MINUTES OF MEETING OF PLANT MANAGER'S SAFETY BOARD - May 19, 1976
PLAINTIFF'S EXHIBIT MON-1912
Present:
P. E. Brubaker J. E. Robinson (for Oanner) J. Townsend (for Oaues) S. Kntpllng (for Fuller) J. A. Glass H. S. Hamby
Absent: C. E. Peters
KEY SAFETY STATISTICS
TABLE 1
Comparison by Months
J. E. Clark (for Jones) T. Shuff (for Lane) N. L. Marsh C. M. McCullough Harold Lacy G. T. Ryan J. G. Trafton
TOT TIF TOT
SIF
INJ
MO YTO
SI
M0
YTO
January February March
Apr i 1 First two weeks in May
Since Lift-Off April 16-May 17
28 109 109 1
3.9
19
82 96
0
0.0
20
73 88
2
7.3
17 64 82 3 11.2
15 134 87 1
8.9
27 96 86 4 14.3
3.? 2.1 3.9 5.8 6.1
6.8
There was another serious injury on May 18 bri nging the total to 5 since LIFTOFF. The above data is compared with last years performance on the chart plotted at the
top of the next page.
/
SC 002551
STG 2*01872 LAM003758
PMSB MINUTES - May 19, 1976
-3-
Arnold Glass pointed out that the focus of the overall NASA program was to increase individual awareness to unsafe acts and conditions. The first inclination in emphasizing safety programs is to look at "things" then "act." The most elusive of all sources of accidents, however, is what goes on in our thoughts. It is the thought, or lack of it, that proceeds the act that gets us in trouble. A single moment of inattention of not watching where we are going--not looking at our surroundings--or not being alert to what might happen--that leads to accident or injury. In seeking NEW AVENUES to SAFETY AWARENESS we are looking for new ways to overcome our inattention or thoughtlessness.
SAFETY ADVISORY COMMITTEE- (SAC) Mike McCullough
Respiratory Protection
Mike reported on the results of the SAC study of respiratory protection equipment and regulations for use of that equipment. The SAC obtained information from contacts with five other Monsanto locations, from Tony Ozarchuk, and Mr. Wesley W. Wallace, Vice-President of Vallen Corporation, a major supplier of safety apparel and apparatus.
Mike reviewed all aspects of the SAC study displayed the various types of equipment used in the plant and commented on their used and limitations.
The SAC recommended the adoption of the following policy:
In order to insure the safety of our employees and to comply with Federal Regulations 1910. 132, 133 and 13**, the following policy is in effect:
Where this is a danger that failure of engineering type devices may expose employees to harmful dust, fumes, fogs, mists, gases, smoke sprays or vapors, a respiratory protection plan will be mandatory. Each department is responsible for designing, communicating, training and maintaining its plan according to its unique and individual needs.
The plan shall include, as a minimum, all of the following:
1. Proper selection of approved equipment according to needs. 2. Maintenance and inspection program, including disinfecting. 3. Written standard procedures regarding use, selection of equipment. **. Proper storage for cleaning and sanitation.
5. Develop and maintain list of people who can reasonably be required to use equipment.
6. Instruct each employee as to proper use, care and fitting requirements for use of equipment.
7. Fittings of each employee to determine special conditions to be imposed such as special in-mask magnifiers, facial hair removal, wearing of dentures, etc. where applicable.
sc 002552
STG 2401873 LAM003759
PMSB MINUTES May 19, 1976
-k-
8. Instructions periodically to insure knowledge by employee of proper fitting techniques.
9. Training of employees in use of applicable equipment, including wearing of same in test atmosphere.
10. Periodic checks 'to insure compliance of employees to insure proper fittings.
11. Where breathing air connections are used, connectors will be com patible with outlets for other gases and cylinders. Will be in accordance with Federal Specifications BBA-103ta or GG-B-00675b.
The PMSB agreed to adopt a total respiratory protection program with emphasis on communication, inspection, testing, maintenance and training in use of respiratory equipment. The development and implementation of the program to execute this policy decision was assigned to SHAC - Harold Lacy.
REMAINING SAC AGENDA ITEMS
The SAC Committee deferred the request for determining who should handle fires and spills on out of battery pipelines. This recommendation will be forthcoming.
The outline of proposed procedure for biennial loss prevention will be reviewed at the next Plant Manager's Safety Board.
It is suggested that "refresher bulletin" be issued to all appropriate supervisors reminding them to bone-up on Procedure Bulletin P-0700, particularly as it deals with Section F, Government Agency Officials. The letter might include St. Louis requirements per Memo #32, "OSHA Communications", July 22, 1975, for emphasis.
SC 002553
STG 2401874
LAM003760
PMSB MINUTES - May 19, 1976
-5-
SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC) - Harold Lacy
I. NEW AVENUES To SAFETY AWARENESS (NASA) PROGRAM
Harold reported thatfhe had received feedback from 19 of 29 operating areas (plus the P. T. Safety Committee) regarding their plans for increasing safety awareness individual departmental actions. A summary of individual plans is attached.
His overall conclusions were summarized as follows:
1. The program to date has had a net positive effect by stimulating individual areas to actively promote safety in their own area to fit their own needs. Harold believes this is consistent with our plant safety objectives.
2. Harold was somewhat disappointed in the overall percentage response. Ten "non-answering" departments is too many, although we recognize we are in a heavy work load period which is likely to continue.
3. Harold impressed with the overall quality of plans submitted although some plans emphasized efforts of other groups (principally the Safety Department) as opposed to self-generated efforts.
Harold responded to all suggestions by letter and in some cases suggested ways in which the plans can be implemented within the unit/craf
Phil suggested that the members of the board check on their own area to to determine whether the groups in their area had active safety awareness programs going.
2. OFFICE SAFETY COMMITTEE
Harold reported that the Office Safety Committee had been formed with Dick McBride as Chairman, details were included in SHAC minutes.
3. TASK FORCES FORMED
In response to direction of PMSB two task forces were formed to develop specific proposals as follows:
TASK FORCE
CHAIRMAN
SHAC MEMBER RESPONSIBLE
Use and Control of Life Support Systems
Rex McDonnell
Gene Stacy
Gas Cylinder Storage Tom Lastrapes
John Tissue
SC 002554
STG 2401875
I.AM003761
PHSB Minutes - May 19, 1976
k. BALL VALVES
Harold reviewed the results of the survey on Ball valves stating that 15 out of 23 areas were complete and the remainder were fairly well on the schedule they`had turned in earlier.
5. GUEST HOUSEKEEPING INSPECTIONS
Harold pointed out that the guest housekeeping inspection schedule had been sent out to PMSB members. Team and area assignments were made to provide different inspectors and team groupings to vary the inspection techniques applied. Prior to the inspection, the teams will be given specific items for emphasis In the inspection.
.6. OSHA ACTION ALERT
These were mailed earlier in the week to alert people throughout the plant about the possibility of having an inspection. Results of the Luling plant inspection were included. Initial reaction to this mailing was good. Ralph Martini, CED, questioned the procedure to be followed when inspectors show up looking for a Contractor of Sub-Contractor. The procedure is uniform and is covered in P-bulletin, P- 0700, Plant Entrance and Gate Pass Procedure. The guards will ask for identification, he will be escorted to the Plant Manager's office and appropriate persons will be contacted from his office prior to any actual plant visit.
REVIEW OF INCIDENTS
The following serious Incidents were reviewed:
- Ethylene Spill at Research II. Although one report has been filed by Ethylene supervision, W. H. Lane has promised to get a Research report on the incident and their plans for corrective measures.
- Wet Benzene Tank Pit Fire (14T1)
- Blanketing and Vent System Failure A review of this incident pointed out the need for a more detailed review of how well we are actually protecting our tanks. A task force is being formed on this. --------Arnold Glass responsible
sc
002555
STG 2401876
L/\W1003762
PMSB MINUTES - May 19, 1976
-7-
MlSCELLANEOUS ITEMS
Storage of Flammable Materials is the subject of a report being circulated
by Greg Daues.
*
A report on the Port Plastics Tank Fire is being prepared by Dick Delacratz of Port Plastics and will be circulated when received.
A proposal for increased participation in Industrial Mutual aid is under consideration by the Plant Manager.
The need for Action plans In case of an ammonia or toxic gas spill was high lighted by the recent tank truck wreck in Houston.
Arnold Glass will send members of the PMSB copies of a research report and other Information on the subject.
J. A. Glass
sc 002556
STG 2401877 LAM003763
*C OATf
* iOCaTjOn)
. .CT
KFHEnCI
TO
J. A. Glass - Texas City May 27, 1976
All Recipients of PMSB Minutes *
cc
The attached revised sheet is being issued to correct an error on page 4 of the May 19 Plant Manager's Safety Board minutes you recently received.
Note I tern 11, page 4: "compatible" needs to read "incompatible".
We regret our oversight in proofreading and will appreciate your inserting the attached page 4 in your copy of the minutes and dis carding the Incorrect copy.
vf
Attachment
C
SC 002557
STG 2401878
LAM003764
r'N
PMSB MINUTES - May 19, 1976
CORRECTED COPY
~`*~
8. Instructions periodically to insure knowledge by employee of
proper fitting techniques.
9. Training of employees In use of applicable equipment, including
wearing of same in test atmosphere.
10. Periodic checks to insure compliance of employees to insure proper
fittings.
^
11. Where breathing air connections are used, connectors will beincom
patible with outlets for other gases and cylinders. Will be in
accordance with Federal Specifications BBA-103^a or GG-B-00675b.
The PMSB agreed to adopt a total respiratory protection program with emphasis on communication, inspection, testing, maintenance and training in use of respiratory equipment. The development and implementation of the program to execute this policy decision was assigned to SHAC - Harold Lacy.
REMAINING SAC AGENDA ITEMS
The SAC Committee deferred the request for determining who should handle fires and spills on out of battery pipelines. This recommendation will be forthcoming.
The outline of proposed procedure for biennial loss prevention will be reviewed at the next.Plant Manager's Safety Board.
It Is suggested that "refresher bulletin" be issued to all appropriate supervisors reminding them to bone-up on Procedure Bulletin P-0700, particularly as it deals with Section F, Government Agency Officials. The letter might include St. Louis requirements per Memo #32, "OSHA Communications", July 22, 1975, for emphasis.