Data Data
Attached are the VCM personal monitoring results for the Flemington and Burlington Resin Plants and the Burlington Compound Plant, by job class ification, for the month of June, 1975.
Values are presented using two techniques:
1. ,TCeiling" exposure values, using 15-minute sampling with charcoal tubes.
2, Eight-hour time-weighted averages, generated by averaging the values obtained in successive 1-1/2 hour sampling for an eight-liour work shift.
For the 15-minute ceiling values, there were no exposures measured greater than 10 ppm in any of the plant locations during the month.
It should be noted that the Compound Plant showed some unusually high results in 15-minute sampling - 4.1, 4.3 and 4.3 ppm. An analysis of possible causes for these results is covered in a separate report. Since these are 15-minute values (with an OSHA maximum of 5 ppm), and since all eight-hour TWA results during the month, including both those reported here and those computed from the Bendix results, are well under the OSHA maximum of 1 ppm, there is no need to establish a regulated area in the Compound Plant.
Attachments WCC/jst
V'
s
013113
FLEM1NGT0N RESIN PLANT PERSONNEL MONITORING SUMMARY
PPM VCM BY CHARCOAL TUBE METHOD (15-Minute Sampling Period)
PERIOD: .limp 1975 & Quarterly
Distribution: W,C. Champion G.I. Fozand J.T. Sweeney Q.C. File
Job ClassifIcation: RESIN PLANT
SI ift Foreman Pc lymerization Foreman Reactor Operator UtilIty Operator Dryer Operator WAREHOUSE Warehouse Foreman Warehouseman Baqqer MAINTENANCE Maintenance Foreman Maintenance Clerk Mechanic Q . C. LAB Q. C. Lab Supervisor Q. C. Technician/Days Q. C. Technician/Shift Monltorinq Analyst BOILER HOUSE Boiler Lead Operator Boiler Operator
1.3, 0.6, 0.6 0.6, 0.6 0.9, 1.2 0.7, 0.2
...............................
0.7, 0.1 0.1 , 0.4, ND, ND
0.3 0.4 0.'3, 0.2, 0.4
0.1 0.5 0.3, 0.2, 0.1, 0.7 0.1, 0.2
0.2 ND, ND, 0.2, ND
|
bhhs
013111
2
PILOT PLANT
Pilot Plant Group Leader
Pilot Plant Enqineer
Pilot Plant Technician
Pilot Plant Maintenance
0.4 0.2, 0.3 1.1, 0.3, 0.2 0.4
y
............ -
m
QUARTERLY R. D. Personnel
QUARTERLY Office Personnel
31 N.D. | s , 0.3, 0.1, 0.3, 0.7, 0.2, and 0.2 6 N.D.* s, 0.7, 0.2, 0.4, 0.3, and 0.4
013115
Name
VCM PERSONAMONITORING EXPOSURES 10 PPM AND OVER
PLANT Flemington WEEK OF June, 1975
Job Classification
Date
Job Area
NO EXPOSURES MO PPM REPORTED FOR THIS PERIOD.
Exposure ppm, VCM
Breathing Air
iim i
>--t>istr ibution: C^.I. Rozand
P.R. Scarito (Burlington)/j.T. W.C. Champion Quality Control File
Sweeney
(Flemington)
F.W. Kanzler
DoviaoH 19/1 (\I~IA
FLEMINGTON EIGHT-HOUR CHARCOAL TUBE TWA BY JOB DESCRIPTION JUNE, 1975
Job Classification
Maintenance Clerk Effluent Man Pilot Plant Engineer Pilot Plant Technician Pilot Plant Maintenance Technician Pilot Plant Technologist Pilot Plant Group Leader Shift Foreman Maintenance Foreman Mechanic - day Mechanic - shift Dryer Operator Warehouse Supervisor Warehouseman Bagger Lead Boiler Operator Boiler Operator Quality Control Technician - day Quality Control Technician - shift Quality Control Supervisor Polyforeman Reactor Operator - relief Reactor Operator - charging Reactor Operator - dumping Utility Operator
TWA
0.1 ND 0.1 0.2 0.1 0.1 0,1 0.1 0.1 1.1 0.4 ND 0.1 0.2 0.2 0.1 ND ND ND ND 2.6 0.6 0.9 1.1 0.4
R. A. Lojewski 7/2/75