Wj B< PAPAGEORGE - 5T. LOUIS December ?, 1970
PCB ENVIRONMENTAL PROBLEM NOVL-MBER STATUS REPORT
" H. S, Bergen
J. Mason . J. E, Springgate
P.J.A. Marsh W. S. Clark J. R. Durland -
M. W. Farrar -
E. V. John --"-Or', e. Keller -
R. M. Kountz T. L. Gossage P. S. Park
W. R. Richard J. R. Savage E. P. Wheeler
BRUSSELS
TOKYO 2nd Street
2nd Street
MARKETING:
NCR appeal's to be making very satisfactory progress toward the replacement of Aroclor 1242 in their carbonless reproduction paper solvent. To date, Monsanto has shipped nearly 100,000 pounds of the replacement product - monoi3opropyl biphenyl (MIPB) to NCR. An additional 100,000 pounds Is scheduled for delivery in January followed by 500,000 pounds in February. NCR is attempting to reach complete conversion by the end of February.
Through our Australian organization we have received an inquiry from the Electracity Trust of South Australia. They have recently.received corres pondence from General Electric Company, U.S.A,, concerning the problems with Askarel Liquid Di electric. As a result, they are requesting infor mation from Monsanto as to the arrangements in Australia for the disposing of contaminated mater ials. We anticipate other inquiries from other parte of the world.
We met with Mr. Katayama of MMK in November. We discussed with him the PCB plans in the U.S. and re viewed the current situation in Japan. As a result, MMK representatives will meet with Kaneka (the other major supplier ofpolychlorinated biphenyl in Japan) to discuss future PCB plans for Japan.
HONS 202077
2-
ENGINEERING:
Incineration - Krummrlch - CEA 2^15
'
Plot plans and layouts have been resolved, and process
design Is complete. Design of piping, electrical, and Instrumentation are proceeding on schedule.
MCS 1016 - Krummrlch - CEA 2^17
Customer trials of the pilot plant product indicated an undesirable high level of low boilers. In a meeting with Research and Manufacturing it was decided to provide facilities in the project for removing a percentage of low boilers as well as the high boilers. The project scope and estimate are being revised, and a revised Data Transmittal is scheduled for submission in late December.
Trlbutyl Phosphate - Queeny - CEA 2371
An early pilot plant run indicated a severe yield problem in the process. Continued studies by Res
earch and Engineering have pinpointed some of the problems, and It is believed a substantial yield improvement can be made.
Pre-approval funds have been requested to proceed with definitive design.
N-C Phosphate - Queeny - CEA 2^51
Pilot plant studies are currently being made on this product, and a project scope report la being developed.
SolId s Was to Disposal - Krummrlch_-CEAJ&O^ 2
Engineering, Research, Manufacturing, and Marketing have been studying disposal of polychlorinated biphenyls on solids. A test was devised with Envlro-Chem, samples of wastes have been collected, and the test Is scheduled to be run December 1.
Preliminary discussions have been held with potential
equipment vendors.
_
JAPAN;
No new action or reports on toxicity to fish/anlmals. Court action on suits on bran oil exposure humans continuing with attendant-newspaper publicity. Major executives of company which processed bran oil cannot be located. More stringent testing and licensing of equipment using PCB as heat transfer will probably ncc f f.'T f'f>od preceding cquipificnt
MOMS 20207*
3- -
NCR-Japan rejecting HB-40 because they prefer one oil
for both clay and resin-type granules and Jujo Paper is definitely switching to resin-coat. Kureha oil refined
from heavy oil cracking bottoms (mixed aromatics' of complex nature) is also being tested. MMK is pushing MIPB assuming NCR-Dayton preference for MIPB. No final decision yet. HB-40 also offered by MMK but MIPB provides better balance on blphenyl/terphenyl.
EUROPE;
1. The decision has been taken to cease sales to noncontrollable applications in the UK by 1 March, 3971.
.2 Sales will continue for ail applications in continental Europe until the end of 1971j but reformulated products will be introduced where possible.
3. We will continue to supply pmducts containing PCB's to German mines through 1971 even where reformulated
products are available, until approval is gained for the reformulated products.
4. Customers will be informed before the end of November 1970 of this policy.
5. We have been assured by the other European producers that they will not knowingly supply former Monsanto
customers in the UK or USA.
6. Bayer have indicated that they are in agreement with
the Monsanto timing for withdrawal from noncontrollable applications.
Y. Progil/Caffaro do not yet agree and wish to study
the problem further. We have Invited their repre sentatives to Ruabon for technical discussion.
0. The UK Board of Trade, through their Marine Safety
Department, have proposed that Aroclor should be
classified under Class 9< Dangerous Goods, for the
purpose of carriage by sea. We will meet with the
Board of Trade in December to discuss this and
following discussion with J, T. Garrett will attempt
to persuade the Board of Trade to alter the pro
posal .
.,
HONS 202079
MEDICAL;
Arrangements were made for Initiating acute and sub
acute studies at Industrial Bio-Test Laboratory for
Aroclor 1221, 5432, 544? and MCS 1016, Sub-acute studies
will include 90 day rat and 90 day dog studies and sub
acute fish studies (according to protocols to be devel
oped). Rat and chicken reproduction and rabbit tera
tology studies are being deferred for the time being.
Rabbit teratology studies were begun with Aroclors
1242, 1254 and 1260,
'
PUBLIC RELATIONS?
The Anniston Star, Anniston, Ala., obtained figures
from the FDA which showed unusually high levels of PCB
In fish samples taken from Choccolocco Creek. A Star
reporter oontacted the Anniston plant for comments on
the data and Information about our PCB production oper
ations there. Public relations prepared replies to
specific questions.
.
Plant management convinced the reporter to visit the plant for a firsthand view of what the plant was doing
to eliminate PCB escape to the environment. A factual front-page feature appeared In the Star Sunday, November 22, edition reflecting the value of cooperation with news media planning PCB stories.
' Quoting both plant management and the Alabama Water Improvement Commission, the feature emphasized the PCB
problem was relatively new, was being solved by Monsanto
and, at this point, was no cause for public alarm.
RESEARCH:
Biodegradation Testing - St. Louis -
'
Statistical analysis (t-tests) of the data accumulated
to date in the semi-continuous activated sludge (SCAS) testing of the PCB Aroclor products Indicates that some bacterial degradation is occurring. The percent, dis appearance rates, based- on a feed level of 1 mg/cycle,
were as follows: MCS 1043--55* {? - 0.05); MCS 10l6--
llSt (p 0.05) i Aroclor 1242--30$. (p - 0.05); Aroclor J?f>4 -Ojt (p 0.05). However, the observed degradation
HONS 202080
5- -
rates are still highly scattered Indicating that the
units have not reached a steady state yet.
'
Other physical sources of data scatter are being Investi gated, The addition of stirring, modification of the sampling method and the elimination of the LAS from the feed all appear to be steps in the appropriated
direction, but have by no means totally eliminated the scatter.
SCAS testing of trichlorobenzene (TCB) and Arobromochlor 3232 at the 1 mg/cycle level have been started and analysis of the first samples is in progress.
River die-away (RDA) tests have been started for Aroclor 1242, Aroclor 1254, MCS 10l6, MCS 1043, Arobromo chlor 1232, and TCB. Completion of the RDA tests is scheduled for 1-13-71.
A liquid chromatographic method for the analysis of halogenated terphenyl systems is being developed. A liquid-liquid chromatography -system using Zipax Permaphaze (a new DuPont chromatography packing) as the stationary phase and water/methanol as the mobile phase appears to give sufficient separation to characterize the isomeric distribution of the materials. The system is being optimized for solvent composition and column length.
Environmental Program - U.S.
*
Analysis of a second set of Mississippi River fish collected above and below the WGK plant has been com pleted. The levels found in fillets from these fish
ranged from 0.2 ppm to as high as 8 to 9 ppm total PCB's.
All the necessary equipment for PCB's, with the except
ion of two gas meters, required to sample the Enviro-Chem St. Charles incinerator has been assembled and laboratory tested. The PCB bum is now scheduled for 12-1-70. Additionally, analysis of background samples taken at
the site 10-29-70 for PCB has been completed. Low levels of apparent PCB'a were observed in all cases. The PCB analysis of the JFQ September and October sewer water composites has been completed. The levels found,, 77 ppb and 70 ppb respectively, were higher than in previous months.
Shrimp from Escambia Bay, fat and liver from a dead
pig found near the Anniston landfill, OE plant water
samples, Delaware River phthallc acid, and a U.S. Steel
plant water effluent sample have also been analyzed for
PCB's,
.
HONS 2020*1
-6-
Partlcle size analysis by microscopy was performed on a solids sample from the Anniston limestone waste pit.
Correlations are being developed between particle size of adsorbent and waste retention In the Aroclor waste treatment studies.
Aroclor 1121 and 1129 distillation fractions were anal yzed by QC for isomer distribution to compile data for plant design.
Aroclor 5442
We recently reported tetrachlorodibenzofuran as s possi
ble Impurity In Aroclor 5442. Additional work has shown
that this Identification Is not conclusive; tetrachloro-
methyl biphenyl might Interfere with this determination.
Methylbiphenyl has been shown to be an Impurity in
the Santowax R used to make Aroclor 5442. Efforts are
currently underway to develop a reliable method for
distinguishing between chlorinated dlbenzofuran and
chlorinated methylbiphenyl.
'
Environmental Studies - Ruabon
Workers at the Tolworth Laboratory of the Ministry of Agriculture, Fisheries & Food have been studying effects of feeding Aroclor 1242 to pigeons and quail. Their
analyses have Indicated, what we have ourselves sus pected, that the residues tend to resemble 1254/1260. Discussion with Bailey and Bunyan from this laboratory shows that they now believe that Aroclor 1242 may be a major source of the environmental .pollution. They have also "discovered" that reproducing paper of the no carbon type is s potent source of Aroclor 324? and,
Although they have not published this inforaation yet, they may wish to do so as an explanation of the presence
of PCB In cardboard. Feeding trials using single Isomers
are alao planned by the Tolworth group, who are hoping to eatabllah metabollo routes for the degradation of FC8*a In animal organs. A visit was made to the Monks Mood Experimental Station of the Nature Conservancy,
but little new information emerged from the discussion.
Biodegradation - Ruabon
.
It has been confirmed that 2,3,2', 3', 4', S'-hexaohlorobiphenyl is degraded by c2 when mixed with lower chlorine isomers. This has been achieved under less vigorous conditions of flask shaking than previously,
which suggests that the addition of the lower chlorine isomers has increased the solubility of the material.
We are currently studying a pentachloro-biphenyl. which should degrade, and the 4,4'-dichlorobiphenyl, which should he resiM-ant-. using a similar technique to im-
MOWS 202082
7- -
prove solubility. The analytical results are awaited on these tests..
The results of degrading a series of pcb products with Cg until no further change with time can be observed are now available. Subject to limitations Imposed by the difficulties of Interpretation of the GLC chromato grams it appears that the order of degradability, or the inverse order of apparent residues, is as follows:
MCS 1016, MCS 717, MCS 762, Fyralene 15OO, Aroclor 1242
Satisfactory progress in the Identification of isomers corresponding to the peaks obtained using high select ivity PLOT columns is reported, but development work is still needed on GLS - Maes before this can be util ized.
The most recent results on attempts to degrade HB-40 by C2 have shown that at low concentrations (5 ppm) con siderable degradation has occurred. The main problem in this Investigation has been that of sensitivity in the analysis, but this problem now seems to be overcome.
Pydraul Reformulation
Factory Mutual Visit
A representative of FM visited the fire test facility November 4 and 5. Tentative PM approval was obtained for Pydraul 625-A, F-9A, MCS IO63 (Turbinol 153A), MCS 1066 (312A), MCS 030T, 050T, O05T, 0115E, Santosafe W/G 15, 20 and 30. All fluids submitted were approved.
Pydraul 312A
A VI05C purup test on MCS 1066 indicated excellent lubri city. A tentative process will be issued shortly.
pydraul 54OB
The terphenyl version is tentatively defined. The FR la equivalent to old 540. Approximately 3S^ of a poly glycol VI improver will be incorporated to meet old 540 viscosity specs.
Pydraul 230A
A terphenyl blend has been developed which looks good on the FM spray test. It will contain 2j6 of a poly glycol VI improver to meat ?30 viscosity npecs.
HONS 202063
-8-
pydraul 135A
A blend of TCB, 5432, oil and Sanfclclzer 711 has been developed which looks excellent on the FW spray test.
Turblnol 153A
'
MCS 1063 demonstrated good lubricity in a V105C pump test. The moderate wear noted was attributed to high TAN Krummrlch CDP. This fluid also exhibited low deposits In the Alcor Deposition test.
pydraul A-200B '
A lower viscosity F-9A type blend was blended, tested and a tentative process Issued to fill an order from Chevy Messena. They refused to purchase any more fluid containing PCB's.
A V105C pump test was terminated at 225 hours due to mechanical failure of the pump. A lobe cracked off of the rotor. This is considered to be a mechanical
failure and not fluid related. The test will be repeated Just to make certain, though, lhe wear observed up to 225 hours was very low (11.8 mg total) and no problems are expected.
Carbon Adsorption Study
The pilot unit (series of four five-inch diameter columns), that was put on stream 10/2, continues to operate with minimum difficulties. The initial flow of 2 gpm/fta was increased to 4 gpm/ft^ on 10/28. Effluent quality, at the present flow, is <-10 ppb Aroclor for Influent con
centrations in the range 100-2,000 ppb. The present plan is to increase the flow to 6 gpm/ft2 by II/25.
MANUFACTURING;
W, Q, Krummrlch Plant
PCB Levels In Sewer
A. Aroclor losses from the Aroclor Department averaged about 1.0 lbs/day and ranged from about 0.4 to 2.5 lbs/day.
Losses from the Sauget Village treatment plant for the period 10/16 - 11/16 averaged 72 lbs/day (495 ppb).
Range for 9 samples was 32 to 115 lbs/day (220-790 ppb).
HONS 202084
9- -
Projecta To Reduce Sewered PCB's Prom Aroclor Department
A. Blow tank demister project was successfully
demonstrated. About 100 lbs/day of mist Aroclor is being collected. Sewer loss has been reduced from
about 20 lbs/day to about 0.5 lb/day. .
B. Project to provide paving, curbs, trenches, and catch basins in the tank car and truck loading areas has been approved as part of the Aroclor incinerator project. The design package is about 75^ complete.
Program To Eliminate Sewered ?CB(s .From Using Departments
A. A second meeting with Don Roush is scheduled for
12/7/70. Don will discuss with plant production and engineering personnel design considerations for ' changing Therminol units to non-Aroclor Therminols.
B. Status of work on Therminol units is as follows:
Dept. 255 ..
Switched from PR-2 to Therminol 66
on 11/16/70.
Dept. 222 0 & P,
Dept. 2?3, Dept. 2ko
Plans underway to change out these systems to Therminol 6o. EDO for all units is 3/l/7l.
Removal of Soluble PCB's Prom Sewer Stream
A test is planned for the week of 12/7/70 to determine effect on Aroclor losses in the treatment plant effluent by neutralizing the sewer flow to the treatment plant,
id mu will be added at Dept. 265 for about 3 days to hold the pH above 7.0 at the treatment plant. The re
sulting floe Is expected to Improve PCB removal based on Anniston work.
PCB Levels In The Atmosphere
Sampling program has been completed. Only significant area of loss is at the mix tanks due primarily to the nitrogen purge. Loss is in the range of 4 to 5 lbs/day.Plana are to replace the nitrogen purge with a nitrogen
blanket.
F;CB Rework Project
Project approved as part of the Aroeior Incinerator project. Construction schedule will be determined
in December.
.
HONS 202085
10
Anniston Plant PCB Levels In Sewer
Aroclor losses during November averaged 25#/day (4620 ppb).
One high value accounted for l8#/dey, neglecting this the "
November average would be 7#/day (1410 ppb). Based on
knowledge of plant operations and performance of abatement
devices in November, much of the high level data is due to
sample contamination. ->
.
Spills
'(
Minor leaks were contained by use of sand and disposal in drums. No spills occurred.
Projects and Fvaluatlon3
1. Laboratory work to date indicates the presence of minimal amounts of PCB in the residue from Solid Aroclor distil' lation (Montar 5) This eliminates 10TT pounds per year or solid wastes from our PCB disposal plan.
2. Design work to collect spent carbon from HC1 carbon
towers has been deferred to early 1971 to accomplish the No. 1 HC1 Limestone Pit rebuild.
3. Solids removal from plant effluent (part of program to reduce PCB in plant effluent to 10 ppb) is moving
forward with preliminary screening tests at Denver Equip ment Company and Betz Laboratories indicating good to moderate success with flocculation and settling. Fur ther laboratory testing is scheduled for early December. A project has been written, design is underway and equip ment modifications under study working with Monsanto Biodize to set up one of their clarifier* at Anniston for pilot scale testing of the apparent best techniques recommended by Denver and/or Betz.
4. A successful test was made of removal of limestone Inerts from the #2 HC1 neutralization pit while in operation.
A total weight of 127,000 lba was removed of which 36$ by weight was solids. Lab analysis of the total material revealed more than 100,000 ppb Aroolor or 12 to 15 lbs of Aroclor. Present Indications are that.this method of removal of nolichs while the pit Jo In operation will increase the efficient life of the pit by 2556.
5. A project for repair of the No. 1 HC1 neutralization
pit was written and approved. This project will be
coordinated with the Niran pit project to apply an
asphalt lining at the same time, to save money on mater
ial a.
.
HONS 202086
-11Newport Plant The October Newport Report has not been received.
W. B. PAPAOBORGE ms
HONS 202087