PYROCLOR - DIRECT MAIL SHOT
Front Page CHOOSE 'PYROCLOR' AND YOU BUYf^CONOMyD
(Illustrated with picture of Seaforth Dock Complex) The Mersey Docks and Harbour company did)
Inside Pages
Only 'Pvroclor1-filled transformers would do for the 40,000,000 Seaforth Dock Complex..................
\ For meat, grain, timber, pulp and every kind of containerised
import and export, Seaforth offers a unique combination of IV*-'
capacity and the modern approach to cargo handling.
The meat terminal can handle the largest refrigerated ships
either commissioned or contemplated, with half a million cubic
feet of cold store capacity. The silo system at the grain
terminal has a capacity of 100,000 tons, with unloading
equipment to handle 2,000 tons an hour. The four container
berths' are 900 feet long, and the stacking area is big enough j J.
to land a Jumbo Jet.
^
' . 11-.
17
Seaforth-makes an enorniuueUuutrlliuLioii ~to~ tK5')gmodCtp'fIow
of traffic_gn-a'vasfc.-scale - the life-blood of our/small,
busy,""crow<3ed''island, and a key factor in our continuing
prosperity.
Throughout the whole complex there are altogether twelve substations containing a total of 21 transformers.
Everyone is *Pyroclor*-filled.
/ 0102905
,../2
TOWOLDMON0022361 WATER PCB-00006830
T
-2 -
Why Pvroclor ?
Safety was a prime requirement so the Mersey Docks and Harbour Company specified Pyroclor based on successful experience on other projects, and backed by the recommendation of the company's consulting engineers, Rendel, Palmer and Tritton.
The answer is summed up in one key phrase 'SAFETY p1
ff j>f^y <
p/ui /?el
Safety.ulus Eoonemy
For a start, there's the total absence of fire-risk with
Pyroclor-filled transformers. This means that there was
__ no need for costly automatic CO, fire-fighting installations
^\Voc*wi'a.4 lO.11.
o
^
^ and immediate saving of more than 5,000, and further
economies over the years because the cost of maintaining
and testing such equipment does not have to be met.
Then there1s the advantage of 1 load-centering A Pyroclorfilled transformer can be sited to save long and costly M.v. cable-runs - even in a high fire risk area like the Seaforth timber terminal. The savings on installation totalled some thousands of pounds on this count also. A further source of economyis the exceptional degree of
reliability and virtual freedom from maintenance. The Pyroclor fluid sealed into these transformers will not be disturbed for the next quarter of a century.
your next project may not be as vast in extent or
as
Seaforth, but Pyroclor-filled transformers can still offer you
significant eooaems./jj--Vn. S-e^Js^
0.-.K } 1lyfi ijrUXJ
I
c
0102906
.../3
TOWOLDMON0022362 WATER_PCB-00006831
3
Back Page Write or telephone for the pvroclor literature get the full story of Pvroclor economy ....
ECONOMY AND SAFETY
^ SLVftC'^'
IllWtl
' (5^ fire-risk, no costly fire-fighting equipment required
in sub-stations, no periodical testing)
ECONOMY AND RELIABILITY (25 years' trouble-free operation, no inspection, no maintenance)
ECONOMY AND FLEXIBILITY ^Complete freedom^o install where YOU want them)
ECONOMY AND EFFICIENCY (high impulse levels, lowloss_^evels, low noise levels)
ECONOMY AND SPACE SAVING (to save space is to save money)
/"//- ?
leiiMi'-ir'f
SA-fSTi
CHOOSE QUALITY ...CHOOSE D001I011Y-. . .CHOOSE PYROCLOB1
Pyroalor-ia--a- 1
MONSANTO 10-18 Victoria Street, London SWlH ONQ
01-222 5678
0102907