Document 3JGyJw0da55JgD1wdKwEaOE4J

jjlvl--F iu.Vl~*< c\i* i 10 -i /. ' ' I'UtS-- /VI .id v/iui/.'i* jlLuS I LARI' iXuu . . u*>u i X X*.-Xv..i > / ! ii IH- Y-AR 1949 For convenience, tills report has been divided into the Following pai'ts: 1. Copper neliueries 2. Zinc Plant 3. Rolling s:llls (Anaconda -ire and Cable Company) 4. Ferromanganese Plant b. General 6. impenditures ' 7. Slag ireating Plant, Zast Helena 1 COPI'rJv I a-i'liti-t'.] 23 The i.lectrolytic Copper Heilnery operated at an average rate of 40.2l ox capacity, and an average current aensity oi' 11.36 amperes per square loot, producing 129,373,464 pounds ox" cathodes. Inere -ere 200,395 pounds oi cathodes snipped during the year. in addition to the cathodes produced irom oar own electrolytic copper Atliuery, .e received and treated in cur i urnace i.eiinery 13,277,944 pounds oi catliodes From Inspiration, /M'izona. The Anode Casting Riant operated 174 iurnace days in 1949, producing a total oi 37,379,231 pounds oi copper anodes, oi widen 0,437,936 pounds came From anode scrap and miscel laneous copper scrap, 10,032,434 pounds From :.:larai blister copper and 1,103,311 irom Ktnnecott blister copper. The no. 1 iurnace in the Furnace nexinery department did not operate in anode production during 1949. pMVC 00012637 The rcmt-lting oi anode scrap and blister copper lor casting into anodes .:n& tr^nsiured iroi ti.c old anode cast ing plant to tne .o. 1 furnace in the itin.ace .miner/ i;epurttacut ..unual'y o, ls^U. iho anode casting plant is being con verted iiito a plant xor tiie production oi copper billets, ihe ho. 1 furnace in the furnace neiinery L'epurtment was equipped l'or casting anodes in early lsuB but has not been operated since Jlarch 13, 1943, when the plant #us snut clown because of lack ol sufficient copper to Justify the operation oi a large lurnace. Tne lurnace ke-iinery operated Sol days during the y..ur* at an average rate ox *1.1,,, Capacity* producing l4J16o&31 pounds oi shapes. J-. total ui 120,933,390 pounds ox refined cop per ..as sliipped during the year. insufficient cattjoues .'.tie available to maintain a oiie-xurnsce o;er.-ticu on a live-day-per-wee* basis in duly, August ,.nd September, with the result that tne Furnace !.erinery je.urtment uas shut sown xrom July a to July 24, inclusive, and l'rora August 19 to September 7, inclusive. The scalping i lent operated 242 days in ls>4&, pro ducing s4,jS3,236 lounds oi scalped wirebar. Shavings amounted to 2*Odd,376 pounds, or a. 34,. oi -..Irebur scalped, which ..as re treated tij-ough the furnace ..eiinury. s,SU,031 pounds oi scalped wirebur ..as delivered to the holling 1 ills at Great lulls, unci 13,021,221 pounds i.as snipped to the .American crass Company durihf.. the year, including a,Bus pounds oi silver. A total oi 14,101,lu pounds ox' silver-bearing copper, containing PNYC 00012638 -3- 70,818 troy ounces 01 silver, .--us produced lor tne American rass Company. 74,771 troy ounces oi silver sas used ior this production, iving a loss ol 3,953 ounces Tor the year. Arrangements were completed with nemecott Copper Corporation in December, 1949 lor the relliiing oi approximately C,OOC,OCio pounds oi carlieId, Utah blister copper per month at Croat ialls. Ohipments were begun on snort notice and arrived beiore we were able to lully equip our plant lor sampling and moisture uetsir.iination. ,ie succeeded in securing a secondliand 'drill lor sampling and we adapted one oi our sample grinding . mills to this use so that we were able to .Keep up with the hand ling oi receipts oi this material. The distribution oi copper shipped during the year was as hollows: A.C.;-. Copper Founds fercent ol Total American crass Company ^Cathodes) 00,396 American crass Company (chapes) 33,769,05o nssex ..ire Corporation (Chapes; 247,578 A.C.U. Company i-lectrode Holders; 54,054 A.C.M. Company (, .armors; 96,868 creat balls Foiling Mills ol Ana conda Aire a Cable Company 101,635,944 0.15 24.83 0.18 0.03 0.07 74.74 Total 135,*83,895 lOu.OQ 2. .~a.c i . i All units oi the ..iuc l imit operated at lull lead tiJvuwnout the year with tne exception ol reduction in pcer during the months ol July, August and tester because ol atmospheric temperature. PNYC 00012639 The total production ol zinc cathodes i'or the year was 337,305,341 pounds, of wiiich 9,271,410 pounds cane from the retreutment ol zinc plant dross. 2,123,339 pounds ol cathodes was produced Iron zinc oxide recovered Iron zinc casting plant bag-house. 20,409,809 pounds or zinc, as zinc dust, was returned to the zinc Leaching Department for solution purification. 3,343,784 pounds of zinc dust was returned to the Purification Residue Plant lor solution purification, and 1,223,681 pounds ol zinc dust was used in the retreatment of purification residue ror the recovery ol cadmium. The Casting Plant treated 337,095,672 pounds ol Great Falls cathodes, producing slabs in an amount ol 291,530,036 pounds. No Anaconda cathodes were treated. The Casting Plant also produced 24,932,273 pounds ol zinc dust and 24,675,314 pounds ol zinc dross (including taghcuse zinc oxide) containing 20,139,387 pounds ol zinc. 3,317,839 pounds ol zinc in dross was sold to other companies. 01 the cathodes treated at the Casting Plant, ->5,343,219 pounds was Company zinc, and 242,352,403 pounds was toll zinc. From Company cathodes was produced 82,Z'J.,2o8 pounds ol slabs, arid iron toll cathodes was produced 209,233,678 pounds oi slabs. The net production ol 291,530,936 pounds ol slabs was cast as follows: A.C < COMPANY Slabs - Anaconda Electric Slabs - Hign Grade Slabs - High Grade (U.5. Treasury Dept, B.F.S.) Slabs - Intermediate No, 1 Slabs - .Anaconda S.c. No. 1 Slabs - Brass Special POUNDS 23,765,761 25,634,466 22,715,995 10,075,036 Total Company 32,241,253 PNYC 00012640 -5' TOLL Slabs -'Special sine 599,893 Slabs - Frime 'Western Interlocking 1,254,126 Slabs - High Grade (Special Line) 1,399,836 Slabs - High Grade 165,721,666 Slabs - High Grade (Purchased by Anaconda) Slabs - High Grade (fa.S.) 363,089 Slabs - Special Intermediate No. 1 2,515,495 Slabs - intermediate 799,715 Slabs - Intermediate No. 1 799,832 Slabs - Special zinc Alloy Slabs - Prime Western 28,553,216 Slabs - Special Intermediate 800,000 Slabs - Brass Special 200,000 Slabs - Special zinc Alloy 1,784,159 Slabs - Special zinc Alloy - G.D.3. 4,498,651 Total Toll 09,289,-678 Total Net Production 291,530,936 The zinc shipments from .the Great Falls Plant, l'or account o1 Anaconda Company, for the year were distributed as follows: Tons Percent American Brass Plants (inc. option) 454 Others 40,577 1.11 93.39 Total 41,031 100.00 The Zinc Plant produced during the year a total of 94,034.80 tons of residues xor shipment, which contained 25,126,696 pounds ol lead, 7,869,414 pounds of copper, 3,31,90o.Q5 ounces of silver, and 11,729.744 ounces of gold, included in this figure are 84,393.65 tons of regular zinc plant residue, and 9,636.15 tons cl purification copper residue stdpped to Anaconda The 9,686.15 tons ol purification copper residue is the result of treating purification residue from both Anaconda ana Great Falls Line Plants; 8.47 tens of Last Helena Slag Treatment Plant baghouse fume was sold locally during the year. PNYC 0001264) -6- A total oi' 20,658 tons or lead bullion, resulting Iran Great Fulls and Anaconda hesidue and Anaconda lead con centrate, as shipped to American Smelting and defining Company at Omaha, Kebraska, lor refining and with return of refined lead to Anaconda Sales Company. The Cadmium Plant produced 1,036,604.70 pounds of metallic cadmium during 1949, of which 1,221,064.70 pounds ..'as Company cadmium and 642,540.00 pounds toll cadmium. ' A total of 2,101,186.46 pounds, including that alloyed in de bused zinc, was snipped during the year, of which 1,237,605.70 was for. the Company and 363,580.76 pounds was toll cadmium, on January 1, l5C there was on hand at the Great Falls Plant a total oi 51,778.67 pounds of finished cadmium, of which 2u,CQC.U0 was Company cadmium and 26,778.67 pounds, toll cadmium. 6,100.69 tons of purchased concentrate, 145,072.22 tons cl' toll concentrate., 3a,535,59 tons of bughouse fume from the Slag Treatment Plant at >.ast Helena, 501.52 tons of international smelting and Ktfining Company ceomiua-beuring fume from Tooele, and 57,654.50 tons of zinc concentrate from Anaconda, was treated in the roasters during the year. The following toll concentrates were treated: TOLL liaC CwnChIPXIevTaa 1 iv^.TAD DAY American Sine Company (ind. Fresnillo) Federal .Vlning cc Smelting Company International Minerals <s Petals Corp. Combined Petals Deduction Company U.S. Smelting Piefining a Wining Co. Philipp brothers, Inc. U.S. Treasury Dept., bureau or Federal supply G.S.A., Bureau of P'ederal Supply 11,a95.42 3,990.62 53,563 66 54,345.10 2,810.64 5,504.81 526.11 12,734.96 Total 145,072.22 PNYC 00012642 -7- The calcine produced irom these concentrates end luise, together with 54,916*58 tons oi calcine, end 10,5^0*51 tons oi puriiica-- tion residue from Anaconda was treated in the Leacldng Hunt. 2,bos.3d ounces oi indium was transierred Iro-s in process during 1949. >.e had on hand at Great Falls 50,526.52 troy ounces or indium on January 1, 1949. There was also 1,000.28 troy ounces at Men York and bo0.14 troy ounces at Perth Amboy. The sales or indium lor the year totaled 43,013.08 troy ounces. The total inventory as or January 1, 19uC, was 28,323.21 troy ounces, or which 20,322.93 was at Great Falls. The ho. 1 Rod Mill operated 25 snirts and no. 2.Rod Mill operated Is shilts during 1949. The net rod production for the ho. 1 Mill ror the year was 10a,302,043 pounds, and tat gross production iincluding scrap and scale; was 106,064,006 pounds. The net rod production ti.e ho. 2 Mill was 5,13G,o75 pounds, and tne gross proauction was 5,232,194 pounds. A new record production of 5/3" rods was established on Oecember 16, 1949 with 1,610 bars rolled for a total weight of 002,456 pounds, v/hich was a new record both for number or bars and weight rolled in an eight-hour shirt. Trie production of wire, including wire ;aade into strand, was 9,2uo,o?u pounds. There was also produced during the year 252,536 pounds oi urawn rods, and 10,738 pounds o! twisted, flat wire, waking a total wire and drawn rod production oi 9,453,444 pounds. The strand production was 3,945,005 pounds. PNYC 00012643 v?e produced 30,312,950 pounds or ox-oir rods In 1949 as compared with a production or 49,049,435 pounds in 1943. 4. FiTuvQMAhaAI-fcii PLANT Ferromanganese production at Great Falls was dis continued with tne raianight shirt July 31, 1949 u,,d the furnace remained down until November 28, 1949, when operations were resumed. During the year 1949 the Ferromanganese Plant produced 4,647.542 long dry tons or ferromanganese, assaying 80.35,* manganese. Shipments amounted to 4,643,246 long dry tons. In the month of December we produced 567.18 long tons of ferromanganese, widen is a record nigh production ior any one month of operation of the furnace at Great Falls. 5. GIG iLRAL The annual report or Sirs. Dahl, our Industrial Nurse, uhows that duriiig the year she made 964 house calls, 251 calls to hospitals, and averaged 3l hours per day in the North Montana Clinic Office, caring ior 641 patients and holding 254 baby clinics. In the homes sne cared for a total or 547 patients; 136 men, 209 women, 130 pre-scnool children and 72 school children, Membership in the A.c.M. Club January 1, 1949 was 319 and on December 31, 1949 it was 378. The goir course officially opened June 5, 1949. Members of the Meadow Lark Country Club were permitted to play on the course while rebuild ing of their course was being completed. Liberal guest privi leges were also extended to personnel at the Last base of the U.5. Air Force. PNYC 00012644 Arrangements were made lor the a .C howling League to bowl at Little's Lanes, alleys In the city or Great iails, and two shirts, on eight alleys, bowled on two nights a week. I'orty teams participated in regular weekly schedule. riant tournament was held at the close or the season, in which 31 teams took part. The games bowled during the season totaled 16,3*5. Twenty-two teams participated in the A.C.M. bowling tournament held in Butte. Construction or a new clubhouse lor Great falls employees was begun during the year and foundation work was completed and brick work was begun, but delivery of steel was delayed by reason ox the steel strike, so that only a limited amount of brick work could be erected. All or the building and rcoxing steel was delivered in January ani February, I960, so that construction can now go ahead without further interruption. The total maturity value or bonds purchased by employees of the Great falls Reduction Department from January 1, 1942 to January 1, 1*50, amounted to j2,923,680,00 and the total maturity value of bonds purchased by Great Falls employees of the Anaconda -lire and Cable Company amounted to .234,676.00 for tiid same period, giving a total of 3,163,365,00 in bonds pur chased tlirough Company iacilities by the Great Falls employees. The total maturity value ol bonds purchased by employees at the -uat nelena alag Treatment riant during the same period amounted to 117,326.00. A total of 143,999.64 was subscribed in savings bonds during 1*4* with 20.67^ of the employees partici pating and amcuntiiig to 2,44,i> of the total payroll. PNYC 00012645 -11< mere were 44,* of this group scheduled to work on a six-uay- per-week basis, luring the summer months the employment of high school and college hoys reduced ou' six-day-per-'.veek employees to 12,,. by the middle of October se had been able to make further reductions, so tliat the group of o-duy-per-./eek employees among the C.I.O. amounted to only Z%, or the A. F. or, L. employees (craftsmen) 90/ were working on a slx-day-per-week basis in mid-July, by October tills figure had been reduced to lb,* inid at the year's end only 4/ were working on a six-day-perweek basis. During the year 1949 we hired l,bll employees and had l,b29 separations, leaving a net loss of 18 employees. Negotiations with the Unions for new contracts were held during the summer months and resulted in new contracts ex piring June 3u, 1900, with no increase in wages over those in effect July 1, 1949, 6. nXr~.ivUIIUlvLS AOAlliUl 'uTIiOPKlATIQNS Construction of the A.C.M. Clubhouse was 28,0 completed at an expenditure of ,,)o4,041.70, building ana equipping of the new Cadmium Casting Plant was completed with an expenditure of $33,790.00. One .Buffalo No. 1/2 x 12" Throat Universal Iron V/orker with motor drive v.as installed on a concrete foundation at a Cost in '3,111.08. one Yale and Towne K41-6F; Fork Truck, 6000 pounds capacity, with adison battery of 30 Do cells was purchased at a cost of '7,970.12. PNYC 00012646 -12- One double cascade ol 12 electrolytic cells bu s con structed at the east end ol the Zinc Plant tank room at an expenditure ol ^14,379,95. Conversion oi tr.e present anode casting plant into a copper billet plant bu s begun, with an expenditure oi ,",Zl,70y .20. Installation ol new electric hoists lor strirpirig oderations on one unit in the Zinc Plant tank roots was 33,. completed with an expenditure ol Col,216.95. _ A one-unit extension to the Zinc Plant ms authorized but construction was postponed ir.del'initely, awaiting improve ment in metal markets, A total ol .'-,41.80 was expended on tils item. Installation oi spare rotors lor the booster generator sets at the Zinc Plant substation was begun, but with no expenditure by December 31, 1349. One aaker Rodel J03i 40-48 4000-pounds capacity, industrial truck with H-36 ready power unit was purchased at an expenditure ol *.6,599.95. Construction and installation ol two 18* diameter x 14' leach taiiks lor cadmium sponge at the Purilication Residue Plant were completed at a cost ol ',11,139.75. Installation ol a hammer mill lor oversize calcine and a conveyor Iron the RcDougal Roasters to the calcine screen was begun, with an expenditure ol '243.19. Installation ol a 30-pound air compressor in correction with installation ol equipment lor separate leaching ol Last Helena lame was 77* completed, with an expenditure ol '13,100.57. PNYC 00012647 -13- An extension to the Line Plant change house was o5,i completed, with an expenditure or >13,IOC.57. installation ol equipment lor separate leaching of East Helena lume ms 40^ completed, with an expenditure or >51,435.05, Purchase and installation or a magnetic, reduced voltage starter lor a 150 H.P, motor were completed at the nast Helena Slug Treatment Plant at a cost ol' ^1,203.07. Installation ol a secondhand pulverizer and Ian in the Coal Pulverizing Department or the East Helena Slag Treatment Plant was completed at a cost or ill,018,21. Installation or automatic bag shakers and a one-bay extension to the tag house was Cl,\> completed, with an expenditure ol 035,045.50. One Joy Lanui'acturing Company 15 H.P., double drum electric hoist. Type AAF-212, was purchased and installed at the hast Helena Slag Treatment Plant at a cost or 01,621.00. Installation or a Hoto-Clone dust separator at the coal drier in the Last Helena Slag Treatment Plant was 54,. completed at a cost ol 03,433.45. The rollowing appropriations and expenditures were made at the Rolling '.'ills Departments: Purchase and Installation or one .Morgan Hono-Llock wire macnine was 100^ completed at a cost or 017,834. Purchase and installation ol one exliaust lan and PNYC 00012648 -14- aotor was 100i completed at a cost of $801.78* Construction ox an extension to toe pump nouse and installation ox spare 8" centrifugal pump was lOOJt completed at a cost oX $5,873*89. Purchase oX miscellaneous oXXioe Xurniture and equip ment was completed at a cost oX $1,848*58. Construction oX an extension to toe steel platXora in toe mill building was lOOjt completed at a cost oX $1,574.29* Construction ox improvements in toe ventilating system at toe billet Xurnace was 100J& completed at a cost of $1,453.15. Purchase ox one -iuanset 40 building to be used for a reel repair shed was 100$ completed at a cost oX $17,900.79. Purchase of one quonset 24 building to be used for a reel paint shop was 100$ completed at.a cost of $8,800.04. Construction of a garage for shift foreman was 100$ completed at a cost of $895.18. construction of a steel platform for electrical equip ment was 100$ completed at a cost of $1,057.65. Purchase and installation of equipment to provide a standby oil burner on the billet heating Xurnace was 100$ completed at a cost of $8,141.44. Purchase and Installation of reversing control for l strander was 100$ completed at a cost of $1,089.45. Purchase and Installation of 15 industrial control units was 100$ completed at a cost of $754.65. PNYC 012649 -15- Enlargeaent or the inspection laboratory was 1C0 completed at a cost or $2,251,09, Purchase and installation or push button control Xor the riat mill was 100% completed at a cost or $2,330* Purchase and installation or one Worthington 3-02-8 Uonobloc puap and motor was 100 completed at a cost or $466,S3. Purchase and installation or one 10^ Tilting Arbor circular saw was 100j completed at a cost or $336,44. An appropriation or $1,329*00 lor one combustion air ran Tor the billet furnace was approved but none or this money was expended in 1949, 7. SLAG TREATING PLANT - EAST HELENA There was treated during the year 208,735.46 tons- or molten slag and skulls, assaying 13.70136 zinc, and 14,146.92 tons or cold slag Xrom the dump, assaying 12.3703& zinc, making a total or 222,382.38 tons, assaying 13.81656 zinc. The production resulting was 36,827.06 dry tons or fume assaying 69.342 zinc, showing a recovery or 84.1453& or zinc content or slag treated, 33,574.96 tons or fume was shipped to Great Palls for treatment in the Zinc Plant; 21.25 dry tons was sold locally, 606.02 tons was shipped to the American Chemet Corporation, 1,282.93 tons was shipped to kagle Picher Lead Company, and 1,095.18 tons was shipped to the Ozark Smelting and Mining Company. The Slag Treating Plant operated continuously through out the year except Xor a Xew interruptions when the plant was shut down for flue cleaning and necessary repairs* pNYc 126so