Document 3JejLO4DkN6Yw2mDj4YrY1a7n

suoieci Insulation and Pipe Removal Project at AT&T Communications, 811 10th Avenue, NYC, NY ART Bell Laboratories date. December 10, 198 4 tfom Lisa Lee MH 77621 1F-210 X3444 K. D. Tait MH 77621 1F-210 X3449 Summary An insulation and pipe removal project was evaluated for AT&T Communications at Bll 10th Avenue, New York, NY by the Environmental Health, Environmental Management and Safety (EHEM&S) Center of AT&T Bell Laboratories on August 9 and September 6, 1984. Various methods for removing asbestoscontaining insulation from pipes and fan rooms were examined during work, transport and cleanup. Numerous personal and area samples were collected to measure airborne fiber concentrations. During the initial sampling of asbestos work activity on August 9, 1984, the 8-hour time weighted average (TWA) fiber concentrations were less than the Occupational Safety and Health Administration (OSHA) Permissible Exposure Level (PEL)of 2.0 fibers/cc. The 8-hour TWA fiber concentrations exceeded the OSHA action level of 0.1 fibers/cc. Medical monitoring is required by OSHA for all work activity that exceeds this action level. Elevated fiber concentrations ir. the air plenum, resulted from employees entering during work activity to complete pipe removal. The highest fiber concentrations were produced by dry sweeping during clear.-up. Recommended work procedures were evaluated by air sampling on September 6, 1984. Lower fiber concentrations resulted from the wetting of insulation prior to its removal and transport. The use of a glove bag was impractical due to the difficulty of working within a confined area. The HEPA vacuum did not effectively capture fibers during pipe wrap removal. Cutting the pipes with a torch or saw is the preferred method of pipe reroval. The use of HEPA vacuum greatly reduced airborne fiber levels during clear.-up. LLA 001548 Memorandum for Record - 2 Follow up sampling was performed on November 29, 1984, with recommended work procedures in place. Area and personnel samples were below the 8-hour TWA action level of 0.1 fibers/cc. Adherence to recommended work practices is required to minimize airborne fiber concentrations. Recommendations for asbestos work practices and use of personal protective equipment are presented within this report. A summary of State and Federal requirements for asbestos removal and disposal is presented in Attachment D. Methodology The NIOSH recommended sampling and analytical method 7400 was utilized cn August 9, 1984. This method was issued as an alternative to P&CAM 239 due to its improved sensitivity and reproducibility. The original NIOSH analytical and sampling method (P&CAM 239) was utilized on September 6, 1984. Airborne fiber samples were collected on mixed cellulose ester filters. The filters were attached to MSA sampling pumps and operated at a flow rate of approximately 2.0 liters per minute. The pumps were calibrated using a Kurz Model 541 Mass Flow Meter and a precalibrated precision rotameter before and after sampling. Filter samples were analyzed in accordance with NIOSH Method 7400 and P&CAM 239. These methods involve sizing and counting fibers using a phase contrast microscope. All fibers are counted which have a physical dimension of longer than 5 micrometer and a length to diameter ratio of 3 to 1 or greater. Fiber concentrations, expressed as fibers per cubic centimeter (fibers/cc), were calculated from the sampling and analytical data. The location and description of all personal and area sanples are presented in the results. Actual and projected time weighted averages (TWA) have been calculated for personal samples so they can be compared to the regulated exposure limits for asbestos. Air samples taken during the recommended work activity were of short duration to assess fiber concentra tions associated with specific practices. Results The sampling results from August 9, 1984 are presented in Tables 1-4. The sampling results from September 6, 1984 are presented in Tables 5-8. The sampling results from November 29, 1984 are presented in Tables 9-12. LLfi 001549 Memorandum for Record - 3 j/ Conclusions Based on the sampling results, the following conclusions were reached : 1. The use of recommended work practices resulted in lower fiber concentrations. 2. Wetting the insulation during the removal of pipe wrap is preferred over the use of a glove bag or HEPA vacuum to reduce airborne fiber levels. 3. The use of a torch or electric saw to cut pipes resulted in lower fiber levels than breaking the pipe joints with a hammer. 4. The use of a plastic bag to contain loose pipe wrap minimized the contamination of the work area. 5. Fiber concentrations outside the work area were not detectable during the use of recommended work practices. 6. Plenum fiber concentrations during recommended work practices were not detectable. Employees did not enter the plenum during recommended work activity. 7. Fiber levels in the near and far area samples during recommended work practices were lower than the initial sampling results. 8. The use of a HEPA vacuum is preferred over dry sweeping during the clean up phase of activity. Recommendations Project Management 1. A member of management should be assigned to managing all asbestos work projects. The Insulation Work Permit and Supplies and Personal Protective Equipment Checklist (Attachments A & B) should be completed, signed and dated for each 8-hour work tour. 2. These records should be filed in the Building Managers office. 3. Periodic audits should be made by the Regional Safety Coordinator to assure records are being kept. 4. Periodic air monitoring by Safety Coordinator should be conducted to assess employee exposure during new jobs, modified jobs, or practicing new techniques. LLA 001550 I Memorandum for Record - 4 5. New employees and employees performing new work techniques must be trained prior to being assigned to a job. 6. Medical monitoring is required for all employees working on jobs where the action level' is exceeded. The need for continuing medical monitoring will be evaluated by air monitoring of new and modified jobs. 7. Personal protective equipment is recommended to ensure worker protection and minimize the possibility of contaminating other areas. Work clothing must be vacuumed prior to leaving the work area. No work clothing should be worn or taken home. If possible, showers should be taken by employees after completing work. All potentially contaminated clothing should be stored in a sealed bag prior to laundering by a contracted firm. A suggested asbestos respirator program is attached (Attachment C). 8. Insulation and pipe removal activity is a strenuous job. At a minimum, two employees should be assigned to all work projects. The following recommendations are guidelines for performing this work in a safe and practical manner. These recommenda tions are presented in the following attached tables: Table 13; Pre-Work Guide Table 14: Work Activity Attachment A: Attachment B: Attachment C: Attachment D: Insulation Work Permit Supplies and Personal Protective Equipment Checklist Asbestos Respirator Program Asbestos Removal and Disposal Requirements Lisa Lee XH-7 7621-LAL-KDT-jve Copy to: (w/att.) R. S. Draper D. R. Johnson, HD J. Mitchell J. Stuart at&T-C Keith Tait C. P. Lichtenwalner j. Schreibeis G. M. Wilkening LLA 001551 1 List of Tables and Attachments TABLE 1 Area Samples 8/9/84 2 Area Samples 8/9/84 3 Personal Samples 8/9/84 t 4 Personal Samples - 8 hr TWA 8/9/84 5 Area Samples 9/6/84 6 Area Samples 9/6/84 7 Personal Samples 9/6/84 8 Personal Samples 9/6/84 9 Area Samples 11/29/84 10 Personal Samples 11/29/84 11 Personal Samples8-hour TWA 11/29/84 12 Comparison of 8/9/84 and 11/29/84 TWAs 13 Pre-Work Guide 14 Work Activity ATTACHMENT A B C D Insulation Work Permit Supplies and Equipment Checklist Asbestos Respirator Frograir New York State and Federal Requirements Concerning Asbestos Removal and Disposal LLA 001552 rwi C. h. tfl 11 u n $ ro S O ** oV oV pinO >wo- 491 41 > s3 2 < =s S co * n ~9 --w*co <g9 |1ea A ro .i *4k U8 o4UeoC ^kk<- k .4O Ik a4kOkc < k k41* ~O u. u *s it >O --<k *41 w68o *kcO9* -wege^*>* oe *41 *a* E8/ Okw^41 o so o> o <M m mO' ^4 00 so STO no ouo OCmO' t 1 1 cOtk*9or-.*oukIOcM9- ' --4aE4> --^e>4s Iac9Q , W4--1 a4*) au ^i(*k4J*jC8CoLo9umO0*>i--4<--jk0c9>m9Cc1 -c4a kwko4*mck >mr 41 &Bi H7& c E3 mok aac. AOowak<a>----cwv<0a. --cSOua'---<ge>o9 *k4> k k9* <9 JDCt JO liO CmM so 4# CL mB8 2O *C--D1 -j *CDr QQ CoO CoO .-JJ ppCOO' o C<_zDJ to IO in oo e 4w1. MB > 41 *T4D1 O<4kkUj c 4V/ Q. *o (VI I PoiC/KOJ o a 4 k CcJ kOw4kU1 oo 4ak1 k--a4wk-sl ---ww4U4tOea1i k. 4ouwogak* e moo* C MCo a 4k1 "k4kD1 Cak4 oor-* o W fc e 9-9-- --tg4A1i * *4o) --k4uc<>*9\ W uW4CO9o %kn a4> ik ogc wwok kc4gco>> "^O44O1 --aB6C3w 4eOC1 6 k4 Oz lA 9*4 Csj cn w mrcJr c* wtn *4 &*> o AW *m4 <n 96 * *c* ol >f> a C^CMM O i*i Z 2te/i *o in i S om r0sm. I3 IA m mw 8 nw> j iOn SO 0*m o AwA S! 1 sPS kmaa c*k r*f<l P0S0 m mCM i 1i mc J a 2 s_ SV> Is; o m *k 5a i? C8 ;u 1 ii) 8 w* macn 1 at 1) '3 8jk2itf 8JC ^ f si c5 *SJSv JkK A* tilli S *ckJ vwc*s < CM CM CM s i CmM s 0o0 v ievkp 8 e % es u II cc o o cS' c. 0 a O' V o A k Mw k kVffl ills* & U (M 55 I IIu*> o a M ** W -- O >. <4 k <*I3J<3KUf> A*Jkl, e >, o-J u i55j PV im u^ si u Jilu* 151 aMl 3--' *T OJ IIk ul Ml M*j s I VI s o^ CM*i O I' 1 s 5s l 3 OflLI ** V) * l I $ *4 U ^ OJ U S' < IoA s | * Mzl e I KJ t m p*. cm m CM * w mS t*\ <C 5* -3 \i ?$*8 Sk i wra-4 O*o Bc3 If w no S 8 5# IaArt Nm B' 51 3 a 3 s i? H ii ia Jt -~Z ft cmi | S3 C k 3 UTj *j u CM cm CM s 8s rg r* k | kk & 8i a <5 fc 5 o k *> k 3 55 J1 kV 3o 2 Ml k - V mm o i ! > & k3 Mil o * kk e 3k Ml a n M V ka. 4 o e co * I5 a eo ue ow k sgcv +c* k w 5 Uv Ck3 >- ko k o3 z a3 k ft> k a sc -- vD lO in o o o OK ' Area Samples (9 /6 /8 4 ) A irb o rn e F ib e r C oncentration? a t 811 10th Avenue, New York, NY ATIT Communications OU V. iA * k. oCo> iOa*-J CgJ it mO < %o V m o o20v 00 mo CoNJ 2 OV koUil +eQ4l a .# oa tfl m o rn u. u *. o> a t/). u% <43 o mco CO (oSI CuOn m CM 1 11 1/1 3g 33 O >\ w a tarfn * r-- c -- Ur- W -a a 43 .C eft ift C ?2 a 44 O >1 U ^ 91 CMC Ur- k <0-0 3 V i/ c56 oW 3 C4> S u -- o> ct> a c w* *u w k. <0--3 43 ^ Om mr-4 W QL 0s0o CvO t/l o'T' o oOON o <43 i/i v ,e auco> a. 0/ 3 > 4uJ kVu OJ uo -c>t9t 0U1 tfl CL 01 moo rs, OO TwaO> 0k1 Co a-- 4J 0u) kouu. k0i/11 40(4J) 43 01 4* C* oou(/9 1L U Cn --s 0uAS1 jo -- 3 ei0/1f/t ^U g 44 r-- 44 L. >> o 1^ a. C 01 a c 'rm t- 0) ^ *4 vft U 6 03 C 03 2 4-4 a a- S c a> -- a 41 c o <a -- o u oj e 4J c tft c O 03 k. C Jr 0 u 43 c 44 ft a* o O so U. o 2 Cm cO rtino o o Area Samples (9 /6 /8 4 ) A irb o rn e F ib e r C o n ce n tra tio n s a t 811 10th Avenue, Hew Y ork, NY AT&T Communications CM oPe- --u* t* u +V- |uA| e or our f4 e u., S'-1 (k/.) 40-1* 2" 1131 <O0- *Qa-T Ii/I w cH --49av-. O3 tn *Cs". ea --0Q1.-*pa** BL 9u c/1 at0/>1 0/ Q, V9e/> zo 9 V--O4 o 00 0o0 o rcn to o 00 tpoH o o 9 CM o a9 CM o -4U0C*11 cawi 9a o3r * > to to tO CM CM o 91 PN* pW CM Cr*M* <*> wu0a1i Vu. 01 to to CM 00 CM r*. to om m pH pH O tpo-4 po--r u c <9 O Vm a. *3 0) iQnO O poH at to 3>k.. 1 9 a* ao 9v. -X a 04 > wa Op- 2 Ok u 9 +4 0> 3 eo V0O0 402-l1) 9a 9i2n o Uf 9L 4VO2Ci "U001} u- O 44 01 3 eu m00 d v>i 0L1. o O1 JC < V. Q_ O2 Ui <L9. 4- 01 3 co to to o>u1 1 oi 99 0w1 JO 9 0) > -vx --a a2 ai k. 41 93 4- U o VO Vi i 2 v<9 904*u*- V<9 ^VU -OV2x* <--aV * ^U 4U3- cmo 2 <i/9 9U UL. fV-. _ 9 4U- >Vk JC 013 U 1-- o2 a<_i VaiOi 49- O3 UXI s o m<30u-mk) 0oaul/1k. ouV. s ooH e a "031 4u0u1-14. ou Vc 001.-PoJ- 4ooVu*--rI xuoorr o Je9d oo o HW O ce oV9r 3or 9 -p- 4-i t/k p9-v ovir-*v-r 4uoo&-r V. -- V>k 9 oor e9 o pH CM o r--4 CM pH CM CM CM ---1J 9 CO too OOk --1 9 CtooaoO> _--ii 9 CO oVoaO 9--3)4 tO oQat --9JJ- CO --JI ao otoaot toO oOk oar c 3 uO o0Uor u. 4u+UCo9Ucoucop-44p)r 4Uoo-o-1rr ococr Oz 65 E eerowor --vi --H CM ro CO ID in W'H COD Personal Sanplcs (9/6/84) A irb o rn e F ib e r C o n c e n tra tio n s a t A ll - 10th Avenue, Mew Y o rk, MY A T I! - Communications % rA Personal Sample (9 /6 /8 4 ) A irborne F ib e r C o n ce n tra tio n s a t 811 > 10th Avenue, New York, NY AT&T - Communications c o u 4- U *4 ^ U </) 4- w e oi ai x u *- e u. O cj -* *0 (A 01 k 4-4 41 C jQ U. (O-3> t&- oi t~ o t-~ e 0) o y* Q.44 C ^ke wi a a c o 41 44 a Q,^ 69 Lu <A yi S 01 Ok so 9z to SO m ao at PN. Q CM no fv. Z CO o cn CO r*. m CM co cm O CM oCO VO z tn o ro o> CO o Vo O o Vo o a o m to tO m o tn roo 00 ro CM CM CM CM 00 CM CM CM SO VO P"* to S s' frsn* 5 2 to CM o CM O CM CM CM to CM > u a i at 19 3 41 ^> LO O** at >1 k *a i x g k O 4i * k 4i Oa 1U 4J 1$ 41 -* kk Qi ^C $1 V 3 9 tn u f* k 44 g 41 a> ^ k. 4- oa iu k o 1 < a. liJ x jd k 44 23 au 4-4 4> a i 4-4 k o a. %/t e * k 4-1 w 5 i a * o u k 4-* o V 4> 2d 4 k 44 O3 au as k aa 3 1 e 01 Ik -- Ui UX o H CM ro tn tO r* tn tn lO tn vn tn tO to i _i --i _i _j --1 .j -i -i 4J a> 3 00 nr ao oo 03 Mr CO CO s sto VO vO to vO 3 o Oo o o a* at at A a* at gj at O o o o o o oo J4Oi<k0eE/-9*)i a. ai 3 > V *o a! a4ouukv0u*> co k4*. CM *y3t 41 JCSO <4- o o o 41 4- O k 0/ c at a y V k. tfi 44 k kU 4> O g <k. -a< 41 C & o go y* o 41 uk u V 41 O 44 -- 41 k- -O O *4-- O <Z 44 <9 *" z8 44 -" F-- 6 *o 4) y) tn -- 4- a> 4 k --o -b4 o w* cx c 41 k 41 -- 44 *0 t/1 U C 01 e 0> 9 *4 o 4-* e 1> a o 4-4 <9 *0 e3s ok 44 <v cc yi c o ^ k 41 C s 41 <J Xe 41 o OX U. to Z 44 ^4 CM ro I o vjO in o o | Area Samples (11/29/84) >- z ->* o >- za> a* 3 C o> > <x jr 4- V oc --t o 4-1 ns ao u 44 c i 3 m co ou p < ad k. h- < auC; ca o t<r jQ U. 03 c so ^3 s 3 CM c o^ r- U 44 U X 1- VI 44 U 0C 01 ) jO u -- e u. o --' lp CD co ih 0z 0 0 V CM O O oc rr t-h Oz 0 0 V Ns- -H 13 ul 0) W 44 un O O 01 C JO 3 r- O m f--4 U. (J 0c1 O mm & ai e -- E 3c^w CM H rv. CM GC --4 SC in SO O L. <1 C ai c r-- *- VI 0.44 C g ^ *f <B w E l/> Ow d e 0 0 44 r-- Q. Q."EL a0 l/) 1/) C d SO CO a 3 c c u *0 c a ra O W PC 0 L. O PC 2 u c O5c w UL <9 3 1*- -o tr m ro CO Q. 3 C ro 03 U x e 03 X 4<3 PC u PC 0 L. 2 0 * c* c l_ <3 (. 03 3 c -e a. 3 c a; cu C. *3 iE sr "C L. CO 22 O > 1. *3 a* cr 2 c p< -- -- fJ -- L. fl q r ^ -C "C rH CM CO c O0 _J -J 03 CO CO 00 CL a> a o> e0 CM (V CM ^ z r-H iH OO ^4 in J4U0c0LiC/433.i a c a; 3 <T5 > 03 |E , *0 X4OU0L10u4>1..I 03 4- Pc<<0 U0O3. J3 XVI CMg 03 ria>nc. OO 8 c* l/3*l 03 0- <cs0uO>ULU*.. s OOr*4 c T4ac4J/ OO3 *P0O00uuu03) PrcaC 0aU3. -J0rVu2--3) 4Cr--4 0JO3- -O wOeCW4PL %Ca/i uVp 4c04 <--i0Xn; 1 '44OOw0a443 T440cu00P4333" 10*. -4f4- x: & 03 -- -uVtL0O--3..I 40c0Oc0-3* COc J0Z3 44 Qz s*n- CM CO IVTO> O o l Table 10 i. o >- zai * 01 3 c flj > < CO C -*J V' cm e ***-* o 1--4 * HH+J t-t 9 00 o 1/) 0> *M C i- fl 3 ^| f5 c o go o e> e-**k r0 ra *9 C I* 1O 4- < t/t c U 01 01 u a. c o CJ u a; .a -- u. c c k3 1 k. --- < CM C o^ -- u +> u 03 ^ k. y 4- L- c a> a .a U -r" C LL. O '------' o o in CM O m IT o co m r-* r-. 10 mO on o CO O C zo zo VV o -a i/j a> k- 4-1 oi e -O 3 f- o u. o in CM m 4- "2 o -- a g jg 5 GO J r-- ou > *" On CM CM O CM CO C id ^-4 CM o cc CO n 10 CM nc r*. o O e --4 TT X H c p-- y c c01 O ^ f-* GO r-4 cQ. 4-> C C 1--4 r^ IM 6 *- p--4 1--4 <9 U m s 'w f2 C o C 4-> -- a. a.-*Su 9a o" V c c. 3 <9 y u F"- L. 4*1 44 a u JC 3 01 I a. c 4mJ i- 4-! O 5 2 U JJ 9 cr c T-- 4-J a. *- 4-1 3 C3c 3U a Q t 4-1 <-- u <- u /r Cy c 39 9 a. 19 3 1/5 C #0 j 01 -- CJ 4- a-r 3 U jC 3 C? u --u i ao ^ t. -J *c O3 c 3 u <-- 3 1/1 U r-- t- c: u 3 a; I CJ ^ * S- 4-> C3 3w c c cr c p-- 4-1 4-1 4-4 01 3 3U a. iW3 ir C **- <z wyc c y -- 3^o ir r^. CC O' o c C cC -j -J _j 01 ^3" r C\J co CO GO cc a. o> or a* O' a> EO CM CM CM CSJ CM 9Z p4 GO f-H i--4 iH r* > r ^ </> 01 01 Os19- 031 <T) > a> 1-- 13 01 S0/ Q. CM gi in cc rv. O O o t/1 p-- O' p-- V- 01 a. o c y o k. u -- E O o p--4 c o 01 c 3 O u y k. a; n u. o 01 J 01 J1o u J/ c <o p-- 0) u c a 4-1 u o a. ai u y c o *p-- 4-1 19 i. 4c-1 01 o c o GJ t CM TJ 01 *J u 01 tk. o u c 19 r-- O y 13 01 p-- +- 8 u 01 Q. y C 01 n p^ <- o c c 9 4-1 * c ya y-- 01 --i --u c: 1 4-1 a: *c 3 M Hco 3 4J 4-4 3 ** a e 3 *-- c C3 C 4-> Qy Z-- 1 ro CVI VD in o o Personal Samples (11/29/84) VI <-- Cu a 0 u 01 u 44 1/1 <3 3 3u O < L QJ 334JJ O' 1 h- C 0; 00 cr 0) II u ^-r c 0 u r" * --i LkJ a O <' Cm X VO 0-- OJ > O 0J e r-- c bj 0 i p h" w 0 e u >-- lO < < X 1/1 0 l r--1S --J UJ CL O1 <c CM X t/i O <-- a; > *3 0J c-- <0 c 00 H 1 -r 1-- 4-1 O *9 0 h-- *0 < X on 4/1 c o <o e aj o c o o > U2 01 X3 > (L U ce --* o 3 * L P- oi o wZ u 01 * c Ol 01 3 3 3 g 1_ C E Ol OJ O > > <J < <c H^09 OJ 4-> h4-> O < -C -4 9 H 0/ 3 CC 01 E jZ 01 c u 0 .0 w 5 c Q L. 40 3 L. O< ai T 3 U j3 J-- +J N-- 00 c u. OJ u c 0 bj rv kO 0 0 CM c *-- 0u *" 0 -M ^ as L vi t. C 0/ 0) A <J c u. Ow CJ O in CM O 00 ro r*v O0 z 0 \y c 0J 0 VI Q.4-* C B33 i. e on 3 w a rv C O fV, c a 01 ** *-- a, a-^ 6 JL u VO V> 0 0 3 <t v u u 4J 4-J 0J U 3 0J O *-- b. 1 0J 0 JC I. 4- "O O3C 3U^ 3 as V* 0 b. P 4J 0J u 3 0J f-1 0J ^ U 4-) O3 3u 43 0 O . lO to rH O 00 O ^4 O' c - 0. +-> 3 4- 4- 0J 3 C } u *0 0J 1 4- -- 4/1 u .X '-- b. V "O O 43 c J 'TJ TJ m m r>s, 0z 0 0 V 0 rs a* c 4J CL PMC 0) 3 C 3U OJ 1 4-> u -* 1L Ifl-C O VI C f 03 03 0J CL EO ft z t/3 ** O _1 CO a* CM rH CO O _J aj00 <T CM rH U> o> O0 -J --i _1 -J CO CO 01 cn CM CM HH rH *H 0 X +j VI 01 u 0J 0. CM B p m 00 r^. O O O V) *a 0; OJ Q. a 0 VI 0 u u T-- e 2 0 *H c p-- T3 0J H C 3 O O v> u OJ 03 rU1 r--4 VI vi OJ JZ 4-> c OJ w OJ a c *3 r O OJ b. 3 OJ O. 05 > -X L OJ O -C 3 1-- OJ JC * 4-J TD OJ <* 4M OU OJ L L. 0J L. *3 O rC L> sc 0J >o u XI 0J X VI 4-1 r--a 01 c OJ -- f" 4- L. 30 3 0 rH 01 u 1. 3 OJ V 0. O a. VI Xw OJ 3 X> 0 c v> O 0J r-4 B 3c v'l v JC <3 +J C VJ O v> OJ 4M 03 U | +J c c *3 O 0) a; <u M 4/ c OO 0 OJ OJ u 44 +4 OJ OJ < *3 "O 3 >-- OJ <4~ c0 b. 0 3 C +j O rX E 1 CD -- 00 Z -- 11 CM ro C O H u 03 < X on O *o c fO bJ 1 H0 h-X -O C UJ CL .^ j-- rE* --J OJ b. 3 V O CL X UJ OJ r-- JO VI VI E L OJ Q_ c X cn O 44 c 01 VI OJ u a. VI c 0 *" 4-1 "0 b. 4J c CJ u c c 0 < 3 J-- b3 O GO -3 OJ *Jr-- 03 <U '-- > QJ OJ ac-- Pervonol S p le i A C atnurKan of A irborne T IM Weighted Averoge (TWA) f ib e r C oacenlrktIM S B ll 10th Avenue, Hex York, NY A ItT -C o a a u flIc o tto n * i TABJjE , 1 3 PRE-WORK GUIDE OBJECTIVE To aid the Supervisor in managing asbestos work - The following guidelines present considerations for safe work activity. The Insulation Work Permit (Attachment A) and the Supplies Checklist (Attachment B) document that proper preventive measures have been taken for each workshift. A. Assignment of Employees Medical and Industrial Hygiene considerations must be met before employees begin work on asbestos projects. Medical 1. Medical evaluation of employees assigned to project 2. Fitness for use of respirator Industrial Hygiene 1. Respirator training 2. Qualitative Fit-Test B. Work Area Survey Necessary tools and protective equipment must be available. C. Air Plenum Work i The need for air plenum, work must be decided by the Supervisor before starting the job. Access to the air plenum corridor is prohibited and all outside openings to the plenum, must be seal until the final area wet mop is completed. Two options exist if plenum work is determined to be necessary 1. Schedule and perform work prior to asbestos work activity. 2. Schedule work after completion of asbestos work activity. LU TABLE 14 WORK ACTIVITY Phase 1: Insulation Removal OBJECTIVE To minimize the release of dust during all phases of work activity - This is accomplished by wetting the insulation with the penetrant solution and placing the debris in a plastic bag to prevent the release of dust. 1. Wear appropriate personal protective equipment. 2. Position plastic bag under pipe(s) to catch falling debris. 3. Cut insulation with utility knife. Do not use hammer. Wet mist insulation during cutting. 4. Cut insulation in a circular motion around the pipe at two locations. Leave enough room between cuts to allow the use of a torch or saw. 5. Cut insulation along the pipe, joining the two circular cuts. 6. Remove the insulation carefully, ir.ist with penetrant solution, and drop into the plastic bag. Mist the exposed ends of the insulation on the pipe prior to beginning next phase of work. LLA 001566 Phase 2: Cutting the Pipe OBJECTIVE To minimize the disruption of the insulation and release of airborne fibers - All exposed insulation must be misted or sealed. 1. If a torch is used, mist the exposed insulation ends prior to cutting. Use sealant compound to seal exposed insula tion ends on the small cut pipe pieces. 2. If a torch is not available, a saw can be used. (CAUTION: Tool must be double insulated). Seal the exposed insulation ends with sealant compound PRIOR to cutting with electric saw. 3. Place any small cut pipe pieces inside the plastic catch bag. 4. Seal with a sealant compound any exposed insulation on pipe runs which are left intact. 5. Seal with a sealant compound the exposed insulation on large cut pipes that cannot fit into a plastic bag. 001567 Phase 3: Transport OBJECTIVE To eliminate the possibility of contaminating areas outside the work area - All work clothing must be vacuumed prior to leaving work area. 1. Open the plastic sheeting and place it on the cart. Position the cart under large pipe runs and gently lower piping onto the cart. 2. Try not to rip the pipe wrap. If the pipj wrap rips, seal or mist the exposed area. 3. Place large pipe pieces on the cart. 4. Seal and place the plastic bag on the cart. 5. Cover the piping and the plastic bag with another sheet of plastic. Secure the top sheet to prevent it from opening. 6. Vacuum work clothing before carefully wheeling the cart from the work area to the storage area. 7. Gently remove the piping and plastic. Ensure the cart is clean. t:CTE: Sore of these items may have to be done cut of sequence, depending upon the specific situation. LLA 001568 P Phase 4: Clean Up OBJECTIVE To minimize the release of airborne fibers during all clean-up activities - 1- Wear a respirator. 2. Dry sweeping is prohibited. 3. A properly functioning HEPA (High Efficiency Particulate Absolute) vacuum with correct attachments is to be used. 4. Vacium the work area, floor, adjacent horizontal surfaces, tools and remaining piping adjacent to or below the work area. 5. Continue to wear protection if it is necessary to empty the HEPA vacuum. Carefully empty the vacuum cleaner to minimize the release of airborne fibers. Seal the vacuum bags before placing them into disposal bags. 6. With a respirator on, decontaminate work clothing with the HEPA vacuum. Place respirator and full vacuum bags inside a sealed plastic bag. Place the sealed plastic bag with the removed piping in the storage area. Phase 5: Post Work Activity OBJECTIVE To ensure the work area is clean and work clothing is removed after the job is completed. 1. Wet mop the floor. 2. In locker area: Remove work clothing and place in plastic bag for laundry pick-up. 3. Shower if possible. 4. The Supervisor should visually check the work and locker area. Complete and sign the Insulation Work Permit and file it with Building Manager ar the end of the workshift. LLA 001569 ATTACHMENT A ( Instructions; This Insu'lation Work Permit is to be completed by the Supervisor prior to beginning and after completing each workshift. It is to be retained by the Building Manager. Insulation Work Permit Work Location Pre-Works Employees Assigned to the Job Personnel Assigned Meet Medical/ Environmental Requirements Shift HVAC System Shut Down Plenum work Necessary Plenum Work Scheduled: Prior to Insulation Work After Final Wet Mop Date Scheduled 1st_____ 2nd____ 3rd _________________________ _ Yes__________ No_____ ___________________________ ___________________________ Plenum Sealed All Tools in Work Area All Personal Protective Equipment Available Work: Wet Method Used Personal Protective Equipment- Used Pest Work: HEFA Vacuum, of Area -'Clothing Dene Work Clothing sealed for Pick-Up Waste Disposal Properly Done Final Wet Mop Done Area Visually Clean Air Sampling Conducted ves Results Attached yes no no Signature and Date Supervisor LM 001570 ATTACHMENT B Instructions: The Supplies Checklist is to be completed / the Supervisor prior to beginning the job. Job Location: 1. Supplies Checklist Tools: penetrant solution spray bottle sealant compound utility knive6 electric saw oxygen-acetylene/torch and assorted equipment cart plastic clothing disposal bags plastic debris bags plastic sheets HEPA vacuum with attachments necessary additional tools mop and bucket ladder ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ _______ ?.. Personal Protective Equipment Checklist Respirators Type _________________ ______ Signature and Date Supervisor LLA 001571 ATTACHMENT C Asbestos > Respirator Program I. Introduction AT&T Communications is committed to eliminating employees1 exposure to airborne contaminants by engineering controls. In some specific instances when additional protection from airborne contaminants is desired due to the nature of the substance or operations, personal respirators may be worn. This program is designed to establish uniform practices for training and the proper selection, use and maintenance cf respirators. The Occupational Safety and Health Administration (OSHA) has established requirements for an acceptable respirator program in 29 CFR Part 1910, Subpart I, Subsection 1910.134. II. General Respiratory protective equipment is designed for unique purposes. Each type has certain advantages and disadvantages. The specific air contaminants, airborne concentration, length of exposure, tasks to be performed and personal limitations must be considered when selecting respiratory protective equipment. Respiratory protective equipment can be classified in two general categories: A. Air-Supplied Breathing Apparatus 1. Self-Contained Breathing Apparatus (SCBA) 2. Air-Line Breathing Apparatus (Air Mask or Hood ) LLA 001572 2 B. Air-Purifying Respirators 1. Chemical Cartridge Respirators 2. Particulate or Dust Respirators (Dust Mask) This Respirator Program'will discuss air-purifying respirators which may be worn when working near insulation materials. Changes in working conditions and practices which release airborne contaminants shall be evaluated to assess their impact on the use of respirators. This program will ti reviewed periodically to ensure its effectiveness: 1. All respiratory protective equipment shall be used in accordance with the manufacturers' instructions and training received. 2. Respirators shall be regularly inspected and main tained prior to their use. Defective equipment shall be repaired or disposed. Problems with respi rators shall be reported to supervisors. Ill. Maintenance and Care of Respirators A. Inspection of Respirators All respirators shall be inspected before and after each use. This inspection shall include the examination of: 1. the tightness of connections and the condition of the face piece LLA 001573 3 2. the headbands 3. rubber or elastomer parts for pliability and deterioration B. Cleaning of Respirators 1. Disposable type respirators shall be used once and disposed. Respirators are to be the last piece of personal protective equipment removed after final vacuuming. C. Repair of Respirators 1. In general, defective respirators shall be exchanged for new ones, making repairs unnecessary. D. Storage of Respirators 1. Respirators shall be stored to protect against dust, sunlight, heat, extreme cold, excessive moisture or damaging chemicals. 2. Air-purifying respirators such as dust masks may be stored in plastic bags. IV. Medical Limitations A. No person shall use a respirator unless they are able to perform the work and use the equipment. This shall be determined by the Medical and Safety Departments. B. The medical status of respirator wearers will be reviewed periodically by the Medical Department. LLA 001574 4 V. Selection. Issuance and Training Practices A. Selection of Respirators 1. The type and make of respirator will be selected by the supervisor with the assistance of the Regional Safety Coordinator. 2. Only respirators approved by the National Institute of Occupational Safety and Health (NIOSH) may be used. The following disposable respirators are approved for asbestos: 3M 6710, 9900, and 9910. 3. The proper type of respirator for each contaminant will be selected in accordance with the manufac turers ' instructions and the assistance of the Regional Safety Coordinator. B. Issuance of Respirators 1. Air sampling will be performed tc determine if the use of a respirator is recommended for certain types of work activity. Area and personal air sampling will be performed periodically to assess airborne contamination and the effectiveness of respiratory protection. C. Employee Training The following topics will be presented and discussed during respirator training sessions: 1. The nature of the air contaminants and their potential toxicity. LU 001575 - 5. - .2 The use of engineering controls and respiratory protective equipment including previous industrial hygiene studies. 3. The proper selection, use and care of respirators. 4. Instruction and training in the actual use of air-purifying respirators including qualitative fit tests. 5. Any other emergency or special instructions. VI. Operating Procedures for Respirators A. Respirators should be stored appropriately when not being used. A clean plastic bag can be used for storing respirators. B. Respirators should not be worn when conditions prevent a good face seal (i.e., beards, eyeglasses and missing dentures). C. Before and after using a respirator, the employee should inspect the tightness of connections and condition of the face piece, and headbands. If any questionable items are found, they shall be corrected prior to use. D. To assure proper protection, the fit of the face piece must be checked by the wearer before each use. To check the fit, cup both hands over respirator and exhale vigorously. If air Ieak6 around the nose, tighten the nosepiece. If air leaks around the edges of the respi rator, adjust the head straps. lib 001576 - <, - I ; E. After prolonged use, air purifying respirators should be disposed. Excessive use or damage may result in the impaired performance of respirators. F. Air purifying respirators must never be worn in an oxygen-deficient or toxic atmosphere. Air-supplied respirators must worn in these conditions. Additional qualifications and training is required prior to the use of air-supplied respirators. LLA 001577