Port St. Lucie Florida Water and Sediment
Resample for the Empirical Human
Exposure Assessment Multi-
City Study
Port St. Lucie, Florida July 18-19, 2000
Prepared by:
Pace Analytical Services, Inc. Minnesota Field Services 1700 Elm Street, Suite 200 Minneapolis, MN 55414
Bradley G. Jacobson Project Manager
Prepared under contract with:
3MET&SS Field Analytical Services and
Technologies
Client Coordinator: Jess Eldridge 3M Lab Request: E00-2003 3M Department: 502180
Pace Project No.: 1034438 (Field)
--- ----------
August 15, 2000
BACK TO MAIN
Table of Contents
Page
Introduction
1
Sampling Protocols
2
Field Observations
3-5
Deviations from the GPO
6
Contacts for Municipal Sites
7
Table 1 - Field Summary Table 2 -G arm in GPS12 Coordinates Table 3 - Abbreviations Table 4 - Samples Collected
8 9 10 11
Figure 1 - Surface Water Collection (Quiet Water) Figure 2 - Sediment Sampling Figure 3 - WWTP Injection Well Figure 4 - WWTP Chlorine Contact Chamber
Figure 5 --W W TP Injection Well Pond
Figure 6 - Quiet Surface Water Figure 7 - Quiet Surface Water Shoreline I Figure 8 - Quiet Surface Water Shoreline II
12 13 14 15
16
17 18 19
Appendix A General Project Outline (GPO) Appendix B Field Data Log Sheets Appendix C Chain of Custody Forms
A-1 B-1 C-1
BACK TO MAIN
Introduction
Pace Analytical Services, Inc. was contracted by the 3M Company to recollect samples for the Port St. Lucie Multi-City Study, The sampling was originally conducted in July 1999 by Battelle. The resampling was conducted to confirm baseline information obtained during the July 1999 event. Target analytes for this event are PFOS, PFOSA, POAA, PFHS, and TFA (fluorochemicals). Surface water samples were also analyzed for metals. The area of greatest interest was the quiet surface water located near Martin County Marina (Mapp Rd and SW Chapman Way). Emphasis was placed on quality control measures such as extensive field matrix spiking at multiple concentration levels, duplicate samples, and procedures to reduce possible contamination during field collection. The sampling was conducted according to the specifications set forth in the 3M General Project Outline (GPO), except as noted in the report section "Deviations to the GPO". A summary of the field observations can be found in Table 1. Sampling locations were located for future reference with GPS longitude and latitude coordinates and are listed in Table 2.
Pace Analytical Page 1
BACK TO MAIN
i Sampling Protocols
j Equipment Preparation: The 1 liter NalgeneTM sample containers used for sampling were rinsed with "Optima" grade methanol and Dl (Type I water) prior to use. Transfer devices, such as the stainless steel bucket, were field decontaminated between samples by mechanical removal of visible
j contaminants followed by a thorough rinsing with methanol and Type I Dl water. New nitrile gloves were worn at all times during the equipment preparation,
I sample collection and handling procedures. New gloves were donned with every . change of sample location and/or sample matrix. ' Surface Water Samples: Samples were collected approximately 15 cm below I the surface of the water by first submersing the sample container into the water.
Then the container was uncapped, filled and recapped while continually | submerged (Figure 1). This procedure was used to avoid capturing a possible
concentrated surface film layer. | Sediment Samples: Samples were collected using a stainless steel scoop. The
sediment samples were collected at the corresponding subsurface water sample J location. Approximately the top 2 centimeters of sediment were collected into
the scoop. The scoop was then raised slowly to the surface to avoid loss of top
J sediment layer (Figure 2).
Tap Water Samples: Samples were collected directly into the sample container | via the cold water tap.
Wastewater Treatment Sludge: This sample was collected using a stainless I steel bucket and a nylon rope. The first two feet of nylon rope above the point of . attachment to the bucket was rinsed with methanol and Type I water in the field * prior to use.
I
I Pace Analytical Page 2
I
BACK TO MAIN
Field Observations
A summary o f the field observations can be found in Table 1.
M unicipal Drinking W ater Plant: The drinking water plant has added a deep aquifer (approximately 1350 feet) to the plant intake source. This water is treated via reverse osmosis and is referred to as the RO water. This site was not available for collection during the 1999 Battelle sampling event, per site contact Brad Macek. The RO site was collected in addition to the original shallow aquifer (approximately 100 feet). The shallow aquifer undergoes lime-softening treatment. The outflow from the plant is a blend of the RO and lime softened waters. The plant refers to the plant outflow as the "point of entry" because this water enters the city water system.
North Port W astewater Treatment Plant (WWTP): The final effluent for the WWTP is at the Injection Well (Figure 3). This is the point where the effluent is injected into the ground. Samples were collected at this point, but after further discussions with site contact Carl Norton, it was determined this water would not be representiative of the effluent collected by Battelle in 1999. This
sampling point is now a blend of the W W TP effluent and waste reverse
osmosis (RO) water from the drinking water plant. The samples were submitted to the laboratory, but effluent samples were also collected at the chlorine contact chamber (Figure 4). Per Carl Norton, the chlorine contact chamber effluent would be representative of the discharge collected in 1999. Chlorination was not occurring in the chlorine contact chamber at the time of sampling. Note Figure 5, which shows the algae-like film on the surface of the pond leading to the injection well. Port St. Lucie Landfill: There were two leachate ponds in use. The operators were currently pumping into Pond #3 and pumping out of Pond #4.
Pace Analytical Page 3
BACK TO MAIN
Samples were collected from Pond #4 using a pond sampler. The sample container was inverted as it was submerged into the leachate pond to minimize the entry of surface leachate into the container. Fire Department - Station #5: The cold water tap to the kitchen sink was purged for approximately 5 minutes and the sample was collected. No abnormalities noted. Stuart Harbor: This site is located just off the NW corner of Jefferson Bridge. The sediment appeared to be relatively clean sand. There appeared to be some landscaping activities occurring approximately 100 yards to the west. Pendarvis Park: The cold water tap samples were collected from the women's restroom. The surface water samples were collected by walking out on the concrete boat landing to avoid stirring up sediment. Sediment samples were collected approximately 20 yards to the right of the landing. A light rain started during the surface sampling and the 3M project coordinator Jess Eldridge was contacted. Per that first phone conversation, as long as the rain remained light, finish Pendarvis Park sampling. A second phone call was made to Jess Eldridge after collecting Pendarvis Park. The rain had become heavier and outside sampling activities were halted for the day to allow the surface water systems to settle. Total rainfall for the event was 0.23 inches and lasted approximately one hour. Holiday Inn: Samples were collected in room 413 after purging the cold water line for ten minutes. The water remained near ambient temperature. Nothing abnormal noted. Martin County Marina: GPS coordinates from the 1999 sampling event indicated the sampling location to be within the boat docking area. This area of the marina was littered and had several boats in dock, so a sampling point was selected just outside the boat docks. Quite Surface Water: The pond was relatively small (approximately 200 feet X 200 feet) see Figure 6. The water was fairly clear with some minnows
Pace Analytical Page 4
BACK TO MAIN present. Styrofoam, plastic bags, a can and a bottle were some of the litter noted in the water (Figures 7 and 8). Sampling was conducted approximately 45 feet away from visible litter. The technician waited approximately five minutes after stepping into the water to allow bottom sediment to settle prior to collecting the water sample.
Pace Analytical Page 5
BACK TO MAIN
Deviations from the GPO
Addition of the deep aquifer - reverse osmosis sampling point at the drinking water plant.
Addition of the chlorine contact chamber sampling point due to changes at the wastewater treatment plant.
Pendarvis Park samples were collected during light to moderate rainfall. Sampling at Martin County Marina and the Quiet Surface water occurred with 24 hours of a rain event. GPO requested dry conditions for a 24 hour period prior to sampling.
Per the July 11, 2000 phone conversation with Jess Eldridge, use of the subsurface water sampler would be needed only if a sampling configuration required its use. The surface water samples were collected manually by hand.
Benchmark locations for GPS accuracy confirmation were not located due to construction activities.
As mentioned in the "Special Precautions, QA/QC" section of the GPO, Zip Lock bags and aluminum foil were to be tested for background levels of fluorochemicals. The Zip Lock bag was clean but the aluminum foil had some positive results. As a precaution, after this information was made known, the sediment scoops which had been cleaned and wrapped in foil, were rinsed with "Optima" grade methanol and Type I water in the field prior to use. The data regarding the aluminum foil will be evaluated and re analyzed if necessary.
Pace Analytical Page 6
BACK TO MAIN
Contacts for Municipal Sites
Perm issions Granted by Municipal O fficials: Full cooperation was received from the respective officials of the municipal drinking water plant, municipal wastewater treatment plant, municipal landfill and Station #5 fire department. Following are the names and phone numbers of the site contacts:
M unicipal Drinking Water Plant 1. Wes Upham - 561/873-6400 2. Brad Macek - 561/343-2373
Wes Upham made the arrangements for Brad Macek to show the Pace technicians the monitoring points.
Wastewater Treatment Plant 1. Wes Upham - 561/873-6400 2. Carl Norton (onsite) 3. Mark Rowen (onsite)
Wes Upham made the arrangements for Carl Norton to show the Pace technicians the monitoring points.
M unicipal L a n d fill.
1. Ron Roberts - 561/462-1768 2. Chuck Lamb (onsite)
Fire Station #5
1. Chief Vaughn - 561/462-2312
Pace Analytical Page 7
Port St. Lucie Resampling Lab Request: E00-2003 July 2000 Event Field Summary Table
Location Name
Municipal DW Plant Intake RO Municipal DW Plant Intake LIME Municipal DW Plant Outflow Tap W ater site #1 Holiday Inn Tap W ater Site #2 Fire dept Tap W ater Site #3 Pendarvis Park Surf. W ater Site #1 Pendarvis Park Sediment Site #1 Pedarvis Park Surf. W ater Site #2 Martin Cty Marina Sediment Site #2 Martin Cty Marina Surf. W ater Site #3 Stuart Harbor Sediment Site #3 Stuart Harbor North Port W W TP Effluent North Port W W TP Chlorine Contact Chamber W W TP Sludge (pretreated) Port S t Lucie LF Leachate Quiet Surface W ater Palm City Field Blank Control Sample Riled Field Blank Control Sample Empty Reid Spike Control Sample (FSCS)
Table 1
Field Summary
Comments
Cam e on-line July 1999. Deep aquifer - reverse osmosis treatment. Not collected by Battelle. This is the original site collected by Battelle in 1999. Blend of the Reversed Osmosis and lime softened water intakes. Hotel Room 413. Fire Station #5 - Kitchen sink. Collected from Womens rest room. Raining quite hard by end of sampling. Sampling halted for the day after Pendarvis Park. Raining quite hard by end of sampling. Sampling halted for the day after Pendarvis Park. Moved out of the boat docking area to reduce possible contamination from boat motors etc. Moved out of the boat docking area to reduce possible contamination from boat motors etc. Sandy shoreline - very little silt like material Relatively dean sand, not much silt Collected from valve as it enters the injection well. Blend of W W TP effluent and waste DW RO water Representative of what Battelle collected in 1999 per site contact Chlorine not being added here at this time. Strong ammonia odor, thick and black. Dark brown - very little odor. Small pond - Some styrofoam, bags, bottles,cans etc. in water. Minnows present Labeled and filled at Pace and transported with the sample bottles for the duration of the project Labeled at Pace and transported with the sample bottles for the duration of the project Bottles filled with Type I water at Pace and spiked in the field along with the other samples.
Pace Analytical Page 8
BACK TO MAIN
Port St. Lucie Resampling Lab Request: EOO-20O3 July 2000 Event Garrnin GPS12 Coordinates
Table 2
Sam pling Location
-- Duly ZOTOevent--
instrum ent reading t
P o s itio n
(deg. and min.)
July 2000 event Conversion t
(deg., min. and sec.)
Municipal DW Plant 1001 S.Prinville Road
Latitude
N27 18.521'
Longitude W080 20.484'
N27 18' 31.3" W080 20' 29.0"
North Port WWTP 281 St. James Ave.
Latitude
N27 20.175'
Longitude W080 21 .070'
N27 20' 10.5" W080 21' 04.2"
Port St. Lucie Landfill 6120 Glades Cutoff Rd
Latitude
N27 23.362'
Longitude W080 23 .9 1 2 '
N27 23' 21.7" W080" 23' 54.7"
Fire Station 5 1616 Port St. Lucie Blvd
Latitude
N27 16.246'
Longitude W080 18.195'
N27 16' 14.8" W080 18' 11.7"
Stuart Harbor
Latitude
N27 12.197'
N. side of Roosevelt Bridge Longitude W080 15.693'
N27 12' 11.8" W080 15' 41.6"
Pendarvis Park Pendarvis Cove Park
Latitude
N27 11 .251'
Longitude W080 16.213'
N27 11' 15.1" W080 16' 12.8"
Holiday Inn 10120 S Highway 1
Latitude
N27 16.748'
Longitude W080 17.494'
N27 16' 44.9" W080 17' 29.6"
Martin County Marina
L a titu d e
N27 10.997'
Mapp Rd/SW Chapman Wa Longitude W080 16.118'
N27 10' 59.8" W080 16' 07.1"
Quiet Surface Water
Latitude
N27 10.991'
Mapp Rd/SW Chapman Wa Longitude W080" 16.344'
N27 10' 59.5" W080 16' 20.6"
July 1999 event Battelle Measurem ents
(deg., min. and sec.)
N27 18' 32.1" W080 20' 37.8"
N27 20' 10.7" W080 21' 08.7"
N27 23' 21.4" W080 23' 53.1"
N27 16' 21.8" W080 18' 14.6"
N27 12' 13.6" W080 15' 43.0"
N27 11' 15.2" W080 16' 12.9"
N27 16' 46.2" W080 17' 30.1"
N27 11' 00.1" W080 16' 08.7"
N27 11' 00.1" W080 16' 20.4"
I t The Garrnin GPS12 used for this project displays the position in degrees and minutes. Previous data was reported in degrees, minutes and seconds. For comparison to previous data, the fractional increment of the minute was multiplied by 60 to convert to seconds.
I
I
I
Pace Analytical Page 9
I BACK TO MAIN
I
Port St. Lucie Resampling
I Lab Request: E00-2003 July 2000 Event Abbreviations
I
Table 3
I
Abbreviation
Full Description
c Sample for Centre Laboratory
I dup FB-Empty
Duplicate sample collected same as original sample Field Blank Control Sample Empty
FB-Filled
Field Blank Control Sample Filled
I FMS FSCS (D1 and D2)
Field Matrix Spike (either 200 ppt, 1 ppb.or 25 ppb) Field Spike Control Sample (Day 1 and Day 2)
K Sample for Kris Hansen
I MDWPIN-LIME MDWPIN-RO
Municipal Drinking Water Plant Intake - LIME Municipal Drinking Water Plant Intake - Reverse Osmosis
MDWP-OUT
Municipal Drinking Water Plant Outflow
NPWWTP-CC NPWWTP-EFF
I NPWWTP-SLUDGE
PSLLF-LEACH
I QSWPALM CITY
North Port Wastewater Treatment Plant Chlorine Contact Chamber North Port Wastewater Treatment Plant Effluent Wastewater Treatment Plant Sludge (pretreated) Port St. Lucie LF Leachate Quiet Surface Water Palm City
I SED #1 PEN PK SED #2 MCM SED #3 - SH
Sediment Site #1 Pedarvis Park Sediment Site #2 Martin County Marina Sediment Site #3 Stuart Harbor
I SW#1 PEN PK SW#2-MCM SW#3-SH TW#1 HOLIDAY INN
Surface Water Site #1 Pendarvis Park Surface Water Site #2 Martin Cty Marina Surface Water Site #3 Stuart Harbor Tap Water site #1 Holiday Inn
TW#2 FIRE DEPT
Tap Water Site #2 Fire Department
TW#3 PEN PK
Tap Water Site #3 Pendarvis Park
1
I
I
1
I
Pace Analytical Page 10
I mm m BAQKbTO A M IN . ^ mm mm mm
Port St. Lucie Resampling Lab Request: E00-2003 Listing of Samples Collected July 2000
Table 4
Sample Date/Time Location 7/18/00 09:00 Municipal DW Plant Intake RO 7/18/00 09:25 Municipal DW Plant Intake Lime 7/18/0009:40 Municipal DW Plant Outflow 7/18/00 17:45 Tap W ater site #1 Holiday Inn 7/18/00 13:40 Tap W ater Site #2 Fire dept 7/18/00 15:00 Tap W ater Site #3 Pendarvis Park 7/18/00 15:10 Surf. W ater Site #1 Pendarvis Park 7/1 8/00 15:20 Sediment Site #1 Pedarvis Park 7/19/00 07:10 Surf. W ater Site #2 Martin Cty Marina 7/19/00 07:20 Sediment Site #2 Martin Cty Marina 7/18/00 14:15 Surf. W ater Site #3 Stuart Harbor 7/18/0014:25 Sediment Site #3 Stuart Harbor 7/18/00 10:20 N. Port W W TP Eff Injection W ell 7/18/0010:45 N. Port W W TP Eff Chlorine Chamber 7/18/0011:05 W W TP Sludge (pretreated)
dupK dupC 1
i1 i1 11 i1 i1 i1 i1 i1 i1 i1 i1 i1 i1 i1
Blind dup K 1
1
Blind dup C 1
K-FMS-200 ppt 1 1 1 1
1 1
1 1
K-FMS-1ppb 1 1 1 1
C-FMS-200 ppt 1 1 1 1
C-FMS-1ppb 1 1 1 1
Metals Scan
1 111 1
1
1 11 1 11
Sample Date/Time Location 7/18/0012:15 Port St. Lucie LF Leachate
Sample Date/Time Location 7/19/00 07:55 Quiet Surface W ater Palm City
Sample Date/Time Location 7/14/00 11:00 Reid Blank Control Sample (FB)
dupK dupC K-FMS-200 ppt-A K-FMS-1ppbA
11
C-FMS-200 ppt-A C-FMS-1ppb-A
11
K-FMS-25ppb-A
1
C-FMS-25ppb-A
1
K-FMS-200 ppt-B 1
C-FMS-200 ppt-B
1
K-FMS-1ppb-B 1
C-FMS-1ppb-B
1
K-FMS-25ppb-B
1
C-FMS-25ppb-B
1
dupK dupC 1i
K-FMS-200 ppt-A
1
C-FMS-200 ppt-A
K-FMS-1ppb-A
1
C-FMS-1ppb-A
11
K-FMS-25ppb-A
1 C-FMS-25ppb-A
1
K-FMS-200 ppt-B 1
C-FMS-200 ppt-B
1
K-FMS-1ppb-B 1
C-FMS-1ppb-B
1
K-FMS-25ppb-B
1 C-FMS-25ppb-B
1
FB-Filled
FB-Empty 1
Metals Scan 1
Sample Date/Time Location 7/18/00 18:42 Field Spite Control Sample (FSCS) 7/19/00 08:25
Sample Date/Time Location 7/19/00 08:20 Rinse methanol/bottle blank
'
FSCS-200 ppt D1 FSCS-1ppbD1 FSCS-200 ppt D2
111
FSCS-1ppb D2
1
Pace Analytical Page 11