Document 38YbZaYyGEBw2148pL3qZJ4O

- PRODUCTION SUMMARY (Current Month) Operation Report Dept. 246 - Aroclor November - 1965 Scheduled - 2,205,569# Actual - 2,2'05,569# PRODUCTION (Year to Date) Aroclor Current Month Year to Date 1232 1242 1248 1254 1260 1262 Therminol PR-0 0 1,008,126 468,026 429,448 283,769 16,200 (MCS-295) 0 47,840 8,302,525 5,765,407 5,368,959 4,702,o4l 110,880 67,945 2,205,569 24,365,597 Average Monthly Production - 2,215,000# Availabilities Repair - 100# Process - 100# Other - 100# All downtime in October was due to high inventories. Total - 100# Quality No quality tests were run this month. An attempt was made to test the effect of substituting potassium carbonate for lime to neutralize the crude aroclor. The potassium, carbonate plugged the still pump and the test could not be run. Other physical forms of potassium carbonate are being investigated by TSD to see if one can be found that will not plug lines, Three lots of electrical grade 1242 were produced with thermal-chemical stability chlorides of .71, *58, and .4l ppm. Operations Four of the five chlorinators were operated this month. The catalyst basket has not been replaced in #5 chlorinator. This chlorinator without the catalyst basket will remain out of service except for non-electrical material until customer tests are completed on material made without the catalyst basket. If #5 chlorinator must be put back into service before customer tests are completed the catalyst basket will be replaced. The experimental horizontal pump on No. 2 still operated satisfactorily except during boil down when it leaked so much that the old submerged pump had to be used for all boil downs. The special packing was replacec twice but the leaking during boil down continued. We are continuing to try to get the packing adjusted to stop the leaking so that the horizonte pump can be used exclusively. The density gauge on #4 chlorinator continued to be out of operation this month. We are now waiting on the manufacturer's representative to check the unit. Both still furnaces were repaired with temporary plates so that all four burners on each unit could be used at normal operating conditions. DSW 296432 STLCOPCB4066376 / Dept. 246 2 Stock Position Stock Aroclor * ,1st of Month ( 1242 ( 1248 ( 1254 . ( 1260 ? 1262 (Therminol FR--0 ( (MCS-295) 123,080# 334,980 280,340 183,120 59,160 57,150 Total Whse. Stock - 1,037,830# Stock ( 1242 ( 1248 ( 1254 ( 1260 287,552# 197,870 117,408 175,705 7787535# & Dept . Stock - 1,816,365# Last of Month 15,675# 324,960 210,780 200,940 63,720 21,590 837,665# 366,077# 202,254 159,600 62,065 7897960# 1,627,625# D . E. Harris oS\N 296433 STLCOPCB4066377