Document 3JyVLpLgjKaXvbmmqem17RLOa

FILE NAME Colonial Sugar Refinery CSR DATE 1960 July 22 DOC CSR114 DOCUMENT DESCRIPTION Letter to Senior Inspector of Mines Kalgoorlie with Govt Inspection Results from Wittenoom with Dust Count Tabulation Tables Sadhana SY oe mane we J. PLAINTIFF'S EXHIBIT The Senior Inspector of Wines Hines Department KALGOORLIE 22nd July 1960 Ventilation - Australian Blue Asbestos Limited Wittenoon Together with Workmen's Inspector Hunt I carried out an - inspection and airflow survey of the Colonial Mina and Treatment Plant from 22nd to 25th June 1960. . ' Underground . , . Conditions were satisfactory at all working places except most places where a machineman was employed As can seen from the recorded dust counts and temperatures nost places where a machineman was working resulted in above average dust counts high humidity and a negligible airflow The reason for these factors as be seen can from the accompanying plan is that the stope faces are gouged out forming pockets where I consider it is impossible for the natural air current to satisfactorily ventilate All scrapers are installed at the marways thus receiving the full benefit of the air current which flows from the levels via the manways and chutes if empty into the stopes and thonce through the stopes to the exhaust fan Air water spraya aro installed at all passes in the stopes The northern workings are by far the most poorly ventilated This is because they are outside the influence of the exhaust fan appliances It was suggested to the management that workings outside the natural ventilation circuit should be equipped with secondary ventilating but this suggestion did not meet with very wara appro- vol appro- When looking from the bottom to the surface of the main adit a noticeable amount of dust appeared to be present in the air throughout As the conveyor system operates in the main adit and th transfer points are fitted with water sprays some of the apparont dust may actually be fog created by the sprays Only one dust count was taken in the main adit this being adjacent the No 6 levol Ross Feeder where wolders were working in the mouth of the chito A count of 670 p.p.c.c. was obtained but it is doubtful if this concentration would be throughout the main adit As one third of the total air is drawn down the main adit the intake air is polluted by workings dust to a cortain degree before it enters the mine At the grizzly on each level much dust was caused through the tipping of ore and would then join the main airflow on each levol and pass through the respective mine workings No sprays werd evident at the various grizzlies although I carnot say for certain whether or not sprays were installed at theso points Air Measurements Ventilation of this mine is still carried on by a Richardson 60 A.F. Class A Axial Flow Fan running at 700 r.p.m. wit a 20 H.P. electric motor driving it The management informed me that this fan was to be speeded up during the wook following my visit during Infortunately the new speed was not discussed therefore| Three main intake areas are at present drawing air viz Main Adit No 3 Cliff Opening and No 4 Cliff Opening Except the Exhaust Fan Opening and the above intakes all other cliff face are bratticed off openings Doors are installed at the to the Cliff Openings and both are fitted with locks ^ os& are kept shut thereby ensuring they All major air velocities were measured with the Wilh Lambrecht Flow Meter The lesser velocitios being measured with th obtained with Flame Anemometer Unfortunately the readings the Flow Metor were found to be well below the true velocities Upon arrival back at Kalgoorlie a check was made between the Flow Meter and Tube the Pilot Lake View and Star Hine a Graphs were drawn anowir Flow Meter velocities and true velocities From these graphs all velocities recorded at Wittencom have been adjusted adjusted therefore the volumes shown should be correct . 4. Leakage The recorded volumen at the main points wore as Hain Adit No 3 level No " thro No 2 Cliff It Opening It " Intake 23,000 cumine , , 24,000 bi 1. .22,500 . ~* 1,000 follows Total " 70,500 * Main Exhaust Fan 65,500 * area This exhaust reading of 65,500 cfm would be very question- able because side of the reading was taken at the cliff face at the discharg the fan The position occupied for reading was very unsatisfactory as a steady flow was not issuing over the whole Instead a turbulent flow was issuing from the fan which would cause an erroneous result The intake quantities gave steady flows and were checked up to three times and each time gave similar readings ard therefore I would say the total quantity of air circulating the mine would be approximately 70,000 cfm Previous years have shown greater quantities than this but it must be remembered the mine is increasing in size therefore longer distances to draw the air resulting in higher pressures for the fan to work against air pessing Although the quantities shown remained constant throughout the period of the curvey it was noticed that when the wind changed to an easterly 1.e. blowing directly into the main adit the volume of air entering the edit increased considerably On the morning of Saturday 25th June the volume of air entering the main adit whilst an easterly wind was blowing was measured at 35,500 cumins This represents half the normal quantity of through the wine and as the exhaust fan would be working against thi wind its output must be decreased to some degree Apparently the wind blows from this quarter quite a lot at various times of the year therefore a short vertical evase attached to the fan would be a definite advantage in overcoming the increased pressure caused by the wind stopes Volumes measured in the Nos 1 and 2 level Turnouts were 7,000 and 5,000 cumins respectively As all work is now advanced below No 3 level the above quantity totalling 12,000 cumins is just going to waste 1.c. passing directly to the exhaust fon four Only stop a are now being worked above No 3 level yet some 17,000 Cumins are being expended from the No 3 level intake and some 5,000 cumins from the main adit intake to ventilate these four - seen From the tabulation of dust counts it will be seen that one of these stopes viz No 3 level 9014 stope has a negligible through air flow and the other 9017 stope is ventilated by a 24 electric fan from the manway From this it can be that a Nos 1 and 2 levels gives a total of 27,000 cumine serving no useful purpose This represents approximately fifths 2/5 of the total airflow 1.c. approximately 33,000 cumina passing into actual operating stopes which is rather for laor f sg uch e larg- e- large- open areaG I consider the greatest danger with the large openings and the possibilit lack of airflow through most of the working places is of miners being funed Especially when the machineman fires knock- off day shift and the scraper driver has to enter the fired ares in order to rig his shift . blocks and bog back etc. first thing on ofternoon ee eee ee SOS has ceased Since my last visit November 1956 the old Wittenoom mill has ceased operations and a new mill has been erected at Colonial ~ better than line The new mill appears equal to if not any other operating plant in this State Every section of the plant is being kept in spotless condition If any dust or fibre leaks are seen that particular section is closed down until repairs are effected All ducting associated with dust extraction is painted grey and all that associated with fibre extraction yellow From the tabulation of dust counts it can be seen that most counts are above average for which no explanation can be forwarded Visually the atmosphere inside the plant appeared extremely free of dust Very little fibre was observed in the samples whilst counting but this would be no criterion as the Watson Konimeter is highly unsuitable for measuring asbestos concentrations Ken employed at the Bagging Stations wear dust masks at all times whilst bagging The duct upon being extracted from the ore is passed through three Rotoclones situated outside the building The Rotoclones are definitely doing a marvellous job in dust extraction but unfortunately the finer particles are not being collocted Consequently a steady stream of smoko dust is being passed into atmosphere above the plant via the stacks attached to the Rotoclone Although this dust has little or effect upon surface operations it tends to be a source of annoyance as far as underground is concerned This is because when an easterly wind is blowing the dust is carried into the intake openings of los 3 and 4 level Cliff Openings The dust would be expected to have dispersed sufficiently before entering the mine working but unfortunately this is not the -- ----- RECOMMENDATIONS 1 Doors be erected in Nos 1 and 2 level Turnouts in order to prevent loss of 12,000 cumins The installation of these doors was also recommended by District Inspector Foichney in his report dated 2 A regulator door be erected at No 3 level Cliff_Opening Cliff_Opening in order to reduce the quantity of air entering this level OR ord All mamways on the No 3 level south of the manway at 550N be fitted with regulator trap doors together with the erection of a regulator door south of ord 550 manway These would allow a full flow of air into No 3 level at the Cliff Opening and only a desired amount through the various regulators the rest would downcast to the Main Adit and join the Main Adit Councast air 3 If the regulator door be erected at No 3 level Cliff Open- ing the No 4 level South of the No 3 Adit would need to be stripped out in order to take the increased airflow also to lower the resistance More air could be passed through the No 4 level regulator door if desired steam ond 5 Better planning and control of stoping in order to earleimfianartetoa ospfraervaalsenptracticable the dead pockets which at present 6 Secondary ventilating appliances be supplied to all machi parties and used to their best advantage ance working faces extend beyond the through air current allow until that would 7 _-. A sound mining method of overcoming 5 and 6 would be to stope the ore by using the Retreat Rethod of Mining is up and -. then mine out the northern block first brattice open off this section commence block south of the mined portion and ac level is completely full volume air method ac pass through the working areas level the the lovel . rake is At present when a rake of trucks is not being used the left just north of the turnouts On the Ro 5 quantity before and after a rake of trucks was left in north of the turnout was 12,000 and 4,000 cumins respectively From this it is evident more thought into the positioning of idle trucks is required . 9 Piready instaledSprays to installed be installed all level ore passes passes 15 not 10 Regarding the dust exhausting from the Rotoclones I do not think the installation of another Rotoclone will reduce the dust exhausting to any appreciable degree I consider a cheaper and more effective means of depositing the dust would be as follows : Cut a chamber on large tunnel into the side of the instal banks of water blasts and exhaust the airflow gorge from the Rotoclones into the far end of this chamber The sudden Grop in the solocity would cause a deponition of dustere hike wrot time would The exhoust air from the c coh lla ecm t bonetrhethmoisnt formed by the sprays~ iscue slowly into the mee cutting 27a Instead of a chamber portion of the old workings could be sealed off and serve the same purpose General During the process of counting the dust particles particular attention was paid to the amount of asbestos fibre present in each sample In both the underground and mill present odd strand of fibre was observed samples only an short of the main impracticable Regarding the apparent dust concentration in the main adit upcasting it there appears nothing can be done Upcasting s^/itseems highly at present 0 Ir order to illustrate the dead pockets referred to in thi report I have numbered most of them on the accompanying plan the same number has been placed on the attached tabulation of dust counts for the corresponding working place The numbers have been drawn with blue ink for easy recognition temperatures recorded Attached is a tabulation of dust at the Colonial line and Surface counts and 22nd and 23rd Plantt State Mining Engineer PERTH ASISTANTSISTANT INSPECTOR INSPECTOR OF INSPECTOR Pee ata d Dan ora AmPaemandtian avd manawa KV DATE AUSTRALIAN ; 23-6-60 23-6-60 | MINE ASBETOS Burface Plant Colonial - TABULATION OF DUST COUNTS ' : PLACE : COUNT . Wine Din 160 Picking 330 Primary 470 150 Crusher Secondary Screens Floor .210 |Cyclones Switchboard 540 - Screna Cyclones Station Station TEMFICATURI DRY WET REMARKS . Vantilated by B.F. om employed employed working full capacity 1 Warmsunny easterly [ | 367949 TABULATION OF DUST COUNTS ; . : STOS ASIE DATE : AUSTRALIAN vo . PLACE TEMPERATURE 4 | COUNT DAY WET REMARKI 22-6-60 Colonial sin { ! : Level No. No.3 1.8stope 8076.5 76.5 ScrapingThro L.8.6Stopa 50 .78SoraperThro : air No.3 9014 L.86Stopa No. .901.7 2 Boring 110 80.5 _76 20.85 73 Thro nagligible - Thro 4000 : induced induced by E.F. No M .9017 , 4000. Stopo No.4 # 70 83.5 Scraping 150 75 Temp 140. 77 Scrapingair No.4 a 110 78 Hand bogging - Venth beinat 3. No.4 Pad w 250 78 Negligiblo No. Ls 38 " No.4 ee bed X 4 No 22 " i No. 5 Bfi O 430 ..76 64.5 Boring Thro air Boring Negligibleairflow 210 77.5 74 Boring Regligible 320 70 Scraping Thro air sa No.6 No.6 adit Focdor 670 ..75 nw Welders Thro air chute | No_6 Charging 290 ..76 69.5 from No.6 No.6 Rice , -240 Boring EFfrom No _ Rice -100 Charging i % <n 23nfwO veo ove No.6 Rise 5 No onl 00 Stopo No.6 nn _1_levol Stope No 5 " x 7 No Ls 19 Ly C 160- -79.5- 270 .82 -74 Boring 12" EF 2500 75 Boring 16 EFspliti 2500 72.5 Moch bog idle 1500.cfm 140 HO STO CS 75.566.5 75.566.5 Scraping Thro 220- 75.5 Negligible airflo 140- 77 70.5 Charging induced h Merry DI Is DATE 3660 3660 TABULATION OF DUST COUNTS : doch y PLACE t TEMPERATURE DRY WET AIMARKS No Lovel Stope No.5 | No. 5 oe 00 No_5_ 20 ft No 5 cn oH No No. No 19 ' atope W & N Scraping =. Thro air Adjacant 79.5 Charging Thro Adjacant 78 71.5 idle Thro .39 .80.5 78.5 79.5 81.5 ; at { T : i eee ee ook. wn epee oe <= - ASEASTANZ JNSPRCTcOR OF HINES ed warmes nem vse AIR MEASUREMENTS A.B.A LTD & 25th 1960 MEMO FOR VENTILATION OFFICER wa. The follidng volumes were derived after calibrating our flow meter and correcting the recorded velocities Turnout Sth of awe Nth " " Nth of 2020 "_"2050 bad 3,500 2,000 * soo Ct 5,000 2,000 & fi 500 N11 1,000 * 24,000 ed 17,000 * @mo * Mamway to Turnout-- 1 @ No 3 Main Adit isdowncast "9, 5,00 Laval * 5,00 ooene Nth of 9020 9050 7,000 5,00 * een ena (%&F " NamwayNamway ord - 8 1050 ord 8 2,000 wane 8 ordord ManwayManway 1,000 _ Cliff Opening Intake a No 3 Adit Intake --- eoewe Nth Nth 11 " thro regulator of 42S to 41 S " 40 door 1.". Upcast from Main Adit No 4 Turnout- Level -mee ae Nth " 8 It 41 42 43 N . tune wee 9th of No 3 Adit Weat Anum Sa 7 it 22,500 * 19,000 * 3,500 2,000 1,000 6* 3,000 fi 2,000 * 6,000 * 6,000 * * 4,000 2,000 =O 3,000 8 , a neeeneremed : Nth of 50 i.e. Upcast from Main Adit - . No 5 Turnout Lavel ... Main Adit & " " we West supplies East Therefore total- Nth of " - "* Turnout 51 52 5 500 camina from No 6 2,500 9 - 6,5006,500 " 5,000 1,500 td] Lovel 12,000 ' 8,000 * 4,000 mete be me No 6 Law Upcast into 65 $ "ewe 3,000 * Nth of 65 S into Fan 4,000 8 and thence Main Adit Main Fan Exhaust 65,500 ' TOTAL INTAKE 70,500 ' ; Because of the intermittent flow from the exhaust fan thereby giving a doubtful result the total intake voluma has been taken as correct The total quantity of ait flowing through the mine has therefore been taken as approximately 70,000 cumins _ . Quantities measured before and after a rake of trucks was left north of No 5 level Turndut were 12,000 and 4,000 cumins respectively Sgd 7 SDOMONDS ASSISTANT INSPECTOR OF HINES ws ita Mine LIAN BLUE ASBESTUS 1.60 Colonial . .6.60 =, 4 ae g a Temperature Place Count Dry 1 Wet No 3 level 9020 L.5 stops No 3 level 9050 L.s. " No " 9014 . , 4 No " 9014 a uy No " 9017 No " No N 4000 L.S. * , 4 No WH " No " x) No " 18 4 No 18 a | No N . n No . 28 * No 6 Main Adit Ross Feeder Rise No 6 N No * Charging Station No * 35 35 No " 25 * Riso AO 76.5 = 68 78 69.5 110 80.5 20 85 320 70 83.5 75 150 75 75 67.5 140 77 66.5 -- 963437372 29 250 80 963437372 29 430 2 96343737229 440 78,5 96343737229 210 77.5 96343737229 320 77.5 670 80 96343737229 290 76 96343737229 240 76 69.5 100 77 96343737229 160 79.5 2 No - Stope No 6 " 8.228 leval 270 N2 NG 350 = 81.5 72.5 No nannni N nannnnnnnni No 3 No , nannnnnnnni , nannnnnnnni : nannnnnnnni & 8.228 Stope 8.228 8.228 8.228 8.228 8.228 . & . 7792 nannnnnnnni * nannnnnnnni 8 , &H Stope we nannni * 7792 i nannnnnnnni 7792 Stope 100 75.5 66.5 220 2222222223 32EJENGENE 140 222223 70.5 250 2222222223 73.5 110 2222222223 32EJENGENE 2 2 2 2 23 72.5 2222222223 32EJENG ENE 600 2222222223 32EJENGENE 2222222223 68.5 360 2222222223 2222222223 . Remarks Scraping ~ Thro air Scraper temp idle - Thro air - Boring Thro air megligible flow Boring Thro air 4000 cfm induced by 24 E.F. Scraping - Thro air Temp idle - Thro air Scraping Thro air Hand Bogging - Vent to be installed Boring - Negligible airflow Boring Thro air Negligible Boring - airflow ! Boring - Negligible airflow Scraping - Thro air Welders - Thro air up chute Mech Bog - Sat- 12 2F from 2500 ofn Boring - Sat - 12 EP from 4000 cfm Charging - Adj thro air 4000 cfx Rise 5 foot up Boring 15 from duct To be extended : up 12 EF from 2500 cfm Rise 30 from cfs Boring - Sat - 16 " EF split 2500 fr Mech Bog temp idle Sat. 16 EF split i Scraping Thro air Charging - Negligible airflow Charging - Thro air indu~ edby 12 EF Scraping - Thro air Charging Thro air Adjacent Temp idle = Thro air Scraping Thro air Boring - Negligible airflow Scraping = Thro air Charging - Thro air Negligible Charging Negligible Thro air : vs wt yl : j : Sgd ? SIMMONDS DISTRICT INSPECTOR OF MINES Place Count Mine Transformer Bin 160 Picking Station 330 Primary Crusher 470 Secondary Crusher Switch Board 250 Screen Floor 210 Cyclones Switchboard 540 Screens after Cyclones 390 Bagging Station North 150 Bagging Station South 300 Temperature Dry 3 Not Remarks Ventilated by 12 E 6 Man employed Not working at full capacity Hiru day with bran...a Sgd 7 SIMMONDS DISTRICT INSPECTOR T T e