Document 3NpdOg4kYMMkgedg2qnRKeEex
INDUSTRIAL HYGIENE 1984
JERRY E. STEWARD
00 f'ONFTOFNTTAI
DOW CHEMICAL U.S.A.
March 22, 1985
LOUISIANA DIVISION P. O. BOX ISO
PLAQUEMINS. LOUISIANA 70765-0150 BOA 3*9-6000
J. D. Weldon 3801
xc: R. S. Touchet J. R. Norman B. Ledford C. Halphen Dr. Currier
RE: INDUSTRIAL HYGIENE - 1984
LHC III had four incidents in 1984 in which the employees were monitored for potential exposure to benzene, compared to eleven in 1983. Of the four incidents, none of the spills resulted in significant personnel exposure. The exchange of catalyst in R-521 by VIP was also monitored. Only the people on top of the reactor were exposed to benzene and the levels were well below 10 ppm. Normal shift operations were monitored and were seen to have very low exposure levels. Enclosed are copies of the monitoring data, the yearly noise survey, the accomplishments for 1984, and the plans for 1985
Jerry E. Steward Sr. Envir. Chemist Light Hydrocarbon III
jys
AN OPERATING UNIT OF THE DOW CHEMICAL COMPANY
THE ROLE OF INDUSTRIAL HYGIENE AT LHC #3
The nest important function for industrial hygiene is the protection
;f the workers. The first step ir. that protection is recognition of
potential problems.
At LHC #3 several problems areas are defined.
The hazards of benzene and toluene are well doucmented. There are
questions concerning the safety of exposure to butadiene, fuel oil,
and dicyclopentadiene. LHC #3 has areas of high noise and there is a
potential for heat stress in the furance areas.
LHC #3 is designed to operate under a guideline of one part per million benzene on a time weighted average. The plant design greatly
aids in keeping the exposure limits, however engineering is not the only means of achieving low exposures. LHC #3 has a continuing educational program to train personnel in the hazards and methods of handling the chemicals found in the block.
A key part of the role of the industrial hygienist is to provide a
data base of worker exposures.
Easeline date is collected by
monitoring normal day to day operations.
Jobs that have a high
probabiality of exposure are defined and monitored. At LHC #3,
sampling, tarze leading, and pump repair are jobs that need specific
job monitoring.
Monitoring during a spill cleanup is considered as
the worst case monitoring.
00 U>51?k C0NF T OFNT Tfl>i
ACCOMPLISHMENTS LHC #3 19S4
Tank farm, LHC #3 operations and maintenance personnel were
trained on the consequences of overexposusre to the block's
hazardous chemicals.
Hearing protection requirements and the
monitoring program were also reviewed. Eighty five per cent
of the employees received the training program.
Personnel were monitored for exposure to benzene and toluene during the clean-up of spills. Ease line monitoring data was obtained by monitoring two operating shifts and a maintenance shift.
A noise level survey of LHC #3 was taken. The noise levels were checked during the venting of the superheaters. The low pressure superheater exceeded the recommended levels. Capital has been requested to install larger mufflers on the unit.
Levelcement work on the methods of analysis for butadiene and dicyclopentadiene was continued.
CO/vp TFnTTai
( LHC *3 NOISE SURVEY
DATE
9-16-83
12-20-84
Inside Control Room
East of Control Room N.E. of Control Room Warehouse West V-1400A West T-1200 West T-1210 Eetween T-1200 and T-1210 D-531 Deck West E-531
Bz Reactor Deck Bz Reactors-around level North R-500F*
North D-580 Fin Fan Deck Cooper Deck S.W. Cooling Tower w.W. Cooling Tower
/uth Propylene Storage
Spare Parts Yard S.E. Motor Control Center East C-55 S.E. C-54 S.E. C-150 S.E. C-52 South R-1A S.W. D-130 K-71 Ground Level
K-71..Deck
K-12CT Ground Level K-12Q Deck South E-9's East C-3 Deck with superheater vents HPSH venting LPSHr venting Furance wallwav
West B-3 S.E. B-3 S.E. Bl-B
-
All noise levels are given in decibles
65 83 83 80 91 85 81 74 78 82 79 85 --
87 88-96
90 86 ' 83 82 76 86 82 97 80
--
77 92 96-112 99-103 96-108 98-104 96 102 91
--
--
90-96
104 84 88
65 77
85 80 92 84 90 75 80 82
80-85 86 85 88
88-96 86-90
84 85 81 78 84 95 83 85 87 80 98 92-102 96-108 96-108 96-108
. 94 - 101
s. 92 100-108 114-120
88-96
102 88 90
DO 1 0 5 1 OB OONFTDFNTTAI
1. 02-09-84
2. 04-03-84 3. 05-15-84 4. 05-17-84 5. 05-22-84 6. 07-17-84 7. 10-08-84 8. 10-09-84
LHC #3 INDUSTRIAL HYGIENE SUMMARY OF MONITORING DATA
Working around slab water pit after dumping an emulsion from C-20.
Block 58 cleanup after P-1601C blew a seal. Easeline monitoring data - "B" shift days Baseline monitoring data - "D" shift dogs Baseline monitoring data - Day Maintence
R-521 catalyst exchange
Elock 58 sump cleanup
Block 58 sump cleanup
no 'lOFO?9
CONFTOFNTTAl
FASTS FT?. MI11I '1C
/. X *.
uc \
SLAB
423SS2 SOT
433228
PTT AFTER DUMPING EMULSION FROM
3 7 < .01 <.01 <.01
< .01
3 7 <.01 < .01 <.01
< .01
2/9/84
SLEANUP AFTER P- 1601C BLEW A SEAL.
206866 0 3.5 .41 .52 .08 .20 .56 15 26 4/3/84
OT
1 .W. 280799 0 3.5 .72 .62 .05 .18 .54 1.0 6.0 4/3/84
f3
OT
' .E. 434294 0 1.3 .42 .48 .08 .12 < .01 6.0 7.0 4/3/84
^0 OT
, L.G. 433826 0 6.5 .68 .55 .15 < .01 .16 6.0 6.0 4/3/84
20 OT
i. J.
278012 0 3.5 .79 .99 .06 .13 .81 20 51 4/3/84
i55 OT
AUX . 433821 0 4.0 .31 .32 < .01 .03 .34 <5.0 6.0 4/3/84
029 OT A L.M. 474264 0 3.3 .25 .27 < .01 .10 .19 > *** 4/3/84
3318
OT
**%t ~
DO 1 OS130 OONFTDFNTTA!
NAME/S.S.
MASTER CLASS
PT TWA EQ (HR)
PARTS PE?. KILL I OK TIME WEIGHTED AVERAGE
BEN
TOL
ET _XYL. BEN
STY
3" SHIFT MONITORING; DAYS ; MAY 15,1984
M. JENKINS
432042
0 10.0 0.05 0.04 <0.01 <0.01 0.02
43666927
S.S.
R. GERMILLION 432049
0 10.0 0.06 0.03 <0.01 <0.01 <0.01
439749814
LEAD OS
C. RICHARDSON 070952
0 10.5 0.01 0.05 <0.01 <0.01 <0.01
365620063
FUR OS
C.L. HBOLEN
431043
0 10.7 <0.01 <0.01 <0.01 <0.01 <0.01
436565812 M. BROWNING
OS 433343
0 11.0 <0.01 <0.01 <0.01 <0.01 <0.01
437067067
EOARD OS
H. ALFORD, JR. 432677
0 11.0 0.01 0.01 <0.01 <0.01 <0.01
434882220
BOARD OS
A.D. ABBOTT
433752
0 10.5 0.05 0.04 <0.01 <0.01 0.02
39909820
EEN SOT
u.L. DAVIS
433820
0 10.5 0.01 0.02 <0.01 <0.01 0.05
436687843 C. RAYMOND
FUR SOT
434177
0 11.0 0.01 0.01- <0.01 <0.01 <0.01
546889988
ETH SOT
K. DIXON
433842
0 11.0 0.02 <0.01 <0.01 <0.01 <0.01
433942815
SOT
S. DOTSON
434287
0 12.0 0.03 0.08 <0.01 0.02 <0.01
435139205
OT
C.K. EAGLES
433893
.0 10.5 0.03 0.05 <0.01 <0.01 <0.01
43702^267 R.T. LOONEY
EEN OT 276854
0 12.0 0.02 <0.01 <o.oi <0.01 <0.01
429156805
FUR OT
R. STUFFLEBEAM 277485
W1 0 10.5 0.05 0.21 <0.01 <0.01 <0.01
448726049
OT
no AO?'''3
rV:z: *3 A : (1) IH Monitoring of VIF
7:37
ONITCEING OF THE CATALYST EXCHANGE IN R-521
-essel setup cp.es:
Name
Ray Pourian E. J. Landry Jim Marino D. R. Kelly Joe Landry Randry Pitre
Time
F?M (TWA) Benzene Toluene Ethyl Ben Xylene Styrene
180 min 180 min 180 min 180 min 180 min 180 min
0.46 0.48 0.04
0.18 0.40 0.54
0.14 0.17 <0.01
0.30 0.13 0.24
<0.01 <0.01 <0.01 <0.01 <0.01 <0.01
0.11 <0.01 <0.01 <0.01 <0.01 <0.01
0.06 0.11 <0.01 <0.01 0.03 <0.01
DRUM LOADING CREW
Randry Pitre E J. Landry Joe Landry B. R. Kelly Ray Pourian Pat Decote
DOW PERSONNEL
D. Wallace R. D. Sproles R. W.cLacombe J. R.:Bordenlon
480 min
480 min 430 min 480 min 430 min 480 min
0.17
0.13 0.12 0.17 0.10 <0.01
420 min 630 min 645 min 180 min
0.44 0.07 0.95 1.72
0-08 0.06 0.02 0.03 0.02 0.02
0.07 0.03 0.11 0.15
<0.01
<0.01 <0.01 <0.01 <0.01 <0.01
'
0.01
<0.01 0.01
<0.01 <0.01 <0.01
0.18
0.02 0.06 0.02 0.02 0.08
<0.01 <0.01 <0.01 <0.01
<0.01 <0.01 <0.01 <0.01
V
0.02 <0.01
0.01
<0.01
on Cr>Nn TonNy
M/
I6-Feh-S5 ?:27 AM vMor.-; = r:eei (4) IK-ELOCK 58 SUMPS
:i on
x. .7:41
1n A
IH MONITORING
CLEAN-UP OF BLOCK 58 SUMPS
Monitored 10/8/84
Block contract personnel
Name
Time
Bull Buhler John Morris Oliver Talyor James Lewis Pat Decote A. Shultz
510 min 510 min 510 min 510 min 510 min 510 min
Dow Personnel (fire watch)
Mike Miller
510 min
. M itored 10/9/84 Block contract personnel
Pat Decote A. Shultz James Lewis Bull Buhler Oliver Talyor
420 min 420 min 420 min 420 min 420 min
PFM (TWA) Benzene Toluene Ethyl BZ Xylene Styrene
0.23 0.08 0.05 0.10 0.11
0.08
0.03 1.90 0.16 2.85 0.36 0.07
<0.01 0.29 0.05 0.40 0.06
<0.01
<0.01 0.53 0.01 0.70
0.03 0.01
<0.01 0.23 0.05 0.30 0.05
0.02
0.14
0.06
0.02
<0.01
<0.01
0.05 0.06 0.73 0.06 0.77
0.10 0.14 7.85 0.59 8.13
<0.01 <0.01
0.43 0.03 0.40
<0.01 0.01 0.26
<0.01 0.31
<0.01 <0.01
0.08 0.03 0.09
no
(~ONF
lOF.*) tdfn-h
--f-- -Tf*# ,
~V'
INDUSTRIAL HYGIENE PLANS FOR LHC #3 1. Continue to inform plant personnel on the consequence of exposure
to chemicals in the block. Emphasis will be placed on benzene and butadiene. 2. Continue to monitor personnel for potential exposure to benzene and toluene when cleaning up spills. Obtain job specific monitoring date for sampling and pump repair. 3. Reduce employee exposure during sampling handling through the installation of new benzene sampling systems and through the purchase of a specific gravity meter. 4. Set up a monitoring program for butadiene and dicyclopentadiene. 5. Check the level of radioactivity at the propane and propylene pumps to test if Radon-222 is an- exposure problem in the block. 6. Run personal noise dosimeter tests and yearly noise survey.
oo 10 'A C.o^