Document 3Nj7EVRnXO5wbGrZvL8yLmkOE
DASHIRLL CORPORATION
ENGINEERS CONSTRUCTORS
23 February 1990
POST OFFICE BOX 147 BATON ROUGE. LA 70E PHONE' 504/293-9359
Dow Chemical USA P.0. Box 150 Plaquemine, LA 70765
Attention: Mr. Jimmy Jumonville
Re: P.0. #1175704 Ground Grid Check Dashiell Job No. 2586
Dear Mr. Jumonville:
Enclosed are results of the tests performed by our company for the above referenced project.
Thank you for the opportunity to be of service. If you should have any questions, please call our office.
Sincerely,
DASHIELL CORPORATION
WHB/hle Enclosures
W. H. Bland Vice President, Field Services
D0 A 023176 CONFIDENTIAL
DOW CHEMICAL PLAQUEMINE, LA
DASHIELL JOB NO. 2586
We have completed testing Block 26, Areas 5, 6, and 7, with the exceptions of the areas noted on the result sheets, everything appears to be in satisfactory condition.
As you will notice, there are two areas not thoroughly tested:
1) Area one is by the Control Room end of Cells 1-8 where the I-beams were covered with pipe and there were only a couple of places to check.
2) Area two is on the warehouse side of the Hydrogen Unit where Emmett Irwin asked us not to test because of the danger of a hydrogen fire.
Thank you for the opportunity to be of service. If we can help you in the future, feel free to call upon us.
James D. Smith Technician, Field Services
DO A 023177 CONFIDENTIAL