Document 3NkobpvrgdDr581jzZG5RvGa3
ETHYL Inter-Office
October 22. 1986
TO: All PDC Personnel FROM: F. H. Currie SUBJECT: Asbestos
Prior to 1969, asbestos-containing materials were used
extensively in industry, commerce and home construction. Asbestos was used in materials for pipe insulation, floor tile, wall and ceiling covering and insulation. gaskets. pipe. specialty cements, brake linings............... The list is almost endless.
Asbestos-containing materials can release a fibrous dusting that, if not handled correctly, can be injurious to your health. Asbestosis. a lung condition, can result from continuous unprotected exposure to this fibrous dusting.
Pipe insulation (steam, hot water, condensate) contain ing asbestos was widely used at the Baton Rouge Plant until
1969. Most of the insulation on steam, hot water and condensate
piping in the PDC Change House. PDC Main Lab Building, PDC Office Building. PDC Maintenance Building. Special Purpose Lab (not the ceiling cover). Pilot Plant Building, High Pressure Lab. Library and all main steam supply headers to the PDC area contain asbes tos. An asbestos surveilance and handling program has been instituted at the PDC in each of the above mentioned buildings and areas.
Background air sampling was conducted by Ethyl's Health and Environment Group. The results of the sampling show that the fiber content (not .identified as asbestos) of the air in the
buildings is only marginally higher than outdoor baseline analy ses. The highest reading found was only five percent of the allowable 'eight-hour exposure limit for asbestos fibers set by the new government asbestos standard. These results show no health problems for employees at the PDC as along as the asbestos is not disturbed in a manner to cause it to become airborne.
, Piping insulated with an asbestos-containing material is.^heing labeled as such. A program to repair and seal asbestos
.. insulation is being instituted. Repair, removal or alternation
VV
Vv * V'
y
E-01347
E TH 0 0 0 2 12
ETC 14752
2.
must not be done without prior approval and scheduling by PDC maintenance supervision. Repair, removal or encapsulation must only be done in strict accordance to maintenance policy based on asbestos standards published by governmental agencies (federal and state).
Attachments show location of asbestos-insulated piping in your work area.
If you have any questions about asbestos at PDC. please contact F. H. Currie or C. F. Hay.
FHC/cd 3035C
F. H. Currie
ETC 14753
E-01348
ETH 000213