAL ASSESSMENT MODIFIED PHASE I FINAL REPORT
Attached is the final "Modified" Phase I Environmental Assessment report for the Alcoa building. The consultant has listed their conclusions and recommendations on page 35 of the report. I have the following comments regarding the recommendations:
1. Based on my conversations with 1. C.F. Kaiser and others within Alcoa (Gary Crouth & John George), I do not feel that soil and groundwater sampling is warranted due to past problems with leaks in the snow melt system. The leakage did not appear to be major and the heat exchange fluid would be very biodegradable and most likely would not be present at this point in time. Perhaps the only reason to conduct any sampling would be to take a "belt & suspenders" approach. I would recommend not conducting sampling and to wait until a buyer is found to see if testing is an issue in the transfer.
2. I would not recommend that we perform wipe sampling to determine the chemical composition of the suspected chromate contamination. The staining is very small and is most certainly a result of minor leakage from the cooling system when chromate based corrosion inhibitors were used. The condition is extremely minor in nature.
3. Don Burrell has informed me that the problem with the stained shelves and floor tile in the basement has been corrected.
4. The hydraulic lift in the Executive Annex is inspected regularly and has not presented a problem. Future building owners would be responsible for proper maintenance.
5. The asbestos issue is still under investigation. Galen Anderson is sharpening the estimate to remove the asbestos in the building so that a more exact cost can be factored into the decision as to what asbestos material will be removed. I have also asked Laura Rippey and Karen Krall to look at the health effects and potential sampling plans.
At this time I do not see any driving reason to perform any additional Phase II testing. If you agree, I will write a letter to Rick Kelson explaining the reasons for no additional Phase II work. If you recall, we used Rick as the person to be notified when I did the assessment of the 14th floor of the building when the outside legal group moved in. I wanted to get your concurrence before proceeding.
C60763 0082
Attachment
M/AB.Assess.Final.PRA
ENVIRONMENTAL AFFAIRS
FROM
BILL SNEE PITTSBURGH OFFICE -19
to RUSS PORTER PITTSBURGH OFFICE - 25
NOVEMBER 15,1993
RE: ALCOA BUILDING - MODIFIED PHASE I ENVIRONMENTAL ASSESSMENT DRAFT REPORT
Attached for your review, is the draft report of the Phase J Environmental Assessment for the Alcoa Building. The report highlights four environmental findings, some which would be considered minor and some that would be significant. The following summarizes those findings.
1. Chemically stained shelves and floor tile were observed in the old darkroom located in the former duplication center in the basement. This would be a minor finding that could be easily remedied.
2. Suspected chrome deposits were found on some of the piping in the fan room and in some areas above the metal pan ceiling. It is suspected that this was a result on minor leakage in the heating/cooling system when chrome based corrosion inhibitors were used. This would also be a minor finding that could be confirmed by additional testing. Chrome based corrosion inhibitors are no longer used.
3. The consultant's investigation indicated a possible leakage of a ethylene glycol solution (antifreeze) from the snow melt system installed beneath the sidewalks outside the building. The snow melt system was in use between 1987 and 1990. There may be a need to conduct testing of the soil/groundwater beneath the sidewalk to determine the significance of this release. This however, should not be a major issue.
4. The normal Phase I protocol was modified to include a more detailed asbestos survey so that an asbestos abatement cost estimate might be generated. In order to better estimate the quantities of friable asbestos in the building, the contractor conducted a detailed asbestos survey of seven floors and a more general survey of the remaining floors. Based on the contractor's investigation, a very broad and preliminary cost estimate of $2,222,082 was generated for the cost of asbestos abatement. This estimate does not include the cost of removal of the metal pan ceilings and some heating and cooling piping located above the ceiling. Alcoa Building Services had previously estimated that removal of the ceiling would cost approximately $250,000. This item is obviously the most significant item raised in the assessment.
C60763 0083
ENVIRONMENTAL AFFAIRS
Meetings will be held with the consultant and Building Services to better define the asbestos abatement cost and to determine what, if any, asbestos could remain in the building and still comply with the Alcoa mandatory practice for asbestos abatement. I will keep you posted on the outcome of those meetings. t>in s>nee cc: Ron Katila - cover letter and report
Don Burrell - cover letter and report Pat Atkins - cover letter only Russ Yester - cover letter only
C60763 0084
#ICF KAISER
ICF KAISER ENGINEERS GROUP
1CF Kaiser Engineers. Inc. Gateway View Plaza 1600 West Carson Street Pittsburgh, PA 15219-1031 412/497-2000 Fax 412/497-2212
March 19, 1997
Mr. William Snee Aluminum Company of America, Inc. 425 Sixth Avenue Alcoa Building, Room 1920 Pittsburgh, PA 15219
Subject:
Phase I Environmental Assessment Alcoa Building Color Photos from Final Report
Dear Mr. Snee:
As you requested, I have enclosed a set of copies of the color photos from the Finals Report for the Phase I Environmental Assessment conducted by ICF Kaiser for Alcoa at the Alcoa Building in 1993. I have also sent a copy of Volume II of this report to Bun Hill Kosar Rittelmann Associates as you requested.
Please call me at (412) 497 - 2391 if you need any additional information or if ICF Kaiser can be of assistance in any other way.
Very truly yours.
Andrew J. Kandray Project Manager
Enclosure
&
C60763 0085
C60763 0086
C60763 0087
Cooling tower conditioned water piping; room SB-65.
Wall in room SB-80.
C60763 0088
Batteries for diesel emergency generator in generator room. C60763 0089
C60783 0090
Computer storage room interior, room SB-86.
Interior of room SB-65.
C60763 0091
Oil stain on subbasement corridor ceiling, beneath escalator.
C0O763 0092
C80763 0094
Chemical mixing area in subbasement engine room.
C60763 0095
General condition or subbasement engine room.
C60763 0096
Metal lathe in subbasement engine room.
C60763 0097
Sump pumps and sewer ejector pumps in subbasement engine room.
C60763 0098
Breeching over ductwork insulation in subbasement fan room #1 (asbestos sample SB-2G).
C60763 0099
C60763 0100
Pipe insulation in room SB-78.
Breeching over ductwork insulation in subbasement locker room.
C60763 0101
C60763 0102
C60763 0103
Rope packing around fire protection water line (asbestos sample SB-6) and pipe insulation on city water line (asbestos sample SB-7A) in room SB-65.
Pipe elbow insulation in room SB-65A (asbestos sample SB-8B). C60763 0104
Pipe elbow insulation in subbasement meter room (asbestos sample SB-9B). C60763 0105
Pipe insulation in subbasement meter room (asbestos sample SB-10A).
Insulation on steam line in engine room.
C60763 0106
Pipe insulation on city water line in subbasement in engine room (asbestos sample SB-1 IB).
Pipe elbow insulation on chillers in subbasement engine room (asbestos sample SB-12). C60763 0107
C60763 0108
Pipe insulation in room B-61 (asbestos sample B-1).
Underside of escalator at basement level (above stained area in subbasement corridor).
Storage area for chemicals in room B-61.
Ceiling tile in former duplication center in basement (asbestos sample B-2). C60763 0110
C60763 0111
Acoustical tile in recording studio, room B-51E (asbestos sample B-4).
Waflboard in duplication center, room B-48 (asbestos sample B-3).
C60763 0112
Stained floor tile in former basement darkroom, room B-51. C60763 0113
Chemical storage in cleaning supply room, room B-84. C60763 0114
Fireproof insides of fire door to room B-74 (asbestos sample B-6).
Basement transformer and electrical switchgear room, room B-26D.
C60763 0115
Solvent cabinet in basement paint shop, room B-28A.
Paint spray shop in basement, room B-28A.
C60763 0116
Paint storage area in basement, room B-28B. C60763 0117
Basement carpenter's shop, room B-28. C60763 0118
C60763 0119
Fan room on 28th floor.
Medical waste storage area on 15th floor.
C60763 0120
Intake chamber for outside makeup air in 14th floor primary air handling crossovers (outermost chamber).
C60763 0121
Additional intake chamber for outside makeup air in 14th floor primary air handling crossovers (innermost chamber).
C60763 0122
Exhaust system for medical floor air.
Reservoir tank for former snow melt system in 2nd floor fan room. C60763 0123
Pipe insulation in Cigar Shop, above ceiling (asbestos sample 1-CS-01A). C60763 0124
C60763 0125
Breeching located in 2nd floor fan room (found in all fan rooms on all floors).
Pipe elbow insulation in 5th floor fan room (asbestos sample 5-2B). C60763 0126
Pipe elbow insulation in 5th floor fan room. C6Q763 0127
Beige floor tile in room 1570E, 15th floor (asbestos sample 15-2).
Green and black floor tile in room 1570D, 15th floor (asbestos sample 15-3). CG0763 0128
Covering on door and on yellow tile in busbar room (found on all floors). C60763 0129
Typical ceiling opening on 30th floor. C60763 0130
Pipe insulation in bathroom of 3002A (asbestos sample 30-04A).
Sprayed roof material on 31st floor, west gallery (asbestos sample 31-2). C60763 0131
Pipe insulation in fan room on 31st floor (asbestos sample 31-7A).
Pipe elbow insulation in basement of Harvard/Yale/Princeton Club (asbestos sample HYP-1-6B).
C60763 0132
C60763 0133
C60763 0134