FOR RADIANT HEATING with Gypsum Wallboard
PLAINTIFF'S EXHIBIT GP-795
GENERAL
The purpose of these recommendations is to explain. the propet use of gypsum wallboard when used with radiant heating. Gypsum wallboard or backing board can be satisfactorily used in conjunction with radiant heating
installations, howe\ /, certain precautions must be taken to minimize the possibility of such things as cracking due to thermal shock, shadowing under die heating sys tem due to unequal initial drying rates, or calcination of the gypsum wallbo-ud due to over-heating. These recom mendations are i ended to provide information which should help avoid Jch difficulties.
TYPES OF RADI tNT HEATING SYSTEMS
Electrical syste s where cables are located between two layers of gyps' m wallboard.
Hot water systems in which the heat conducting med iums, such as pipes, are located between two layers of gypsum wallboard.
Systems in which the heating elements are located be hind the gypsum wallboard.
SPECIFICATIONS
Gypsum wallboard shall be applied in accordance with the requirements of ASA A97.1, "Standard Specifications for Gypsum Wallboard Finishes" except as herein modi fied.
Systems Using Two Layers of Gypsum Wallboard The first layet of gypsum wallboard or backing board shall be applied horizontally to nailing mem bers using nails as specified below. Nails shall be spaced a maximum of 14" o.c. for the first layer and 7" o.c. for the face layer.* Nails shall be driven flush with surrounding wallboard surfaces for application f the first ply.
For exception see "Note", Electric Heating Systems.
Nails:
Gypsum Wallboard (Thickness)
Recommended Nails
First Ply
3/8"
1-1/8" or 1-1/4" GWB-54 or 4d, 14 gage, 1-3/8" long, 7/32" flat head, diamond point, bright finish cooler.
1/2"
1-1/4" GWB-54 or 5d, 13-1/2 gage, 1-5/8" long, 15/64" flat head, diamond point, bright finish cooler.
5/8"
1-3/8" GWB-54 or 6d, 13 gage, 1-7/8" long, 1/4" flat head, diamond point, bright finish cooler.
Second Ply
GWB-54 Type nails pro viding 3/4" penetration or "Cooler* nails providing 1" penetration.
SGP 0025258
Staples: The first ply only of two-ply construction may
be attached by power driven staples. When staples are used, the following recommendations should be employed.
The staples shall meet the following minimum requirements: 16 U.S. Standard gage flattened gal vanized wire, 7/16" wide crown, 1" long legs for 3/8" thick board, 1-1/8" long for l/2"thick board and 1-1/4" long for 5/8" thick board, with divergent points.
The spacing of staples shall not exceed 7" on center on ceilings.
Staples shall be dr-ven with the crown at right angles to the paper bound edges of the gypsum wallboard, except where the paper bound edges fall on the framing members, then the staples shall be driven parallel to the edges. Staples shall be driven in such a manner that the crown bears tightly against the wallboard, but does not cut into the face paper. The legs of the staples shall be no less than 3/8" from the ends and edges of the gypsum wallboard.
ELECTRIC HEATING SYSTEMS:
Electric heating cables shall be securely attached to the base or first layer of gypsum wallboard in accordance with cable manufacturer's recommendations, with cables parallel to and between nailing members. Cable shall be positioned at least 1-1/4" from center of nailing member on each side so that at least a 2*1/2" unobstructed chan nel is provided under each nailing member. This is ne cessary to prevent nails, used to subsequently attach the face layer of gypsum wallboard, from being driven into the cable. Cables shall cross nailing members only at ends of ceiling 4" to 6" from wall. There shall be at least a 4" space completely around the perimeter of each ceiling, which is clear of cables. Cables shall be kept at least 8" clear of all openings.
TYPICAL CEILING LAYOUT PATTERN
All inspections and testing of the heating system shall be completed before, application of face layer of gypsum wallboard.
Heating cable spacing between joists shall be as re(OVER)
AIA FILE NUMBER 't t - t .
commended by die heating cable manufacturer. Under no operating conditions shall the gypsum board core exceed a temperature of 125F>
Complete embedding of the heating elements is neces sary. The area between the heating elements shall be filled with a filler which shall be level so there is com plete contact between the face layer and the back layer of gypsum wallboard. (Note: Where the filler serves as an adhesive to hold the face layer, nail spacing may be 7" o.c. for the first layer and 16" o.c. for the face layer.) When required to produce a uniform thickness of die filler and to provide a firm base for nailing, furring strips of a thickness equal to that of die layer of the filler, may be attached over the base layer to the ceiling joist at par allel relationship. The face layer shall be erected im mediately after the filler has been spread. The last nails around the perimeter < ' the ceiling shall be spaced 8" to 10" away from the a<. oining wall to prevent them from striking the electric c; bles where they cross the framing members.
All joints and nail .leads shall be finished according to the wallboard mani facturer's recommendations. Allow a minimum of one week with good drying conditions and two weeks in the cold season before turning on the heat ing system.
HOT WATER HEATING SYSTEMS:
Apply insulating gypsum wallboard for die first layer parallel to the joist with the aluminum foil facing down ward to act as a reflector behind die heating elements. Nails shall be spaced not more than 8" o.c. They shall be driven flush with surrounding wallboard surfaces.
Nail 2" x 2" furring strips 16" o.c. over the insulating gypsum wallboard and at right angles to the joists.
The heating elements shall be suspended from and sup ported by die framing members and not from the gypsum wallboard.
TYPICAL HOT WATER SYSTEM
All inspections and testing of the heating system shall be completed before application of the face layer.
Under no operating conditions shall the gypsum board core exceed a temperature of 125F.
Apply the final or face layer in the normal manner, at" right angles to the furring strips. Nails shall be as speci fied for die first ply and shall be spaced not more than 7" o.c. Do not use insulating or foilback wallboard for face layer.
All joints and nail heads shall be finished according to the wallboard manufacturer's recommendations. Allow a minimum of one week with good drying conditions and two weeks in the cold season before turning on the heat ing system.
OTHER SYSTEMS:
Where the heating system is located behind the gypsum wallboard, the recommendations for the applicable sys tem shall be complied with.
Under no operating conditions shall the gypsum board core exceed a temperature of 125l.
All joints and nail heads shall L finished according to wallboard manufacturer's specifications. Allow a minimum of one week good drying conditions and two weeks in the cold season before turning on the heating system.
DESIGN DATA
It is the responsibility of the architect to prepare and correlate complete plans and specifications. The limita tions and characteristics of the materials used for the
structure shall be taken into consideration. It is t
responsibility of the heating engineer to properly design the radiant heating system to work effectively with these materials.
Be certain to follow the job specifications. Substitu tions in materials might change the rate of heat flow, which in turn might give results that would make the en tire installation unsatisfactory.
The following design data is recommended for use in calculating the heat transmission coefficients (U) for gypsum wallboard.
Thermal Conductivity Values:
Conductance "C"
(Thickness as Resistance "R*
Matetial
stated)(1/C)
3/8" gypsum wallboard 1/2" gypsum wallboard 5/8" gypsum wallboard
3.73 2.76 2.42
0.27 0.36 0.41
DECORATION
Decoration of the finished work including sizing or sealing shall not proceed until the heating system has been test operated for a minimum of 24 hours. The sys tem should then be turned off and decorating of the gyp sum wallboard performed. Do not decorate the wallboard while the heating system is being tested, or is in opera tion. It is also recommended that where texture finishes are used, such finishes be allowed to thoroughly set rdry prior to the operation of the heating system.
June,1959