COMPANY CONFIDENTIAL > Monsanto Anniston Plant TECHNICAL SERVICES DEPARTMENT MONTHLY REPORT Anniston J. T. Bell A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee 0 -Hv-irr Williams- S-1/ t // Month Summary JUNE 1970 COST IMPROVEMENT RESULTS Est. Act. ______ Target % of Target $46,720 $43,465 107% General Offices YTD $481,577 $394,975 122% H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard W. K. Johnson C. F. Luecke W. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens Agricultural Division The Parathion plant test of Process Amendments "Chlorination in the Presence of Acetone" and "Hydrocarbon Dilution of Resi<due" started 6/22/70. Distilled intermediate assays have risen from 93% to 98+%. The diesel fuel addition to the still started on 6/29/70 and first indications were that increased yields and good residue handling would be realized. On the 4th distillation batch with hydrocarbon dilution, an operating prob lem resulted in formation of plastic sulfur in the still and residue hold tank preventing normal handling. It was necessary to suspend the test on 7/2/70 in order to clean out equipment. Laboratory work has tentatively confirmed the suspected cause for plastic sulfur precipitation. Field testing is expected to resume the week of 7/6/70, incorporating the neces sary countermeasures and controls to overcome the problem with plastic sulfur. OTHER LOCATIONS A. H. Forsten Alvin, Texas P. O. DeGarmo South Second D. W. Jackson W.G.K. Organic Division HB-40 design proceeding essentially on schedule. Therminol heater manufacturers' data needed to complete AC&M drawings. In strumentation drawings out for review, electrical drawings on the board. 881 manhours were devoted to this project in June. The waste Aroclor Sump Project. AFE 3427 ($22,500 NFC) has been approved. Construction has started and is expected to be com pleted by early September. DSW 551478 COMPANY CONFIDENTIAL INFORMATION "This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written STLCOPCB4089895 ) 2. Organic Division - continued A Tentative Process Amendment, to make.low color Solid Aroclor 5460 by distilling in the presence of caustic soda, has been written and submitted for approval. The field test is anticipated for August 1970. Operation of the Polyphenyl Pilot Unit continues to be smooth. The promoter scanning study outlined in Work Plan IV issued on 5/20/70 is proceeding on schedule and is still targeted for completion on 7/13/70. Laboratory studies on treatment of high color HB-40 made from Santowax C have shown that Attapulgus Clay will remove color bodies. However, initial studies show that clay usage is very high. Further work is cur rently being directed toward defining the usage rates. Pollution Control A project premise is in review to provide a drying bed for the sludge which is collected in the HC1 neutralization pit mixing basin. Analyses are 90% complete on second Aroclor department Waste Audit. Equipment is on order and the Pollution Control Engineer, assisted by a CO-OP, will conduct a pilot plant study of the parathion waste treatment aeration basins to retard the production of solids in this process. Solids to the City of Anniston Waste Treatment Plant are being controlled at close to the ordinance limit of 700 ppm by sewering excess to the waste lagoon. The Eimco filter is also operating to remove solids from clarifier bottoms. Quality Control The Plant Quality Score was 86.9, down 1.4 from May, with a YTD score of 85.6 against a target of 95.0. The semi-annual review of process quality capability showed a relaxation of control on 45 standards versus an im provement on 31 standards, a substantial decline from the historical 3:1 improvement to relaxation ratio. J. C. Landwehr :kd DSW 551479 STLCOPCB4089896 ) PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O. Kemp 3. Complaint Report Quality Number NY 28 P Material Aroclor 5460 Customer Manhattan Adhesives Reason Specks YTD Quality Complaints/100 Shipments 0.35 Target 0.20 DSW 551480 STLCOPCB4089897 ) COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT Community Relations 1. S. O. Kemp, Laboratory Supervisor, attended the Annual Industrial Management Club Midsouth Round Table held at Pine Mountain, Georgia, May 2930. Development 1. Safety Committee presented departmental safety program June 30 entitled "Automobile Safety." Personnel 1. Michael L. Marcum (University of Tennessee) and Danny J. Johnson (University of Alabama), Chemical Engineering students, reported for work in TSD as summer employes June 8. Mickey will report to W. B. Dunlap and Danny will work in ED&S. 2. Coby Riggins, BSChE University of South Florida, reported to work July 1. His initial assignment is as a Manufacturing Cost Accountant in Accounting. After 4 months he will report to TSD as a Process Engineer. 3. Frederick D. Ramsey, Jr., BSChE Auburn University, reported to work June 29 as Chemical Engineer I, Process Group B. Ricky will report to V. R. Haupt. 4. Danny F. Pittman, BSChE University of South Alabama, reported to work June 15 in Process Research and Development reporting to J. L. Brown. 5. Lee 0. Chambers (Auburn University) and John M. Jones (Georgia Tech), two TSD CO-OPs, have completed their last working quarter and resumed their studies. 6. R. V. Carlisle, Electrical/Instrument Technician in TSD, will assume duties in Maintenance Engineering effective July 1 reporting to J. W. Kennedy. 7. Transfer-promotions in TSD and Lab effective June 15 were: G. W. Miller to Production Department as Production supervisor for Aroclor, Muriatic Acid and Packaging. J. T. Bell promoted to Chief Chemist. J. L. Brown promoted to PR&D Group Leader reporting to J. T. Bell. J. F. Benson to Maintenance department as Corrective Maintenance Engineer reporting to J. W. Kennedy. E. E. Bowles to Maintenance department as Corrective Maintenance Engineer reporting to J. W. Kennedy. dSVN551A8A STLCOPCB4089898 ) COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT - continued 5. 8. J. T. Bell attended a Parathion Research meeting in St. Louis on June 4. - 9. David Dixon, CO-OP, returned to work June 29 and will be conducting a waste treatment study this summer. Visitors 1. Messrs. Earl Billen and John Thompson, Inorganic Division - St. Louis, visited Ag and TSD to discuss P2S5` qSNN STLCOPCB4089899 ) 1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE EXISTING PRODUCT . TECHNOLOGY IMPROVEMENT NEW PRODUCT EVALUATIONS MAJOR PROJECT SUPPORT PROCESS CONTROL IMPROVEMENT 70 60 50 40 PROJECT DESIGN 30 20 10 PROCESS MAINTENANCE TECHNOLOGY AND TECHNICAL SUPPORT TECHNICAL MANPOWER 15 " 5 PLANT IMPROVEMENT PROGRAM REAL ESTATE MANAGEMENT STLCOPCB4089900 ORGANIC DIVISION 1970 TSD COST IMPROVEMENT JAN FEB . MAR APR MAY JUN JUL AUG SEP OCT NOV DEC FUNCTIONAL FLUIDS TAR EST ACT Disposal of Liquid Montar #3 Aroclor Still New Burners TAR EST ACT TAR EST ACT 15.00 600 600 1080 0 C 1080 1080 .0 0 1500 0 .0 500 500 1080 0 1080 1080 1080 1080 1080 1080 #2 Still Entrainment TAR EST 3000 3000 "' Separator ACT 1242 Distillatio -l Productivity TAR EST ACT 1500 1500 1500 1500 1500 1500 0 100 1000 1520 C 100 1000 1500 1500 1500 1500 TAR EST ACT TAR , PLASTICIZERS EST . ACT Flaking & Drum ming Facilities Headcount Solid Aroclor Instrumentation TAR .3000 EST 3000 ACT 3000 TAR EST ACT TAR 3000 2000 1000 3000 2000 1000 3000 2000 1000 3750 0 1000 1(500 1000 3750 3750 3750 3750 3750 3750 00 0 2250 2250 2250 2250 3750 2250 3750 2250 Sandvik Belt EST ACT Add Tray Strip TAR ping Sections to EST Santowax ACT TAR Cl2 Bulk Handling Facilit l.es EST ACT Solid Aroclor Expansion . TAR EST ACT Chlorinator Back Pressure TAR EST ACT 4580 4580 4580 4580 4580 4580 4580 0 00 00 4580 2000 3500 3500 2000 2000 2000 3550 1950 3440 3550 3050 344C 30000 5000C 49.50C 5000C 10000 36000 24000 5190C 5590C 1050C 38500 30000 360 360 360 4580 .j 360 TAR EST ACT TAR EST ACT TAR EST ACT TAR -- ... EST ' ACT . --- osV)551`84 STLCOPCB4089901 ) - ORGANIC DIVISION 1970 TSD COST IMPROVEMENT FUNCTIONAL FLUIDS & plasticizers Aroclor Ware house Reduced Headcount Improved Santowax Yield HB-40 Reduce Nickel Catalyst Usage Substitution of Santowax C for Santowax R TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR JAN FEB' MAR APR MAY JUN JUL AUG SEP OCT NOV DEC (AFF ECTIN 3 bot: i bus: NESS GROUP S) i nnn 1000 1000 1000 1000 1000 1000 1000 1000 ' 1160 4000 4000 4000 4000 5900 2800 5800 4000 4450 2800 5800 700 700 700 700 .1330 - 525 1230 425 1335 525 2080 4000 4000 4000 4000 4QQQ 4Q0.Q 700 700 700 20Q0C 2QQQU EST ACT GENERAL CHEMICALS TAR EST ACT CBIP HENYL PNP, HCl 1 Biphenyl Cool-r ing Water Treatment PNP Modify Acidifiei Dump Valve Svste m Install Entrain ment Separator Production Optimize Reactoi Variables-PNP Refuse Well Water TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT 600 670 670 3150 520 520 600 600 __6.Q0_ 600 600 680 580 600 67C 440 680 580 600 675 625 625 625 625 625 625 625 625 625 625 625 5500 5500 5500 5500 5500 5500 3150 3150 1277 2164 3016 2164 463C _4_6_2G. 127 " 1604 0 12' ' 1605 .46311 _43.Cl _43Q .-4.6.30. j 500 __ 5_Q0 _5QQ_; Untargeted PNCB Heel Credits HCl HC1 Catch Tank & Coalescer 150 M Gallon Storage Tank HCl Instrumentation TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR 5700 2500 2500 43(JU 4300 4300 2275 563 3078 1650 920 2275 563 3078 1650 5700 5700 5700 57Q0 7560 9000 1030C 6545 7560 9000 1030C 6545 4300 4300 4300 4300 430Q 4300 4300 4300 4300 4300 4300 1875 4000 12.30C 4300 4300 4300 1875 1875 1875 3440 6500 1875 1875 1875 1875 _4_000_ 1230C 3440 1875 EST ACT ___TAR --EST ACT - ---- ... _. -- ---------- 1 f ; DSW 551485 STLCOPCB4089902 ) ; ORGANIC DIVISION 1970 TSD COST IMPROVEMENT PLANT WIDE Improve Plant Power Factor Central Air Compressor Chlorine Plant Shutdown . RTN Cooling Water to Tower Cooling Con veyor - P?S5 Total Organic Month - M $ Total Organic YTD - M $ JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC TAR EST ACT TAR EST ACT TAR EST ACT 950 900 940 950 950 950 950 950 900 916 790 suer 914 840 790 810 845 . TAR 1000 1000 1000 EST ACT TAR 19900 EST 19900 ACT 19900 19900 19900 19900 19900 19900 19900 19900 19900 19900 9950 9950 9950 TAR EST ACT' 25 25 25 25 25 25 TAR EST ACT TAR EST ACT TAR EST ACT 40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68 36.29 94.54 103.6 43T58~ 36.33 99.86 109.1 70.89 77.98 TAR 40.6 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.8 EST 36.29 130.9 239.8 315.7 390.8 437.7 ACT 36.33 136.2 245.3 316.2 394.1 ' DSW 551486 STLCOPCB4089903 ) AG DIVISION 1970 TSD COST IMPROVEMENT PARATHIONS Replace #3 Chlorinator Improve C^Still Yields Increase Chlor inator Coolings Acetone Recovery Chlorine Unloading Optimize Methyl PNP/PCT Ratio Optimize Ethyl PNP/PCT Ratio Change Cooling 1^0 - Item 737 Untargeted: Plant Test - Total AG Month M $ Total AG YTD M $ Total Plant Month M. $ ' Total Plant YTD M $ TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT JAN 2800 1957 1957 2250 3634 3634 500 0 0 200 310 310 5.75 5.90 5.90 5.75 5.90 5.90 46.35 42.19 42.23 46.35 42.19 42.23 FEB MAR APR MAY JUN JUL a.UG . SSP 4860 4860 3500 3500 234(7 0 2340 3000 3000 00 0 3500 3000 3500 3000 8500 3000 3500 2800 1069 1069 2250 4237 4237 2800 1225 1225 2250 3350 3350 750 2641 2641 200 230 230 750 0 0 200 270 270 2800 1935 ~ 1935 3200 1406 1406 2800 130 130 3200 3431 3431 3000 0 0 2800 715 3200 2430 3000 0 2800 2800 2800 3200 3200 3000 1500 2430 2430 5270 5270 6.0 8.17 8.17 6.0 6.0 4.85 10.63 4.85 10.63 15.5 15.5 IXT2" 3.15 11.2 11.75 17.75 23.75 14.08 18.92 29.55 14.08 18.92 29.55 39.25 54.75 40.73 43.87 40.73 15.5 22.5 14.3 70.25 92.75 107.1 78.1 102.9 64.07 60.12 43.47 102.8 108.5 81.02"' 8577T 46.72 108.0 113.9 81.52 89.15 49.62 53.02 45.18 124.5 227.3 291.4 145.0 258. S 345.3 150.3 264.2 345.8 351.5 395.0 444.6 431.5 481.6 434.9 497.6 542.8 OCT NOV 3000 8500 2800 2800 500 14.3 3.3 121.4 124.7 78.98 54.98 621.8 676.7 DEC 50: 125.; 52.1J 728. < OS\N 551487 STLCOPCB4089904