Document 3NZYRaJdzDEDwng7mMpLKJ2jy
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
*REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQONU,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination System
(" NPDES ")
Summerwind Place Residential Development
From:Eleanor Horvath, Clean Water Act Inspector
Thru:Karissa Oakes, Clean Water Act Inspector
Katie Rosenberg, Clean Water Act Inspector
Damian Bednarz, Clean Water Act Inspector
To:FileELEANORDigitally signed by ELEANOR
HORVATH
I. Facility InformationHORVATHDate: 2024.11.05 13:20:42 -05'00 '
A. Facility Name:Summerwind Place Residential Development
B. Facility Location:Tower Place
Greenland, NH 03840
C. Facility Contacts:Andrea McCurry, Office Manager, Chinburg Properties
Dale Moreau, Site Superintendent, Chinburg Properties
Chinburg Properties, Inc.
3 Penstock Way
Newmarket, NH 03857
D. NPDES ID No (s).: NHR1001W7
II. Background Information
A. Date(s) of inspection: October 22, 2024
B. Weather Conditions: Sunny, 70 Fahrenheit
C. US EPA Representative(s):
Eleanor Horvath
Karissa Oakes
Katie Rosenberg
1
ED_019088A_00005825-00001
D. State / Local Representative(s):
None
E. Federally Enforceable Requirements Covered During the Inspection:
National Pollutant Discharge Elimination System Construction General Permit
(CGP), Effective February 17th, 2022
F. Previous Enforcement Actions:
None
III. Type and Purpose of Inspection
Routine Compliance Evaluation
IV. Facility Description
Summerwind Place Residential Development, referred to hereafter as the " site, " is an
ongoing construction project that began earth - disturbing activity in July 2024. The site is
approximately 15 acres and is located off Tower Place in Greenland, NH. It is being
developed by Chinburg Properties, Inc. into a 55+ residential community consisting of
approximately 40 units. The site is surrounded by open space to the north and east, I-95
to the west, and a previously built residential community to the south. There are
mapped wetlands and Packer Brook approximately 0.1 miles to the east of the disturbed
area.
V. Inspection
Eleanor Horvath, Karissa Oakes, and Katie Rosenberg (" EPA Inspectors ") arrived on the
site at approximately 9 AM. EPA did not observe signage indicating that the site was
covered under the CGP from the public roadway. Inspector Horvath called Ms. Shawna
Sammis, the Assistant Land Development Manager from Chinburg Properties listed on
the site's CGP Notice of Intent, at approximately 9 AM and left a voicemail. At
approximately 10 AM, Inspector Horvath called the main office of Chinburg Properties
and left a voicemail, identifying herself as an EPA Clean Water Act Inspector and
explaining the purpose of the inspection.
Ms. Andrea McCurry of Chinburg Properties returned her call at approximately 10:15
AM, granted site access, and indicated that she would let the Chinburg employees
onsite know EPA would be present. Inspector Horvath indicated that Chinburg would be
receiving an inspection report and photolog, as well as some follow - up questions about
the site, after the inspection.
2
ED_019088A_00005825-00002
A. Opening Conference
At approximately 11:15 AM, EPA met Mr. Dale Moreau, the site superintendent.
Inspector Horvath presented her credentials, informed Mr. Moreau that Ms. McCurry
had granted EPA site access on behalf of Chinburg and explained the purpose of the
inspection.
Inspector Horvath asked Mr. Moreau whether he was able to answer some questions
regarding the stormwater flow and erosion controls of the site and requested a copy of
the site's Storm Water Pollution Prevention Plan (" SWPPP "). Mr. Moreau explained that
these were the responsibilities of Ms. Sammis, but that he would respond to the best of
his abilities.
Mr. Moreau indicated that he was unaware if there was a copy of the site's SWPPP
onsite. He said that questions regarding erosion control inspections and stormwater
flow would be better directed toward Ms. Sammis.
Mr. Moreau explained to EPA that there were five completed houses onsite at the time
of inspection, with the addition of a clubhouse. There will be 40 total units when the
project is complete. Construction began onsite in approximately July 2024, and house
construction began in September. Lots were unstabilized but being actively worked on
every day. The estimated completion date for the project depends on the market and
how quickly properties sell as they are developed. Mr. Moreau estimated that the site
would be under construction for approximately two and a half years.
B. Facility Tour
EPA began the site tour at approximately 10:50 AM.
They began at the western corner of the site near the entrance and subdivision sign,
walking east along the perimeter of the disturbed area. EPA observed a mulch berm
beginning at the western corner of the disturbed area and continuing along the
boundary between the site and the undisturbed open space. Along the roadway, there
was a gravel barrier between the unstabilized lots and the paved road. EPA observed
minor trackout of dirt from the lots. Near the southeastern corner of the site, EPA
observed multiple stockpiles of dirt that were actively being worked with. The
aforementioned mulch berm continued around these stockpiles.
On the eastern edge of the site, EPA observed two detention basins covered on all sides,
as well as internally, with grasses. There was a culvert emptying into the second
detention basin that appeared to drain from three catch basins in the road, the first
catch basins observed by EPA (photo locations 424, 425). More stockpiles were
observed in the lots along the eastern edge of the site. The mulch berm continued
behind these basins and stockpiles.
3
ED_019088A_00005825-00003
Moving north to the northeastern corner of the site, EPA observed a third detention
basin. This basin consisted of another culvert emptying into a portion of the basin filled
with riprap, which was connected to a larger portion that was stabilized on all sides, as
well as internally, with grasses. At the northeastern corner of the site EPA also observed
more stockpiles, as well as a square pit with a small amount of standing water at the
bottom. The mulch berm continued behind this detention basin, stockpiles, and pit.
EPA then moved west along the northern edge of the site. More stockpiles, unstabilized
slopes, and the continuation of the mulch berm were observed. Near the northwestern
corner of the site, the mulch berm ended. Along the remaining perimeter of the site,
there was instead a large earthen berm stabilized with grasses on all sides.
Returning to near the site entrance at the western corner of the site, EPA observed the
site's concrete washout pit and found concrete mixtures outside of the designated pit
(photo location 445). EPA also observed two more catch basins in the road near the
entrance. The site tour concluded at approximately 11:40 AM.
C. Site Photos
Photo Location ID Photo NameImage Descriptions
393
394
406
407
408
409
410No catch basins in road
411
412
413
414
415
416Mulch berm all around site
417
418
419
420
421
422
423
424
425
426
427
4
ED_019088A_00005825-00004
428
429
430
431
432 Pit
433
434Drinking water
435
436
437
438
439
440
441
442
443Big earthen berm
444Concrete washout
445
446
447
448
5