Document 38mG3L3OV20NY26emMwexLax
inatoi: t. location) P. B. Hodges - General Offices
Rt,rr.RrNCr:
October 9j 1969
!
STATUS REPORT 1r<$lors'
CLEAK-UP OF PJ
EFFLUEi
TO Mr. W. A. Kuhn (4) t;KTJHN
*
OCl J5 i963
i-Ust. l" ' J,.u
Mess its .
hI r -p" V < j> ' /
v
D. B. Hosmer - DHOSM
W. R. Richard - ERICH
. E. S. Tucker - QUEER!
E. V. John
- EJOHN
K. VJ. Farrar -- S li'i.O
- E . ? . Vi he el or - EVIHEE
This memorandum -advises progress and problems involve* with
clean-up of Aroc-lors from the. waste effluents at E. 0 Kruramrieh
and Anniston,
VI. G. KRuMgRICH PLART
-
A, S varus
With the changes in practice at Arcelor using departments plus the greatly improved HOI off-gas cooling at the pro ducing department chlorinatorn, the only significant losses now occur fion -handling at the producing department. Soma
.of the changes in practice:
1. No spent heat transfer Arcelor is now deliberately sewered, Only losses are from leakage in pump pack ing glands , accidental handling losses, vapors. etc. The spent Aroclors are being disposed of in our tori? land fill -- a tempo ":a3:lly aoeepfable practice.
2. Aroelor hue's from tank cars being v,'ashed at the re pair track are also collected and hauled, to the land, fill.
At the producing department free Aroelor is visible
in the sewer trenches. Samples of the affluent have
been collected but, to date, none have been analysed.
Based on material balances, loss to sewer is an
estimated maximum of 30,000 pounds per year (137
pounds per dry average;. actual ice;- is probably
considerably lower due to soaking into chat spread
around the operating area.
'
B, Future Work
.
1. baste Saw.pj.irg
'
In-plant `water, plant effluent 'water and Mississippi River mud samples arc being, taken on a regular basis, but no analyses have been run in recent months. The samples are being stored. Vie need to have the sample b . analysed in order to guide future sampling work. As soon as we can find out vine re we stand quantitatively, wo will review' the sampling points end, no doubt, do
more comprehensive sampling, of the Mississippi River , .
f
DSW 202626
STLCOPCB4052825
Mr. W. A,.Kuhn
2
October 9> 19&9
i including cross-section samples above our outfall and
at a considerable distance below, e.g. Jefferson
Barracks Bridge.
No plans presently exist for air sampling, but these will be developed in the next several months, depend. ing on priorities established as the whole Aroclor problem becomes clearer.
J`r uP
u rJU
is>l
2. Waste Reduction
n engineering study has been made to reduce losses t the production department. A number of sumps have been proposed which would virtually eliminate eersewering of "free" (undissolved) Aroclor by allowing the A roe lors lust oo ut' seutied out anu to ue ww-i..--mittently pumped to a waste trailer. The trailer contents would be hauled to the toxic land fill. Total cost of the projects would be $81,000.
One sump (to cost $11,000) is estimated to collect 90fo of the total losses. This is the collection, \ point for process area discharges. Installation of <> this sump would be a logical point to commence with the next round of clean-up activities with otherprojects to follow as justified by actual measure ments .
AkcidTOii VLi-lVi'
A. Status 1. Waste Reduction.
.
Numerous small changes have, been made to eliminate
any possibility of free Aroclor leaving the plant
>
and depositing in Snow 'Creek (as previously experienced).
These changes include:
a. Rehabilitation of the neutralization pit in the
total (less Nirari) effluent flow leaving the
plant.. This will effectively prevent Aroclor
losses above saturation and will stop future
: deposition in Snow Creek.
'
1) To reduce losses to well bel/ov/ saturation., changes have been made to collect free Ar-oclors at points prior to dilution of the
. wastes. Included, are:
, a)
An existing sump at the end of the ware house is being utilized to trap Aroelors spilled from drumming and flaking opera
tions .
^___________ ______"
| DSW 202627
STLCOPCB4052826
5
Mr. W. A; Kuhn
October 9> 19&9
b)- A coalescer was Installed in the muriatic acid flow from the HC1 absorbers. Primary purpose was to improve quality
. and ease of treatment of the muriatic acid, but a considerable amount of free Aroclor is being trapped following the coalescence.
2 Waste Sampling
A set of samples taken-June '10 were analyzed recently.
A full report will be issued soon. The most interest
ing data are:
-
..
a. Snow Creek, about 1 mile below our plant --
. Mud - 2.36^ PCB Water -- 8.3 ppb POB
With this concentration of Aroclor in the mud
' of Snow Creek, we can expect leaching to continue
for a long time, regardless of how well we clean
up in the plant. ' i'
-
b. Choecclocco Creek, about 10 miles below confluence
with Si iow Creek --
'
Water - 5-8 ppb POB
'
B. -F---u1-t-u---r-e---j V/ork
1. Waste Sampling :---------------------- -----
Drs. Gunning and Suttkus, biological consultants from
I'Tulane University, who have been making fish studies
for the plant, will be conducting a phase of their
(Continuing study during late October. They will be
requested to collect a variety of fish species .above
iand below our cube fall for PCB- analysis by Dr.. Scot t
Tucker' s laboratory . ;'
.
Collection of water and mud samples from Snow Creek,
Choccolocc-o Creek and the Coosa River will be con-
tinned oil an as--'lust if led basis. A limited number
of samples were collected recently during a several-
hay shut dovjn of Arcelor production to establish
losses 'without Aroclor1 production. Another full set
of samples will be collected soon in order to resolve
discrepancies with results from the first (June 10,
1969) samples. Following establishment of reason
ably reliable facts on present receiving stream PCB
levels, we will continue to sample at about six
months intervals. As in the case at W . G. Krummrieh,
DSW 202628
STLCOPCB4052827
Mr. W. A. Kuhn
4- -
October 9, 1969
v;g need the laboratory results fairly promptly in order to guide future sampling work.
2. Waste Reduction
The next logics], step in waste reduction is to provide?
slumps in the operating department to collect spillage
from pipe leaks, pump packing, etc. Firm plans will
be developed after we gain quantitative information
On losses (about January 1, 1970). Meanwhile, efforts
Will be directed toward making maximum use of the
Collection -equipment already provided (the warehouse
sump and the coalescers).
s
aodi
!Xh-(
f
Paul B. Hodge;
iI DSW 202629
i STLCOPCB4052828