.0. 8 NAVAL ENGINEERING EXPERIMENT STATION
Annapolis, Maryland
NP/L5/J10(712B) Test 0102T6C
31MAY 1957
Proms Director To: Chief* Bureau of Ships
SubJ: Investigation of packings and gaskets for use In hydraulic systems employing phosphate ester fluids; NS-066-001* Evaluation Report 010276c
Refs (a) Military Specification M3X-P-5514A
Enel:
i'l) Table I 2} Table II 3} Table HI
1. As requested by Bureau of Ships Code 532 of 22 May 1957* this Is a progress report of the subject Investigation covering various packings and gaskets which are being sub jected to performance tests under simulated service con ditions* The results obtained are given In Tables I and H. Also* measurements of torque to open and close a 6" valve In the normal manner under 1200 psl pressure of Gellulube 220 with installations of various valve stem packings are
given In Table IH*
2. With one exception as noted below* all flange gasket materials have performed satisfactorily as no leakage has occurred from the Joints. However the tests are not con sidered conclusive as they have been underway only a short time and were conducted at room temperature. The results obtained of the metalllc-encased gaskets are not In agree ment with the report that the Bureau has received as to the performance of this gasket In actual service use. The variation In results may be due to the type of finish of the gasket, faces of the flanges and to the method of Installation of the gasket. Information as to the effect of the flange finish was obtained in the test. The Joint
was broken and the gasket and flanges were examined. The gasket was visibly marked and Indented on its surfaces by the serrations of the faces of the steel flanges. Rough ness measurements showed that the gasket finish changed from
6-12 RHR before the test to 90-275 RHR afterward. Mo apparent change occurred In the finish of the faces of the steel flanges* Apparently the embedding of the flange serrations into the gasket was sufficient to prevent leakage.
ENCLCSUE'rS
IN 233
SUT000I
m &
ie
CRMC-M&S-003934 1
m NP/t5/J10(712B)
Eng. Exp. Sta.
Teat 010276c
3. Information as to the method of Installation of the gasket was obtained In a second test of the metalllc-encased gaskets. A new gasket was Installed by the artisan assigned to the work who tightened the flange bolt nuts as much as possible with a 16 Inch open-end wrench. Under these conditions leakage occurred from the Joint at 500 psl pressure. The bolts were further tightened by driving the wrench with a 5 pound maul, as employed In the first test. No leakage has occurred from this Joint under 1500 psl In 48 hours of test. The test of the gaskets Is continuing under 1200 psl and 150F conditions.
4. Because the Vyram 0-ring was subjected to pressures higher than recommended by reference (a) without the use of
a back-up ring. It was removed for examination. The 0-rlng
was found to contain a very fine circumferential cut as described In Table I. To determine if this undesirable con dition will occur at lower pressures as are now encountered In actual service the material will be tested further. The test set-up Is being modified to permit circulation of the hydraulic fluid through the flange Joints at 150F and 1200
psl*
5. Of the valve-stem packings only the Garlock 5861 has given satisfactory service. The Crane C-12 packing requires too frequent gland adjustment to prevent leakage. The squarebraided (Symbol 1103) and lattice-braided asbestos valve-stem packings were unsatisfactory due to extraction of their graphite and lubricating oil by the Cellulube 220* Also these packings require greater torque to open and close the valve than the other packings.
6. The results obtained from hydraulic ram packings desig nated A and F In Table II have been satisfactory and Indicate that the packings will continue to perform satisfactorily for the prescribed test of 1000 hours. At no time has there been chattering of the rams due to gripping of the packings. During the progress of the test of Packing A a Jelly-like substance exuded from the stuffing boxes of the ram but did not appear to affect the performance of the packing. The composition of this packing is such that the manufacturer does not recommend its use for temperatures above 150F. The other ram packings gave unsatisfactory results in a short period of test as noted In Table III.
WKM&GO-S?
/
.. *
|
1
NP/L5/J10(712B)
Eng. Exp. Sta.
Test 010276c
7. It ls< recommended that Symbol 1103* Oarlock 731 and Crane C-12 valve-stem packings and the combinations of Oarlock hydraulic packings designated B,WC, D and E in Table H be considered unsuitable for use in hydraulic systems employing phosphate ester fluids. Recommendations as to the suitability of the other materials will be made upon
if
3 &KV&60-57
t
SUT0001
CRMC-M&S-003936
J
o 00
0C O0 O
> -P O0
in 0> <0
sH
a a 004Stt 6O 0
*>
B* O O <0 0 g
ri
0
I
00.00
> 0 to 0
(C 1 O X!
0
Jtr41
4 H0 4> C*$V*O_
.0
0
aOoV vOr't-
O
k0 i fa
HO C0 OO CO O <c0
> 0X43 0
0<0 > O O
ri4> 0 E fa
in > 43 0 fa O 0
t>- O C 0.6
St*=T O Vi
C0
.
tO Ci dH ee vi
0C0 ctofpa < vvi.(smU^<0cvaai n
0 vi a >m-p 0
0
O1fa
trfci f>a
K
K
a
0to *o-sx
S *>P0
0
Ofa c fa
&vi 43
Suu
3 0 <0 0.0 0 cfl 0
tta 0X0 >
0 4> .J* O 0C+ 00
,OViOfa0 00.C
HU
.o v
"
2 O Vi 0.4* Vi 4 Z O V
Oil
_C 0 ft 0 3 0
1
losioOo Uaorl 403
Oriri O
g4
E
o
c0 I 0 Vi W 43
>tO g OCU4>
ao
c4 o
fa E E 0 0 4* fajO O
O fa C 3 3 5
SVvl 0 0 V
nr
tco
m
US
ri I
O
o n 00 co
tO<
0c <m
00o-*00-403
M e
rVii n *4 HK ffaa
Vi ViK
4> a
0
4> 4>
rivO*fa3i XOcOOB H00Oc
f
0o
6oOevvvhiioiinInvofcii b00
c
o 43
%
Vi
S0
^g oin to oc
o0 ri 43
43
so i
o o0 wr
z
iS
0.K
H a 0=0 ^s.oj
0 in o 0 I It vi
1 O^-VO vi HU HUV ri ns 0AJ I W 43 vom 0 \ tOKin
0in [!
02w1
E
._
p>o
tOfaCVi C 0t-
vfai C b
I vi ti
oox
55 I
I0
oin g0
mm
ri 0 44 vi 0
OVD tO 1 ri C M I vi DO fa om i M ri O
09J&0T0 ^saj.
^s *dxa *3u3
n ^.CUt dc;6 I
oo
in
60 vci to 0u3 00c
g
vi 004 0C
i0* OO ri 4a3 .O
Zi To vj
cmiiuo
Ouvi _ _
0 *U0 00 S 0fa A aEvei o. .fa o0 >o_ H0 U 0gQo a0 0c
0 CM fa 60
ri E ri a tax ri OO f0a -P>0C0 60
fa O 0 0 0O Z
ri a - 0a
*c=
So
ffi 4>
to c>
00
Be. >
O 43 l*9
0a
c
il
'"'ss ri I
s
0 10
XI
'00 0m |O0
(SSU)0ir/&3/*H
CRMC-M&S-003937
SUT0001
oiTi
U)
m
S
I
K
5 H 2
In
J4>a
4)
V *3
60
,,as
o B
zo soc
%
S 84> Eo C0*^4> S5.__.u4_--o_>_A_2_! O H htJ
I *<
P 4>9H0
co ?
O St. HP PIP O
o5
C
>P
! p h f o p
S
g h
*au msh a
3
g p c
g o
tc
rHOiPOlo.H8 itP.o-CrO-JttixtuO
*e
S5
Ia
m If Has taO P oirvo
*3 & .&
'rl 5s
o p p
*3 43
C gCo4
E 43 E p CP a
a3 > a3 3o
no CO O.
O tnO CPHin H H tf 60 toon e
wH p h *0 C33 cr to
3cxa P
a .& a J.rlH E4J
to
i
v O. o.
ao O.P
a
lo3
MP 1 P
'; 2c
o p IP
(O
OJ
to
a
H >H
10 S
1
O * h
* > H rt tO zszwt-PSI >BT&Oj I Xo _ OH . .4> e C P Pa43 oH a
cc * t
tO P
H
O t
C P
3S
HPH
X*> X
H >
aO_c_.Ha.s.>H^bCC
CTP aa
p
O C 0.0
o
> S_O a O
03X1
[cHm
a
E
t*
a
i
a O
o
oI
P a
P
3 a
o c oP
Oh a
.O.HC.PP
P
~ E
' . <H t.
c ahs
>
H
c
jSP
. a p O O 33
|dt.ri a (OP >H O
F to c tt,
ss Hjooom
dtp
aa
ir. o
h t*P
tnpv oa
ao C4
eh
*4 o
H H
pp Jj
HO
PH
a h30. 03hasp
h eh a
dap
E >H
O
XP
09i^OIO ^saj,
b^-S *dxa *3uh
.(asU)oir/ST/JN
?/
//
SUT0001
CRMC-M&S-003938
I
CU
a IP
ss rl
j* a atoo4aa>
3*
rat >
n
oo
9SJS
P
a 5
xes
49
1
au a--6-4a3
6Og
i
u
3a49 h 4cr4 a *nnpa
BHA
1 4ac>
o.-i o a
2 I-
sato
rSl i
49
49 to
haoc.*c*4
49
oj
*
aoOt
t4aa a c
*VOH>W*4-\4
oOaar
i
ss
aa
T*a5
HS a
0
tcO
8P H
Sp loa-5l 4aa9
JO Vi ZO
O
49 P
o s- oa c_
0rl
ht049
4ac9
0*4
h
4a9
t04> I r-i
ac K*axo o,a o**?
Ma au4g9
aa c o
aabOra4 C_ o vi o
?a-
a
49
2
Ti<
49
o*ra>>i4aaa9
*&O*-s,r!o4a>->4 4xca>-i
c **o4>
it Cl
(?
25 J c\J -4VO S 4-1
s
H $a4 in
49
X
o
o o
09ZS0I0 480,1
I
l
O o
to ir<n4u
a 3.. DriM
Pa * |S op
O a
o e ao
rt 3 tOi-4 rt O ^r
rat SI aocvj
P 4-1 P 4-4
Vx4 Ka aa oo trt 4an0Rl k, oa a 03
*$S *dx3 *9ua
i/
4*3
& St
(S2Ti.)0tf/SV
SUT0001
CRMC-M&S-003939
" ~r>&***'*'*** * !
n
NP/L5/J10(712B)
Eng. Exp. Sta
usr
in I
m
Test 010276c
TABLE n Performance Test - Hydraulic ram and valve stem
Material
Service
1
Remarks
A-
E.P. Houghton & Co Hydraulic ram-
Vim Lea packing, test of MIL-P-
thlokol Impreg 2911 para. F-3a
nated leather
with Cellulube
220 at 150*P and
1500 psl
Satisfactory during 700 hours except that a sub stance of greaselike consistency exuded from the stuffing boxes after 150 hours of test. Nature of substance not yet determined
Garlock Packing Co #8220V type with butyl binder, 9283 D fillers & 7857 adapters C- r
Same as B but coated with molyb denum disulfide 5-
Same as B graphite coated , '
Similar to B but apex cut off bottom ring FQarlock 8220 with 9283 D fillers as butyl & cotton adapters
Ditto
Ditto Ditto Ditto Ditto
Unsatisfactory-caused chattering of the rams due to gripping of the packing. Test stopped after a few hours operation
Ditto
Ditto
Ditto
Satisfactory during 675 hours - Test continuing
Oarlock 5861 1/4" size
crane Packing Co C-12, 1/4" size
Slide valve of
Satisfactory during 800
hydraulic ram,5/8f hours of test. Leakage from dia. stem, con gland 0.21 pints/day
ditions as above
Ditto
tJnsatisfactory-requlres fre
quent gland adjustment to
control leakage at same low
rate as Garlock 5861. Gland
almost home after 700 hours
of test
j
!
{ j j
j
*
ENCLOSURE (2), page X
NP/t5/J10(71ZB)
Eng. Exp. Sta.
Test 010276c
TABLE II (Cont'd.) Performance Test - Hydraulic ram and valve stem
Material
Service
Remarks
Oarlock Packing Co. Style 731
Slide valve of hy Unsatisfactory - created
draulic ram, 5/8" excessive friction and
dia. stem,
leakage could not be
conditions as above controlled
/
ENCLOSURE (2), page 2
1 \
SUT0001
o
HPA5/J10(712B)
Eng. Exp. Sta.
5u 7 oco| /7<=jo
Test 010276C
TABLE III Torque Requirements - Valve Stem Packings
Packing Symbol 1103 ^
To open valve, lb-ft
55.0
Oarlock 731 lattice braided asbestos
Garloek 586l^2^ teflon-filled, lattice braided asbestos
Crane C-12^3^ teflon-filled, square braided asbestos
75.0 40.0 40.0
To close valve lb-ft 92.5 100.0
90.0
90.0
l) Leakage could not be stopped at 1200 psl pressure,
J *.2} Under condition of initial tightness, packing compressed 20 (3) Under condition of Initial tightness, packing compressed
52*.
ENCLOSURE (3)