Document 3NKkLMvrrmVDq3aYyeZD82160
TECHNICAL CENTER SERVICES
UNION CARBIDE CORPORATION ENGINEERING AND TECHNOLOGY SERVICES
SOUTH CHARLESTON, WEST VIRGINIA
MEMORANDUM
February 1, 1984
BUSINESS CONHDENTIA
To: J. W. Karn Sistersville Plant
CC :
J. W. Barna
M. E . Bell
M. W. Bosserman
C . P . Maxwell
M. L . Mills
R. L . Noble
D. R. Paugh R. E. Peele H. H. Price
B. H. Avashia, M
R. G. Rowe, M.D.
From:
M. A. Patel
Subject: Asbestos Monitoring of Construction Employees at the Sistersville Plant
On January 12, 1984, Mark Bell and this writer of the Technical Center Industrial Hygiene group visited the Sisters ville Plant to conduct personal exposure monitoring for asbestos fibers while Constructrion Department employees stripped asbestos-containing insulation from pipes at the Steam Plant.
The monitoring was done during the entire stripping operation for that day. The balance of the day when there was no monitoring done, the insulators used that time to in sulate the stripped pipes with non-asbestos insulation. The results of monitoring are shown in the attachment which show that all the employees who were monitored worked in the area where the potential for exposure to asbestos was below the cur rent Federal OSHA standard of 0.5 fibers per cc of air. All employees involved in the stripping operation wore full body hooded coveralls, gloves, safety glasses and respirtor approved for use for asbestos. The area was properly barricaded, insu lation was wetted down while stripping and the gratting was covered to collect any insulation which might fall down.
Please notify all monitored employees of their exposure results.
MAP/sc Attachment
UCC 016611
BUSINESS j c*aai<>4 CONFIDENTIAL
PERSONAL EXPOSURE MONITORING FOR ASBESTOS AT THE SISTERSVILLE PLANT January 12, 1984
NO. NAME
CRAFT
SAMPLING TIME/MIN
EXPOSURE LEVEL Fibers
o
00
1 R.L. Pauley
Insulator
2 B.E. Kelly
Laborer
3 H.P. Stewart
Insulator
4
R.L. Hilverding
Insulator
5 L.R. Shaffer
Insulator
89 82 88 88 86
. 27
. 15 .24 . 17
UCC 016612
I INTERNAL
CORRESPONDENCE
busincss
i confidential
UNION CARBIDE CORPORATION TECHNICAL center
P.Q. BOX 336 1 , SOUTH CHARLESTON, WV 25303
a R. C. Proffitt 511-2009 512
M. E. Bell C. W. Maxwell M. L. Mills L. R. Noble D. R. Paugh R. E. Peele A. L. Postlethwait W. F. Williams
2a,a June 21, 1983
ar^natng^o: 511 Industrial Hygiene/ Environmental Protection
Asbestos Monitoring in Storeroom, 511 Construction Department_______________
Dear Mr. Proffitt:
On May 9, 1983, the Technical Center Industrial Hygiene group conducted a monitoring survey for determining the exposure of employees to asbestos dust particles while handling asbestos containing gaskets in the storeroom at the 512 Construction Department. This work was done by M. E. Bell of our group.
Mr. J. H. White was monitored for asbestos exposure when he received one hundred asbestos spiral-wound gaskets in three bundles. During the monitoring period, Mr. White removed these gaskets from the box, counted and placed them in a storage bin in the storeroom. Mr. White wore a dust respirator approved for asbestos while performing the job. In addition to the personal sample, an area sample was also collected. The results of monitoring shown in the attachment indicate that exposure to asbestos fibers above the permissible exposure limit of 2 fiber/cc are unlikely.
It is our observation that while unpacking and placing gaskets in the bin the probability of exposure is minute; however, it is believed that once the gaskets are stored in the bin some dust will become loose due to friction and may build up over a period of time. We recommend that the gasket storage bin be cleaned once every month. The person cleaning the bin should wear a dust res pirator. The method of cleaning the bin should be wet. The easiest way would be to rinse the bin with water in the sink.
Please notify Mr. White of his exposure results. If we can
UCC 016613
R. C. Proffitt
2
06/21/83
be of further assistance, please call us at extension 3750.
Very truly yours,
rw-i-- X.&J
MAP/sc Attachment
Manhar A. Patel
UCC 016614
ASBESTOS SAMPLING May 9, 1983
rw* 1 BUSINESS CONFIDENTIAL
Name or Location
1. J. H. White
2. Area Sample
Sampling Time (Mins)
10
9
Concentration Fibers/cc
0
< .07
The permissible exposure limit is 2 fibers > 5 pm/cc of air
UCC 016615
T
j."an76w V w ^
"
CONFIDENTIAL
INDUSTRIAL HYGIENE MONITORING FOR
TO: r. F. Painter, Trlr. 5583
ASBESTOS
me
Computer Ref. W-1315 Date April 26, 1982
cc: B. H. Avashia, M.D., 23-512 . G. W. Bott, 701-330 M. L. Mills, 2149-512 '
L. R. Noble, 2149-512 R. E. Peele, 701-334 E. C. Shipley , 2009-512
PERSON MONITORED _________________________ D. C. Shamblin_______________________
Location Bldg. 706
Date
04/21/82
EXPOSURE RESULTS
Sample No. 1 2
Cone.
fibers > 5 1 ^ Lim/cc
fibers > 5 1.0 nm/cc
Sampling Time
92 Mins.
93 Mins.
3
4
5
6
Comments Personal sample Area sample
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers >5 gm/cc
Ceiling
x OSHA ____OSHA
____UCC ____UCC
__;__Other Other
COMMENTS
Personal and area samples were collected,while Mr. Shamblin and Mr. Templeton were stripping insulation from a steam line and condensate line in the old compressor room, Building 706. We recommend the insulators continue to wear protective clothing, respirators, gloves and the area to be stripped wet down. Please inform IH Department of the next stripping
job in this area and inform concerned employees of their exposure.
WORK BY
Mark E. Bell
APPROVED BY rW-JU- A . fjJ Manhar A. Patel
UCC 016616
BUSINESS CONFIDENTIAL INDUSTRIAL HYGIENE MONITORING FOR
TO: r. F. Painter, Trlr. 5583
ASBESTOS
Computer Ref. W-1315 Date April 26, 1982
cc: B. H. Avashia, M.D., 23-512 G. W. Bott, 701-330 M. L. Mills, 2149-512 ' '?
L R Noble, 2149-512 R. E. Peele, 701-334 E. C. Shipley , 2009-512
PERSON MONITORED Location
R. E. Templeton
Bldg. 706
Date
04/21/82
EXPOSURE RESULTS
Sample No.
Cone.
1 0.9 fibers >5 p.m/cc
2
3
4 i`
5
6.
Sampling Time
92 Mins.
Comments Personal sample
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers >5 pm/cc
Ceiling ___________
X OSHA ____OSHA
____UCC ____UCC
____Other ____Other
COMMENTS
Personal and area samples were collected while Mr. Shamblin and Mr. Templeton were stripping insulation from a steam line and condensate line in the old compressor room, Building 706. We recommend the insulators continue to wear protective clothing, respirators, gloves and the area to be stripped wet down. Please inform IH Department of the next stripping job in this area, and inform concerned employees of their exposure.
WORK BY %iJl Mark E. Bell
________
APPROVED BY UCC 016617
X. Manhar A. Patel
CC:
L. R. Noble, 511-2149 R. F. Painter , 511-5583 R. E. Peele, 701-334
R. G. Rowe, M.D., 791 W. T. Shelton, 704 Shop E. C. Shipley, 511-2009
PERSON MONITORED Location
Warren Abbot, Paul Crowder, and Dave Shamblin
Building 701-100___ ____
Date
02/16/82
EXPOSURE RESULTS
Sample No.
Cone.
Sampling Time
1
1.16 fibers/* ;c
50 Mins.
2 0.09 fibers/* :c 150 Mins.
3
4.4 fibers/* :c
50 Mins.
4 0.14 fibers/* :c 150 Mins.
'5
1.07 fibers/* ;c
50 Mins.
6 0.27 fibers/* :c 115 Mins.
Comments
Personal sample - Warren Abbot
1105-1155 hours (morning) Personal sample - Warren Abbot
1305-1535 hours (afternoon) Personal sample - Paul crowder
1105-1155 hours (morning)
^Construe.) (Uonstruc.) tConstruc.)
Personal sample - Paul Crowder (Construe.)
1305-1535 hours (afternoon)
!
Personal sample - Dave Shambim (Insulat)
1105-1155 hours (morning)
;
Personal sample - Dave Shamblin (Insulat) 1305-1500 hours (afternoon)
UCC 016618
INDUSTRIAL HYGIENE MONITORING FOR
TO: cc:
See Page 1
2W4)
ASBESTOS
P. 2 of 2
Computer Ref. W-1401 Date March 19, 1982
PERSON MONITORED ________________Area Sample________________________________________
Location
Building 701-100
Date
02/16/82
EXPOSURE RESULTS
Sample No.
Cone.
Sampling Time
7
1.32 fibers/ cc
47 Mins.
8 0.37 fibers/ 'cc 143 Mins.
9
1.35 fibers/ 'cc
47 Mins.
10 0.56 fibers/ 'cc 143 Mins.
Comments
Area sample - North end Room 106
1108-1155 hours (morning) Area sample - .North end Koom
1310-1533 hours (afternoon)
Area sample - South end Room
1108-1155 hours (morning) Area sample - South end Room
1310-1533 hours (afternoon)
100 10U 10U
Not enough sampling time Time-Weighted Average Concentration (TWA) to determine TWA
Ceiling Concentration
ALLOWABLE EXPOSURE (8-Hour Shift)
TWA i Ceiling
2 Fibers/cc
X QSHA OSHA
_UCC UCC
_Other Other
COMMENTS
Two Construction workers and one insulator were monitored for exposure to asbestos fibers during an insulation cleanup operation in Building 701-100. The insulator worked on stripping old insulation from a small section of steam line while the two Construction workers vacuumed old insulation particles and dust from the tops of the fume hoods, the ceiling, duct work, walls, and in strument panels. All workers wore gloves, coveralls, shoe covers, safety goggles, and fresh air masks. Workers were monitored during the entire work period.-^ Please report results to employees.
WORK BY
Mario F. Stowers
APPROVED BY '
Manhar A. Patel
UCC 016619
/ /-
INDUSTRIAL HYGIENE MONITORING FOR TO: J. E. Midkiff, Trlr. 5583 (511)
ASBESTOS
Computer Ref. W-1402 Date March 19. 198!*
cc: L. R. Noble, 511-2149
R. F. Painter, 511-5583 R. E. Peele, 701-334
R. G. Rowe, M.D., 791
W. T. Shelton, 704 Shop E. C. Shipley, 511-2009
PERSON MONITORED Warren Abbot
Location
Building 701-100 Date 02/17/82
EXPOSURE RESULTS
Sample No.
Cone.
Sampling Time
1
0.13 fibers/ cc
190 Mins.
2
0.04 fibers/ cc
140 Mins.
3
0.03 fibers/ cc
183 Mins.
4 0.01 fibers/ cc 136 Mins.
5 6'
0.10 fibers/ cc 0.02 fibers/ cc
183 Mins. 136 Mins.
Comments
Personal sample - Warren Abbot (Con struction) 0820-1130 hrs. - morning
Personal sample - Warren Aooot (con struction) 1310-1530 hrs. - afternoon
Area sample - North end Room iuu 0822-1125 hrs. - morning
Area sample - North end Room 100 1316-1532 hrs. - afternoon
Area sample - South end Room 1UU 0822-1125 hrs. - morning
Area sample - South end Room 100 1316-1532 hrs. - afternoon
Time-Weighted Average Concentration (TWA)
0.06 fibers/cc
Ceiling Concentration _______-_________________
ALLOWABLE EXPOSURE (8-Hour Shift)
TWA Ceiling s
2 Fibers/cc
X QSHA ____OSHA
____UCC UCC
____Other Other
COMMENTS
Construction -worker monitored for exposure to asbestos fibers -while performing cleanup operation of old insulation and dust in Building 701-100. Insulation and dust particles were collected by means of a vacuum cleaner. Worker -wore gloves, coveralls, shoe covers, safety goggles, and a fresh air mask. Monitoring done during entire work period. Time-weighted average com puted based on results of personal exposure over the entire day. Please notify employee of results.
WORK BY
Mario F. Stowers
APPROVED BY UCC 016620
X * PM
Manhar A. Patel
2-
INDUSTRIAL HYGIENE MONITORING FOR TO: J. E. Midkiff, 511-5583 (Trlr)
ASBESTOS
Computer Ref. W-1405 Date March 19. 1982
cc: L. R. Noble, 511-2149 R. F. Painter, 511-5583 R. E. Peele, 701-334
R. G. Rowe, M.D., 791 W. T. Shelton, 704 Shop E. C. Shipley, 511-2009
PERSON MONITORED Location
Paul Crowder
Building 701-100
Date
02/17/82
EXPOSURE RESULTS
Sample
Cone.
Sampling Time
1
0.11 fibers/ cc
190 Mins.
2
0.08 fibers/ cc
140 Mins.
3
4
5
6
Comments
Personal sample - Paul Crowder (Con struction) 0820-1130 hrs - morning
Personal sample - Paul Crowder (Con struction) 1310-1530 hrs. - afternoon
Time-Weighted Average Concentration (TWA) _______0.09 fibers/cc Ceiling Concentration __________-_________________
ALLOWABLE EXPOSURE
TWA Ceiling
2 Fibers/cc
X__OSHA OSHA
____UCC UCC
____Other Other
COMMENTS
Construction worker monitored for exposure to asbestos fibers while performing cleanup operation of old insulation and dust in Building 701--100. Insulation and dust particles were collected by means of a vacuum cleaner. Worker wore gloves, coveralls, shoe covers, safety goggles, and a fresh air mask. Monitoring done during entire work period.
WORK BY
W1JLAv<t/U
Mario F. Stowers
rn
f)
A
APPROVED BY 1
________________
Manhar A. Patel
UCC 016621
BUSINESS CONFIDENTIAL INDUSTRIAL HYGIENE MONITORING FOR
TO: W. T. Shelton, 704 Shop
mo\)
ASBESTOS
Computer Ref. W-1274 Date Feb. 1, 1982
cc:
B. H. Avashia, M.D., 23-512 J. R. Hall, 8745-514 , L. R. Noble, 511-2149 M. A. Patel, 701-330
D. R. Paugh, 511-2009 R. E. Peele, 701-334 R. G. Rowe, M.D., 791
PERSON MONITORED
W. G. Wheeler
Location
704 Powerhouse
Date
1/26/82
EXPOSURE RESULTS
Sample No. 1 2
Cone.
3.6 fibers >5 |jm/cc
3
4
5
6
Sampling Time
28 Minutes
Comments Personal sample
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers >5 ^m/cc
Ceiling
-
X QSHA ____OSHA
____UCC UCC
____Other ____Other
COMMENTS Personal samples were collected while Mr. Agosti and Mr. Wheeler were
stripping insulation from aerator and connecting lines on the second level in 704 Powerhouse. The levels of asbestos fibers found were in excess of OSHA standard of 2 fibers <5 pm/cc. We recommend the insulators continue to wear protective clothing, respirators, gloves and the area to be stripped wet down. Please inform IH Department of the next stripping job in this area and inform concerned employees of their exposure.
WORK BY
M.E. Bell
APPROVED BY UCC 016622
.J>77oG. W. Bott
BUSINESS CONFIDENTIAL INDUSTRIAL HYGIENE MONITORING FOR
TO: w. T. Shelton, 704 Shop
/
ASBESTOS
2<?`
Computer Ref. W-1274 Date Feb. 1. 1982
cc:
b. H. Avashia, M.D., 23-512 J. R. Hall, 8745-514 L. R. Noble, 511-2149' M. A. Patel, 701-330
D. R. Paugh, 511-2009 R. E. Peele, 701-334 R. G. Rowe, M.D., 791
PERSON MONITORED ______________________ P. J. Agosti_______________________________
Location
704 Powerhouse
Date
1/26/82
EXPOSURE RESULTS
Sample No.
Cone.
1
3.08 fibers 5 11 m /r*
2
3
4
5
6'
Sampling Time
26 Minutes
Comments Personal sample
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers > 5 pm/cc
Ceiling
-
X OSHA ____OSHA
____UCC ____UCC
____Other ____Other
COMMENTS
Personal samples were collected while Mr. Agosti and Mr. Wheeler were stripping insulation from aerator and connecting lines on the second level in 704 Powerhouse. The levels of asbestos fibers found were in excess of OSHA standard of 2 fibers >5 pm/cc. We recommend the insulators continue to wear protective clothing, respirators, gloves and the area to be stripped wet down. Please inform IH Department of the next stripping job in this area and inform concerned employees of their exposure.
WORK BY
M. E. Bell
APPROVED BY UCC 016623
G. W. Bott
n business "J CONFIDENTIAL
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
Z\ J (
TO: r. F. Painter , Trlr. 5583
Computer Ref. W1167 04/22/81
CC: C. W. Carman, 725-105 L. R. Noble, 511-2149 D. R. Paugh, 511-2009
PERSON MONITORED
R. E. Peele, 701-334
E. J. Tawney, Trlr.558
H. L. Robinson, 701-401
E. C. Shipley, 511-2009
J. F . Chandler
Location EXPOSURE RESULTS
West end - Bldg. 773 Outside at tank pad
Date ______04/20/81
Sample 1 2 3 4 5 6
Cone. fibers i> 5
< . 1 pm/cm^
fibers > 5 < 1 (im/cin^
Sampling Time
78 minutes
125 minutes
Comments A.M. - Stripping
P.M. - Stripping, bagging and cleanup
Time-Weighted Average Concentration (TWA) Ceiling Concentration
<.l Fiber > 5 gm/cm
ALLOWABLE EXPOSURE
TWA
2 Fibers >5 pm/
(^OShJ)
Ceiling OSHA
UCC
Other
UCC
Other
COMMENTS
Insulator monitored -while stripping approximately 100 feet of 1-1/2" pipe of suspected asbestos containing insulation. He -wore coveralls and a disposable Norton dust respirator. The insulation was properly bagged and tagged for disposal at the landfill.
WORK BY APPROVED BY
XXkX
UCC 016624
r^Tl BUSINESS CONFIDENTIAL
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
&J(1)
TO: R. F. Painter, Trlr. 5583
Computer Ref. W1167 04/22/81
CC: Q' W. Carman, 725-105 L. R. Noble, 511-2149 D. R. Paugh, 511-2009
R. E. Peele, 701-334 E. J. Tawney, Trlr H. L. Robinson, 701-401 E. C. Shipley, 511-2009
PERSON MONITORED
D. C. Shamblin
Location West end - Bldg. 773 Outside at tank pad
EXPOSURE RESULTS
Date
04/20/81
Sample 1 2 3 4 5 6
Cone.
fibers > 5 1 um/cm3
fibers > 5 . 2 ^.m/cm^
Sampling Time
85 minutes
123 minutes
Comments
A.M. - Stripping
P.M. - Stripping, bagging and cleanup
Time-Weighted Average Concentration (TWA) .1 Fiber > 5 um/cm3 Ceiling Concentration
ALLOWABLE EXPOSURE
TWA Ceiling
UCC UCC
Other Other
COMMENTS
Insulator monitored while stripping approximately 100 feet of 1-1/2"
pipe of suspected asbestos containing insulation. He wore coveralls and a disposable Norton dust respirator. The insulation was properly bagged and tagged for disposal at the landfill.
WORK BY APPROVED BY
M ex----- ;X .
UCC 016625
INDUSTRIAL HYGIENE MONITORING FOR TO: R. F. Painter , Trlr.
~/?*f
ASBESTOS Computer Ref. W-1198 Date July 17. 1981
cc :
C. W. Carman, 725-105 L. R. Noble, 511-2149 D. R. Paugh, 511-2009
R. E. Peele, 701-334
H. L. Robinson, 701-401 E. C. Shipley, 511-2009 E. J. Tawney, Trlr. 5583
PERSON MONITORED
J. F. Chandler
Location West end Bldg. 774 behind
Date
07/10/81
parking lot to south end of parking lot
EXPOSURE RESULTS
Sample No. 1 2
Cone .
fibers >5 .4 pm/cm^
fibers >5 . 1 pm/cm^
Sampling Time
160 Minutes
164 Minutes
Comments A.M. sample - stripping insulation P.M. sample - stripping insulation
3
4
5
6
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
,3 2 fibers >5 pm/cm
Ceiling
x OSHA OSHA
____UCC UCC
____Other Other
COMMENTS Stripping approximately 450 feet of 4-inch steam line which
had been turned off so the line could cool.
Ruth Clise
APPROVED BY
UCC 016626
Manhar A. Patel
\ UNION BUSINESS [carbide CONFIDENTIAL INDUSTRIAL HYGIENE MONITORING FOR
TO: R. F. Painter , Trlr. 5583
2q j(4)
ASBESTOS
Computer Ref. w-1198
Date
July 17, 1981
cc;
c. W. Carman, 725-105
L. R. Noble, 511-2149 D. R. Paugh, 511-2009 R. E. Peele, 701-334
H. L. Robinson , 701-401 E. C. Shipley, 511-2009 E. J. Tawney, Trlr. 5583
PERSON MONITORED
M. D. Coleman
Location EXPOSURE RESULTS
West end of Bldg. 774, behind Date the parking lot to south end of parking lot
07/10/81
Sample No.
Cone.
fibers ^ 1 .3 >5 p.m/cmc
fibers ^ 2 .3 >5 |i.m/cmc
3
Sampling Time
159 Minutes
152 Minutes
Comments A.M. - bagging stripped insulation P.M. - bagging stripped insulation
4
5
6
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers >5 p.m/cm^
Ceiling
COMMENTS
x OSHA OSHA
_____UCC UCC
____Other Other
Ruth Clise
APPROVED BY UCC 016627
Manhar A. Patel
j UNION j BUSINESS I CARBIDE J CONFIDENTIAL
INDUSTRIAL HYGIENE MONITORING FOR ______ASBESTOS
TO: R. F. Painter , Trlr. 5583
Computer Ref. W-1198 Date July
cc:
C. W. Carman, 725-105 L. R. Noble, 511-2149 D. R. Paugh, 511-2009 R. E. Peele, 701-334
H. L. Robinson, 701-401 E. C. Shipley, 511-2009 E. J. Tawney, Trlr. 5583
PERSON MONITORED
B. J. Agosti
Location EXPOSURE RESULTS
West end Bldg. 774 behind parking lot to south end. ol parking lot
Date
07/10/81
Sample No. 1 2 3
Cone.
fibers .5 >5 pm/cm 3
fibers 4 >5 jim/cm 3
Sampling Time
Comments
149 Minutes A.M. - stripping insulation
156 Minutes P.M. - stringing insulation
4
5
6
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers >5 tim/cm^
Ceiling
-
X OSHA OSHA
COMMENTS
____UCC UCC
____Other Other
WORK BY
t7/. Ruth Clise
APPROVED BY UCC 016628
Manhar A. Patel
BUSINESS CONFIDENTIAL INDUSTRIAL HYGIENE MONITORING FOR
TO: R. F. Painter, Trlr. 5583
ASBESTOS
Computer Ref. W-1198
Date
July 17, 1981
cc;
c. W. Carman, 725-105
L. R. Noble, 511-2149
D. R. Paugh, 511-2009
R. E. Peele, 701-334
H. L. Robinson, 701-401 E. C. Shipley, 511-2009 E. J. Tawney, Trlr. 5583
PERSON MONITORED _______________________ R. E. Templeton
Location EXPOSURE RESULTS
West end Bldg. 774 behind______ Date parking lot to south end of ParkinS lot
07/10/81
Sample No. 1 2
Cone.
fibers , .2 >5 gm/cm* !
fibers _ .2 >5 um/cm*
3
Sampling Time
148 Minutes
155 Minutes
4
5
6
Comments A.M. - bagging insulation P.M. - bagging insulation
Time-Weighted Average Concentration (TWA) Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers >5 um/cm^
Ceiling
COMMENTS
X OSHA ____OSHA
UCC UCC
Other Other
WORK BY
Ruth Clise
APPROVED BY UCC 016629
Manhar A. Patel
XJ
INTERNAL CORRESPONDENCE
UNION CARBIDE CORPORATION TECHNICAL CENTER
P.O. BOX 8361, SOUTH CHARLESTON, WV 25303
To iNa-Tie) d. son Loosrcn
W. L. Browning J. W. Perry, Jr. Institute Plant
Date October 23, 1981 ar3,r,atnSn,,D. IH/EP
coo, _o --
C. W. Carman , M. L. -p Mil Is rr-m
L. R.-Noble il
D. R. Paugh R. E. Peele H. H. Frazier R. J. Sexton, M.D. F. Williams
s-c-aAsbestos Monitoring in Gasket Shop, 512 Construction
Gentlemen:
In my letter of October 20, 1981, concerning asbestos monitor ing in the Gasket Shop - 512 Construction, an error was made due ' to misinterpretation of the data we received from the 512 Industrial Hygiene group. Please replace the letter dated October 20, 1981 from your file with the one attached to this note.
Very truly yours,
A .fLkl
Manhar A. Patel
MAP/sc
Attachment
UCC 016630
INTERNAL CORRESPONDENCE
UNION CARBIDE CORPORATION TECHNICAL CENTER
P.O. BOX B3B1, SOUTH CHARLESTON, WV 25303
Toita^ei W. L. Browning o-j. w. Perry, Jr.
Institute Plant
c3-.e October 23, 1981 Si ar-Bo^ct IH/EP
C. W. Carman M. L. Mills L. R. Noble D. R. Paugh R. E. Peele H. H. Frazier R. J. Sexton, M.D. F. Williams
Asbestos Monitoring in Gasket Shop, 512 Construction
(Replaces letter of October 20, 1981 - front page only.)
Gentlemen:
Attached are the results of the area and personal exposure monitoring done for asbestos in the Gasket Shop - laundry, Building 3 of the Construction Department, Institute Plant. This monitoring was done by the Institute Plant Industrial Hygiene group on October 2, and 9, 1981.
The gasket cutting is done infrequently and it would generally last for a short period of time. The results of the survey indicate that the asbestos exposure in excess of the permissible limit of 2 fibers per centimeter cube of air did not occur.
The workers did not wear a respiratory protective device while working with the gasket material. It is emphasized that all workers wear a disposable 3M #8710 dust respirator which is approved by NIOSH for protection from asbestos exposure. Please notify the monitored workers of their exposure results.
If I can be of further assistance, please give me a call at extension 3750.
Very truly yours,
rl--X-(ZM
Manhar A. Patel
MAP/sc Attachment
UCC 016631
l^JcONHDINllAl
ASBESTOS MONITORING CONSTRUCTION GASKET SHOP INSTITUTE PLANT
# Name/Area Monitored
1 F. M. Hatfield
2 3 Feet from cutting blade
3 F. M. Hatfield
4 3 Feet from cutting blade
Date 10/2/81 10/2/81
10/9/81 10/9/81
Sampling Time Minutes
Asbestos Cone. Fibers >5 nm/cm3
18 < 0.1
17 < 0.1
15 0.4 15 0.2
/ UCC 016632
INTERNAL CORRESPONDENCE
UNION CARBIDE CORPORATION TECHNICAL CENTER
P.O. BOX 0361, SOUTH CHARLESTON, WV 25303
tc ,.,on L=ra-.
W. L. Browning J. W. Perry, Jr. Institute Plant
O^'gioatir
October 20, 1981 TH/EP
Ccc C. W. Carman M. L. Mills L. R. Noble D. R. Paugh R. E. Peele H. H. Frazier R. J. Sexton, M.D. F. Williams
Asbestos Monitoring in Gasket Shop, 512 Construction
Gentlemen:
Attached are the results of the area and personal exposure monitoring done for asbestos in the Gasket Shop - laundry, Building 3 of the Construction Department, Institute Plant. This monitoring was done by the Institute Plant Industrial Hygiene group on October and 9, 1981.
2,
The gasket cutting is done infrequently and it would generally last for a short period of time. The results of the survey indicate that the asbestos exposure in excess of the permissible limit of 2 fibers per centimeter cube of air did not occur.
The workers wore a respiratory protective device while working with the gasket material. It is emphasized that all workers continue to follow this practice while working in the area during gasket cut ting. Please notify the monitored workers of their exposure results.
If I can be of further assistance, please give me a call at extension 3750.
Very truly yours,
MAP/sc Attachment
Manhar A. Patel
UCC 016633
ASBESTOS MONITORING CONSTRUCTION GASKET SHOP
INSTITUTE PLANT
Name/Area Monitored
Date
Sampling Time Minutes
Asbestos Cone. Fibers >5 iim/cnr*
F. M. Hatfield
10/2/81
18
< 0.1
3 Feet from cutting blade
10/2/81
17
< 0.1
F. M. Hatfield
10/9/81
15
0.4
3 Feet from cutting blade
10/9/81
15
0.2
UCC 016634
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter, 5583 (511)
Computer Ref. 1064
CC: C. W. Carman, 725-105 D. H. Cook, 5583 (511) G. F. Hurley, 701-334
:L;Sl.SolSe^"i1S2il9 '*$. c. Shipley,
D. R. Paugh, 511-2009 H. L. Robinson, 701-401
PERSON MONITORED
D. C. Shamblin
Location EXPOSURE RESULTS
Basement of Bldg. 789 (Cooling Tower)
Date
7/3/80
Sample 1 2 3 4 5
,6
Cone.
.
fibers >c
.7 pm/cm3
Sampling Time
108 minutes
Comments
A.M. Sample - Stripping insulation
* P.M. Sample - Stripping lnsuxa llun
Time-Weighted Average Concentration (TWA) Not Calculated Ceiling Concentration
ALLOWABLE EXPOSURE
TWA 2 fibers >5 jim/cm3
Ceiling
__________________'
(oSHSq OSHA
UCC UCC
Other Other
COMMENTS
Because part of the insulation being stripped was believed to contain asbestos, the workers in the area still are required to wear disposable dust masks and keep the insulation to be stripped well wetted. Barricades and signs must be present to warn others in the area of the potential hazard. In the future, when there is doubt aboul the insulation containing asbestos, either full precautions for handl ing asbestos will be observed or a sample of the insulation will be tested fonoasbestos content prior to starting the job.
WORK BY
_____________________________
APPROVED BY
*The P.M. sample could not be %.na.lyzed because it got wet.
UCC 016635
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter , 5583 (511)
Computer Ref.
1064
CC:
c. w '. Carman, 725-105
D. H. Cook, 5583 (511) G. F. Hurley, 701-334
LiH^toBle^511-2149 a E. C. Shipley, 512 H. L. Robinson, 701-401
PERSON MONITORED
C. Miller
Location EXPOSURE RESULTS
Basement of Bldg. 789 (Cooling Tower)
Date
7/3/80
Sample 1 2 3 4 5 6
Cone.
.
"--iTffSFS'TS
.3 pm/cm^
Sampling Time
108 minutes
Comments
A.M. Sample - Stripping insulation
* P.M. Sample - Stripping Insulation
Time-Weighted Average Concentration (TWA) Not Calculated Ceiling Concentration
ALLOWABLE EXPOSURE
TWA 2 fibers >5 pm/cm^ Ceiling
OSHA
UCC UCC
Other Other
COMMENTS
Because part of the insulation being stripped was believed to contain asbestos, the workers in the area still are required to wear disposable dust masks and keep the insulation to be stripped well wetted. Barricades and signs must be present to warn others in the area of the potential hazard. In the future, when there is doubt about the insulation containing asbestos, either full precautions for handling asbestos will be observed or a sample of the insulation will be tesstteecdU^^ffoorr asbestos ccoonntent prior to starting the job.
WORK BY ____ APPROVED BY
*The P.M. sample could not be analyzed because it got wet. UCC 016636
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter, 5583 (511)
Computer Ref. 1064
rr. C. W. Carman, 725-105 D. H. Cook, 5583 (511) G. F. Hurley, 701-334
L^VR,,.;Hobley>-;51Xr2149 | T5. R. Paugh, 511-2009 H. L. Robinson, 701-401
E. C. Shipley, 512
PERSON MONITORED R. R. Burgess
Location EXPOSURE RESULTS
Basement of Bldg. 789 (Cooling Tower)
Date 7/3/80
Sample 1 2 3 4 5 6
Cone.
fibers > 5 . 3 Lim/cm^
Sampling Time
90 minutes
Comments
A.M. SamDle - Bageine StriDDed Insulation
* P.M. Sample - Bagging Stripped Insulation
Time-Weighted Average Concentration (TWA) Not Calculated Ceiling Concentration
ALLOWABLE EXPOSURE TWA 2 fibers >5 jim/cm3 Ceiling _______________________
(jDSHg) OSHA
UCC UCC
Other Other
COMMENTS
Because part of the insulation being stripped was believed to contain asbestos, the workers in the area still are required to wear disposable dust masks and keep the insulation to be stripped well wetted. Barricades and signs must be present to warn others in the area of the potential hazard. In the future, when there is doubt about the insulation containing asbestos, either full precautions for handling asbestos will be observed or a sample of the insulation will be testteedds^&oorr asbestos ccoonntent prior to starting the job.
WORK BY* *
APPROVED BY
l*The P.M. sample could not be (analyzed because it got wet
UCC 016637
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter , 5583 (511)
Computer Ref. W-1078
CC:
C. W. Carman, 725-105
D. R. Paugh, 511-2009
G. F. Hurley, 701-334
H. L. Robinson, 701-401
L. R. Noble,. 511-2149 3 E. C. Shipley, 511-2009
E. J. Tawney, 558
PERSON MONITORED ___________________R. E. Templeton
Location EXPOSURE RESULTS
Bldg. 777 - Between easteipfete
8/25/80
of aOR Unit ana Dewatering ShH
on second level of elevator shaft
Sample 1 2 3
Cone . ibers >
0.2 (im/cm3
< 0.1
Sampling Time
68 minutes
73 minutes
Comments
A.M. P.M.
Sample - Bagging insu la non
Sample - Bagging
------------------ insulation and
cleaning area
4
5
6
Time-Weighted Average Concentration (TWA) <0.1 fibers >5 gm/cm3 Ceiling Concentration
ALLOWABLE EXPOSURE TWA 2 fibers >5 gm/cm^ C/oshZ^
Ceiling _______________________
OSHA
ucc UCC
Other Other
COMMENTS
.
Stripping was done outside and it was very well wetted by rain.
WORK BY
APPROVED BY
UCC 016638
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter , 5583 (511)
Computer Ref. W-1078
CC:
C. W. Carman, 725-105 G. F. Hurley, 701-334
L. R. Nobley 511-2149
D. R. Paugh, 511-2009 H. L. Robinson, 701-401 >E. C. Shipley, 511-2009
E. J. Tawney,
PERSON MONITORED
D. C. Shamblin
Location Bldg. 777 - Between eastenSate
8/25/80
of ACR Unit and Dewatering She'S
EXPOSURE RESULTS on second level of elevator shaft
Sample 1 2 3 4 5
.6
Cone. fibers
0.1 gm/cm3
Sampling
Time . o
71 minutes
0.2 "
64 minutes
Comments A.M. - Stripping insulation P.M. - Stripping insulation
Time-Weighted Average Concentration (TWA) <0.1 fibers >5 pm/cm^ Ceiling Concentration
ALLOWABLE EXPOSURE TWA 2 fibers > 5 nm/cm^ Ceiling ________________
0SHA__^ OSHA
UCC UCC
Other Other
COMMENTS Stripping was done outside and it was very well wetted by rain.
UCC 016638A
oo
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter, 5583 (511)
Computer Ref. W-1078
C. W. Carman, 725-105 G. F. Hurley, ,,701-334 L. R. Noble, 511-2149^
D. R. Paugh, 511-2009 H. L. Robinson, 701-401 E. C. Shipley, 511-2009
E. J. Tawney,
PERSON MONITORED
C. Miller
Location EXPOSURE RESULTS
Bldg. 777 - Between easteriBP-te _____ of ACR Unit and Dewatering Shed on second level of elevator shaft
8/25/80
Sample 1 2 3
Cone.
fibers ; 5 0.1 |im/cm3
< :o.i
"
Sampling Time
74 minutes
63 minutes
Comments
A.M. P.M.
Sample Sample -
Stripping Insulation Stripping Insulation
4
5
.6
O
Time-Weighted Average Concentration (TWA) <0.1 fibers >5 pm/cm
Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers >5 pm/cm3 dpSH^)
Ceiling _______________________
OSHA
UCC UCC
Other Other
COMMENTS
.
Stripping was done outside and it was very well wetted by rain.
UCC 016639
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter, Trlr. 5583 511
Computer Ref. W-1076
CC: c. W. Carman, 725-105
D. R. Paugh, 511-2009
G. F. Hurley, 701-334 iH. L. Robinson, 701-401
L. R. Noblej/4511-2149 ... 3e. C. Shipley, 511-2009
E. J. Tawney, 5583 R. G. Rowe, M.D. , 7
PERSON MONITORED
R. E. Templeton
Location Bldg. 777 - Room 111
Date 8/19/80
EXPOSURE RESULTS
Sample 1 2 3 4 5
6
Cone. fibers >
10.1 5 jim/cm 3
Sampling Time
118 minutes
Comments
P.M. - Wetting and bagging insulation and cleaning up area
Time-Weighted Average Concentration (TWA) 2.5 fibers > 5 pm/cm3 Ceiling Concentration
ALLOWABLE EXPOSURE TWA 2 fibers > 5 pm/cm3, (^OSHaJ)
UCC
Ceiling _______________________
OSHA
UCC
Other Other
COMMENTS
,
Even though the workers had been advised to keep the insulation well wetted, it didn't appear as if they had done so.
UCC 016640
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter, Trlr. 5583 511
Computer Ref. W-1075
CC:
C. W. Carman 725-105 G. F. Hurley. 701-334 l. r. Noble; 511-2149"'
- ,.T.d
D. R. Paugh, 511-2009 H. L. Robinson, 701-401 E. C. Shipley, 511-2009
E. J. Tawney, 5583 R. G. Rowe, M. D. ,
PERSON MONITORED
R. E. Templeton
Location Bldg. 777 - Room 111
Date
8/18/80
EXPOSURE RESULTS
Sample 1 2 3 4 5
.6
Cone. ixceri . >
6.3 5 gm/cm *
Sampling Time
42 minutes
Comments "
A.M. - Wetting and bagging insulation
3.9
"
149 minutes
P.M. - Wetting and bagging insulation and cleaning up area
Time-Weighted Average Concentration (TWA) 2.8 fibers > 5 am/cm3 Ceiling Concentration ________________
ALLOWABLE EXPOSURE
TWA 2 fibers > 5 |im/cm3 (jOSHA^) UCC
Ceiling _______________________
0SHA
UCC
Other Other
COMMENTS
,
More water needs to be used in keeping the insulation wetted. Disposable dust respirators should be worn while in the stripping area and until the cleanup is completed.
WORK BY
APPROVED BY
UCC 016641
B. E. Bess, 514 P. W. Young, 512
L. R. Noble,- 512 -- * H. L. Robinson, 511 E. C. Shipley, 512 F. Williams, 512
September 12, 1980 IH/EP Asbestos Exposure Monitoring
Gentlemen:
Asbestos monitoring in the SEVIN operations area on Septem ber 3, 1980 showed an air concentration of 0.1 fiber per cc which is well below the present OSHA standard.
Six samples of breathing zone air were taken on Messrs. D. R. Smith, J. F. Sampson and P. D. Coyner. Due to an error in analyti. cal procedure only one valid sample, that for Mr. Smith, was obtained. Since all the recommended procedures for stripping asbestos-containing insulation were followed it is felt that the 0.1 result obtained represents the breathing air concentration in the ambient air.
Please give the people sampled the results. The actual sam pling was done by members of Fred William's Industrial Hygiene group at Institute.
Very truly yours,
GFH/sc
G. F. Hurley
UCC 016642
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter , Trlr. 5583 511
Computer Ref. W-1076
CC:
C. W. Carman, 725-105 G. F. Hurley, ,701-334*. L. R. Noble,..511-2149
D. R. Paugh, 511-2009 H. L. Robinson, 701-401 E. C. Shipley, 511-2009
E. J. Tawney, 5583 R. G. Rowe, M.D.,
PERSON MONITORED ________________ D. C. Shamblin__________________________
Location Bldg. 777 - Room 111
Date
8/19/80
EXPOSURE RESULTS
Sample 1 2 3 4 5
6
Sampling
Cone.
________Time________
fibers > 14.4 5 gm/cm 3
125 minutes
Comments
P.M. Stripping insulatior and cleanup of area.
Time-Weighted Average Concentration (TWA) 3.8 fibers > 5 gm/cm^ Ceiling Concentration
ALLOWABLE EXPOSURE
TWA 2 fibers > 5 um/cm^ (OSHA^? UCC
Ceiling
OSHA
UCC
Other Other
COMMENTS
The concentration of fibers was as great the second day even though the men had been advised to keep the insulation well watered.
WORK BY
APPROVED
V
7
UCC 016643
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: R. F. Painter , Trlr. 5583 511
Computer Ref. W-1075
CC: c. W. Carman, 725-105 G. F. Hurley, 701-334 L. R. Noble, 511-2149..1
D. R. Paugh, 511-2009 H. L. Robinson, 701-401 E. C. Shipley, 511-2009
E Tawney, 5 R. G. Rowe, M.I
75c
PERSON MONITORED
D. C. Shamblin
Location Bldg. Ill - Room 111
Date
8/18/80
EXPOSURE RESULTS
Sample 1 2 3 4 5
.6
Cone.
fibers > 15.4 5 um/cE l3
Sampling Time
Comments
41 minutes A.M . Stripping insulation
11.3
"
149 minutes
P.M . Stripping insulation and helping with cleaning
of area
Time-Weighted Average Concentration (TWA) 4.1 fibers > 5 um/cm3 Ceiling Concentration ________________
ALLOWABLE EXPOSURE
TWA
2 fibers > 5 pm/cm^ (oSHA
Ceiling __________
OSHA
UCC UCC
Other Other
COMMENTS
More water should be used to wet the insulation before stripping. Those stripping and bagging should always wear their disposable dust respirator while in the area and until the cleanup is finished.
WORK BY APPROVED BY
UCC 016644
oC 149*2
INTERNAL CORuESrOf'DSNCE
C-5
AGRICULTURAL PRODUCTS CO.nPA^Y, ?M.
'/si'Cs 9 P.0. BOX 2831, CHARLESTON, WEST VIRGINIA 25:
INSTITUTE PLANT
To (Name) Division Location
Mr. G. F. Hurley Building 701/334 Technical Center
Floor Nu nber
Date January 5, 1981 originating Dept. Industrial Hygiene
Floor Number
Copy to
Mr. A. S. Howard Mr. L. R. Noble-""' Mr. H. L. Robinson Dr. R. J. Sexton Mr. E. C. Shipley Mr. F. Williams
Answering letter date
Subject Asbestos Exposure Monitoring
Monitoring for personal exposure to asbestos at the No. 1 Steam Plant on December 12, 1980, showed a maximum airborne level of 4.1 fibers per cc of air.
Twelve 511 Construction insulators and laborers were measured for 15 minute sample periods over a time period of 150 minutes. Two results (see attached data sheet) were at or above the present OSHA standard of 2.0 fibers per cc of workplace air.
This monitoring occasion was scheduled during peak activity of demolition of asbestos material from No. 6 boiler at operating floor level. A minimum number of Plant 512 employees were in the area at the time work was in progress. The area was properly barricaded, signs in place and vM Construction employees involved in the demolition process wore MSA Dust Foe A\y \ ~3*77 or 3M Model 8710 dust masks. Material being demolished was generally wet down but some dust was generated from the interior surfaces. Laborers bagged the material for disposal as the project progressed,
This demolition of asbestos material was carried out according to acceptable guidelines and airborne material was maintained generally at permissible levels. Future jobs of similar nature need to be performed in a like manner and continued use of respiratory protection be required.
Please inform the above participating employees of their individual monitoring results.
/
HHF:me Attachment
H. H. Frazier
UCC 016645
INDUSTRIAL HYGIENE SAMPLING
WORKPLACE LOCATION: No. 1 Steam Plant
CONTAMINANT:
Asbestos
DATE: 12/29/80
NAME: J. L. Miller
BUILDING: 5 OSHA TLV 2 f/cc
'
' /2l OAJ/
sf6-~
-B-. -E. Begs-;--514 // #\//U>
-P-, W.--Young, 512^ ^
^
L. R. Noble, 512 H. L. Robinson, 511 E. C. Shipley, 512 F. Williams, 512
September 12, 1980 IH/EP Asbestos Exposure Monitoring
Gentlemen:
Asbestos monitoring in the SEVIN operations area on Septem ber 3, 1980 showed an air concentration of 0.1 fiber per cc which is well below the present OSHA standard.
Six samples of breathing zone air were taken on Messrs. D. R. Smith, J. F. Sampson and P. D. Coyner. Due to an error in analyti cal procedure only one valid sample, that for Mr. Smith, was obtained. Since all the recommended procedures for stripping asbestos-containing insulation were followed it is felt that the 0.1 result obtained represents the breathing air concentration in the ambient air.
Please give the people sampled the results. The actual sam pling was done by members of Fred William's Industrial Hygiene group at Institute.
Very truly yours,
GFH/sc
G. F. Hurley
UCC 016647
*&. `i!eSSb~' >" , &U" '''*'
INDUSTRIAL hygiene monitoring for
... * .-V ^ '.
. - ' j-' y
:' -`-.vv.
TO: D. L. Johnson - ;
- i,-\
ASBESTOS Computer Ref. W-1040
:
cc:
C. W. Carman, G. F. Hurley,
C. R. Johnson
TgWuKi. D. R. Paugh,
> a-V PERSON MONITORED
i-% : .r.f ... . .
.
Location.
EXPOSURE RESULTS
. L. Robinson, 701-401 E. C. Shipley, 511-2009
D. K. Naylor
#1 Powerhouse Institute
Date
4/11/80
... t ... . . -
/ .f. / 2
/' `
.
3 4 5 6
Sampling
Cone.
Time
fibers . r .
.35 5 um/cm; 1 60 minutes
fibers :
. 81-'5 pm/cm- ! 105 minutes _
fibers :
.18 5 um/cm; * 87 minutes
fibers 1
.. 06 5 iim/cm1 * 49 minutes
Comments A.M. - Bagging insulation
A.M. - Bagging insulation
P.M. - Bagging insulation P.M. - Bagging insulation
cleaning area
. Time-Weighted Average Concentration (TWA) 0.3 fibers > 5 um/cmv Ceiling Concentration
/|f|^ALLOWABLE EXPOSURE
TWA 2 fibers > 5 um/cm3 Y^sij)
Ceiling _____________
'
OSHA
UCC UCC
Other Other
COMMENTS
Bagging insulation that had been stripped from #2 boiler front and /boiler front duct on second level of #1 Powerhouse at Institute. ,, , NfiCr* Nkylor fmpre a disposable Norton dust respiratory and disposable vS^^fcbweriils-dufing the bagging and cleanup. The insulation was placed
plastic bags for disposal and dropped from the second level to a - truck: below.'>At'this point the full bags should be handled carefully. ^ It is suggested that they could be lowered on a rope to prevent the
bags from splitting.
fQRK BY
L<UL BY-1
i-,r. ,,** :; .. ' /'
%
UCC 016648
A"*#-
-" INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: D. L. Johnson, 511-5518 'ilfer '-
Computer Ref. w-1040
- hycci .
C. V. Carman, 725-105 G. F. Hurley, 701-334 C. R. Johnson, 511-2009 D. R. Paugh, 511-2009
H. L. Robinson, 701-401 E. C. Shipley, 511-2009
PERSON MONITORED
G. H. Landers
Location #1 Powerhouse - Institutd)ate
4/11/80
' EXPOSURE 'RESULTS
Sample 1
ft
JfS'--".i. C-
2
3
' . . 4
Cone.
fibers > . 35, 5 pm/cm3
fibers > .42 5^jim/cm3
Sampling Time
60 minutes
105 minutes
fibers >
.09 5 um/cm3 80 minutes
fibers > .65 5 um/cm3 38 minutes
*> :v^
; : > ':r \ *Arr. ; ~
56
A.M. - Stripping insulation A.M. - Stripping insulation
P.M. - Stripping insulation
P.M. - Strinning insulation cleaning area.
.Time-Weighted Average Concentration (TWA) 0.2 fibers > 5 qm/cm^ f - Ceiling Concentration
% ,, or 4
ALLOWABLE EXPOSURE 5n TWA 2 fibers > 5 um/cm3 <$SHA>
Ceiling
OSHA
UCC UCC
Other Other
COMMENTS*
U
Stripping susjpected asbestos containing insulation from #2 boiler front
and boiler front duct on second level of #1 Powerhouse at Institute. The last sample of the day was the highest concentration found. This
be atftribu^ed to the fact that they got in a hurry and didn't keep %:7': the insulation well'wetted. Mr. Landers wore a disposable Norton dust
respirator, and disposable coveralls during the stripping.
i WORK BY
PPROVED BY
UCC 016649
fe$\5V`\V;V.;#^A.v ..-. INDUSTRIAL HYGIENE MONITORING FOR
f\ 1
D L. Johnson, 511-5518
ASBESTOS Computer Ref. W-1041
;C* W. Carman, 725-105 G. F. Hurley, 701-334 C. R. Johnson, 511-2009 D R. Paugh, 511-2009
P. A. Perrj
H. L. Robinson, 701-401 E. C. Shipley, 511-2009
PERSON MONITORED
D. K. Milan
Location
#1 Powerhouse - Institu-ff&te
4/11/80
EXPOSURE RESULTS
Cone. fibers
69 5 qm/cm*
fibers 2.72 5 nm/cm *
Sampling ___IlS&____ 68 minutes
27 minutes
Comments P.M. - Stripping insulation P.M. - Stripping insulation
" ,\*.-rj.:.f'***'/; --
, Time-Weighted Average Concentration (TWA) Not monitored long enough
isi&V'r
Ceiling Concentration
to calculate TWA.
^ C^I allowable exposure
* y:
-
..... .......
. _____
, k^sT
TWA 2 fibers > 5 um/ern^ ^OSHA)
Ceiling
0SHA
UCC
UCC
Other Other
doMMENTS
Stripping insulation from #2 boiler front and boiler front duct on second
level of #1 Powerhouse at Institute. Mr. Milan wore a disposable Norton respirator;\and disposable coveralls during the stripping. The
f?^^liJSulatorsf got ih a hurry toward the end of the day and didn't keep the
insulation well wetted. This resulted in the last value being higher.
/?
isWtOVED BY 1
VAv
7
UCC 016650
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: D. L. Johnson, 511-5518
Computer Ref. w-1040
imm:- CC:
J 4$-
^ ^
7I' ` 'v
C. W. Carman, 725-105 G. F. Hurley, 701-334 C. R. Johnson, 511-2009 D,, R. Paugb, 511-2009
L. Robinson, 701-401 E. C. Shipley, 511-2009
PERSON MONITORED
B. Beckett
Location EXPOSURE RESULTS
#1 Powerhouse Institute
Date
4/11/80
aT1 fr:'-~
mmmi
. . ** Sample
.'
1^ 2
Sampling
Cone. fibers , >
Time
.48 5 um/cm * 60 minutes
fibers i >
1.24'-5 um/cm *84 minutes
.
*. ~ -
t
. 3 ;/ 4
wM
Comments A.M. - Stripping insulation A.M. - Stripping insulation
.6
Time-Weighted Average Concentration (TWA) Not monitored long enough
Ceiling Concentration
to calculate TWA.
ALLOWABLE EXPOSURE
TWA 2 fibers > 5 pm/cmv Ceiling ________________
LOSI OSHA
UCC UCC
Other Other
^^J^Stxipping sqppected asbestos containing insulation from #2 boiler front ?^^^4'andholler''.^ont.^iict on second level of #1 Powerhouse at Institute.
Mr. Beckett ^s not monitored in the afternoon because he was trans'^^^^.^Perjced %o another job. During the stripping he wore a disposable Norton
'irV^V*>J- dust -vrtAeasMp-jiitrna+AtoMr nann/4d ^d^ isposaKb1lea acaovoetroalilels.
'
UC 149-2
INTERNAL CORRESPONDENCE
S2fo*// S'C'CsaS Cm-
AGRICULTURAL PRODUCTS COMPANY INC.
P.0. BOX 2831, CHARLESTON, WEST VIRGINIA 25
. INSTITUTE PLANT
To (Name) Mr. G. F. Hurley
Division
Building 701, 334
Location Technical Center
Floor Number
Date July 25, 1980 Originating Dept. Industrial Hygiene
Floor Number
Copy to
Mr. Mr. Mr. Mr. -^Mr. Dr. Mr. Mr.
K. B. Drake S. E. Illikainen A. S. Howard S. w. Jensen L. R. Noble R. J. Sexton E. C. Shipley Fred Williams
Answering letter date
Subject
Asbestos Exposure Potential, Precipitators, No. 1 Steam Plant
Concern has been expressed on various occasions relative to the condi tion of protective covering over asbestos containing insulation on the south side of the No. 1 Steam Plant precipitators. A recent storm apparently caused large sections of the protective cover to be torn from the precipitators, leaving some sections free to move according to wind direction and elocity.
Industrial Hygiene was requested to evaluate the existing conditions in terms of personal exposure potential of personnel involved in the 511 Construc
tion Project of retubing the boilers. By observation, the condition appeared to have serious potential and it was suggested to Mr. Jensen that "freehanging" protective cover be removed and consideration be given to application of a binder material to the exposed insulation. Sampling at appropriate locations and personal sampling of selected workers for asbestos exposure was initiated to determine the degree of the apparent problem.
The current OSHA Standard for asbestos sets an eight-hour time-weighted average airborne concentration to which any employee may be exposed not to exceed two fibers, longer than 5 micrometers, per cubic centimeter of air. A ceiling concentration of 10 fibers has been established which is not to be exceeded for any time period.
Samples collected at this location on July 21, 1980, show results as follows:
Name/Type Sample
Fibers/cm^
Job Task/Location
D. R. Stephens W. P. Gilmore S. J. Edens
1.8 0.08 0.09
Rigger inserting piping in. tube: sheet. 3rd level.
Rigger guiding tubes into tube sheet. 4th level.
Rigger guiding tubes into tube sheet. 4th level.
UCC 016652
Mr. G.. F. Hurley
-2-
July 25, 1980
Naine/Type Sample
Fibers/cm^
Job Task/Location
B. J. Wehrle Area Area Area Area Area Area
0.05 0.05 0.09 None detected None detected None detected 0.05
Rigger inserting piping in tube sheet. 3rd level.
Face level No. 3 boiler (upwind) while pipe was inserted.
Face level No. 3 boiler (downwind) while piping was inserted.
South of No. 6 precipitator at source undisturbed by workers.
South of No. 4 precipitator at source undisturbed by workers.
South of No. 1 boiler while scaffold was eracted at No. 3 (downwind).
South of No. 2 boiler while scaffold was erected at No. 3 (dow'nw'ind) .
These data indicate that exposure potential to airborne asbestos is minimal from the large areas of exposed insulation material on the south side of the precipitators when the material is undisturbed. The four personal samples were collected during a time period when tubes were being inserted into the north side of the tube sheet and local disturbance of the insulation material was near a maximum. The extreme north tubes require manipulation of the piping against the insulation and it was observed that pieces of insulation up to hali inch diameter were being released into the work area. Individual fibers, which are the real hazard, were not being released at the expected rate nor at an excessive degree.
Industrial Hygiene, therefore, recommends the following:
1. Energy Systems follow-up on a Maintenance request to remove all "freehanging" protective covering which can be safely removed without scaffolding. Personnel involved should wear a 3M dust mask and the Insulation side of the removed covering should be wet down for immediate disposal.
2. Plant 511 Construction personnel should continue to wear 3M dust masks while inserting tubes in the north side of the respective tube sheets and/or while raw insulation is being disturbed.
3. At the discretion of the Construction supervision, a sealer may be applied at local areas of exposed insulation proximal to where work is to be performed and insulation is likely to be disturbed.
Should there be questions or need for additional monitoring, please call me at 6161.
H. H. Frazier
UCC 016652A
MEMO TO___
AVOID ORAL INSTRUCTIONS /JjAz-c-kX. '
197 %0
+ DO IT THE SAFE WAY HH
SIGNED
UCC 016653
INTERNAL CORRESPONDENCE
~7
CHEMICALS AND PLASTICS
To (Name) Division location
Mr. D. L. Johnson 511-5518.
Institute Plant
Mr. Mr. Mr. Mr.
Mr. Mr. Mr. Mr.
C. W. Carman G. F. Hurley C. R ...-Johnson. L.,,R.i Noble ^
D. R. Paugh P. A. Perry H. L. Robinson E. C. Shipley
P. O. BOX 8361, SOUTH CHARLESTON, WEST VIRGINIA 25303
Date January 22, 1980 Originating DePtTechnical Center IH/EP
Asbestos Monitoring - No. 1 Powerhouse, Institute Plant
PROJECT
Determine the exposure of Construction employees to asbestos during the stripping of old insulation from #1 boiler at the #1 Powerhouse, Location 512.
DATE OF SURVEY January 15, 1980
SUMMARY
Although asbestos exposures to employees were higher than normal, the use of approved respirators and protective clothing as well as proper stripping and disposal procedures protected the workers from a potentially hazardous situation.
DISCUSSION
Construction insulators are in the process of stripping several thousand feet of old asbestos type insulation from the steam boilers at the #1 Powerhouse, Location 512. The job will be in progress for the next two years and will involve many crafts before completion.
The area to be stripped was doing the work were protected by disposable coveralls and gloves. hats while in this area.
barricaded, labeled and persons the use of approved respirators,
They are required to wear hard
UCC 016654
2- -
Four personal samples were collected as well as area samples on the first three floors of #1 boiler, north side. The results are listed in the attached "RESULTS". Although the results of two personal .samples are greater than the OSHA standard of 2 fibers, the workers were protected.
RECOMMENDATIONS 1. Bags of stripped insulation should be handled carefully, not
dropped from one level to another. 2. Cleanup should be thorough and inspected by Construction
supervisor for completeness. Complaints can be easily generated by powerhouse employees or other workers in the area.
3. Protective clothing should be discarded in plastic bags along with the insulation.
REFERENCES Volume 38C-29X4-Rla Asbestos, Dust Determination by Membrane Filter Technique Using Phase Contrast Microscopy
REPORT PREPARED BY G. W. Bott Technical Center Industrial Hygiene Group
.&rv. /Sd&r-
APPROVED BY
F. HuaivLey
GWB/sc Attachment
/j
UCC 016655
RESULTS
DATE
SAMPLE TYPE
1/15/80
G.H. Landers
1/15/80
M.E. Drake
1/15/80
J.F. Chandler
1/15/80
T.G. Grant
1/15/80
Third Level
1/15/80
Second Level
1/15/80
First Level
TIME (MIN.) 60
60 60
45 70
60
72
ASBESTOS FIBERS FOUND 4.4
3.2 1.5
1.6 0.4
0.8
0.03
TWA REMARKS
3.3
Stripping insulation
2.4 Laborer
1.1
Stripping insulation
1.2 Laborer
- Directly above work area
- Center of work area
- Directly below work area
TWA was calculated assuming that stripping was done for six hours out of eight.
UCC 016656
INTERNAL CORRESPONDENCE
CHEMICALS AND PLASTICS
P. 0. BOX 8361, SOUTH CHARLESTON, WEST VIRGINIA 25303
o (Name) division ocation
Icpy to
Mr. D. L. Johnson 511-5518 - Institute Plant
Mr. G. F.^urlev Mr. L. R. Noble I Mr. H. L. Robinson Mr. E. C. Shipley Mr. E. J. Tawney
~<> `//so/so
April 9, 1980
)r,g nat ng Depi Technical Center IH/EP
;ob:pet
Asbestos Monitoring at Institute #1 Powerhouse
PROJECT
Monitor employee exposure to airborne asbestos fibers during removal of insulation from the 2 boiler in the #1 Powerhouse at Institute.
DATE OF SURVEY
April 3, 1980
DISCUSSION
Four Construction employees, three insulators and one laborer, removed insulation from boiler #2 on the third level in the Institute #1 Powerhouse. All employees wore disposable coveralls, gloves and respirators. The insulation was wetted before and during removal and the area was barricaded. Ah insulator, Mr. B. M. Beckett, and a laborer, Mr. R. D. Ward, wore personal samplers during the removal and bagging operations.
The air concentrations of the four samples taken ranged from 0.17 to 0.41 fibers per cubic centimeter of air (f/cc). Since there was no other exposure to asbestos the rest of the day, the eight-hour time-weighted average (TWA) exposures were 0.06 and 0.07 f/cc. The OSHA permissible exposure limit for an eight-hour TWA is 2 f/cc.
DATA
(Continued on next page)
UCC 016657
2 4/9/80
DATE 3/3/80 3/3/80 3/3/80 3/3/80
SAMPLE B.M. Beckett B.M. Beckett R. D. Ward R.D. Ward
SAMPLING TIME
0825-0945 1010-1053 0825-0945
1010-1110
AIR CONC. (f/cc) 0.23 0.41 0.17 0.26
TWA (f/cc)
-
0.07 -
0.06
REPORT PREPARED BY
W. F. Blythe, Jr. WFBJr/sc
UCC 016658
ron'EsroNDHiiC:
Mr. Mr. Mr. Mr. Mr.
J. Byrd G.. F. .Hurley L. R. Noble H. L. Reveal H. L. Robinson
c29(u/)
33d',. 3GUTH CHARLESTON, WEST VIRGINIA 25303 us-, February 6, 1979 c. . r,v r Ce,,. Technical Center IH/EP
Asbestos Monitoring at Sevin Shipping
INTRODUCTION
On January 22, 1979, Messrs. C. C. Bragg and
C. R. Lanier were monitored for exposure to
asbestos during the removal of insulation from the flanges of
a pipe line in Building 233, the Sevin Shipping area.
SUMMARY AND
CONCLUSIONS
The asbestos concentrations in the breathing
zones of the insulators were 7.75 and 5.37
fibers/cc while an area sample indicated a concentration of
0.3 fibers/cc. Both men wore respirators during the entire
operation, but facial hair on each man possibly prevents an
adequate seal. The OSHA ceiling limit for asbestos is 10
fibers/cc. The OSHA standard for an eight-hour time-weighted
exposure is 2 fibers/cc. Due to the short exposure time (25
minutes), the insulators' TWAs would not exceed the OSHA standard
without further exposure. However, in future operations where
large amounts of water cannot be used to reduce emission of air
borne asbestos fibers, a garden sprayer might be used since a finer
spray and smaller volumes of water can be used.
DISCUSSION
Mr. C. C. Bragg and Mr. C. R. Lanier wore per
sonal samplers while removing insulation from
the flanges of a pipe line in Building 233. Due to the storage
of Sevin directly under the pipe line being worked on, the insu
lation could not be watered down during removal. Both men wore
respirators. One man stripped the insulation while the other
held a plastic bag directly under the flange to catch the insula
tion. The effectiveness of this procedure in keeping down airborne
asbestos dust in the surrounding area was indicated by a sample
taken eight feet below the first flange which showed a concentration
of 0.3 fibers/cc. The personal samples indicated concentrations
of 7.75 fibers/cc and 5.37 fibers/cc for a twenty-five-minute
exposure. Further exposure was minimal since the pipe was to be
UCC 016659
2
dismantled at the flanges and taken outside where it could be wetted with water before, during, and after removal.
DATA
Date 01/22/79 01/22/79 01/22/79
Sample
C. C. Bragg
C. R. Lanier
Area Sample below first flange
Sampling Time 0855 - 0920 0855 - 0920 0855 - 0920
Air Cone. Fibers/cc
7.75
5.30
0.30
REFERENCES
(1) UCC C/P Industrial Hygiene Method 38C-29X4-Rla (2) 29 CFR 1910.1001
REPORT PREPARED BY
W. F. Blythe, Jr. Technical Center Industrial Hygiene Group
WFBJr/sc
UCC 016660
':e: l co::'.Lsro:
Mr. J. Byrd Mr. G. F. Hurley Mr. L. R. Noble Mr. H. L. Reveal Mr. H. L. Robinson
charleston. WEST VIRGINIA 25303
February 6, 1979 Technical Center IH/EP Asbestos Monitoring at Sevin Shipping
INTRODUCTION
On January 22, 1979, Messrs. C. C. Bragg and
C. R. Lanier were monitored for exposure to -evC*
asbestos during the removal of insulation from the flanges of
a pipe line in Building 233, the Sevin Shipping area.
1MARY AND
COI^CLUSIONS
The asbestos concentrations in the breathing
. zones of the insulators were 7.75 and 5.37
fibers/ccN^hilb^ an area sample indicated a concentration of T5T3~Tt>ers./bc. N^oth men wore respirators during the entire
operation,
hair on each man possibly prevents an
adequate seal. nTie OSHA ceiling limit for asbestos is 10
fibers/cc. The OSHA standard for an eight-hour time-weighted
exposure is 2 fibers/cc. Due to the short exposure time (25
minutes), the insulators' TWAs would not exceed the OSHA standard
without further exposure. However, in future operations where
large amounts of water cannot be used to reduce emission of air
borne asbestos fibers, a garden sprayer might be used since a finer
spray and smaller volumes of water can be used.
L
DISCUSSION
Mr. C. C. Bragg and Mr. C. R. Lanier wore per
sonal samplers while removing insulation from
the flanges of a pipe line in Building 233. Due to the storage
of Sevin directly under the pipe line being worked on, the insu
lation could not be watered down during removal. Both men wore
respirators. One man stripped the insulation while the other
held a plastic bag directly under the flange to catch the insula
tion. The effectiveness of this procedure in keeping down airborne
asbestos dust in the surrounding area was indicated by a sample
taken eight feet below the first flange which showed a concentration
of 0.3 fibers/cc. The personal samples indicated concentrations
of 7.75 fibers/cc and 5.37 fibers/cc for a twenty-five-minute
exposure. Further exposure was minimal since the pipe was to be
UCC 016661
2
dismantled at the flanges and taken outside where it could be wetted with water before, during, and after removal.
DATA
Date 01/22/79 01/22/79 01/22/79
Sample
C. C. Bragg
C. R. Lanier
Area Sample below first flange
Sampling Time 0855 - 0920 0855 - 0920 0855 - 0920
Air Cone. Fibers/cc
7.75
5.30
0.30
REFERENCES
(1) UCC C/P Industrial Hygiene Method 38C-29X4-Rla (2) 29 CFR 1910.1001
REPORT PREPARED BY
W. F. Blythe, Jr. Technical Center Industrial Hygiene Group
WFBJr/sc
UCC 016662
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: D. L. Johnson, 511-5518
Computer Ref. W-1043
CC:
C. W. Carman, 725-105
G. F. Hurley, 701-334 C. R. Johnson, 511-2009 L. R. Noble, 511-2149
D. R. Paugh, 511-2009 P. A. Perry, 511-5583 H. L. Robinson,. 701-401 E. C. Shipley, 511-2009
PERSON MONITORED
T. L. Jividen
Location#! Powerhouse - Institute Date
4/28/80
EXPOSURE RESULTS
Sample 1 2 3 4 5 6
Cone. fibers ^ >
.52 5 urn/cnr !
Sampling Time
57 minutes
.62 "
111 minutes
Comments A.M. - Stripping insulation A.M. - Stripping insulation
Time-Weighted Average Concentration (TWA) Not monitored long enough to Ceiling Concentration calculate TWA
ALLOWABLE EXPOSURE TWA 2 fibers > 5 ixm/cm3 Ceiling _______________________
(qSHa) OSHA
UCC UCC
,, Other Other
COMMENTS
Stripping insulation from several steam lines on #1 boiler on the first level of #1 Powerhouse at Institute. Sometime during the afternoon, the filter cassette worn by Mr. Jividen was lost so a TWA was not calcu lated. During the stripping he wore a disposable dust respirator and dis posable coveralls.
Even insulation that does not contain asbestos should be watered to help conttrrooll^^tthhe dust.
CJjjtfJWORK BY
Jjj4j
APPROVED BY
7
UCC 016663
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: D. L. Johnson, 511-5518
Computer Ref. W-1043
CC:
C. W. Carman, 725-105 G. Fl Hurley, 701-334 C. R. Johnson, 511-2009
L. R. Noble, 511-2149
PERSON MONITORED
F. E. Cobb
P. A . Perry, 511-5583 D. R . Paugh, 511-2009 H. L . Robinson, 701-401 E. C . Shipley, 511-2009
Location #1 Powerhouse - InstituteDate
4/28/80
EXPOSURE RESULTS
Sample 1 2 3 4 5 6
Cone.
fibers ^ .15 5 Lun/cnU
.37
"
.06
"
.52
"
Sampling Time
63 minutes
108 minutes 30 minutes
45 minutes
Comments A.M. - Stripping insulation A.M. - Stripping insulation P.M. - Stripping insulation P.M. - Stripping insulation
Time-Weighted Average Concentration (TWA) .14 fibers > 5 nm/cmS Ceiling Concentration
ALLOWABLE EXPOSURE
TWA
2 fibers > 5 iim/cm3 ^SHA^ UCC
Ceiling _______________________
OSHA
UCC
Other Other
COMMENTS Stripping insulation from several steam lines on #1 boiler on the
level of #1 Powerhouse at Institute. Mr. Cobb wore a disposable dust respirator and disposable coveralls during the stripping.
firs
Even though part of the insulation being stripped did not contain asbe tos, the insulation should be well watered to help control the dust.
WORK BY APPROVED BY
UCC 016664
INDUSTRIAL HYGIENE MONITORING FOR
ASBESTOS
TO: D. L. Johnson, 511-5518
Computer Ref.W-1043
oo
C. W. Carman, 725-105 G. F. Hurley, 701-334 C. R. Johnson, 511-2009 L. R. Noble, 511-2149 K
P. A. Perry, 511-5583 D. R. Paugh, 511-2009 H. L. Robinson, 701-401 E. C. Shipley, 511-2009
PERSON MONITORED
T. G. Grant
Location #1 Powerhouse - Institute Date
4/28/80
EXPOSURE RESULTS
Sample 1 2 3 4 5 6
Cone.
fibers ^ > .43 5 um/cm* *
Sampling Time
58 minutes
'
Comments A.M. - Bagging insulation
.64 "
116 minutes A.M. - Bagging insulation
.34 "
89 minutes
P.M. - Bagging insulation
Time-Weighted Average Concentration (TWA) .27 fibers > 5 |im/cm3 Ceiling Concentration
ALLOWABLE EXPOSURE TWA 2 fibers > 5 pm/cm3 Ceiling _______________________
(QSHA) OSHA
UCC UCC
, Other Other
COMMENTS
Bagging insulation that had been stripped from several steam lines on #1 boiler on the first level of #1 Powerhouse at Institute. The stripped insulation was placed in plastic bags tagged and placed in a dumpster for proper disposal. Mr. Grant wore a disposable dust respirator and disposable coveralls.
juiJl)WORK BY
APPROVED BY
UCC 016665
imm 1 INTERNAL CORRESPONDENCE
/*/**:' &9***sc2 swfoj/r*'e
CHEMICALS AND PLASTICS
To (Name) Division location
Copy to
Mr. D. L. Johnson Mr. L. R. Mr. H. L. Robinson Mr. E. C. Shipley Mr. E. J. Tawney
P. O. BOX 8361, SOUTH CHARLESTON, WEST VIRGINIA 25303
Date March 3, 1980
Originating Dept. Technical Center IH/EP
Subject
Asbestos Monitoring at Institute #2 Powerhouse
PROJECT
Monitor exposure of employees to airborne asbestos fibers during the removal of insulation from a boiler at the #2 Powerhouse at Institute.
DATE OF SURVEY
February 20, 1980
DISCUSSION
Construction insulators and laborers wore personal samplers during the removal of insulation from the third level of the easternmost boiler in the #2 Powerhouse. All employees involved wore disposable coveralls and respirators. The insulation was adequately wetted with water during removal. The first set of samples was taken while the insulation was being removed from the front of the boiler and placed in plastic bags. The second set of samples was taken while insulation was being removed from a horizontal section of the boiler and shoveled into plastic bags.
The personal air samples indicated concentration from 0.2 to 0.8 f/cc. The OSHA standard sets a permissible exposure limit of 2 f/cc for an eight-hour time-weighted average exposure and a ceiling limit for a fifteen minute exposure of 10 f/cc. Continued use of the prescribed work procedures - use of water to wet insulation, respirators, barricading the area, etc. - should aid in keeping exposures below the OSHA standard.
DATA
See page 2.
UCC 016666
2 3/3/80
DATE
2/20/80 A1l ' 1 1 1 1 1 1 l 1 1 1 1 V
SAMPLE G.H. Landers
?t Tt
J.H. Johnston C.N. Cunningham T.G. Grant
SAMPLING TIME 0905 - 0935 1010 - 1145 0906 - 0935 0935 - 1058 0911 - 0935 1045 - 1145
o
00
AIR CONC (f/cc) 0.2 0.4 0.1 0.3 0.7
REPORT PREPARED BY
W. F. Blythe, Jr. Technical Center Industrial Hygiene Group
APPROVED BY
WFBJr/sc
UCC 016667
INTERNAL CORRESPONDENCE
o (Name) division ccation
lopy to
Mr. D. L. Johnson Mr. E. C. Shipley Mr. E. J. Tawney
Mr. L. R. Noble \ Mr. H. L. Robinson
P. O. BOX 8361, SOUTH CHARLESTON, WEST VIRGINIA 25303
Date March 29, 1979
Originating Dept. Technical Center IH/EP
Subject
Asbestos Monitoring at Institute
PROJECT
Monitor exposure of insulators to asbestos during the removal of insulation from a 3" steam line in East Area Complex Six.
DATE OF SURVEY
March 17 and 19, 1979
DISCUSSION
Construction insulators J. F. Sampson and G. P. Hall wore personal samplers while removing sections of insulation from a 3" steam line which crossed the road approximately 15 feet above the ground. The area below the insulators was evacuated initially with some walk-through traffic later. The insulators wore respirators during the entire operation. The insulation was not wetted with water during removal. The personal samples indicated asbestos con centrations of 3.4 and 1.7 fibers/cc. When it was determined that another section of insulation needed removed, more personal samples were taken. This time the air concentrations were 2.9 fibers/cc and 0.7 fibers/cc.
On March 19, 1979, Mr. J. F. Sampson and Mr. D. L. Carpenter wore respirators and personal samplers while removing insulation from the steam line-which was taken - down on the 17th of March. The insulation was wetted with water before and during removal. The air concentration indicated by the samplers were 0.2 fibers/cc and 0.4 fibers/cc. An area sample twenty feet downwind from the operation showed a concentration of 0.01 fibers/cc. The OSHA standard sets a ceiling limit for a 15-minute exposure of 10 fibers/cc and a limit of 2 fibers/cc for an eight-hour time-weighted average expo sure.
UCC 016668
2 3/29/79
SUMMARY, CONCLUSIONS AND RECOMMENDATIONS
The exposures of the insulators were below the OSHA permissible exposure limits. Exposure requirements of the OSHA standard may be more easily satisfied by the use of wet methods to prevent emission of airborne asbestos fibers. One way to do this is the use of garden sprayers to wet asbestos-containing insulation in locations inaccessi ble to water hoses.
Also, in order to better protect other employees in the area from exposure to excessive concentrations of airborne asbestos fibers, barricade tape and warnings signs should be posted around every asbes tos job. It may be useful to have stands made to which the tape and signs could be fastened.
DATA
Date
3/17/79 3/17/79 3/17/79 3/17/79 3/17/79
3/19/79 3/19/79 3/19/79
Sample
J. F. J. F. G. P. G. P. Area
Sampson Sampson Hall Hall
J. F. Sampson D. L. Carpenter Area
Sampling Time
0830 1023 0830 1021 0835 -
0940 1038 0940 1038 1040
0850 0850 0853 -
0938 0938 0940
Air Cone. (F/cc)
3.4 1.7 0.7 2.9 0.3
0.2 0.4 0.01
REFERENCES
UCC C/P Industrial Hygiene #38C-29X4 - R1A OSHA 29 CFR 1910.1001
REPORT PREPARED BY
W. F. Blythe, Jr. Technical Center Industrial Hygiene Group
W. F. Blythe, Jr. APPROVED BY
G. F. Hurley
UCC 016669
INTERNAL CORRESPONDENCE
:hemicals and plastics
o {Name) ivsion ^cation
opy to
Mr. D. L. Johnson Mr. E. C. Shipley Mr. E. J. Tawney
Mr. L. R.
P. O. BOX 8361, SOUTH CHARLESTON, WEST VIRGINIA 25303
Date June 4, 1979
originating DeptTechnical Center IH/EP
suoject
Asbestos Monitoring
PROJECT
Monitor employee exposure to asbestos during the removal of insulation in Building 5 at Institute.
DATE OF SURVEY
April 30, 1979
DISCUSSION
. Personal samplers were worn by Mr. K. A. Neal and Ms. H. F. Beaver while removing insulation from piping in the east end of the first level of Building 5. All the insulators on this job wore Norton 7170 respirators. The insulation had a layer of dust sitting on it. Although some water was used to wet the insulation during removal, enough dust was generated to interfere in the analysis of asbestos. The sample worn by Ms. Beaver was voided while the one on Mr. Neal Indicated an asbestos concentration of 1.85 fibers/cc. The OSHA permissible exposure limit for an eighthour time-weighted average (TWA) exposure is 2 fibers/cc.
CONCLUSION
Since this job did not take eight hours, Mr. Neal's TWA would be less than 1.85 fibers/cc and below the OSHA limit. However, the amount of dust and asbestos in the air indicates the need to use more water before, during and after the stripping of insulation.
REFERENCES
UCC C&P Industrial Hygiene #38C-29X4-R1A 29 CFR 1910.1001
UCC 016670
2 6/4/79
REPORT PREPARED BY W. F, Blythe, Jr. Technical Center Industrial Hygiene Group W. F. Blythe, Jr.
APPROVED BY WFBJr/sc
UCC 016671
3W(4
/*<:&
A,p/s
v i s'h'f
INTERNAL CORRESPONDENCE
i) z '
'
i/AiCALS AND PLASTICS
--srjrrt9T9--
SAFETY DEPT,
P. O. BOX S361, SOUTH CHARLESTON, WEST VIRGINIA 25303
Mr. D. L.. Johnson 511-5518 (512)
Mr. Mr. Mr. Mr. Mr. Mr. Mr. Mr.
C.W. G. F. C. R. D. R. P. A. C. E. H. L. E. C.
Carman j. Hurley Johnson Paugh Perry Richardson Robinson Shipley
.
Dale December 10, 1979
cr^n^ng D-,pi.Technica 1 Center, IH/EP
Sob.ect
Asbestos Monitoring 704 Powerhouse
PROJECT
Determine the exposure of Construction workers to asbestos fibers during insulation stripping in Building 704.
e
DATE OF SURVEY
November 26 and 27, 1979
DISCUSSION
On November 26 and 27, 1979, separate breathing zone samples were taken on Construction workers to determine their exposure to asbestos fibers while they were stripping and bagging suspected asbestos containing insulation from the exhaust ducts of Number 3 and Number 4 boilers in Building 704 - Powerhouse. During the stripping and clean-up procedure all Construction workers in the work area wore Norton disposable dust respirators, gloves, and coveralls. The boilers had been shut down so the insulation could be properly wetted before and during' the stripping. Plastic was placed around the duct to prevent debris from the stripping from falling through the floor grating. Stripped insulation was placed in bags on site for disposal.
CONCLUSIONS
The results are given in the attached table. An 8-hour timeweighted average was calculated for November 26, 1979, since the
UCC 016672
Mr. D. L. Johnson
2
12/10/79
Construction workers were monitored during their total exposure for that day. The values are well below the OSHA standard of 2 fibers > 5 jim/cm3 on a time-weighted average for eight hours.
REFERENCES
Volume 38C-29X4-Rla Asbestos, Dust Determination By Membrane Filter Technique Using Phase Contrast Microscopy
RESULTS
'
See attachment.
REPORT PREPARED BY
Ruth Clise Technical Center Industrial Hygiene Group
REPORT APPROVED BY
RC/sc Attachment
UCC 016673
Bagging and c le a n in g
(A ttachm ent)
sss
<<a
111
bo fan bn GCG CO H *H *rH aaa Pi ft ft ft < H *H *H ^^^ w Pi CO CO CO
sss
<c a
iii
bo fan bn ccc tH *H *H aaa ft ft ft H *rH H m^^ -p -p +-> CO CO CO
s saa
<; ft ft
till
bn bo bn bo . CCGC
H H iH `H bn bn bn bn bn bn bn bn dd dd n n nn
tj x! x) n c a aa dddd
bn bn ho bn GGGG H *rH *H *H GGGC dddd CD CD <1) CD --1 rH rH rH oooo
S2 S S
<< aa
iiii
bn bn bn bn GC GG rH *rH *H *rH bn bn bo hn bn bn bn bn cS rt d d DDDD
a T3 a x) GG GG cS ci d d
bn cn bn bn GGGG rH H *H CGGG d d ci ci O 0 <D i-K rH rH rH oo o o
bn G H G d <D rH
o
TJ
G
bn bn d
Gc
H H
bn
aa G
a a H
rH H
bn
Jh Sh -P P>
bn d
CO CO m
P ww
E-* O 1 K< WO PS SMW
nW>
Eh S= <J
t
o A
1
1 1 I
A CO CO O cn e Eh CO ^ O CO pi <u \ W Wn 6 taW'H a co t-i w
< w^
1------------------ 1 1
oooai
<N rH
in
o A
1
1 1 1
11 11
rj< m in CO Ol 00
rH
o A
1 1 1 1
1|
*1 co m co ^ O O) ^ ^ CO .-c
,
m
o A
1
1 1 1
1 1
O O CD CO cn o1 co o
<M
a DC (M CD CD
oO o
1 1 /2 7 /7 9 D. R. P o w e ll 38 1 .8 6
RESULTS
cn 0) W P>
ss MG E"* 'H
s
in co ^ Tji a CD
w Pw
aa
S Sw < Eh CO
UPu XXX U U t-i
cacQW
SS2
CO CO CO
C'HO ^a o
MO OOO ^ O CO CD
rH
t-- d CO CD
^ O 00 ID rH
cn cn cn U ^ 5h <U d> <u X3 Tj Xj ccc ddd PPP
KWH
ooo
CGGG ps ? 5= oooo 5h P M Sh cq m m m
aaaa
aaaa
' rH t--^ rH rH rH rH rH rH CD <X> CD CD ???? oooo aaaa
xXXX
PQQQ
cti rH m in
e ci X bfi o G rH rH -d GG Gd DA OO
S5 pH
o
G ? O
P
a
CD
t\
CD w co Eh \ C rH Q rH
a cn
c- o \\ CD CD <N <N \\ rH rH
rH i--(
a
o
\ CD <N
\ rH
rH
UCC 016674
aa a
t- o
\\ \ t> t> CO CO CO \\\ rH rH rH rH r--1 rH
INTERNAL CORRESPONDENCE
.y\
(V-A
<4
aYk ..O'
.W
"(
1 0^^
NOV 2 0 1S79 jatfClYlliW-
}<U(6) Af
"-vIMICALS AND PLASTICS
P. O. BOX 8361, SOUTH CHARLESTON, WEST VIRGINIA 25303
Mr. D. L. Johnson 511--5518 (512)
Mir. Mr. Mr. Mr. Mr. Mr. Mr. Mr.
vt, ciiW^Carma n>
G. F. Hurley C. R. Johnson D. R. Paugh P. A. Perry C. E. Richardson H. L. Robinson E. C. Shipley
Date November 16, 1979
Originating Dept.Technical Center. IH/EP
Subject
[Asbestos Monitoring^
-704 Powernouse, First and . Second Level
PROJECT
Determine the exposure of Construction workers to asbestos fibers during insulation stripping in Building 704.
DATE OF SURVEY
October 26, 1979
DISCUSSION
On October 26, 1979, separate breathing zone samples were taken on J. C. Erwin, J. F. Chandler, S. M. Barker, D. R. Powell, and P. M. Brown to determine their exposure to asbestos fibers. They were stripping and bagging approximately thirty feet of an 8-foot by 6-foot exhaust duct coming from No. 3 boiler in Building 704 - Powerhouse on the first and second levels. During the - stripping and clean-up procedure all Construction workers wore Norton disposable dust respirators, gloves, and coveralls. All others who needed to be working in the 704 Powerhouse operating area were given 3M disposable dust masks to wear during the strip ping. Because the duct was hot and electric motors were situated near the duct, the insulation was only minimally wetted with a garden sprayer.
The dust created by the stripping and throwing the insulation to the floor became so heavy that the insulators were advised to
UCC 016675
Mr. D. L.. Johnson
2
11/16/79
hand the insulation to the laborers to be bagged. The stripped asbestos was placed in plastic bags for disposal.
-
When the dust became so heavy at the site of stripping on
the second level, samples were taken on the first level on the
north and south side of the stack.
'
. ?.
After the stripping of the duct on the second level was com- :
pleted and the dust had settled some, breathing zone samples were ;
taken on D. R. Powell and P. M. Brown as they finished bagging__thej/
stripped insulation and cleaned the second level area.
'
:
When the stripping started on the first level, only area samples were taken. Two samples were taken on the first level on the north . and south side of the stack, and one sample was taken on the west wall north of the stack on the second level. All area samples were placed at breathing zone level.
CONCLUSIONS
The dust collected on the breathing zone samples of J. C. Erwin, J. F. Chandler, S. M. Barker, D. R. Powell, and P. M. Brown, was so heavy that it was impossible to determine the concentration of asbes tos fibers on these samples. The results of the other samples are given in the attached table.
. Since asbestos levels were so high on samples taken after some.of the initial dust had cleared, they were likely higher during-the period of greatest dust concentrations. Since all people in the area wore masks they were probably protected if a good mask fit was . obtained.
RECOMMENDATIONS
It is suggested that all Construction workers that are involved with the stripping and disposal of suspected asbestos containing insulation be shown the Industrial Hygiene slide presentation on the proper handling of asbestos containing materials.
REFERENCES
Volume 38C-29X4-Rla Asbestos, Dust Determination By Membrane Filter Technique Using Phase Contrast Microscopy
UCC 016676
i
i
My D. L. Johnson
3
11/16/79
RESULTS
DATE 10/26/79
SAMPLE TYPE
Area
10/26/79 Area
10/26/79 D.R. Powell 10/26/79 P.M. Brown 10/26/79 Area . 10/26/79 Area 10/26/79 Area
TIME
ASBESTOS FIBERS
(MINUTES) (Fibers >5 |j.m/cm3) REMARKS
32/2 LPM
0.28
First level, north side of stack while dust was settling afl stripping on the sect level. Cleanup being completed on second level.
27/2 LPM
0.51
First level, south side of stack while dust was settling afl stripping on the secc level. Cleanup -being completed on second level.
15/2 LPM
3.93 -
Bagging insulation after stripping on second level finishei
15/2 LPM
2.97
Bagging insulation after stripping onsecond level finishei
51/2 LPM . /
1.01
First level,- north o: stack while first le1 being stripped.-
55/2 LPM
0.9
First level, south o; stack while first le being stripped. .
48/2 LPM
1.16
Second level, on wes wall, north of stack while first level be stripped.
REPORT PREPARED BY
Ruth Clise Technical Center Industrial Hygiene Group
CI,,J
Ruth Clise
UCC 016677
Mr. D/ L. Johnson
REPORT APPROVED BY George F Hurley
RC/sc
4
11/16/79
UCC 016678