Document 37G8Ojd4Zz82p2k48nMgzea3y
MCS 1239
/
1. Approach to short-term manufacture:
a. Process in 00 Building is O.K.
b. Conflicts with phthallyl chloride schedule and desire for TXS rate demonstration.
c. Plasticizers Division probably willing to relinquish control if Functional Products makes a commitment.
2. Approach to Interim Manufacture:
4a. Everett fit may be good -- CED pursuing. .
b. 00 Building probably, much too small -- and TXS competes.
c. Toll manufacture of 1839 (or perhaps TXS) a possibility.
d. 6-817 pounds/year desired (as blend).
.
3. Need on both points to have dialogue with Plasticizers and make some commitments.
DSW 185289
STLCOPCB4051535