Document 3MbLKLNEpmZOZ48GyZa8qmkO
[pJ-o/Yy fctx-
UNION CARBIDE CORPORATION ENGINEERING. MANUFACTURING. AND TECHNOLOGY SERVICES
Central Engineering South Charleston, West Virginia
UCC BUSINESS CONFIDENTIAL
April 6, 1987
RECEIVED
APR 71987
PR KAVASMANECK
TO: L. E. Calvert S. W. Clark G. B. Elder R. W. Engle S. S. Murphree
COPY TO: R. R. Allen H. N. Baylor D. 3. Dickson
Jr: X: Franson Kavasmaneck
J. G. Keeler M. G. Lilly, Or.
B. G. Perry J. E. Sanders S. W. Turlcch!
FROM:
C. C. Neely
fh
RECErvHD
ApR * 2 1987
SUBJECT: Minutes of Task Group Meeting of March 17, 1987 Phaseout Use of Asbestos-Containing Materials In Work Place
Chemicals and Plastics Group
J
Following Is an Executive Summary of the action/agreements resulting from the subject meeting. The detailed minutes prepared by the responsible Task Group member are attached for those who desire additional Information.
Executive Summary
The "heart" of the C&P Group asbestos-usage phaseout program Is the requirement that no asbestos-containing products be purchased after January 1, 1989. Consistent with this date, the Task Group agreed last fall when preparing the proposed program that the affected valve, piping, and process vessel Standard Practice documents must be revised to show substitute materials by July 1, 1988, and manpower estimates were made accordingly. However, because of the rapid (and very likely, continuing) reduction of suppliers of asbestos-containing materials due to liability Insurance coverage problems, In combination with the desire of key plant personnel to cease using these materials at an early date, the Task Group
UCC 005974
Meeting Minutes
2- -
April 6, 1987
recommends that the responsible CED skill areas complete the required revisions to the affected Standard Practice documents by September 30, 1987.
Action
H. N. 8aylor R. R. Allen
This accelerated schedule will require additional technical assistance In the Piping Technology skill area. Preliminary discussions with R. R. Allen and R. W. Engle regarding the possibility"of an accelerated schedule were held on March 23, 1987. Arrangements to obtain the needed technical assistance should now be made.
Action J. E. Sanders
The total CED cost of the accelerated program In 1987 over and above planned and budgeted T&S programs Is estimated to be $34,000, much less than our earlier $93,000 estimate which was developed last September on the basis that much more work would be required. Funding for this activity is needed.
Action
P. D. Franson D. J. Dickson
The Task Group requests the assistance of the Machinery Technology Group In Identifying what actions. If any, are needed to assure that the broadly advertised aramld fiber nonasbestos asbestos gasket substitutes are not used In machinery items (e.g., pumps, compressors) for our process units. One of the major reasons these materials are
generally considered unsuitable for gaskets Is because they will not pass fire tests. The perception Is that machinery manufacturers are'uslng these materials without our know ledge and consent. Any costs associated with this request will be In addition to the $34,000 mentioned above.
Action
The Task Group requests advice as to where the now-approved
asbestos-usage phaseout program documents will reside. It
J. E. Sanders needs a permanent "home" within the TMS manuals system.
N. Clark suggested It be Included In Section 8 of_the
'"Safety Health^manuaT -- fins rs' The Operaflon arid Maintenance
Section'
'
The meeting agenda was based on the duties listed In our recom mended program that are delegated to the Central Engineering Department. These duties are listed below along with a brief summary of the action/ agreements reached:
A
Agenda Number
Responsibility
Duty and Actlon/Aqreement
4.1
S.H. Clark/C&P Industrial
Iden11f1 cat1on of Asbestos
S4Hygiene Department erry Hanning)
Contain 1ng_materUXsi C&P Industrial Hygiene Department
estimates completion of Criteria
Document 4Q87. No cost to CED.
^ JJU IH cs-J&ct
UCC 005975
Meeting Minutes
-3-
Aprtl 6, 1987
Agenda Number
4.2
Responsibility G. B. Elder
Duty and Actlon/Agreement
Reglacement of_Asbestos-Conta1n1ng Xnsuiatlon_as Required_to Maintain Structural_and_FunctIonai integ rity. Responsibility of each location; CED-prepared criteria not required.
4.3
_S~-W--ClarkTG&P Industrial
Removal,.Modification,_and/or
Hygiene Department
D1sposal_of Asbestos-Containing
'7TerryHann3ng)
Materials. Procedures already In
place at all locations; no further
action required.
4.4.1
G. B. Elder (Materials)
Use of_Asbe$tos-Substitute Gas-
kts/Packing. Extended use of GRAFOIL", spiral-wound with GRAFOIL" or TEFLONm fillers or reinforced TEFLON" will cover our needs for now. Internal program of testing other non asbestos substitute gasket materials not needed; will rely on test data developed by Materials Technology Institute (we are member) at no additional cost to CED.. A concern was raised regard ing the control of the use of the aramid-reinforced "nonasbestos" asbestos-substitute materials for gaskets In machinery items (e.g., pumps, compressors, etc.). These materials will not only not pass fire tests but will also perform poorly as gaskets because of their propensity to cold flow. The perception Is that the vendors are making these substitutes without our knowledge and consent.
4.4.2
R. H. Engle (V&P Specs)
Two-to-three manTmonths of work Is required to revise and Issue valve manual and V&P Specifications. Can accomplish this with in-house staff by original July. 1988, target date; however, will prob ably need technical assistance to meet required September 30, If87,
completion date. Approximate additional cost to CED $20,0M.
UCC 005976
Meeting Minutes
-4-
April 6, 1987
Agenda Number
Responsibility
Duty and Actlon/Aqreement
4.4.3
C. C. Neely (COP Specs)
Modest additional manpower re quired to revise specs; however, printing/distribution cost of unplanned revision of COP Specs in
1987 not Included In T&S budget. Estimated additional cost to CED: $8,000.
5 C. C. Neely
Condyctlng_on-site_semi.nars at major p1ants_not_requ1red; Key plant personnel do not need to be "sold" on need to quit using asbestos-containing materials In favor of more costly substitutes. They are fed up to here with even more costly monitoring, record keeping, disposal requirements for asbestos-containing materials, etc.; and hence, are desirous of -haying Standard Practice documents available to allow them to cease using these materials prior to the mandated January 1, 1989, cutoff date.
6
G. B. Elder <H. G. Clem)
Identlf1cat1on_of Asbestos-Free
Insulation^ Hill prepare Location
Practices for Inclusion in Insula
tion Manual as appropriate by end
of third quarter. Estimated cost
to CED: $6,000.
6.1 C. C. Neely
Next_Meeting^ Unless the need for an earlier meeting is identified, the next meeting of the Task Group will be held on August 4. 1987, at the South Charleston Technical Center in Room 3505. All members are requested to mark their calendars accordingly.
The detailed minutes are attached for those Interested In more complete Information.
Respectfully submitted.
CCN:at Attachments 43141
C. C. Neely for the Task Group UCC 005977
ONION CARBIDE CORPORATION ENGINEERING, MANUFACTURING AND TECHNOLOGY SERVICES DEPARTMENT
HEALTH, SAFETY AND ENVIRONMENTAL TECHNOLOGY South Charleston, West Virginia
BUSINESS CONFIDENTIAL MEMORANDUM March 23, 1987
TO: C. C. Neely
COPY: FROM:
L. E. Calvert S. W. Clark G. B. Elder R. W. Engle P. R. Kavasm&neck S. S. Murphree J. E. Neff
T. E. Hanning
RECEIVED
MAR 2 41987
CCN
SUBJECT:
Asbestos Implementation Task Group March 17 Meeting Minutes
Clyde,
The following information is being forwarded for issue as
part of the subject minutes and, represent.* those items tagged for
responsibility by the(induTr&rlal Hygiene contact)on the Asbestos
Implementation Task Group.
' ~~--------------/
Also please find attached SH-256, Removal and Handling
Asbestos-Containing Materials, which is a Standard Practice of the CAP
Safety/Health Technology Manual. Section 2.6 of this standard deals
with the EPA regulations for removal and handling of. asbestos
materials and has not been updated with respect to recent EPA asbestos
proposals. The sections dealing with OSHA regulations have been
updated. SH-256 has been volatile and will be revised when needed as
part of my responsibility as a member of the Safety/Health Standards
Team.
Identification of Asbestos-Containing Materials
A goal of the asbestos task group is to establish a program so that asbestos will not be purchased after January 1, 1989. A CAP criteria ( guideline document ) for the identification of asbestos-containing materials is needed as part of the overall program. A consensus of CAP .Industrial Hygiene Departments will be sought as a basis for the criteria. The criteria will provide recommended techniques and when-to use them, .pricing', timing and accuracy of results, and other subjective information. Polarized light or scanning electron microscopy are two identification techniques that can provide fast and accurate confirmation for the presence of asbestos.
This assignment will have the following estimated schedule and cost.
Schedule: 4Q 1987. Cost: None, cost will be part of normal Safety/Health Standards Team Work.
UCC 005978
2- -
Removal. Modification, and/or Disposal of ABbes-fcoa-Contalnlng .Materials The need for a protocol to sample asbestos at the new 0.2 fibers per cubic centimeter of air exposure level was discussed. The protocol would be used to establish asbestos exposure data from the storage ( binders may deteriorate and release asbestos ), cutting and changing out of asbestos gaskets and packing. After discussion with Industrial Hygiene representatives, the need to develop a generic test protocol for asbestos exposure is not warranted since the OSHA Asbestos Standard clearly defines the sample taking method that must be used. The Plant Industrial Hygienist is familiar with this method and can quickly outline a technician's Job duties in taking air samples during storage, cutting and changing out of asbestos gaskets and packing. Additionally, the Plant Industrial Hygienist will be able to supply other recent asbestos exposure data from the plant monitoring strategy program, if available and applicable. This action will have the following estimated schedule and
C03t.
Schedule: Sample taking can proceed immediately with the support of the location Industrial Hygiene area.
Cost: None, resources are outside this task group. Sincerely,
Terry 11. Hanning 2000/3828 Onicom 8-721-5903
UCC 005979
TAMOARO PRACTICE
INTER DtVIRtON
BEOMBES 1986
UMCHU. AMD HAWK-IMG ASRCSTOS-CDKTAMIBIC mSUUTHW MATER1AI
I CENERAI-
1.1 This Practice provide* procedure for the safe removal mo handling of asbestos-containing Insulatloe material mo cmpltancc with OSHA regulation 29 CFR 1910.1001 anO 192b. 6* and EPA regulation 40 CFR 61 Subpart K. Tbt purpose of the Practice la to ensure the safety A0 health of employees directly Involved with perfuming the wort and of other*, either In the Imedtate area or downwind, who any he exposed to residual dutt/flbert. Insolation aatarlal containing asbestos Is no longer Installed by l&C; therefore, the concern of this Practice is to control renovation and dmolltlon operations lavolvtng the removal of eld. asbestos-containing Insulation; In these activities OSHA Standard 29 CFR 1926.S8 Is applicable. For additional details, review the OSHA Standards.
All Insulation Biterials approved through the use of UCC Insulation Standards have been specified asbestos-free since 1976.
2 STAHMROS
2.1 Remissible Exposure Units
2.1.1
Eeployee 8-hour tine-weighted average exposure to airborne concentrations of asbestos fibers shall not exceed
0.2 fibers, longer then S micrometer*, per coble centlueter of olr.
2.1.2
An octloh level of 0.1 fibers, longer than t micrometers, per coble centlaeter of sir has been set which
triggers the uonltorfng. uedlcel. and employee Information and training requirements.
2.2 Wort Practices
2.2.1
Insofar as practicable, demolition, removal or handling of asbestos-containing Insulation shall ba performed
while the material trio * tutftctently wet. etato bo peevett emission of airborne fibers exceeding exposure limits prescribed In
2.1.1 and 2.1.2.' See Section 2.7.2 for the specific EPA reguletlons that control wort practices. Wherever feasible, the
employer shell establish negative-pressure enclosures before comenctng removal, demolition, end rannovation operations.
2.2.2
Caution signs shall be posted at all approaches to trees which may contala excessive concentrations of airborne
asbestos fibers so that an tmployee may read the signs sad take necessary protective steps before entering the area. The signs
shall state:
Jttltf8-AS8ESTBS; CANCER AW LUNG DISEASE IWARD - AUTHORIZED PCRSOMKCL ONLY; RESPIRATORS AW PROTECTIVE CLOTHIH*. ARE RETIRED IW THIS AREA
In addition to these signs, legible signs warning of the health hazards of asbestos shall he provided and displayed at each location where airborne concentrations of asbestos fibers may exceed the exposure limits listed In Section 2.1.1. See Section 2.0.4.4 for additional requirement* for posting signs. Whenever feasible, a negative pressure enclosure must be established before commencing renovel, demolition or rennovetlon operation. "Air bxhedsted Tram the enclosure must pass through o KP filter (Sec 29 CFR 1926.68).
2.2.2.1
An appropriate barricade, using caution or barrier tape for exangle, shall be erected around the
perimeter of outdoor areas as a supplementary, protective measure to discourage unauthorized entry.
UCC 005980
22.6.1.2
STANDARD PRACTICE
JH-26b PA6E 2 OF 7
BECOlW.lt 8b
INTER WVISIOM
t.M
Insefer practicable, moved lawletloo shell k vetted end placed directly lets totaled pi attic beg* (or
ether editable ceaulnert) for dlepotal at aa approved landfill. Ottanrfu. piece plattlc sheeting beaaatb the job sit*. Met (pray the moved Insulation with water, ended water, er vetting agent and then place In plattlc Vag*- Men vet vethode el
movel/tleaaap are Inprectlcal. e.g.. when tMperataree are below freezing, vacmming er (weeping way nerve at an effective alternate cleanup method. Sweeping ceapovne thall be applied to the work erea to provent dust generation when sweeping. See
Sections 2.7.J.7 and 2.7.4 for (pacific wort practice regilnanti. -
1.1,4
label Specifications - Container cewtlon labels thill be printed la Intten of sufficient size and contrast as
to be readily visible end legible. Mere feasible. Installed astattot-cootalMAg products stall also contain a visible Isbtl.
The label shall state:
DANGER - UNITAIKS ASBESTOS FIBERS; AUDIO CREATING DOST;
CANCER AW LUNG DISEASE HAZARO
Nhere feasible. Installed asbestos containing products should be labeled la accordance with 7-2.4.
2.2.S
Regulated Areas Eaployert oust Identify at regulated areas any locations!* their workplaces where there asp
be ocomatlonal exposures to airborne concentrations of asbestos above the PEL. Only authorized persons, with proper
respiratory protection, vey enter regulated areas which wist be clearly posted. Eetlng, drinking, end sacking ere prohibited In
regulated areas.
1.2.1
Housekeeping . All external surfaces In any place of employment shall be Maintained free of oeciaulatlon of
asbestos fibers. Speclel attention should be given to cleaning scaffolds used In demolition work. Clean-up of asbestos dust Is
prohibited with cuapressed air, dry-suerping or any dry clean-up process.
2.2.7
Neste Disposal - Asbestos veste, scrap, debris, tags, containers, equipment, and cstastos-contoalMted
disposable clothing, that Is consigned for disposal end which vay produce airborne concentrations of asbestos fibers In excess
of permissible exposure limits, shall be collected end disposed ef In sealed leak-tight containers to an approved landfill. See
Section 2.6.4 for specific disposal requirements.
*
i.i Personal Protective Equipment
2.1.1
Respiratory Protection Eaployees engaged In the spraying (vettfng-dovnj of asbestos, the removal; In the
demolition of pipes, structures, or equipment covered or Insulated with asbestos; and In the removal or demolition of asbestos
insulation or coverings shall be provided with respiratory equipment based on the air concentration In Table I and selected from
aaong those approved by the Mine Safety end Health Administration, Department of the Interior, or the National Institute of
Occupational Safety end Health, Department of Health end Hmaan Services described in X CFR Part 11. Compliance with exposure
limits prescribed In 2,1, Permissible Exposure Limits, shall not be achieved by the use of respirators, except:. ..
1. Outing the Interval necessary to Install or Isplament feasible engineering and wort practice controls.
2. In work operations such as maintenance and repair activities or ether activities which the ewldper establishes that engineering end wort practice control procedures are not feasible,
L In work situations when feasible engineering and work practice controls era nut yet sufficient to reduce exposure to er below the PCI.
4. In emergencies.
Nhere respirators .are permittee the eaployer shell provide a powered, sir purifying respirator In lieu of any negative pressure respirator specified In Table 1 whenever:
22.6.1.2
a. An spicy** chooses to use this type of respirator; and b. This respirator will provide adequate protection to the employee.
UCC 005981
STANDARD PRACTICE rO
INTER DIVISION
SH-2S*
PACE 3 OF 7 DECEMBER 1986
TABU 1
ertPIBATMT PROTECTION FOB ASBESTOS. TREMOUTE. ASTmPHTU.ni. AM) ACTMOUTE FIBERS
Airborne Concentration of Subject Materials or Coabtaitlon of These Materieli
Required Respirator
1. Mot 1 excess of 3 f/cc OO x PEL)
1. Half-nest air-purifying respirator equipped with high-efficlency filters.
2. Not In excett of ID f/cc (SO x PEL)
I. Full facepiece eir purifying respirator high-efficiency filters.
X Mot In excett of 20 f/cc (TOO x PEL)
1. Any powered air-purifying respirator equipped with high efficiency filters.
X Any supplled-eir respirator operated in continuous flow aode.
4. Not in excett of 200 f/cc (1000 x PEL)
1. Full facepiece supplied air respirator operated in pressure denand node.
X Greeter then 200 f/cc (greeter then 1,000 x PEL) or unknown concentretion)
1. Full facepiece supplied air respirator operated in pressure demand aode equipped with an auxiliary positive pressure self-contained breathing apparatus.
2.X2 Specie) Clothing - The caplqytr the)) provide end require etc of tpecie) clothing, such ee covert)It or itailer whole body clothing, heed coverings, glovet, end foot coverings for aqy employee exposed. Contealntted clothing oust he stored in doted containers tuen at seeled lockers. It should be changed detljr.
2.3.3
Hygiene Fecilftiet end Practices - At ary fixed piece of eaplqjnent exposed to concentrations of asbestos
fibers in excess of pernlstibie exposure Haiti, the eaployer shell provide change rooas for aaplqyees working regularly at tht
piece. Two seperete lockers or containers shall bo provided each employee, to separated or isolated as to prevent contentnation
of the employee's street clothes froa hit wort clothes. Employees exposed to asbestos during their work shift oust shower
before leaving the plant and oust not leave wearing contaainated wort clothing. C^lqyees working to asbestos areas oust Neve
ready access to filtered eir lunchrooas and aust wash their face end hands prior to eating or anting. Protective'clothing aetst
not be worn la the lunchrooa.
2.X4
Laundering Laundering of aebestos-contaainated clothing shall he done so as to prevent the release of
airborne asbestos fibers in excess of prescribed exposure Units, fhose performing laundering of asbestos-contaminated clothing
. . ,aust be inforatd of ell requirements listed io Section 2.3, Persona) Protective Equipment. Cootealneted clothing shell be
transported in seeled iaperaeeble containers and labeled fa accordance with Section 2 2 6 label Specifications. If disposable
coveralls are used, they should be placed into containers witn asbestos for disposal.
V.
1 22.6.1.2 UCC 005982
SH-20O PAGE 4 OF 7
BEIEMBER 1966
WTCR DIVIbrON
2.4 Intotrtil m<tw AesoonsIbHItr
1.4.1
Marrltorlm - tnplqyoe exposure monitoring shell U toiMM to determine co^l lance status with regard to
penrisslble expolore Halts end respiratory protection requirements. Emrtrornwrtal/Areo rm!taring stall be conducted along tfaa
partpbeiy of the restricted area to assart that fugitive aattatona exceeding paralsslolt exposure Halts do act extend past the
demarcated area. Staples shall be collected eslng 2$ aa disaster nixed cellelose filters and a SO aai extension coni. Sasples
shall be of such frequency and patters es to represent with reasonable accuracy the levels of exposure of the employees.
Monitoring Is required at least every 4 norths for enployees nbose exposures to asbestos Is at or above the action level, bhere
construction standard 1925.M Is applicable, dally nooltorlng is required unless enployees use supplied sir respirators In e
positive pressure node. Snqrles oust be entlyzed using t phase contrast microscope calibrated asleg a phase shift test slide
and equipped with a Kalton-beckett graticule. The filter aanples oust be prepared using acetoae-trlecetln clearing solution and
be counted In accordance with the
rules contained In the U10SH 7400 nethod. *
2.5 Training
2.5.1
All enployees who are exposed to elrborne ssbestos concentrations In excess of the exposure Halt listed In
Section 2.1.2 with or without the use of resplretort shall participate 1" training progran at the tine of or prior to Initial
esslgruwnt and at least annually afterwards that Includes these Information topics:
1. Health affects associated wtth asbestos exposure.
2. Relationship between exposure to asbestos end smoking In producing lung cancer.
3. Mature of operations which could result In exposure to asbestos and necessary protective steps to nlnlnlxe exposure Including, os applicable, engineering controls, work practices, respirators, housekeeping and protective ClotMng.
4. Purpose, proper ose. fitting Instructions, and Imitations of the respirators used to protect ogslast ssbestos fibers.
5. Review of all provisions contained la 29 CFR 19lb.lUUl, Asbestos.
6. Purpose for and description of the asbestos medical surveillance pregrew.
7. Instructions for handling spills as well as ewergency and clean-up procedures.
2.5.2 Training records shall`he aalnulned hr the location and shall bo readily available to ell affected e^loyees and to OSHA personnel upon their request.
2.6 Medical Surveillance
2.4.1 Medical surveillance shll be provided to oil ewployees where exposure, without regard to the use of respirator. It at or above the action level for 30 or wore days per year.
2.7 Federal EPA Regulation, 40 CTR 61, Hetardous Air Pollutants; Sutpart M - National Emission Standard for Asbestos
2.7,1
Applicability - These requirements apply to the oewolftlon of structures or.renovation of equlpaeet and piping
that Involves reonval of Insulation that contains friable asbestos nstorlsls. Friable asbestos Mterlal weans any material
containing wore than 1 percent asbestos by weight that hand pressure can cru*le, pulvotixt, nr reduce to powder when dry.
Oewolftlon weens the wrecking or taking nut of any load-supporting structural meubsr of a facility together with aqy related
handling operations; on the other bend, renevetlon weans to alter one or wore facility components In qy way without taking out
load-supporting structural wethers. Planned renovation operations Include scheduled end unscheduled operations In which the
22.5.1.2
UCC 005983
o
I
i
I
i.
STANDARD PRACTICE
INTER DWIWON
SH-2S6 PAX & OF 7 PECEN8ER.1SM
Mount of friable asbestos MUriil thst will be removed or stripped within given time perted can ba estimated or predicted bated on operating experience. Adequate!; wetted weens sufficiently nixed or coated with water or an aqueous solution to prevent dust ewltsloas.
2.7.2
Key Notification hegulrements
1. fining - The EPA aust be notified with a written notice of Intention to dewoltsh or renovate according to these tlnlng requirement*:
a. As early as possible before renovation begins If planned, but not necessarily scheduled, renovation operations ore predicted to Involve the stripping or rawing of at least 260 linear feet on piping or 160 square feet on other facility components of friable asbestos meteriels wttMn a year.
0. At least lo'deys before a dewolltlon operation that Involves at least 260 linear feet on piping or 160 square feet on other facility coaqionents of friable asbestos amterials.
c. At least 20,days before a dewolltlon operation that Involves less than 260 linear feet on piping or 160 square feet on other facility components of friable asbestos materials (IPX requires further advance notice for these dnotltlon* that are shorter In duration!.
d. As early ns possible before a structurally unsound facility In danger of taarinent collapse Is demolished under en order of n state or local government agency.
2. Test of Notification Utter - A suggested notification latter for the dewolltlon and/or renovation of facilities containing friable asbestos material per requirements of 40 CFK 61, Subpart H, Section 146 (c). Is:
Form of notification
NOTICE OF INTEWT TO DOWLISH 00 PSKOVATE STRUCT!*tS. ECU1BCKT OK PIPING INVOLVING FK1A6CE ASBESTOS INSUIATION
1. Name of Owner
Union Carbide Corporation
2. Address of Owner 3. Description of Facility
(Location Street Address of facility being demolished or renovated). Various buildings, equipment and piping used In manufacture end
distribution of cheetcals and plastics and also as. size and prior
use of these facilities.
4. Estimate of Quality of Asbestos
Approximate amount of friable asbestos material present In the facility and exploitation of technlours of estimation ff estimate for
demolition operation Is less tlun 160 severe feet or 260 linear feet.
S. Scheduled Stan and Completion Oates
6. Methodist of Demolition/lienovatIon .
7. Compliance Procedures
How EPA regulations will be followed
. Disposal Site
Name and location of site where asbestos waste material will be
: deposited
Only parts 1 through 4 ere necessary for demolition operations Involving less than 260 linear feet or 160 square feet of friable asbestos material. The name, title, and authority of the State or local government representative who oreers the demolition should be odded to the notification for demolition of structurally unsound facilities. Some states. Including Ceorgla, New Tort, North Carolina, and California, also require notification of demolition and/or renovation operations involving friable asbestos materials.
l
. .22 6 1.2
UCC 005984
STANDARD PRACTICE
JM-6
PAGE 6 Of 7
DECEMBER 1l>-
INTER DIVISION
2.7.3
Key Rtnovol Seoul tenants - Per planned denotltloo operation or for the total of scheduled renovation
operations Id wftfck at taait It0 linear feet or >60 square feet of asbestos nataiial Is tenoned: ,
). Friable asbestos netertsls shall be ranoved before a otnolltlon or renovation operation If the operation nould likely break up or preclude access to the asbestos naterlals for subsequent renaval unless the asbestos nsterltls are on a facility component eocesed In a aeteria) such as concrete or are adequately netted whenever exposed.
2. If a facility ceaqnent is covered or coated with asbestos naterlals and Is ranoved In sections or units. It shall be carefully lowered, not dropped or thrown, to the (round level and shall have any exposed asbestos naterlals adequately watted while cutting or discoenectlng.
3. Netting is Mt required during renovations If the EPA is requested to confirm that wetting would unavoidably daaagt oqwlpueat. If the EPA confirms this, then s local exhaust ventilation and collection system oust be used to collect asbestos particulates. The exhaust xystaw Bust exhibit no visible ewtsstons to the outside air or bo designed end operated according to 40 CFR 61.164.
4. After sections or units of piping nr equipment with asbestos naterlals have been taken out of the facility, the asbestos naterlals during stripping shall be adequately wetted or aha! 1 be cellacted bjr a ventilation and collection systen as specified in z.7.3.3.
6. Dust-tight chutes or containers shall be used to loner asbestos naterlal ruaoved or stripped wore than Mi feet above ground level and not removed in units or sections.
6. All friable asbestos naterlals that have been renoved or stripped shall renafn adequately wet until collected for disposal.
7. If the aablent teaperature is below 0*t, then the only wetting requlrauents art those specified In Z.7.3.4 and 2.7.3.6. Equlpneat or piping coated or covered with asbestos naterlals shall be renoved to the naxleia extent possible.
8. For denolttlon of a structurally unsound faclltty under the order of a State or local government agency, the portion of the facility that contains friable asbestos naterlals shall be adequately watted during the wrecking operation. The wetting requlnenents specified In 2.7.3.4, 2.7.3.6, 2.7.3.6, and 2.7.3.7 shall also apply to ary eaergency demolitions.
2.7.4
Key Disposal Requlrenents
1. Tlstbla emissions shall not occur during the collecting, transporting, or disposal of ary asbestos-containing wasta naterlal unless tha air-cleaning nethods specified in-40 CFR fart 61.164 are used to collect asbestos fibers before they escape to the outside air.
2. The disposal nethod for collecting and transporting asbestos-containing waste naterlals shall be approved prior to use by the EPA, unless cither ef these two EPA-approved nethods ore used:
a. Fom all asbestos-containing waste naterlal Into noadriabla.pallats or other shapes, or
b. Adequately wet and seal while wet In leak-tight containers atl asbestos-containing watte naterlal. The waste containers shell be labeled according to Section 2,2.4.
22.6.1.2
UCC 005985
STANDARD PRACTICE
INTER OfVISION
Sh-lcM
PAtE 7 IIf 7
DECEHUERMSUS
3. The disposal site for asbestos-containing waste nateriet stall taw no visible wIiiIom, or the disposed nsterlal stall be covered within i* hours with et least six Inches of nonasbestos-coatalnlng awterial or with an effective resinous or petrvleue-based oust suppression agent (vast* crankcase oil Is not acceptable.) Alternative aethodx forcontrolllng asbestos calsslons oust have EPA approval before being frelenented.
4. Either a natural barrier or a fence shall adequately deter (as determined by the EPA upon request and supply of appropriate Information) public access to the waste disposal site. If fenced, then warning signs (tb* x 1*`| shall be posted at all entrances and at intervals no greater than 330 feet along the perineter of the sections of the site where asbestos-containing naterla) is deposlteo. The signs stall state:
ASBESTOS HASTE DISPOSAL SITE DO HOT CREATE OUST
BREATH1M& asbestos is hazardous to your health
t.b AUDITS
Z.b.l
Ucn location shall periodically audit this procedure to ensure uirierstanalng and compliance.
UCC 005986
tz.b.1.2
UNION CARBIDE CORPORATION
ENGINEERING, MANUFACTURING, AND TECHNOLOGY SERVICES
- ---
CENTRAL ENGINEERING P. 0. BOX B361
(AyMkJW 4.11
JSOUTH CHARLESTON, WEST VIRGINIA 25303
cSH** 44. |
MEMORANDUM
BUSINESS CONFIDENTIAL
March 23, 1987
TO: Mr. C. C. Neely
FROM:
G. B. Elder
SUBJECT: Input to Minutes, March 17 Meeting on Phase-Out of Asbestos-Containing Materials
Received
MAR 2 5 t987 CCN
Item 4.2, Replacement of Asbestos-Containing Insulation as Required to Maintain Structural and Functional Integrity.
Abestos-contalnlng Insulation becomes a hazard when the weather barrier becomes damaged or other conditions such as powdering of the Insulation allows asbestos particles to become airborne. Corrective action would be removal of the Insulation or sealing the barrier to prevent airborne dust.
The Task Group agreed that each location Is responsible for and aware of the problem and that a criteria from the Task Group Is not desirable.
Item 4.4, Use of Asbestos-Substitute Materials
1. Insulation
a. Insulation materials that do not contain asbestos are the only materials currently specified and used, so no action Is required.
2. Gaskets
a. Suitable substitutes are available and already accepted In the specifications (Grafoll, Spiral-wound with Teflon or Grafoll, reinforced Teflon).
b. Aramld-relnforced "nonasbestos" materials do not pass fire tests and have limited ability to maintain preload. A crash program to test these materials Is not Justified and a program currently sponsored by the Materials Technology Institute has promise of providing an Inexpensive way to test such materials In the future.
UCC 005987
2- -
c. New materials that may be Introduced as asbestos substitutes will be tested as a normal technology activity.
3. Packing a. Grafoil and graphite-fiber packing will be adequate, so no action is required.
4. Machine Gaskets a. These gaskets are bought as sets for the machines and substitutes are selected by the machine manufacturer.
Item 6, Identification of Asbestos-Free Insulation. a. Harold Clem's memorandum (attached) lists Identifiers currently being used In insulation to show that it does not contain asbestos. b. Harold Clem Is polling the C&P locations to determine If they are currently using Identification tapes, embossed or color-coded metal weather barriers or other methods to Identify insulation containing asbestos and/or Insulation free of asbestos. Location Practices documenting the Identification codes will be Issued In the Insulation Manual as appropriate.
Schedule: Complete poll of Identification codes - May 15. Issue Location Practices - September 30. Budget: $6000.
GBE/ds 2006H
UCC 005988
BUSINESS CONFIDENTIAL
UNION CARBIDE CORPORATION ENGINEERING AND HYDROCARBONS DIVISION
CENTRAL ENGINEERING SOUTH CHARLESTON, WEST VIRGINIA
MEMORANDUM
TO: CC:
FROM: SUBJECT:
February 13, 1987
G. B. Elder, 51V
D. D. Barnette, 512 R. L. Boggess, 514 J. E. Boley, 380 D. L. Carrick, 519 A. W. Keene, 510 G. H. Reinhart, 312
l. E. Calvert, 511 S. W. Clark, 511 R. W. Engle, 511 T. E. Hanning, 511 D. J. Hymel, 515 R. W. Maddox, 511 D. D. Miller, 512 C. C. Neely, 511 M. Patel, 511 MOC
H. G. Clem
IDENTIFICATION CODE FOR ASBESTOS-FREE INSULATION
RECEIVED FEfi 19.1987.
This report is in response to your letter on asbestos identifica tion concerns with insulation in our plants. Three primary issues, integral asbestos-free visual coding for insulation materials, weather barrier coding, and asbestos identification tests are discussed under separate headings:
1. Integral Non-Asbestos Identification of Calcium ~5ilicate Pipe and Block Insulation ~
All of our approved vendors for calcium silicate pipe and block insulation have visual identification dispersed throughout the white product in the form of either gold colored mica flakes or black fibrous material to indicate that the insulation is asbestos-free as shown below:
0037J
UCC 005989
0037J
2- -
Calcium Silicate Insulation
Manufacturer
Asbestos-Free Identification
Kaylo 10-AF
Owens-Corning Fiberglas. Corp
Mica Flakes
Thermo-!2 Super Cal temp NA
Manville Corp. PABCO
Mica Flakes Black Fibers
Manufactuers of expanded perlite. Material Spec. 4, also have asbestos-free visual identification. The current approved material, Goodtemp 1500 from the Howred Corporation, has a uniform pink color throughout the material. Celotemp 1500, a formerly approved insulation that Is no longer being manufactured, contained mica flakes like the current calcium silicates.
Since apparently only solid white compositions like the early calcium silicates, 85% magnesia, and insulating cements for steam piping and boilers contained significant percentages of asbestos fibers, manufacturers of most other insulation materials have not adopted an asbestos-free coding system. Insulations with distinc tive characteristics or appearance like cellular glass {UCC Spec. 1), polyurethane foam (UCC Spec. 3 and 7), performed fiber glass (UCC Spec. 6), flexible plastic foam (UCC Spec. 12), and mineral wool (UCC Spec. 14 and 40) never contained asbestos.
Of course, since the use of mica flakes and other visual coding was not widespread until the mid 1970's, most insulation In older units may require laboratory testing for possible asbestos content before replacement or modification.
2. Asbestos-Free Visual Indicator for Metallic and Mastic Weather Barriers
You asked for a durable visual indicator for metallic and mastic weather barriers to indicate that the insulation underneath did not contain asbestos. I have found that several methods are being used in the petrochemical industry, but there is no universal standard on this important subject. A summary of asbestos-free identification methods related to weather barriers 1$ listed below:
Surface Texture Variations:
Reportedly, Tennessee Eastman, Eastman Kodak, and Amoco have adopted the use of a "stucco embossed" texture finish In either flat or 3/16" corrugated configuration for aluminum or stain less steel weather barriers on all insulation replacement projects. This method provides a distinctive visual coding that contrasts wfth the older smooth finish metal weather barrier sheet material.
UCC 005990
-3 -
0037J
Surface Texture Variations - Cont.
Only minor changes are required In installation procedures with this approach, and planned or inadvertent painting of the weather barrier will not affect the visual identifica tion characteristics. The method Is not applicable to mastics or plastic weather barriers, however.
Color Coding:
This procedure involves the use of factory finished weather barrier in a specific color to indicate that the insulation is asbestos-free. The colors most used for this purpose are white, green and blue. To be effective, this method would require coordination with existing UCC safety color coding in the plants.
Identification Tapes:
This method utilizes making tapes applied over standard weather barrier materials to Indicate that the insula tion either contains asbestos or Is asbestos-free. E.I. DuPont de Nemours 4 Co. (Inc.) uses this method. A copy of the DuPont specification entitled "Identifi cation for Installed Asbestos-Bearing Insulation" is attached for reference.
This type of identification tape is available from several suppliers. The DuPont tape features fade proof ink lettering and background with a clear polypropylene coating for chemical resistance and durability. The asbestos code lettering is combined with arrows to show the direction in which the indi cated insulation runs.
The primary advantage of identification tapes Is that any type of weather barrier may be marked whether new or exist ing. Entire sections of plant units can be defined as asbestos-free wtth this technique. The main disadvantage of tapes is that they may be inadvertently painted over or removed during routine maintenance activities.
Various versions of asbestos-free identification tapes are available from graphics label suppliers. In most cases, pressure sensitive vinyl is used for the tape material. Unlike the DuPont specification tape, the "ASBESTOS FREE INSULATION" labels and direction arrow tape are usually separate items, not combined. The blue background/white lettering is the same in most Instances.
UCC 005991
-4 -
3. Asbestos Identification Methods
The Identification and monitoring of asbestos fibers from insulation or other sources is the responsibility of UCC Industrial Hygiene Groups at our various locations. According to Mr. Manhel Patel at the Tech Center, several test methods are available to Identify asbestos including colorametric test kits, microscopic examination with polarized light, scanning electron microscopy and trans mission electron microscopy.
However, the colorametric technique is not as reliable as the microscopic methods because it only detects iron and magnesium from bulk samples; interference from related compounds can affect test results. The microscopic methods are approved by OSHA, EPA and NIOSH and represent the best current procedures available.
it is apparent that devising a better way to identify asbestos that meets government approval will be difficult. If quicker results are needed at our plants on insulation replacement jobs, consideration should be given to pre sampling the existing insulation well ahead of any planned work.
Conclusions and Recommendations
The visual asbestos-free coding methods of our calcium silicate and expanded perlite suppliers, 1e mica flakes, black fibers, etc., will be included in our UCC Material Specifications 2 and 4 as suggested by Don Miller of the Institute Plant. This may provide some valuable assist ance in the field identification of insulation materials.
Concerning the visual asbestos-free coding of weather barriers, it appears that no single identification procedure may be suitable for all conditions in our plants and other facilities such as laboratory buildings. One of the main problems is the diverse types of weather barriers encountered; aluminum, stainless steel, PVC, fiberglass laminate sheet, and mastics. Some differences are also evident in our options when we are replacing asbestos containing insulation versus Simply labeling or marking a "good" existing asbestos-free system.
Current asbestos and asbestos-free insulation coding procedures at UCC locations range from no Identification marking to marking all asbestos containing Insulation with labeling tape and entering a code for asbestos replacement jobs in the computer!zed work orders for storage and retrieval. Before we introduce a UCC recommended practice or standard on weather barrier
0037J
UCC 005992
-5-
Identification coding, a poll or request for comments should be solicited from plant Insulation representatives and other responsible parties. To assist in the proposed poll, actual samples of identification tapes and embossed metal weather barrier would also be sent to each respondent.
If there are further questions or comments, please call me.
HGC:es ATTACHMENT
18495
INDEX:
6, 7, 10, 23, 28, 30, 32 42, 43, 44, 44A, 62, 71, 81 112, 120, 121, 122, 127, 138 142, 180, 307, 318, 351
0037J
H. 6. Clem
UCC 005993
22S
IDENTIFICATION FOR INSTALLED ASBESTOS-BEARING INSULATION
THERMAL INSULATION STANDARD ENGINEERING SPECIFICATION
ISSUED
n*s PAGE
REVISED
STANDARD
REATORMED
JULY 1975 APRIL 1984 APRIL 1984
Paga 1 of 2
1. SCOPE
1.1 Tliis specification provide* information for a stan dardized method of placing identification on installed insulation which contains free asbestos fibers or insu lation ofunknown asbestos content.
1.2 This specification is applicable only for identi fying installed insulation which has a questionable free asbestos fiber content. Obviously, materials such as cel lular glass, glass fiber, mineral wool, polyurethane foam, and polystyrene foam do not contain asbestos fibers and, therefore, do not need to be marked for identification.
1.3 Follow this specification only at locations where such identification is required by the operating de partment and the plant does not have a conflicting estab lished identification procedure.
2. CONDITIONS
installed, do not require identification. At turnover, the local construction organization is to notify the plant that the facility is free of materials containing free asbestos fibers.
4.2 , Condition II. Individual insulated lines or equip ment pieces in clearly defined additions in which no insulation containing free asbestos fibers was installed, do not require identification. In lieu of marking individ-. ual lines or equipment pieces, place strips of tape strate gically along the plane that defines the building addition. Locate the tape on selected columns, beams, walls, or ceilings, to dearly identify the plane at which the asbestos-free insulation starts. Apply two parallel strips of tape. Position one piece of tape with the arrows orientated to indicate that, from that point on, all insu lation is nonasbestos. Position a second piece of tape with the arrows orientated to indicate that, from that point back, tbe insulation may contain free asbestos fibers.
2.1 From an installed insulation viewpoint, specific areas on a site are classified as follows:
2.1.1 Condition I. New facilities on which no in sulation containing free asbestos fibers was installed. This could be an entire site or a segregated building on
2.1.2 Condition II. New additions to existing buildings which can be clearly defined by designated column lines or a defined plane through the building. The addition does not contain any Insulation containing free asbestos fibers.
2.1.3 Condition III. Existing areas which are modified by the addition of insulated lines or equipment.
4.3 Condition III. Individually mark all new insulated lines and equipment pieces installed as additions or modifications in existing areas to indicate insulation as bestos content. Where asbestos-free insulation is in stalled on a pipeline, place a strip of tape round the circumference of the finish at the points where the pipe goes through a wall or partition. Orient the arrows to indicate that the line inside the room has asbestos-free insulation. Where a tie-in is made to a line insulated with a material of unknown asbestos content, identify the junction of the insulation by parallel pieces of tape around the circumference of the finish. Position one piece-.of iape-io indicate that, from that point on, the insulation is asbestos-free. Place a second piece of tape with the arrows orientated to indicate that, from that point on, the insulation may contain free asbestos fibers.
2.1.4 Condition IV. Existing areas in which exist 4.4 Condition IV. Where insulation is being replaced
ing insulation is being replaced.
in an area of unknown asbestos content, by asbestos-free
3. TYPE OF IDENTIFICATION
insulation, identify the replacement insulation by a strip of tape placed around the circumference of the pipe
For identification, place strategically located strips of appropriately marked tape around the circumference of the pipe finish or on the equipment finish. Position the tape so as to indicate the type of insulation used with the arrows pointing down the line in the direction in which the indicated insulation runs (see Figure 1).
finish or at strategic locations on equipment pieces. Where a line running from wall-to-wall is reinsulated, place a piece of tape at the points where the pipe goes through a wall or partition. Orient the arrows to indicate that the line inside the room has asbestos-free insulation. Where a portion of the insulation is replaced, identify the junction of the existing and replacement insulation
4. PLACEMENT OF IDENTIFICATION -
by parallel pieces of tape around the circumference of
WHEN REQUIRED
the finish. Place one piece of tape to indicate that, from that point on, the insolation is asbestos-free. Place a
4.1 Condition L Individual insulated lines or equip second piece of tape with the arrows orientated to indi
ment pieces in new facilities or segregated buildings in cate that, from that point on, the insulation may contain
uccwhich no Insulation containing free asbestos was free asbestos fibers.
005994
SUaCOMMOTEE MO. ZS
SN 218 P Pago 2
IDENTIFICATION FOR INSTALLED ASBESTOS-BEARING INSULATION
This Pago Rov April 1984
-- 5. HANDLING INSULATION
' When handling, fabricating, or removing insu laLion in the absence of positive knowledge that it is asbestos-free, assume that it contains free asbestos fibers, and follow S4T.
6. TAPE
6.1 Specifications (ih Figure 1)
a. Supplied in rolls.
b. Pressure-sensitive contact cement backing -- developed for aircraft use.
C. M -90 tape material -- developed for aircraft use.
d. Provide slit in release paper for easy removal.
. ASB letters and arrow red, repeated on 3-inch intervals, on white background. NA letters and arrow blue, repeated on 3-inch intervals, on white background. Letters are approximately 1-inch high.
7. TAPE SUPPLIERS (PARTIAL UST)
Davis Printing Co P. O. Box 696 Camden, SC 29029 (803)432-1901
Top Flight Corp 165 East 9th Avenue York, PA 17404 (717)843 - 9901
TAB Westiine Divirion of Thomas & Betts Corp 220 South Rose Street Los Angeles, CA 90012 (800)421-8618
Sheriden Safety Supply 7029 Huntley Road Suite E Columbus, OH 43229 (614)888 - 8040
York Tape and Label Corp P. O. Box 6805 ' Columbia, SC 29260 (803) 788 - 2635
... . .
NA Nonosbastoa Bearing -
.
FIGURE 1 - TAPE FOR IDENTIFICATION
UCC 005995
PIPING TECHNOLOGY
MINUTES FOR INCLUSION IN ASBESTOS TASK FORCE GENERAL MEETING MINUTES
4*3
Addressing Section 4.4.2 of the agenda listed in C. C. Neely Tetter dated 3/2/87 ...
R. H. Engle presented proposed plans far modifying the Valve and Piping Specifications using strictly GRAFOIL1" products as the only replacement for asbestos. First step would entail developing new UCC "V-numbers" for those valves which are currently listed with asbestos packing and/or bonnet gaskets and no GRAFOIL n alternate. Piping Technology will maintain the old numbers unique to aid in identification of existing valves. Once the new numbers are developed, they will be transferred to the affected piping specification sheets.
Secondly, as with the valves, the existing specification names will be maintained unique by cancelling the existing suffix letters and starting with the next available letter e.g., 1C2 though 1C2E will be listed as "cancelled" and the new listing will be started at "1C2F". The acceptable linejoasket alternate for the asbestos ring will be the 1/16" thick GRAFOIL n GHE and the acceptable replacement filler for spiralwound gaskets will be GRAFOILin Grade GTB. .
The proposed schedule would target July 1988 for completion of issues to the manual; the proposed asbestos program would not be reviewed through normal Technology Manuals Standards (TMS) channels due to the .nature of the changes. Piping Technology believes there to be 2-3 manmonths ( $5000.00/man-month) of work involved in the transition. Approximate printing/distribution cost would run in the $5000.00 range. An accelerated schedule may become necessary if vendors confirm earlier reports of supply problems and would definitely extend the estimated time into 3 man-months because additional technical manpower would be required. Sherry Murphree will continue to feedback on market conditions.
R, U. Engle/pae March 24, 1987 AJ4:RUE
UCC 005996
HANG TO: From:
C. C. NEELY - Location 511 S. S. Murphree - Loc. 515
) (k*d* 4W 4.4
Secretary - Anita Thaxton - 721-4802
Purchase of Asbestos - Substitute Material
The Chemicals and Plastics Division agreements for gasket and packing materials are due for renegotiation In second quarter 1987. The procurement plan and request for quotes have been issued. Bids are now being received and new agreements are expected by Dune 1, 1987.
The traditional method of predicting quantities, material types, and dollars for price agreements is past history and anticipated future activity. Our past history of gasket and packing usage shows a heavy dependance on asbestos at very low prices. He are already seeing a changeover to the Grafoil and teflon based material. The new agreements will be based on anticipated increased usage of these materials and dramatic decreases in asbestos use. Our expenditures will increase due to higher priced asbestos replacements, higher priced asbestos, and increased activity of a wide variety of materials.
Many of our traditional gasket and packing manufacturers are no longer in the asbestos business (Johns-Manvllie, John Crane. Allpax, etc.). The manufacturers who currently handle asbestos do not have assurance from their liability carriers that coverage will continue beyond the next twelve months. Parker Seals has announced July, 1987 as their cutoff date for asbestos manufacture. He have no certainty that asbestos will be available thru January, 1989. From the purchasing viewpoint new standards for gasket and packing should be expedited to the nearest feasible deadline.
After new gasket and packing standards are determined a tremendous effort will be required in the plant storerooms, purchasing groups, and maintenance departments. The effort will be three-fold:
1. Alternates to stocked and purchased material will be determined for each application.
2. New descriptions and usages will be determined and changes made. Major C & P locations have 2000 to 3000 separate line Items. A plan for changeover from old to new material will be required.
3. Training and communications will be needed for every end user.
It Is estimated that the effort for maintenance and materials management will require four to six months of work at each location.
Sherry S. Murphree 3/30/87
RECEIVED
MAR 3 01937
cot
UCC 005997