Document 37DwqZVONZp5nBybB1dwwGjME
CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT - EL PASO, TEXAS
SPECIFICATION NO. EP-358-N April 9, 1979 Page 1 of 6
SPECIFICATION NO. EP-358-N INSULATION AND WEATHERCOATING
FOR VAC FLASHER PIPING
SECTION 1 - GENERAL REQUIREMENTS
1.0 SCOPE OF WORK
1.1 CONTRACTOR shall provide all materials, utilities, tools, construction equipment, labor, including supervision and inspection, and all items of a consumable nature that are required for the insulation and weathercoating of piping, valves, and fittings in the Vacuum Flasher, at the Chevron U.S.A. Inc., El Paso Refinery as detailed by this specification,.including the drawings and other attachments listed in the appendix, except as otherwise provided in Section 1.2 below.
This work includes but is not limited to:
(A) Insulation in accordance with Standard Drawings GA-N99783-3 and GB-N99993-0 of all lines shown on drawings listed in the appendix.
(B) Insulation work shall include all valves, flanges and fittings associated with piping on drawings listed in the appendix.
(C) Insulation shall be N6 (1" thick) on piping 2" and below; N7 (1 1/2" thick) on 3" and 4" piping; N8 (2" thick) on 6" and larger piping. All insulation shall be Hydrous Calcium Silicate Johns-Manville Thermo-12 (asbestos-free) or COMPANY approved equal.
(D) Weathercoating shall be 0.016" thick corrugated aluminum pipe jacket with moisture barrier backing manufactured by Childers Mfg. or COMPANY approved equal.
(E) CONTRACTOR will clean up and dispose of daily, all debris and trash created by the work being done.
1.2 In addition, CONTRACTOR shall provide all items of material to be incorporated into the facility.
CHEV BB
CHEVRON U.S.A., INC, ENGINEERING DEPARTMENT - EL PASO, TEXAS
SPECIFICATION NO. EP-358-N
April 9, 1979
'-
Page -2 of 6
2.0 WORK, MATERIAL AND UTILITIES BY COMPANY OR-OTHERS .
2.1 Work by Others
The following items of work related to the" Facility will he performed for COMPANY hy others:
(A) COMPANY will fabricate and install all new and replacement piping.
(B) COMPANY will provide a site within the Refinery for trash disposal.
3.0 SEQUENCE OF WORK
The sequence of work shall he as mutually agreed between the COMPANY and CONTRACTOR and shall he consistent with the facing sheet of the A.greement.
k.0 INTENT
The Facility shall he complete in every respect, constructed in accordance with generally accepted, current good practices of the several trades involved and the detailed requirements of this Specification and ready to operate in the manner expressed or implied herein, regardless of whether or not full details of such completeness or practices are contained herein.
5.0 COMPANY REVIEW AND APPROVAL'
COMPANY'S review of, approval of, or agreement to the performance of certain items of work or the provisions of certain material shall in no way relieve CONTRACTOR of full responsibility for"the performance of such work, or for the adequacy of such material. All such reviews, approvals or agreements shall he obtained through COMPANY'S Construction Representa tive, or in a manner previously approved in writing hy COMPANY'S Construc tion Representative.
CHEV BB
MOARR
* *.
' "
'
.*4
CHEVRON U.S.A. } INC-. ENGINEERING DEPARTMENT - EL PASO, TEXA!
SPECIFICATION NO. EP-'358--N
April 9, 1979.
''
Page 3 of 6
SECTION 2 - GENERAL CONDITIONS AND PERFORMANCE OF WORK
6.0 PRECEDENCE
6.1 As used in the standard specification attached hereto: (a) "Purchaser" shall mean COMPANY' (h) ."Supplier" or "Vendor" shall mean CONTRACTOR; and (c) "Purchaser's Inspector" shall mean COMPANY Construction Representative.
6.2
Unless other vise expressly provided in this Specification, (a) any data, specification, material, and work or any other matter vhich is covered hy this Agreement which the standard specifications require to he provided hy COMPANY shall instead he provided hy CONTRACTOR; (h) any provisions of the standard specifications requiring COMPANY to inspect certain material or work shall mean that COMPANY has an option, rather than the obligation, to so inspect such material or work; (c) any warranty or guarantee provisions contained in the standard specifications shall he of no effect and the warranty and guarantee provisions of this Specification, if any, shall apply; and (d) any item of material, work, inspection or testing to he furnished at-extra expense to COMPANY pursuant to the standard specifications shall he furnished under this Specification at no Increase in CONTRACTOR'S compensation.
All provisions in the standard specifications concerning compensation of payment to CONTRACTOR in case of delay shall he of no effect, and the provisions of the Terms and Conditions and of this Specification shall apply.
In the engineering instructions, reference to COMPANY'S personnel shall he of no effect, and CONTRACTOR's personnel shall perform all activities which are to he performed under the engineering Instructions, except as otherwise provided elsewhere in this Specification.
Where standard specifications on materials contain sections covering COMPANY'S normal requirement for purchasing and field erection, these sections shall he .of no effect except as otherwise expressly stated in this Specification.
7*0 FIELD REPRESENTATIVES
7.1 COMPANY'S Representative
COMPANY will maintain a Representative in the field pursuant to Section 3.0 of Refinery Instruction No. I^OU, General Instructions to Contractors Working Within the Refinery, attached.
CHEV BB 012464
. -
CHEVRON U.S.A. , INC-. ENGINEERING DEPARTMENT - EL PASO, TEXA
SPECIFICATION NO. EP-358_N April 9, 1979'
Page 4 of 6
7.2 CONTRACTOR'S Construction Representative
CONTRACTOR shall maintain a Construction Representative in the field at all times who shall act in full charge of .CONTRACTOR's work and maintain field liaison between CONTRACTOR and COMPAJfY's Construction Representative.
8.0 OTHER CONTRACTS
COMPANY reserves the right to let other contracts or perform other services in connection with CONTRACTOR'S work hereunder. CONTRACTOR shall afford others equitable opportunities for the introduction and storage of their materials and the execution of their work and shall properly coordinate its work with theirs.
9.0 WORK WEEK AND OVERTIME
CONTRACTOR shall pursue to field construction work on a 4o~hour per week work schedule in accordance with Section 5-0 of Refinery Instruction No.' l4o4, General Instruction to Contractors Working Within the Refinery, attached
10.0 PLANT REGULATIONS
Prior to the commencement of work, CONTRACTOR shall become familiar with the plant regulations specified in the attached Refinery Instruction No. lUoU, General Instructions to Contractors Working Within the Refinery and the following regulations. CONTRACTOR shall be responsible for compliance with these regulations during the execution of his work.
10.1 Electrical Safety Requirements
CONTRACTOR shall provide and use ground fault circuit interrupters for personnel protection at all construction sites (including areas . inside existing plants) on all 120 volt single phase 15 and 20 amper receptacle outlets.
Hubbell type GFP or. Porta-Power Pak Inc. Model -72 series are typical of acceptable portable receptacle units.
Ground fault circuit interrupters shall not be used in areas where flammable vapors are present.
It is essential that the polarity of the conductors in all cords, plugs and receptacles supplying single pole portable ground fault circuit interrupter units be properly maintained to insure proper operation of the units.
CHEV BB 012465
' r.
" . ?''
10.2 Work Space and Storage Area
CHEVRON U.S.A., INCENGINEERING DEPARTMENT - EL PASO, TEXAS
SPECIFICATION NO. EP- 358-n 'April 9, 1.979 ` , Page -5 of 6"
COMPANY vill assign space in the general vacinity of the CONTRACTOR'S vork for CONTRACTOR'S office, work space and storage area.
IR.O TEMPORARY CONSTRUCTION FACILITIES
11.1
CONTRACTOR shall' provide and install all necessary temporary facilities including, hut no limited to, tool rooms, locker rooms, toilets, office and storehouse. All temporary installations shall he subject to approval hy COMPANY prior to installation.
11.2
In addition, CONTRACTOR shall provide all necessary temporary equipment and material including, hut not limited to, shoring, concrete forms, bracing, laddersscaffolding, staging, drop cloths and tarpaulins.
11.3
CONTRACTOR shall maintain all temporary facilities, material and equipment in a safe and adequate manner and remove them immediately upon completion of the vork requiring their presence.
12.0 DRAWINGS AND DIMENSIONS
COMPANY vill provide to CONTRACTOR tvo copies of all pertinent standard dravings, standard specifications, reference dravings, and construction dravlngs.
13.0 INSPECTION AND TESTING
13-1 General
CONTRACTOR shall he solely responsible for thorough craft inspection during construction and for the quality of the vork. COMPANY vill make such inspection as COMPANY may desire in order to check the pro gress and quality of the vork, to see that CONTRACTOR'S employees are properly qualified in their respective crafts, that vorkmanship is of an acceptable grade, and that all requirements of this Specification are being met. Such inspection or any other inspection or testing by COMPANY shall in no vay relieve CONTRACTOR of full responsibility for the vork hereunder.
14.0 INSULATION
CHEV BB
, ft 5
.
CHEVRON U.S.A., INC. ENGINEERING DEPARTMENT - EL PASO, TEXAS
SPECIFICATION.NO. EP-358.-NApril 9, 1979 Page' 6 of 6
lU.l. Insulation
.
All .insulation work shall he by CONTRACTOR and installed in
accordance with Standard Drawings GA-N99783-3 and GB-N99993-O
and as directed hy our COMPANY Representative. All insulation materials will he furnished hy CONTRACTOR. CONTRACTOR shall he responsible for relaying all technical questions pertaining to insulation work to COMPANY for resolution.
15.0 CLEANING UP
During the performance of the work, CONTRACTOR shall keep a reasonable degree of order hy disposing of accumulated rubbish and waste material and, at the completion of the work, the site shall he cleared of all debris, left-over tools, comsumable supplies, and material which may have accu mulated in the performance of the work. Where the CONTRACTOR, after due notice, fails to keep the area of his work reasonably clean and safe, or fails to clean this area at the completion of the work, COMPANY may perform this work; the cost of such work shall he for CONTRACTOR1 s ' account amp. may he deducted from the sums due or to become due CONTRACTOR.
16.0 COMPLETION
The work will he considered "complete" when CONTRACTOR has performed all work expressly stated or implied in this Specification.
CHEV BB 01?4G7
CHEVRON U.S.A. INC. ENGINEERING DEPARTMENT - EL PASO, TEXAS
SPECIFICATION NO. April 9, 1979 Appendix Page 1
EP-358-N
17.0 DRAWINGS AND SPECIFICATIONS
The following Engineering Instructions and Standard Specifications further detail the work covered by this specification.
Construction Drawings PC-02-20993, Sheets 69 through 72 " , Sheet 86 " , Sheet 89 " , Sheet 90
Standard Drawings GA-N99783-3 Standard Insulation for Hot Piping GB-N99993-0 Standard Insulation Item Numbers
Refinery Instruction 1404 - Instruction to Contractors Working Within the Refinery