Document 3NbR9rmbM5jg3JO5RgQQGkL8x
.JBT CYAM/UVUD
Bequest For Capital Expenditures/Retirements
CHVi`.,ION OM COMPANY
Organic Chemical
Division
J.O. CONTROL POINT
Chicago Plant
j o b Ti t l e
JL22______
Purchase arid install water treatment system for boilers
R E POR IN . CLASSIFICATION
OA I APPHOVtO
/OB ORDER NO.
D1
10/30/81
005565
SUMMARY OF AMOUNTS
DESCRIPTION
LOCAL CURRENCY
ESTIMATED PROJECT COST
U.S, DOL LARS
$4430.00
DISMANTLEMENT EXPENSE
TRANSFER EQUIPMENT
GROSS AMOUNT: FOR APPROVAL TRANSFER EQUIPMENT
$4430.00 I
LESS SALVAGE OR TRADE-IN ALLO~W ANC E
: :N:;Elf',.|^A:5:Ni::;.R:ElQ UIRED (g q f -3027 i
$4430.00
RETIREMENT DATA
COST DISMANTLED ENT LESS SALVAGE
AMOUNT
TOTAL - CHARGE RESERVE DESCRIPTION AND REASONS REQUIRED
ECONOMIC S ' as called for in General Prope dure Memo #3
Attachment C# (Attach calculations)
ECONOMICS PERIOD
NET SALES NAT {PRO FIT/SAVINCSl TOTAL INVESTMENT
% ROI (o n t o t a l in v e s t .) INTERNAL RATE OF RETURN PAYOUT OF NEW FI XEp, CAPITAL
REV,# 1 2 3 4'
5 6, 7
REVISION DETAIL (GRO SS AMOUNTS)
DAJE
AMOUNT
C,UM. AUTHORIZATION
. \ ]
1
Funds of-- --------------------------------------------------------------------------------------------------------------------------------------- ---$4430 are requested to purchase and install an automatic chemical feed system to treat the make-up water for the plant's two boilers.
SUMMARY OF ESTIMATED COST - Details on GOF-3027
1 T EM NO.
DESCRIPTION
E' M4TE S'
STARTING D At E
one week
| CO M PL E T 1 ON DATE I one month
MA_T_ER__IA_L______al Pa SPo rrovaENI_G_INaEfEfR-pINGr_an*" 1n*0 rTnALva 1
See attached sheet
ITEM NO.
NET CASH REQUIRED
4230
ACCOUNTING TREATMENT
DEPR.RATE
n
Dr. $4,190 P. P. & E. (2A320) Dr. $ 240 Expense as Incurred
7 1/4%
d r o j ^t
100
100
APPROVALS
AME
C -i L1 i~
4 4 30____
DATE
A/-V//
5 sjja c c o u n t in g t r e a t me n t ,' e c o n o mic s a p p r o v e d b y / i v . Co n t r o l l e r (c h e c k b o -* vE
ZhiZ-K!
POST AUDIT PERIOD
/ /C Y fAL
o^nl'-Nri
po s t au d it d u e d a t e
1r f
fi ILA ______ ________________
fj_ i. /
-
\
P 0 T/rDiViSlON R ES: EN
- RECTO,
N14647
CK<a/W4/W?
OC-5565 10/30/81 Page 2 of 8
PROPOSED WORK AND COST
Funds of------------------------------------------------------ -----------------------------------------------,--------- ------$4430 are requested to purchase and install an automatic chemical feed system to treat the make-up water for the plant's two steam boilers.'*
Present Situation
The Chicago plant operates one of two 150 H.P. steam boilers, three shifts per day, seven days per week. The boilers are used for both heating and process steam requirements. Normally, one boiler is operated at a time on either high or low pressure, depending on the. plants heating and process requirements.
The operating boiler is sampled once per day on the day shift, and the water analysis performed by the plants laboratory stcff. Depending upon the laboratory results, the boiler water is then treated by mixing the various chemicals, and hand feeding them to the boiler all at once.
When the number one and two boilers were opened up for cleaning , and the annual inspection by both the City of Chicago and insurance company, it was found that the water side of the boiler had a 1/8" thick scale deposit on it. Manual clean-out could not remove this scale and the boiler had to be chemically treated to remove this scale.
Justification
The chemistry of the boiler water can be much more accurately controlled if the boiler chemicals are added continuously using a pump, as opposed to slug, feeding. Since the plant makes and uses steam continuously, and make-up water is added continuously, it follows that the boiler water treatment chemicals should be added continuously. The above treatment system is recommended by Betz Entec, the plant's boiler water treatment consultants and Herman Bogot & Co., the plant's boiler service company. See attached letter.
The number two boiler was shut down and chemically cleaned this year at a cost of. $4000. The number one boiler will be cleaned in the same manner. The automatic chemical treatment system would greatly reduce the amount of scale build-up on the boiler tubes, save valves arid fittings from damage due to the concentrated treatment chemicals, reduce energy cost by preventing scaling of the tubes and promote better heat transfer, provide better control of the chemical used and save on labor required to manually treat.the boilers.
N14647.01
CYWX 25-0007376
TrTfiri
COMMERCIAL FACTORS
<#>
r~- o ->3*
r-i O'! VO 00 CN n
ca O A
to
3 o
04 CM CO
CO i--1
r<-
in*
co **
f--j f--i i-i
o
44
CO (0
co M
P 0
N Ct3 H C
ID OA o
ro CO CO
H
-rQ0
cn
P
<3 </>
i--j i--
m ro co ro ro
-P
CO CN CN tH
XI
rO
0
rH
CO .
P rH o o </> D CN kO 44 ** * *
in in ro
4-1 to
0 a>
tn rH
03 rd
P cn
JQ , ID o D>
to OA o ro
-p
X CM
OA
c 4 * ** V
tO r-
Cu
cO
co
4->
P
o
a. Qj
o 1--1 CO CO
toP
OA OA
i--1 rH
i
P a)
0p3 o
CO CO CO
uup
<D c d 0 NNN H H -H 0 --i rH H J3
to
rH rH H +J xi XI -Q C
x: H
CO X) rH
rd rd rd 0 -P X P S
CO CO to 4-1
</>
1--1 r--i rH Xj rH i--1 rH tJA
rd
fd
cd *H
a)
rH -p rH
<1) rd -P
-P
tn
4 -p
CuO
0 3 O -H m U_J
OC-5565 10/30/81 Page 3 of 8
CYWX 25-0007377
CY/UVAmiD
OC-5565 10/30/81 Page 4 of 8
Details of Proposal
Herman BOgot & Company will install an automatic chemical feed system, consisting of a 50 gallon chemical tank, agitator, feed pump, water meter and electrical controls. This system will feed chemical treatment to whichever boiler is running.
Production Factors This proposal will not alter product quality or production rates.
Contingent Future Commitments This proposal will not require additional funds to complete.
Alternatives Considered Herman Bogot & Company installed the companies boilers and provides continued service on them. They will service the treat ment system they install as they service the boilers, thus saving the company money. Installation will be done during normal servicing, thus no additional labor costs.
Risks No operating risks are involved.
Concise Summary Installation of an automatic chemical feed system to the boilers, will provide better control of the boiler water chemistry.
CYWI 25-0007378
DETAIL SHEET
SHEET NO.
JOB ORDER NO.
COMPANY
ITEM OR
CODE NO.
American Cyanamid Company
DESCRIPTION
005565 10/30/81 Page 5 of 8
LOCATION
May 5, 1981 Chicago
EQUIPMENT
OR
ma t e r ia l s
ENG. MECH.
SVC.
1 Automatic Chemical Feed System 2 Pipe fittings 3 Steel for ramp 4 Illinois Sales & Use Tax
2490 400
1100 240
4230
100 100
100 100
2490 400
1300 240
4430
CYWX 25-0007379
Mr. H. C. Gaffney
OC-5565 10/30/81 Page 6 of 8
222 North Broadway, Joliet, Illinois 60435
December 22, 1980
Mr. Chester Dadko American Cyanamid Company 4500 West 15th Street Chicago, Illinois 60623
DEC 2 4 1980
Subject: Boiler Water Treatment Program
Dear Mr. Dadko:
During our meeting of December 18, 1980, we discussed several items which will serve to improve the water treatment program.
The first of these is the installation of a continuous blow down valve which you can use to more accurately control the boiler water chemistry. Enclosed with this letter is a sche matic which you can use as a reference for sizing this valve.
I have also enclosed a revised control chart which you should now begin using. Please note that the control chart defines the application of the various treatment chemicals.
We have agreed that once the Entec 784 arrives that you will begin feeding it to the No. 1 boiler and then after 30 days you will take this boiler down and inspect it. I want to be there at that time and will only require that you give me two or three days notice before hand.
There is another area which you can use to your advantage: the boiler chemistry can be much more accurately controlled if the boiler chemicals are added continuously using a pump as opposed to slug feeding them. A system to accomplish this is described in an enclosure. If you wish to look into this system, I recommend the Milton Roy Company at 711 West Devon, Park Ridge. The telephone number is 775-0525.
The recommendations made above will greatly improve your boiler water control. Since you make steam continuously and add makeup water continuously it follows that the continuous addition of your boiler water chemicals and continuous removal of the boiler water solids will accomplish a steadily dynamic system.
N14647.02
CYWX 25-0007380
nrs K.cii'jj'G
IISJC
American Cyanamid Company Chicago, Illinois
OC-5565 10/30/31 Page 7 of 8
December 22, 1980
-2
If you have any questions regarding these recommendations, please do not hesitate to contact me.
rt
cc.^Mr. H. C. Gaffney, Plant Manager American Cyanamid Company 4500 West 15th Street Chicago, Illinois 60623
CYWX 25-0007381
irrTJC -ill
' :'l I
OOV><>!> 10/30/81 Page 8 of 8
SPECIFICATIONS
i ,r v; .1 `a m ; i
MILTON ROY POLY-LINED DRUM-PAK
DESCRIPTION:
A self-contained packaged, chemical-feed system including a totally-enclosed Milton Roy controlled-volume pump, mounted on top of the tank. The suction piping and strainers are assembled and piped so that the system is ready to install upon arrival.
TANK:
55-gallon, steel, with 3/16" rugged, lipped insert polyethylene liner. Liner will withstand continuous temperatures of 150F. with surges of up to 225F. This liner is replace able on a separate basis.
The tank is equipped with a hinged-steel lid, split approximately 1/3-2/3 for convenient filling.
Rigid PVC suction piping, strainer, and agitator support are included.
PRICE:*
`Delivered with minimum freight allowed. 1049-S 7706
PICTURED WITH OPTIONAL AGITATOR
N14647.03
CYWX 25-0007382
Mr. H . i.;. (iai f noy
OC-5565 10/30/81 Page 6 of 8
222 North Broadway, Joliet, Illinois 60435
December 22, 1980
Mr. Chester Dadko American Cyanamid Company 4500 West 15th Street Chicago, Illinois 60623
DEC 2 4 1980
Subject: Boiler Water Treatment Program
Dear Mr. Dadko:
During our meeting of December 18, 1980, we discussed several items which will serve to improve the water treatment program.
The first of these is the installation of a continuous blow down valve which you can use to more accurately control the boiler water chemistry. Enclosed with this letter is a sche matic which you can use as a reference for sizing this valve.
I have also enclosed a revised control chart which you should now begin using. Please note that the control chart defines the application of the various treatment chemicals.
We have agreed that once the Entec 784 arrives that you will begin feeding it to the No. 1 boiler and then after 30 days you will take this boiler down and inspect it. I want to be there at that time and will only require that you give me two or three days notice before hand.
There is another area which you can use to your advantage: the boiler chemistry can be much more accurately controlled if the boiler chemicals are added continuously using a pump as opposed to slug feeding them. A system to accomplish this is described in an enclosure. If you wish to look into this system, I recommend the Milton Roy Company at 711 West Devon, Park Ridge. The telephone number is 775-0525.
The recommendations made above will greatly improve your boiler water control. Since you make steam continuously and add.makeup water continuously it follows that the continuous addition of your boiler water chemicals and continuous removal of the boiler water solids will accomplish a steadily dynamic system.
N14647.04
CYWI 25-0007383