Document 3Ng2Qm0YrqkV9p9ojqxQ4j8OD

Laboratory Y/crk Orders Page Two of Four January 27, 1937 L'wO-2312 Objective: Assigned to: Ford's warranty costs on '86 Rar.ger, Aerostars and Brcncc II's are too nigh. To help solve this problem, Ford has made interim changes cn front disc brakes for '86-1/2 models. Ford is also proposing additional changes including larger calipers, heavier rotors and shoes with increased lining area for 1989. The object of this program is to quantify the effect of these changes and help us sort some cf the options planned for the 1989 MY disc brake. W. J. Macintosh; Sales Contact: J. J. Brown LWO-2813 Objective: Assigned to: The objective of this dynamometer test program is to study the effects of different attachment methods cn the noise characteristics cf S16-46Q2. This dynamometer study is in support cf the vehicle test program covered under LVJC-2812. It will also help quantify some of the attachment options planned fcr the 1989 MY disc brake. T. J. La Russo; Sales Contact: J. J. 3rown LUO-2315 Objective: Assigned to: Oshkosh (Rockwell Axles) is searching for suitable non-asbestos material to replace MM8C5 on Tandem Axle Air Force Refueler - Rockwell 16-1/2 x 7 "P" brake. Determine by FMVSS' 121 ' testing, plus 20, 50, and 60 MPH post effective ness, the most suitable of three recommended materials. Based on Dyno test results, Oshkosh wants to start field test by March '87. Timing is urgent! T. J. La Russo; Sales Contact: R. L. Boyd