Document 2qzZzVaK1Ox3GLKBYvomejnGg
jr*OONU AtMM
MCmtlCM WKVICtt MMmuirT.ICM SkAM
.*. Kkyw:xicN
J.
/TlO.t. Bratsch SI Jckson fi
K'D.J. O'Toole 0r$, V. Coi-lew *S R, MoCutchan fin W. C. Bngman
iP C, P. Buckley]
|> *
tEi H Mfeiivi KtAti M^***.'
& fc>
& P & fci Si 1 S' * S' 1 El
. . J . 31151 MR, 913701*1119
MM1 Nft.
I . pprici
1 ?0IMU 1?/ l*/ OTHIM _
I'D M.P. Ulk
. gnnlstori
rl>. Banna C) Lg, j.o. Lsndwehr
rO D.B. Hosier/
Mltro
F.J. Holeapfel I Q W>R7 Kenogg
KLiR.B. Howard
8, Pnd St.
J. R. Savage UP.O. DeOaimo I'B'W. Papageorge pT.M. Patrick
'i J.P. Quinn
"UR.L. Vlese
"S'
unit
AROCIOR POU.UTION - AIR POLIWION REDUCTION PROORAM
mmonnih W. A. Krull (V. C. Bngman)
aaopLiMt
SOKV.AKV
o
Determine levels and define problem areas.
As part of the overal PCB pollution control, a study eras Initiated to measure the Aroclor air pollution levels and develop a program for reduction. A tentative goal of two pounds/day was set at this time.
The present level as measured and/or calculated from the manufacturing department is about 5*7 pounds/day. Most of this Is due to the sparging of Aroclor blends with nitrogen In the mix tanks.
To reduce the losses to S pounds/day or less the following should be done.
1, Blanket the mix tanks Instead of sparging with nitrogen. BBC 3/1/70.
2. Route the relief lines on the batch chlorlnatore to the concrete pad. BDC A/l/70
/br
o
V. ft. Krull Technical',Services Dept.
HOMS 058268
law turn:* k M*
COMPANY CONFIDENTIAL I NrORATION
af ln>!i'i
j *' Sr mplePW k
I* U aafckMkt>< ' 41i<xlllf k
cmfu*rr
Ikt kk.lllr W.lNi'klt Ck;!I| MMarlir.W
MukrM.ii'rVrlK' s>>' at act araP-k aartr, aMt
paac; itllitrbiUac SW*i mtalr k aatw; Ski m Stttit.
'' ' '
R*-:a*e Htv-t/tt
Vi '
/
91J701|119(3)
-2-
December A, 1970
BACMROUND
Ae pert of the overall PCB pollution control, a program was Initiated to define and reduce the level of Aroclor air pollution from'the V. 0. Krummrlch Plant. This progress report describee the results of this program relative
to the Aroclor Production Department.
PR0B1.PM ARRAS
A survey of the department and consequent sampling and calculations defined these problem areas.
Sources
1. Mix tanks (while sparging with nitrogen)
Measured boss ~ |/bay
Mot sampled but visible loss exists.
Calculated boss
' iMy
5.70
P. Tanks and loading areas (assuming 55 R #/yr production)
0.70
3. Sorubber stack
O.OCl.
A. Fume removal stack
0.05
9. Vacuum jets
Not sampled. None ob served and condenser
should remove most of Aroclor.
0.10
o.oA
0.01 No calculations
6. Thermlnol Furnace
Not sampled. No visible fumes or odors.
No calculations
Estimated Totals - About 7.0 #/day.
The relief lines on four batoh chlorlnators relieve Into the air creating a potential loss.
REDUCTION PROORAM
To reduce the loss to two pounds per day, a blanketing system should be applied to the mix tankB. The rupture discs on the batch chlorlnators should be routed to the concrete pad to eliminate a possible large loss.
/br