ASBESTOS ESTIMATE
trePARTMENJ: 7"7>
]ZuS<,
INSULATOR MANH3URS ESTIMATE: ACTUAL MWOJRS: 3 ^
ESTIMATED COST:
S', J <2
The above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The work is described in the following pictures.
With the description of the pictures are the following information:
PRIORITY - This is the conditio) of the insulation. Priority 1 is insulation in very bad condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR OOCE - This signifies the work necessary. Blue - Cover and/or patch existing insulation. Green * Strip and reinsulate. Red - Strip only. All of the insulation pictured has been spray painted with the appropriate color.
\JCC 002247
UNION CARBIDE CORPORATION
P. D BOX 8004. SOUTH CHARLESTON. W. VA. 5303 Silicones and Urethane Intermediates South CheHeston Plant
ASBESTOS ESTIMATE
/ _ ^DEPARTMENT:
j..
INSULATOR MANHOURS ESTIMATE:
ACTUAL MANHOURS:
ESTIMATED COST:
f)p ^ Q_f 2 * cj SMeJi
The above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The work is described in the following pictures.
With the description of the pictures are the following information:
PRIORITY - This is the condition of the insulation. Priority 1 is insulation in very bad condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR CODE - This signifies the work necessary. Blue - Cover and/or patch existing insulation. Green - Strip and reinsulate. Red - Strip only. All of the insulation pictured has been spray painted with the appropriate color.
UCC 002248
UNION CARBIDE CORPORATION
P O BOX BOOA BOOTH CHARLESTON. W, VA. PS303 Silicones end Uf'ethane Intermediates South Charleston Plant
ASBESTOS ESTIMATE DEPARTMENT: B> I dLb'2" INSULATOR MANHOURS ESTIMATE:
ACTUAL MANHOURS: 7 //k' ESTIMATED COST:
The above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The work is described in the following pictures.
With the description of the pictures are the following information:
PRIORITY * This is the condition of the insulation. Priority 1 is insulation in very bad condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR OOOE * This signifies the work necessary. Blue - Cover and/or patch existing insulation. Green - Strip and reinsulate. Red - Strip only. All of the insulation pictured has been spray painted
\ with the appropriate color.
UCC 002249
UNION CARBIDE CORPORATION
P. O BOX BDOO. SOOTH CHARLESTON, W. VA. 65303
Silicones end Urthane Intermediates Sooth Charleston Plant
ASBESTOS ESTIMATE
DEPARTMENT: i.-V,
": *
t
INSULATOR MANHOURS ESTIMATE:
ACTUAL MANHOURS: 2oo
ESTIMATED COST:
The above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The work is described in the following pictures.
With the description of the pictures are the following information:
PRIORITY - This is the condition of the insulation. Priority 1 is insulation in very bad condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR GODE * Ibis signifies the work necessary. Blue - Cover and/or patch existing insulation. Green - Strip and reinsulate. Red - Strip only. All of the insulation pictured has been spray painted with the appropriate color.
UCC 002250
UNIDN CARBIDE CORPORATION
P. O BOX BDOA. SOUTH CHARLESTON. W. VA P5303 Silicones end Uf'ethane Intermediates South Charleston Plant
ASBESTOS ESTIMA1 DEPARTMENT: Qa
INSULATOR MANHOURS ESTIMATE: ACTUAL MANHOURS: ESTIMATED COST:
The above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The work is described in the following pictures.
With the description of the pictures are the following information:
PRIORITY - This is the condition of the insulation. Priority 1 is insulation in very bad condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR CODE - This signifies the work necessary. Blue - Cover and/or patch existing insulation. Green - Strip and reinsulate. Red - Strip wily. All of the insulation pictured has been spray painted with the appropriate color.
UCC 002251
I
UNION CARBIDE CORPORATION
P O BOX BOOA SOUTH CHARLESTON!, W. VA 5303
Silicones and Urethane Intermediates South Charleston Plant
ASBESTOS ESTIMATE
DEPARTMENT; fa . o ^ $ Lr-
INSULATOR MANHOURS ESTIMATE:
ACTUAL MANHOURS:
/nfl
ESTIMATED COST:
The above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The work is described in the following pictures.
With the description of the pictures are the following information:
PRIORITY - This is the condition of the insulation. Priority 1 is insulation in very bad condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR CODE * This signifies the work necessary. Blue - Cover and/or patch existing insulation. Green - Strip and reinsulate. Red - Strip only. All of the insulation pictured has been spray painted with the appropriate color.
4
UCC 002252
UNION CARBIDE CORPORATION
P. O BOX BDOA SOUTH CHARLESTON. W VA. C5303 BiNconos and Urethane intermediates Booth Charleston Plant
ASBESTOS ESTIMATE DEPARTMENT: If
- J.INSULATOR MANHOURS ESTIMATE: <2 0
ACTUAL MANHOURS: ESTIMATED COST:
The above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The writ is described in the folltving pictures.
With the description of the pictures are the following information:
PRIORITY This is the condition of the insulation. Priority 3 is insulation in very bed condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR CODE - This signifies the work necessary. Blue - Cover and/or patch existing insulation. Green - Strip and reinsulate. Red - Strip only. All of the insulation pictured has been spray painted with the appropriate color.
UCC 002253.
(3 L 0 -S
103 -2 1 6
OUV'O/f/ &/<, UCC 002254
UNION CARBIDE CORPORATION
P D BOX BOOA. SOUTH CHARLESTON. W. VA S5303 Silicones end Urethane Intermediates South Charleston Plant
ASBESTOS ESTIMATE DEPARTMENT: INSULATOR MANHOURS ESTIMATE: ACTUAL MANHOURS: ESTIMATED COST:
TTie above estimate is to seal, cover, strip, or strip and reinsulate the asbestos insulation in the above mentioned department. The work is described in the following pictures.
With the description of the pictures are the following information:
PRIORITY - This is the condition of the insulation. Priority 1 is insulation in very bad condition with a high degree of exposure. Priority 2 is insulation needing attention but with less immediate risk of exposure.
COLOR 00^ - This signifies the work necessary. Blue - Cover and/or patch existing insulation. Green - Strip and Teinsulate. Red - Strip only. All of the insulation pictured has been spray painted with the appropriate color.
UCC 002255
PICTURE: Left
DISCRIPTION: Unused line at stairway ; on the N/W comer of bldg. 195.
COLOR CODED: Red MANHOURS REQUIRED: PRIORITY: 1
24 ___________________________
PICTURE: Below
i DISCRIPTION: Two lines at stairway on j the N/W corner of bldg. 195.
PRIORITY: 1 COLOR CODED: Red MANHOURS REQUIRED;
32