Document 2yq5R8XQRB1ZN21eM7BoZbMN

Cardinal k is, ?. X DO A 122803 CONFTDFNTTAl ***************************************************************** 100 AREA BI-WEEKLY CHECKLIST ***************************************************************** 1. TEST LEVEL ALARMS ON UNIT-100 HIGH, MEDIUM, AND LOW PRESSURE BOILERS AND DEAERATOR. 2. TEST AUTO OPERATION OF UNIT-100 DC SEAL OIL PUMP. 3. TEST UNIT-100 GENERATOR LIQUID LEVEL ALARM. 4. TEST UNIT-100 STAND-BY VOLTAGE REGULATOR. (6 MONTHS) 5. TEST UNIT-100 GAS CONSOLE EXPLOSIMETER ALARM. 6. TEST ANNUNCIATOR ALARM PANELS FOR UNIT-100 TURBINE, GENERATOR AND 1000 COOLING TOWER 7. TEST FLAME DETECTOR ON UNIT-100 HOT END BEARING. R. TEST UNIT-100 HYDROGEN CONTROL CABINET EXPLOSIMETER ALARM. 9. TEST AUTO OPERATION AND ALARMS ON UNIT-100 DC COOLING OIL PUMP, JACKING OIL PUMP, AND AUXILIARY LUBE OIL PUMP. 10. TEST EMERGENCY LIGHTS - BUILDINGS 3703 & 3704. 11. CHECK 0CB-100 AIR COMPRESSOR OPERATION. 12. CHECK UNIT-100 INVERTER. (S/S APPROVAL) 13. OPERATE GEN-100 NEUTRAL SWITCH. 14. PERFORM HYDROGEN LEAK TEST ON GEN-100. 15. SPRINKLER SUPERVISORY AIR SUPPLY PRKSKURK (10 OZ. MIN.) 07.. 16. POSITION OF BLOCK VALVE TO THE SPRINKLER SYSTEM VALVE BOX. 17. SWAP CONDENSATE PUMPS 1220 A / B / C ON OR NEAR FIRST OF EACH MONTH. ia. FLUSH EACH CONDUCTIVITY LINES ON THE CONDENSATE SYSTEM. 19. OPERATE MOV 1250 AND CV 1250 MONTHLY. DO A 122804 CONFTDFNTIAl DATE- MO/DA/YR. SHIFT SUPERVISOR ***************************************************************** 200 AREA BI-WEEKLY CHECKLIST ***************************************************************** 1. TEST LEVEL ALARMS ON UNIT-200 HIGH, MEDIUM, AND LOW PRESSURE BOILERS AND DEAERATOR. 2. TEST AUTO OPERATION OF UNIT-200 DC SEAL OIL PUMP. 3. TEST UNIT-200 GENERATOR LIQUID LEVEL ALARM. 4. TEST UNIT-200 STAND-BY VOLTAGE REGULATOR. (6 MONTHS) 5. TEST UNIT-200 GAS CONSOLE EXPLOSIMETER ALARM. 6. TEST ANNUNCIATOR ALARM PANELS FOR UNIT-200 TURBINE, GENERATOR AND 900 COOLING TOWER 7. TEST FLAME DETECTOR ON UNIT-200 HOT END BEARING. 8. TEST UNIT-200 HYDROGEN CONTROL CABINET EXPLOSIMETER ALARM. 9. TEST AUTO OPERATION AND ALARMS ON UNIT-200 DC COOLING OIL PUMP, JACKING OIL PUMP, AND AUXILIARY LUBE OIL PUMP. 10. TEST EMERGENCY LIGHTS - BUILDING 3706 AND OUTSIDE. 11. CHECK 0CB-200 AIR COMPRESSOR OPERATION. 12. CHECK UNIT-200 INVERTER. (S/S APPROVAL) 13. OPERATE GEN-200 NEUTRAL SWITCH. 14. CHECK UNIT-200 CARDLOK. 15. PERFORM HYDROGEN LEAK TEST ON GEN-200. 16. SPRINKLER SUPERVISORY AIR SUPPLY PRESSURE02. (10 OZ. MIN.) 17. POSITION OF BLOCK VALVE TO THE SPRINKLER SYSTEM VALVE BOX. 18. SWAP CT PUMPS 1000 A/B ON OR NEAR FIRST OF EACH MONTH. 19. FLUSH PROCESS WATER BACK-UP UNTIL CLEAR. 20. TEST BUILDING 3709 EMERGENCY LIGHTS. DO A 122805 CONFIDENTIAL DATE- MO/DA/YR. SHIFT SUPERVISOR ********************************************************************** 300 AREA BI-WEEKLY CHECKLIST ************************************************4^******************* 1- TEST LEVEL ALARMS ON UNIT-300, HIGH, MEDIUM, AND LOW PRESSURE BOILERS. 2. TEST OPERATION OF UNIT-300 DC SEAL OIL PUMP. 3. TEST UNIT-300 GENERATOR LIQUID LEVEL ALARM. 4. TEST UNIT-300 TURBINE HOUSE EXPLOSIMETER ALARMS. 5. TEST UNIT-300 HYDROGEN CONTROL CABINET EXPLOSIMETER ALARM. 6. TEST ANNUNCIATOR ALARM PANELS FOR UNIT-300 TURBINE, GENERATOR, AND BOILER. 7. TEST UNIT-300 ELECTRICAL ALARM PANEL AND SYNCH BUS ALARM PANEL. 8. TEST OPERATION OF UNIT-300 DC LUBE OIL PUMP. 9. TEST AUTO OPERATION OF AND SWITCH UNIT-300 LUBE OIL PUMPS. 10. TEST EMERGENCY LIGHTS - BUILDING 3707 - 300 ELECTRICAL PACKAGE - 300 MECHANICAL PACKAGE. 11. TEST OPERATION OF ALL MOTOR OPERATED VALVES ON UNIT-300 BOILER FEEDWATER SYSTEM. 12. PERFORM HYDROGEN LEAK TEST ON GENERATOR 300. 13. TEST FLAME DETECTOR ON UNIT-300 HOT END BEARING. 14. CHECK MECHANICAL PACKAGE AIR FILTER; CHANGE IF NEEDED. 15. SWAP EVAPORATIVE COOLER PUMPS. (DATE- MO/DA/YR) SHIFT SUPERVISOR'S SIGNATURE 00 A 122806 CONFIDENTIAL ********************************************************************* 400 AREA BI-WEEKLY CHECKLIST ********************************************************************* 1. TEST LEVEL ALARMS ON UNIT-400, HIGH, MEDIUM, AND LOW PRESSURE BOILERS. 2. TEST OPERATION OF UNIT-400 DC SEAL OIL PUMP. 3. TEST UNIT-400 GENERATOR LIQUID LEVEL ALARM. 4. TEST UNIT-400 TURBINE HOUSE EXPLOSIMETER ALARMS. 5. TEST UNIT-400 HYDROGEN CONTROL CABINET EXPLOSIMETER ALARM. 6. TEST ANNUNCIATOR ALARM PANELS FOR UNIT-400 TURBINE, GENERATOR, AND BOILER. 7. TEST UNIT-400 ELECTRICAL ALARM PANEL AND SYNCH BUS ALARM PANEL. 8. TEST OPERATION OF UNIT-400 DC LUBE OIL PUMP. 9. TEST AUTO OPERATION OF AND SWITCH UNIT-400 LUBE OIL PUMPS. 10. TEST EMERGENCY LIGHTS - BUILDING 3708 - 400 ELECTRICAL PACKAGE - 400 MECHANICAL PACKAGE. 11. TEST OPERATION OF ALL MOTOR OPERATED VALVES IN UNIT-400 BOILER FEEDWATER SYSTEM. 12. PERFORM HYDROGEN LEAK TEST ON GENERATOR 400. 13. TEST FLAME DETECTOR ON UNIT-400 HOT END BEARING. 14. SWAP E-H PUMPS. 15. CHECK MECHANICAL PACKAGE AIR FILTERS; CHANGE IF NEEDED. 16. SWAP EVAPORATIVE COOLER PUMPS. (DATE- MO/DA/YR) SHIFT SUPERVISOR'S SIGNATURE DO A 1.72807 COIsIFTDFNT T At.