Document 34D212XLgRYK52VbgzM7Ja0y

J-M Manufacturing Company, inc. To: T. E. Lohman From: J. T. Armstrong Copies: Subject: TEXAS AIR CONTROL BOARD INSPECTION ' Internal Correspondence Dale: August 1, 1984 . On July 26th, James Sandel of the Ft. Worth Region Office of the Texas Air Control Board (TACB) visited the Denison plant. ' His ostensible purpose was to perform a routine annual inspection; however, he did not want to see the entire plant. . I updated the TACB's plant process and operation description. . Afterward, I accompanied Mr. Sandel to the Bettenfeld shop, the railcar unloading location, the Perma-Loc shop, and the A/C scrap dump. He specifically requested these areas. . There are three areas of potential liability. Two Battenfelds were operating with no dust collection as required by permit exemption. Also, construction had begun on the railcar unloading facilities without a permit exemption or construction permit. The existing scrap dumps were not registered. On July 2?th, a forecasted annual asbestos usage was sent to Mr. Sandel per his request (copy attached). ' 'JTA/la AUS. O 6 1384 D 004835