Document 2rjgrkXDROG82voR7p18pbK6

6 '' 1*--4 DpartmnC Engelbrecht From-4^*m & L. Redmond Plant Manager Industrial Hygiene Fll Cod* Division Basic Mfg, Personne1 Oil* February 20, 1973 PI*nt/Otfice CIMS Numt>*r 440-14-01 Eldon Avenue Axle Pla Plam/Otlic* CIMS Number 417-05-19 Chrysler Center Suto)er Asbestos Survey - Departments 78, 80. and 81 As required by Section 1910.93a, Asbestos, promulgated in the'OSHA standards, a semi-annual survey was performed by the writer on February 6 and 7, 1973, to determine airborne concentrations of asbestos dust. Environmental and personal monitoring were performed as required by this regulation. Results obtained during this survey are listed on the attached data sheet. Discuss ion The OSHA standard states that the eight hour time-weighted average airborne concentration of asbestos fiber to which any employee may be exposed shall not exceed five fibers, longer than five micro-meters, per cubic centimenter (cc; of air. On July 1, 1976, a limit of two fibers per cc will become effective. As indicated by the data all fiber con centrations were below both the present and future require ments , therefore , no corrective action is required. At the time of this survey we were informed that the Centrispray wet dust collector will be replaced by a dry bag type collector, having an 8000 to 8500 cubic feet per minute capacity. The 1910.93a Section stipulates that asbestos waste be collected and disposed of in sealed, impermeable bags or other closed im permeable containers. Caution labels must be affixed to all waste asbestos containers and to the dust collector clean out door. ' Respiratory protection will be required for employees removing bags of waste material from the dry type dust collector. The continuous flow air line respirator (NPSP-226) is the type needed for this operation. Respirators must be cleaned and sanitized as described in the Corporate Respiratory Protec tion Program. The air line supplying this respirator must be *4.! M-7 879 T L. REV. 1-7 1 2 tested for carbon monoxide gas concentration on a monthly basis. Records must be kept indicating the results of these te sts. . ' hm Attachment Louis Redmond Industrial Hygienist cc: W. F. Bavinger F. M. Borawski R. F. Bowers J. R. Crawford D. L. Eschelbach E. A. Garma, M. D. R. T. Gaskill F. G. Hautte N. McCallum R. D. McIntosh, M. D. R. H. Miller E. B. Nelson R. C. Sprague W. C. Turland Dnta Sheet Eldon Avenue Axle Plant Asbestos Dust Concentrations Location Threshold liir.it value Number of Fibers per Milliliter of Air 5.0 January 21 . 1 972: X-L-0 Grinder 55-0137, Mr. Thomas Wyrybkowski,6842 Rockwe11-De1ta-Be 11 Sander, west of grinder P-2641 Mr. Emil Zreliak.2093 X-L-0 Grinder P-2641, Mr. Raymond Koule,7667 Belt Sander 31-723, Mr. Eli Griffin.2430 X-L-0 55-0140, Mr. Sylvester Bogel,8495 X-L-0 Grinder P-2642, Mr. Emil Zreliak,2093 X-L-0 Grinder 550134, Mrs. Bernice Worthy,3352 0.2 3.9 0.2 1 .2 0.4 0.3 0.3 December 15, 1971 X-L-0 Grinder 55-143, Mr. Ben Jaroneski.3524 X-L-0 Grinder 55-01^-3. Mr. Ben Jaroneski,3524 X-L-0 Grinder 55-0133 Mr. Ben Jaroneski,3524 X-L-0 Grinder 55-0133, Mr. Ben Jaroneski,3524 X-L-0 Grinder 55-0136 Mr. Thomas Wyrybkowski,6842 X-L-0 Grinder 55-0136 Mr. Thomas Wyrybkowski,6842 X-L-0 Grinder 55-0135 Mr.' Thomas Wyrybkowski , 6842 No.l Belt Sander, Mr. Sylvester Bogel,8495 No.l Belt Sander, Mr. Sylvester Bogel,8495 X-L-0 Grinder'" 55-0135 Mr. Thomas Wyrybkowski,6842 0.8 1 .1 0.8 0.5 0.8 1.6 0, 1, 2. 1. The samples were obtained with membrane filters and a Unico Pump, Model 30. rrA P-' i. File Code Dnf'' January 28, 1972 .... . .. Name *- H. T. -Engelbrecht f^rom-- Name L. Redmond Department Plant Manager Division Basic Mfg. Plant/OHiCc . -ji- CIV.3 Number Eldon Avenue Axle Plant Department Division Plant'Of11co CIVS Number Industrial Hygiene Personnel Highland Park Subject: Asbestos - Department 78 Because of the promulgation of an asbestos emergency standard by the U. S. Department of Labor on December 7, ]971, the atmos phere in Department 78 was sampled by the writer on January 21 , 1972, for the purpose of determining asbestos levels. Previously, airborne concentrations of asbestos dust were determined at five brake shoe grinders in this department on December 15, 1971 and the most recent survey was performed to obtain additional data. One of the requirements of the emergency standard is that per sonal monitoring be performed. Thus, the results and the names of employees whose work environments were evaluated are listed on the attached data sheet. Results of the December 15 survey are also listed. Discussion The emergency standard has established a threshold limit value for asbestos dust of 5.0 fibers greater than 5 microns in length per milliliter of air. As indicated by the results obtained during the two surveys, the asbestos dust concentrations at all work stations sampled were below the threshold limit value. Fiber counts ranging from 0.2 to 3.9 fibers per milliliter of air were obtained. Since the standard stipulates that asbestos dust shall be removed by vacuum cleaners only and that asbestos waste and scrap shall be collected and disposed of in sealed bags or other closed con tainers, it is recommended that all air blow-off guns be removed from the brake shoe grinding machines and that vacuum cleaners be utilized to perform cleanup operations. }l* &i J-( - 12- hm Attachment ^^ Louis Redmond Industrial Hygienist AT* cc: W. F. Bavinger R. D. McIntosh, M.D. R. F. Bowers L. W. Perry J. L. Dagenais C. E. Polsgrove W. T. Diehl J. G. Shepherd D. L. Eschelbach N. A. Trombley R. T. Gaskill W. C. Turland J. J. Hayes F. G. Mautte 84-110-7879 Rev. 10-70 * / ( Data Sheet Eldon Avenue Axle Plant Cj! , /<j!3 Asbestos Dust Concentrations / Location. Eight hour time-weighted average for fibers longer than five micrometers Fibers pesr Cubic Centimeter * 5.0 Department 78; XLO grinder 55-143 (Ben Jaroneski) 0.3 XLO grinder 55-0134 (Raymond Houle) ... T -u \ 0.4*. Belt 'sander, southeast corner of grinaefESre^i 'JCtC son^ 0.5 XLO grinder 55-0137 (Tom Wyrybkowski) XLO grinder P-2612 (Sylvester Bogel) Belt sander 31-723 {Dorothy Jackson) At #4 brake shoe oven, exit end, general air At #1 brake shoe oven, exit end, (John Shumake) Brake shoe transfer to XLO 55-0133, general air West side of #1 brake shoe oven, transferring shoes, general air . Cement application room, loading applicator, .. (Alfred Zanojein) ~ At #1 brake shoe oven, entrance end (Kenneth Johnson) At #2 brake shoe oven, entrance end (Henry. Shanks) At #4 brake shoe oven, entrance end(Mike Dawson) XLO grinder 55-0133 (Stanley S:o. t) XLO grinder 55-0137 (Beverly Autry) XLO grinder 55-0141 (Sam Polinbo) XLO grinder 55-143 (Stanley Szott) Belt "Sander 31-723 (Odell Lillard) Belt sander, southeast corner (Kern Shadrock) ' Storage area for brake linings, general air Brake shoe transfer to XLO 55-0133, general air 0.5 0.9 1.4 0.8 1,0 0.2 0.4 0.5 0.8 0.3 0.4 .0.3 0.5 0.4 0.3 0.7 0.5 0.5 0.1 `V V v Department 80; - Line 8, brake assembly, placing brake shoes on plate Line 5, brake assembly, placing brake shoe on plate Shoe and lever machine #2 (Gerald Lamb) Line 6, brake assembly, placing brake shoes on plate Gangler machine #2 (Audrey Latimore) General air sample, brake assembly area 1. 0(Dorotty ferown,' 0.3(Irene Wrack) 0.5 0.9(Carolyn Will 0.5 0.2 Department 81; ^ Brakes assembled to axles, Valiant line(Denj.Johnson) 0.3 General air, east side of conveyor along Valiant line 0.1 Brakes assembled to axles, &k line(Oliver Strickland) 0.1 General air, west side of conveyor along 8% line 0.4 Brakes assembled to axles, Chrysler line(James Shorter)0.2 General air, west side of conveyor, Chrysler line 0.1 * The samples were obtained in the breathing zone of employees except where general air samples are indicated. Monetaire pumps and membrane filters were used to obtain the samples. 7