Document 3NmNY2mR6BN0adQZqpDK6Qed6

FILE NAME Corning OC DATE 1969 Aug 22 DOC OC116 DOCUMENT DESCRIPTION Detailed Grievance Statement RE Dust and Working Conditions in OC Berlin Plant with Cover Letter IL PACSIDENT ae s we we eS rricrrict t O August 22 1969 M. D. Burch Director of Personnel and Industrial Relations Corning Fiberglas Corp. P. O. Box 901 Toledo Ohio 43601 co Dear Mr. Burch ._ 7 ~~ + _~e- SR ae er ene ernment oF yr een I am attaching hereto a copy of a statement received from Berlin New Jersey I have had a series of problems with apparent working conditions and the for itself Since attached this has statement speaks been a continuing thing there must be something that can be done to correct it I have to point the transmittal out in the first that this matter paragraph is not in of our constitution but was a resolution developed by the Health and Welfare Committee I of course will have the opportunity to see you on Tuesday morning and we can discuss the matter in more detail Sincerely LWM njr attachment Lee W. Minton International President SPosetrawnleee ee. ~ * Saloty cussed J moving at _..,., in the CLOSELY . Safety wot ne wae o far an, =e N - The should - eee th LL unitters unitters should be made a grievance after they are dis and the Union Committee feels that the Company is either too slow or not going anything about this serious name of the Local the officers of Local 231 and matter the - Committed file a grievance on the following items hater O a g(eneral escpoencdiailtliyon, loading Sie dust condition throughout the plant We are calling for immediate correction of this dust Calling for a regulor floor cleaning program that would be followed each shift of the operation of this plant Calling for dust correc tion at the Flatware Finishing Line at the box station These men are continuously being subject to a concentration of dust at the boxing end of this line The entire line condition is not good Router area needs correcting Batch mixing dust needs correcting The hazardous method of feeding batch to this department by a lift truck should be dis- continued The method fans the of cooling molds with large powered on floor of the Production Department should be dis- continued and another method installed This keeps a constant agitation of dust spread throughout the production area number of vehicles moving back and forth in the production area continuously stir up the dust Some methods should be devised to minimize this traffic and keep the dust on the floors at a minimum Sy ; oe ,The use of fiberglas pads after they deteriate and burn This keeps a constant amount of fiberglas dust and other dust into the atmosphere by the cages passing in front of cooling fans irrita- -) dropping off of lift trucks and is a constant source of ey "* tion to the employees (( The saws need serious attention . Special , a SpecialAssembly Department The Lines Nos 1 2 and 3 where the men strip this dust method should be corrected instead of the method now used of blowing the dust into faces of one man from another @ @ @ @ The method their load of bulk loading material where the into the bulk system Here there trucks discharge the dust from these trucks blows into the is carelessness and plant in a large cloud The ' ventilating of the Douthern area over the top of the Dowtherm pumps Any ventilation coming into this area must pass over the pumps and contaminated with Dowtherm fumes before it gets into the plant Another method of ventilating this area should be devised High noise level from machinery - steam leaks mA C The Local Union and the Safety Committee are further calling for An educational program to aware the employees of this plant of the seriousness of the contents of this dust so that () is very familiar with this fact and through their daileyvewroyroknewill do whatever they can to reduce the amount of dust pry Attached to this grievance will be an additional list of requests by the Safety Committee for other improvements =~