Document 3JRxnNZ1J0b20j0z5Xe6dGz7n
COMPANY CONFIDENTIAL
> Monsanto
Anniston Plant
TECHNICAL SERVICES DEPARTMENT
MONTHLY REPORT
Anniston
J. T. Bell A. G. Hill G. L. Jessee L. C. Lahman J. C. Landwehr H. E. Schulte W. F. Taffee 0 -Hv-irr Williams- S-1/ t
//
Month
Summary
JUNE 1970
COST IMPROVEMENT RESULTS
Est. Act. ______ Target
% of Target
$46,720
$43,465
107%
General Offices
YTD $481,577 $394,975
122%
H. C. Carder D. Danna (5) M. W. Farrar P. B. Hodges F. J. Holzapfel D. B. Hosmer R. E. Howard W. K. Johnson C. F. Luecke W. R. Richard W. R. Robirds C. W. Roos J. R. Savage J. E. Smith J. A. Stephens
Agricultural Division
The Parathion plant test of Process Amendments "Chlorination in the Presence of Acetone" and "Hydrocarbon Dilution of Resi<due" started 6/22/70. Distilled intermediate assays have risen from 93% to 98+%. The diesel fuel addition to the still started on 6/29/70 and first indications were that increased yields and good residue handling would be realized. On the 4th distillation batch with hydrocarbon dilution, an operating prob lem resulted in formation of plastic sulfur in the still and residue hold tank preventing normal handling.
It was necessary to suspend the test on 7/2/70 in order to clean
out equipment. Laboratory work has tentatively confirmed the
suspected cause for plastic sulfur precipitation. Field testing
is expected to resume the week of 7/6/70, incorporating the neces
sary countermeasures and controls to overcome the problem with
plastic sulfur.
OTHER LOCATIONS
A. H. Forsten Alvin, Texas
P. O. DeGarmo South Second
D. W. Jackson W.G.K.
Organic Division
HB-40 design proceeding essentially on schedule. Therminol heater manufacturers' data needed to complete AC&M drawings. In strumentation drawings out for review, electrical drawings on the board. 881 manhours were devoted to this project in June.
The waste Aroclor Sump Project. AFE 3427 ($22,500 NFC) has been approved. Construction has started and is expected to be com pleted by early September.
DSW 551478
COMPANY CONFIDENTIAL INFORMATION
"This document contains confidential information which is the property of Monsanto Company. Only those portions of the document relevant to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the Company without written
STLCOPCB4089895
)
2.
Organic Division - continued
A Tentative Process Amendment, to make.low color Solid Aroclor 5460 by distilling in the presence of caustic soda, has been written and submitted for approval. The field test is anticipated for August 1970.
Operation of the Polyphenyl Pilot Unit continues to be smooth. The promoter scanning study outlined in Work Plan IV issued on 5/20/70 is proceeding on schedule and is still targeted for completion on 7/13/70.
Laboratory studies on treatment of high color HB-40 made from Santowax C have shown that Attapulgus Clay will remove color bodies. However, initial studies show that clay usage is very high. Further work is cur rently being directed toward defining the usage rates.
Pollution Control A project premise is in review to provide a drying bed for the sludge which is collected in the HC1 neutralization pit mixing basin. Analyses are 90% complete on second Aroclor department Waste Audit.
Equipment is on order and the Pollution Control Engineer, assisted by a CO-OP, will conduct a pilot plant study of the parathion waste treatment aeration basins to retard the production of solids in this process. Solids to the City of Anniston Waste Treatment Plant are being controlled at close to the ordinance limit of 700 ppm by sewering excess to the waste lagoon. The Eimco filter is also operating to remove solids from clarifier bottoms.
Quality Control
The Plant Quality Score was 86.9, down 1.4 from May, with a YTD score of 85.6 against a target of 95.0. The semi-annual review of process quality capability showed a relaxation of control on 45 standards versus an im provement on 31 standards, a substantial decline from the historical 3:1 improvement to relaxation ratio.
J. C. Landwehr :kd
DSW 551479
STLCOPCB4089896
)
PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. O. Kemp
3.
Complaint Report
Quality
Number NY 28 P
Material Aroclor 5460
Customer Manhattan Adhesives
Reason Specks
YTD Quality Complaints/100 Shipments 0.35 Target 0.20
DSW 551480 STLCOPCB4089897
)
COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT
Community Relations
1. S. O. Kemp, Laboratory Supervisor, attended the Annual Industrial Management Club Midsouth Round Table held at Pine Mountain, Georgia, May 2930.
Development
1. Safety Committee presented departmental safety program June 30 entitled "Automobile Safety."
Personnel
1. Michael L. Marcum (University of Tennessee) and Danny J. Johnson (University of Alabama), Chemical Engineering students, reported for work in TSD as summer employes June 8. Mickey will report to W. B. Dunlap and Danny will work in ED&S.
2. Coby Riggins, BSChE University of South Florida, reported to work July 1. His initial assignment is as a Manufacturing Cost Accountant in Accounting. After 4 months he will report to TSD as a Process Engineer.
3. Frederick D. Ramsey, Jr., BSChE Auburn University, reported to work June 29 as Chemical Engineer I, Process Group B. Ricky will report to V. R. Haupt.
4. Danny F. Pittman, BSChE University of South Alabama, reported to work June 15 in Process Research and Development reporting to J. L. Brown.
5. Lee 0. Chambers (Auburn University) and John M. Jones (Georgia Tech), two TSD CO-OPs, have completed their last working quarter and resumed their studies.
6. R. V. Carlisle, Electrical/Instrument Technician in TSD, will assume duties in Maintenance Engineering effective July 1 reporting to J. W. Kennedy.
7. Transfer-promotions in TSD and Lab effective June 15 were:
G. W. Miller to Production Department as Production supervisor for Aroclor, Muriatic Acid and Packaging.
J. T. Bell promoted to Chief Chemist.
J. L. Brown promoted to PR&D Group Leader reporting to J. T. Bell.
J. F. Benson to Maintenance department as Corrective Maintenance Engineer reporting to J. W. Kennedy.
E. E. Bowles to Maintenance department as Corrective Maintenance Engineer reporting to J. W. Kennedy.
dSVN551A8A
STLCOPCB4089898
)
COMMUNITY RELATIONS, PERSONNEL, RECRUITING AND DEVELOPMENT - continued
5.
8. J. T. Bell attended a Parathion Research meeting in St. Louis on
June 4.
-
9. David Dixon, CO-OP, returned to work June 29 and will be conducting a waste treatment study this summer.
Visitors
1. Messrs. Earl Billen and John Thompson, Inorganic Division - St. Louis, visited Ag and TSD to discuss P2S5`
qSNN
STLCOPCB4089899
)
1970 DISTRIBUTION OF TIME BY TECHNICAL SERVICE
EXISTING PRODUCT
.
TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS
MAJOR PROJECT SUPPORT
PROCESS CONTROL IMPROVEMENT
70 60 50 40
PROJECT DESIGN
30 20 10
PROCESS MAINTENANCE
TECHNOLOGY AND TECHNICAL SUPPORT
TECHNICAL MANPOWER
15 " 5
PLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
STLCOPCB4089900
ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
JAN FEB . MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
FUNCTIONAL FLUIDS
TAR EST ACT
Disposal of Liquid Montar
#3 Aroclor Still New Burners
TAR EST ACT TAR EST ACT
15.00 600 600
1080 0
C
1080 1080
.0 0
1500
0 .0
500
500
1080 0
1080
1080
1080
1080 1080
1080
#2 Still Entrainment
TAR EST
3000
3000
"'
Separator
ACT
1242 Distillatio -l Productivity
TAR EST ACT
1500 1500 1500 1500 1500 1500 0 100 1000 1520 C 100 1000
1500 1500 1500
1500
TAR
EST
ACT
TAR
,
PLASTICIZERS
EST . ACT
Flaking & Drum ming Facilities Headcount
Solid Aroclor Instrumentation
TAR .3000 EST 3000 ACT 3000 TAR EST ACT TAR
3000 2000 1000 3000 2000 1000 3000 2000 1000
3750 0
1000 1(500 1000
3750 3750 3750 3750 3750 3750 00
0 2250 2250 2250 2250
3750 2250
3750 2250
Sandvik Belt
EST ACT
Add Tray Strip
TAR
ping Sections to EST
Santowax
ACT
TAR
Cl2 Bulk Handling
Facilit l.es EST
ACT
Solid Aroclor Expansion .
TAR EST ACT
Chlorinator Back Pressure
TAR EST ACT
4580 4580 4580 4580 4580 4580 4580 0 00 00
4580
2000 3500 3500
2000 2000 2000 3550 1950 3440 3550 3050 344C 30000 5000C
49.50C 5000C 10000 36000 24000
5190C 5590C 1050C 38500
30000 360 360 360
4580
.j
360
TAR
EST
ACT
TAR
EST
ACT
TAR
EST
ACT
TAR -- ... EST ' ACT
. ---
osV)551`84
STLCOPCB4089901
) -
ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
FUNCTIONAL FLUIDS &
plasticizers
Aroclor Ware house Reduced Headcount
Improved Santowax Yield
HB-40 Reduce Nickel Catalyst Usage Substitution of Santowax C for Santowax R
TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR
JAN FEB' MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(AFF ECTIN 3 bot: i bus: NESS GROUP S)
i nnn 1000
1000 1000 1000 1000
1000
1000 1000
'
1160
4000 4000 4000 4000 5900 2800 5800 4000 4450 2800 5800
700 700 700 700 .1330 - 525 1230 425 1335 525 2080
4000 4000 4000 4000 4QQQ 4Q0.Q 700 700 700 20Q0C 2QQQU
EST ACT
GENERAL CHEMICALS
TAR EST ACT
CBIP HENYL PNP, HCl 1
Biphenyl Cool-r ing Water Treatment
PNP Modify Acidifiei Dump Valve Svste m Install Entrain ment Separator Production Optimize Reactoi Variables-PNP
Refuse Well Water
TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT
600 670 670
3150 520 520
600 600 __6.Q0_
600 600
680 580 600 67C 440
680 580 600 675
625 625 625 625
625 625 625 625 625
625 625
5500 5500 5500 5500 5500 5500
3150 3150
1277 2164 3016 2164
463C
_4_6_2G.
127 " 1604
0
12' ' 1605
.46311 _43.Cl _43Q .-4.6.30. j 500 __ 5_Q0 _5QQ_;
Untargeted PNCB Heel Credits
HCl HC1 Catch Tank & Coalescer 150 M Gallon Storage Tank
HCl Instrumentation
TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR
5700 2500 2500 43(JU
4300 4300
2275 563 3078 1650 920
2275 563 3078 1650
5700 5700 5700 57Q0 7560 9000 1030C 6545 7560 9000 1030C 6545 4300 4300 4300 4300 430Q
4300 4300
4300 4300 4300 4300
1875
4000 12.30C
4300 4300 4300 1875 1875 1875 3440 6500
1875
1875
1875 1875
_4_000_ 1230C 3440
1875
EST
ACT
___TAR --EST ACT
- ---- ... _. -- ---------- 1
f ;
DSW 551485
STLCOPCB4089902
)
; ORGANIC DIVISION 1970 TSD COST IMPROVEMENT
PLANT WIDE Improve Plant Power Factor Central Air Compressor
Chlorine Plant Shutdown . RTN Cooling Water to Tower Cooling Con veyor - P?S5
Total Organic Month - M $ Total Organic YTD - M $
JAN
FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
TAR
EST
ACT
TAR
EST
ACT
TAR EST ACT
950
900 940
950 950 950 950 950
900 916 790 suer
914 840 790 810 845
.
TAR
1000 1000 1000
EST
ACT
TAR 19900
EST 19900 ACT 19900
19900 19900 19900 19900 19900 19900
19900 19900 19900
9950 9950
9950
TAR EST ACT'
25 25 25 25 25 25
TAR
EST
ACT
TAR
EST
ACT
TAR EST ACT
40.6 72.1 96.88 58.07 44.62 27.97 34.12 30.52 30.88 64.68 51.68 51.68
36.29 94.54 103.6
43T58~
36.33 99.86 109.1 70.89 77.98
TAR 40.6 112.7 209.6 267.6 312.3 340.2 374.3 404.9 435.7 500.4 552.1 603.8
EST 36.29 130.9 239.8 315.7 390.8 437.7
ACT 36.33 136.2 245.3 316.2 394.1
'
DSW 551486 STLCOPCB4089903
)
AG DIVISION 1970 TSD COST IMPROVEMENT
PARATHIONS
Replace #3 Chlorinator
Improve C^Still Yields
Increase Chlor inator Coolings
Acetone Recovery
Chlorine Unloading
Optimize Methyl PNP/PCT Ratio Optimize Ethyl PNP/PCT Ratio Change Cooling 1^0 - Item 737
Untargeted: Plant Test -
Total AG Month M $
Total AG YTD M $
Total Plant Month M. $ '
Total Plant YTD M $
TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT TAR EST ACT
TAR EST ACT
JAN
2800 1957 1957 2250 3634 3634
500 0 0
200 310 310
5.75 5.90 5.90 5.75 5.90 5.90
46.35 42.19 42.23 46.35 42.19 42.23
FEB MAR APR
MAY JUN JUL a.UG . SSP
4860 4860
3500 3500
234(7
0
2340
3000 3000
00 0
3500 3000
3500 3000 8500
3000 3500
2800 1069
1069
2250 4237 4237
2800 1225 1225
2250 3350 3350
750 2641 2641
200 230 230
750 0 0
200 270 270
2800 1935 ~ 1935
3200 1406 1406
2800
130 130 3200 3431
3431 3000
0 0
2800 715
3200 2430
3000 0
2800 2800 2800 3200 3200 3000 1500
2430 2430
5270 5270
6.0 8.17
8.17
6.0 6.0
4.85 10.63 4.85 10.63
15.5 15.5 IXT2" 3.15
11.2
11.75 17.75 23.75 14.08 18.92 29.55
14.08 18.92 29.55
39.25 54.75 40.73 43.87 40.73
15.5 22.5 14.3 70.25 92.75 107.1
78.1 102.9 64.07 60.12 43.47 102.8 108.5 81.02"' 8577T 46.72 108.0 113.9 81.52 89.15
49.62 53.02 45.18
124.5 227.3 291.4 145.0 258. S 345.3 150.3 264.2 345.8
351.5 395.0 444.6 431.5 481.6 434.9
497.6 542.8
OCT
NOV
3000 8500 2800 2800
500
14.3 3.3 121.4 124.7
78.98 54.98 621.8 676.7
DEC
50:
125.; 52.1J
728. <
OS\N 551487
STLCOPCB4089904