Document 2qwvyMoLKe8rkwOGmxQdo12na

S\aTGOO{ ! ' / / .0. 8 NAVAL ENGINEERING EXPERIMENT STATION Annapolis, Maryland NP/L5/J10(712B) Test 0102T6C 31MAY 1957 Proms Director To: Chief* Bureau of Ships SubJ: Investigation of packings and gaskets for use In hydraulic systems employing phosphate ester fluids; NS-066-001* Evaluation Report 010276c Refs (a) Military Specification M3X-P-5514A Enel: i'l) Table I 2} Table II 3} Table HI 1. As requested by Bureau of Ships Code 532 of 22 May 1957* this Is a progress report of the subject Investigation covering various packings and gaskets which are being sub jected to performance tests under simulated service con ditions* The results obtained are given In Tables I and H. Also* measurements of torque to open and close a 6" valve In the normal manner under 1200 psl pressure of Gellulube 220 with installations of various valve stem packings are given In Table IH* 2. With one exception as noted below* all flange gasket materials have performed satisfactorily as no leakage has occurred from the Joints. However the tests are not con sidered conclusive as they have been underway only a short time and were conducted at room temperature. The results obtained of the metalllc-encased gaskets are not In agree ment with the report that the Bureau has received as to the performance of this gasket In actual service use. The variation In results may be due to the type of finish of the gasket, faces of the flanges and to the method of Installation of the gasket. Information as to the effect of the flange finish was obtained in the test. The Joint was broken and the gasket and flanges were examined. The gasket was visibly marked and Indented on its surfaces by the serrations of the faces of the steel flanges. Rough ness measurements showed that the gasket finish changed from 6-12 RHR before the test to 90-275 RHR afterward. Mo apparent change occurred In the finish of the faces of the steel flanges* Apparently the embedding of the flange serrations into the gasket was sufficient to prevent leakage. ENCLCSUE'rS IN 233 SUT000I m & ie CRMC-M&S-003934 1 m NP/t5/J10(712B) Eng. Exp. Sta. Teat 010276c 3. Information as to the method of Installation of the gasket was obtained In a second test of the metalllc-encased gaskets. A new gasket was Installed by the artisan assigned to the work who tightened the flange bolt nuts as much as possible with a 16 Inch open-end wrench. Under these conditions leakage occurred from the Joint at 500 psl pressure. The bolts were further tightened by driving the wrench with a 5 pound maul, as employed In the first test. No leakage has occurred from this Joint under 1500 psl In 48 hours of test. The test of the gaskets Is continuing under 1200 psl and 150F conditions. 4. Because the Vyram 0-ring was subjected to pressures higher than recommended by reference (a) without the use of a back-up ring. It was removed for examination. The 0-rlng was found to contain a very fine circumferential cut as described In Table I. To determine if this undesirable con dition will occur at lower pressures as are now encountered In actual service the material will be tested further. The test set-up Is being modified to permit circulation of the hydraulic fluid through the flange Joints at 150F and 1200 psl* 5. Of the valve-stem packings only the Garlock 5861 has given satisfactory service. The Crane C-12 packing requires too frequent gland adjustment to prevent leakage. The squarebraided (Symbol 1103) and lattice-braided asbestos valve-stem packings were unsatisfactory due to extraction of their graphite and lubricating oil by the Cellulube 220* Also these packings require greater torque to open and close the valve than the other packings. 6. The results obtained from hydraulic ram packings desig nated A and F In Table II have been satisfactory and Indicate that the packings will continue to perform satisfactorily for the prescribed test of 1000 hours. At no time has there been chattering of the rams due to gripping of the packings. During the progress of the test of Packing A a Jelly-like substance exuded from the stuffing boxes of the ram but did not appear to affect the performance of the packing. The composition of this packing is such that the manufacturer does not recommend its use for temperatures above 150F. The other ram packings gave unsatisfactory results in a short period of test as noted In Table III. WKM&GO-S? / .. * | 1 NP/L5/J10(712B) Eng. Exp. Sta. Test 010276c 7. It ls< recommended that Symbol 1103* Oarlock 731 and Crane C-12 valve-stem packings and the combinations of Oarlock hydraulic packings designated B,WC, D and E in Table H be considered unsuitable for use in hydraulic systems employing phosphate ester fluids. Recommendations as to the suitability of the other materials will be made upon if 3 &KV&60-57 t SUT0001 CRMC-M&S-003936 J o 00 0C O0 O > -P O0 in 0> <0 sH a a 004Stt 6O 0 *> B* O O <0 0 g ri 0 I 00.00 > 0 to 0 (C 1 O X! 0 Jtr41 4 H0 4> C*$V*O_ .0 0 aOoV vOr't- O k0 i fa HO C0 OO CO O <c0 > 0X43 0 0<0 > O O ri4> 0 E fa in > 43 0 fa O 0 t>- O C 0.6 St*=T O Vi C0 . tO Ci dH ee vi 0C0 ctofpa < vvi.(smU^<0cvaai n 0 vi a >m-p 0 0 O1fa trfci f>a K K a 0to *o-sx S *>P0 0 Ofa c fa &vi 43 Suu 3 0 <0 0.0 0 cfl 0 tta 0X0 > 0 4> .J* O 0C+ 00 ,OViOfa0 00.C HU .o v " 2 O Vi 0.4* Vi 4 Z O V Oil _C 0 ft 0 3 0 1 losioOo Uaorl 403 Oriri O g4 E o c0 I 0 Vi W 43 >tO g OCU4> ao c4 o fa E E 0 0 4* fajO O O fa C 3 3 5 SVvl 0 0 V nr tco m US ri I O o n 00 co tO< 0c <m 00o-*00-403 M e rVii n *4 HK ffaa Vi ViK 4> a 0 4> 4> rivO*fa3i XOcOOB H00Oc f 0o 6oOevvvhiioiinInvofcii b00 c o 43 % Vi S0 ^g oin to oc o0 ri 43 43 so i o o0 wr z iS 0.K H a 0=0 ^s.oj 0 in o 0 I It vi 1 O^-VO vi HU HUV ri ns 0AJ I W 43 vom 0 \ tOKin 0in [! 02w1 E ._ p>o tOfaCVi C 0t- vfai C b I vi ti oox 55 I I0 oin g0 mm ri 0 44 vi 0 OVD tO 1 ri C M I vi DO fa om i M ri O 09J&0T0 ^saj. ^s *dxa *3u3 n ^.CUt dc;6 I oo in 60 vci to 0u3 00c g vi 004 0C i0* OO ri 4a3 .O Zi To vj cmiiuo Ouvi _ _ 0 *U0 00 S 0fa A aEvei o. .fa o0 >o_ H0 U 0gQo a0 0c 0 CM fa 60 ri E ri a tax ri OO f0a -P>0C0 60 fa O 0 0 0O Z ri a - 0a *c= So ffi 4> to c> 00 Be. > O 43 l*9 0a c il '"'ss ri I s 0 10 XI '00 0m |O0 (SSU)0ir/&3/*H CRMC-M&S-003937 SUT0001 oiTi U) m S I K 5 H 2 In J4>a 4) V *3 60 ,,as o B zo soc % S 84> Eo C0*^4> S5.__.u4_--o_>_A_2_! O H htJ I *< P 4>9H0 co ? O St. HP PIP O o5 C >P ! p h f o p S g h *au msh a 3 g p c g o tc rHOiPOlo.H8 itP.o-CrO-JttixtuO *e S5 Ia m If Has taO P oirvo *3 & .& 'rl 5s o p p *3 43 C gCo4 E 43 E p CP a a3 > a3 3o no CO O. O tnO CPHin H H tf 60 toon e wH p h *0 C33 cr to 3cxa P a .& a J.rlH E4J to i v O. o. ao O.P a lo3 MP 1 P '; 2c o p IP (O OJ to a H >H 10 S 1 O * h * > H rt tO zszwt-PSI >BT&Oj I Xo _ OH . .4> e C P Pa43 oH a cc * t tO P H O t C P 3S HPH X*> X H > aO_c_.Ha.s.>H^bCC CTP aa p O C 0.0 o > S_O a O 03X1 [cHm a E t* a i a O o oI P a P 3 a o c oP Oh a .O.HC.PP P ~ E ' . <H t. c ahs > H c jSP . a p O O 33 |dt.ri a (OP >H O F to c tt, ss Hjooom dtp aa ir. o h t*P tnpv oa ao C4 eh *4 o H H pp Jj HO PH a h30. 03hasp h eh a dap E >H O XP 09i^OIO ^saj, b^-S *dxa *3uh .(asU)oir/ST/JN ?/ // SUT0001 CRMC-M&S-003938 I CU a IP ss rl j* a atoo4aa> 3* rat > n oo 9SJS P a 5 xes 49 1 au a--6-4a3 6Og i u 3a49 h 4cr4 a *nnpa BHA 1 4ac> o.-i o a 2 I- sato rSl i 49 49 to haoc.*c*4 49 oj * aoOt t4aa a c *VOH>W*4-\4 oOaar i ss aa T*a5 HS a 0 tcO 8P H Sp loa-5l 4aa9 JO Vi ZO O 49 P o s- oa c_ 0rl ht049 4ac9 0*4 h 4a9 t04> I r-i ac K*axo o,a o**? Ma au4g9 aa c o aabOra4 C_ o vi o ?a- a 49 2 Ti< 49 o*ra>>i4aaa9 *&O*-s,r!o4a>->4 4xca>-i c **o4> it Cl (? 25 J c\J -4VO S 4-1 s H $a4 in 49 X o o o 09ZS0I0 480,1 I l O o to ir<n4u a 3.. DriM Pa * |S op O a o e ao rt 3 tOi-4 rt O ^r rat SI aocvj P 4-1 P 4-4 Vx4 Ka aa oo trt 4an0Rl k, oa a 03 *$S *dx3 *9ua i/ 4*3 & St (S2Ti.)0tf/SV SUT0001 CRMC-M&S-003939 " ~r>&***'*'*** * ! n NP/L5/J10(712B) Eng. Exp. Sta usr in I m Test 010276c TABLE n Performance Test - Hydraulic ram and valve stem Material Service 1 Remarks A- E.P. Houghton & Co Hydraulic ram- Vim Lea packing, test of MIL-P- thlokol Impreg 2911 para. F-3a nated leather with Cellulube 220 at 150*P and 1500 psl Satisfactory during 700 hours except that a sub stance of greaselike consistency exuded from the stuffing boxes after 150 hours of test. Nature of substance not yet determined Garlock Packing Co #8220V type with butyl binder, 9283 D fillers & 7857 adapters C- r Same as B but coated with molyb denum disulfide 5- Same as B graphite coated , ' Similar to B but apex cut off bottom ring FQarlock 8220 with 9283 D fillers as butyl & cotton adapters Ditto Ditto Ditto Ditto Ditto Unsatisfactory-caused chattering of the rams due to gripping of the packing. Test stopped after a few hours operation Ditto Ditto Ditto Satisfactory during 675 hours - Test continuing Oarlock 5861 1/4" size crane Packing Co C-12, 1/4" size Slide valve of Satisfactory during 800 hydraulic ram,5/8f hours of test. Leakage from dia. stem, con gland 0.21 pints/day ditions as above Ditto tJnsatisfactory-requlres fre quent gland adjustment to control leakage at same low rate as Garlock 5861. Gland almost home after 700 hours of test j ! { j j j * ENCLOSURE (2), page X NP/t5/J10(71ZB) Eng. Exp. Sta. Test 010276c TABLE II (Cont'd.) Performance Test - Hydraulic ram and valve stem Material Service Remarks Oarlock Packing Co. Style 731 Slide valve of hy Unsatisfactory - created draulic ram, 5/8" excessive friction and dia. stem, leakage could not be conditions as above controlled / ENCLOSURE (2), page 2 1 \ SUT0001 o HPA5/J10(712B) Eng. Exp. Sta. 5u 7 oco| /7<=jo Test 010276C TABLE III Torque Requirements - Valve Stem Packings Packing Symbol 1103 ^ To open valve, lb-ft 55.0 Oarlock 731 lattice braided asbestos Garloek 586l^2^ teflon-filled, lattice braided asbestos Crane C-12^3^ teflon-filled, square braided asbestos 75.0 40.0 40.0 To close valve lb-ft 92.5 100.0 90.0 90.0 l) Leakage could not be stopped at 1200 psl pressure, J *.2} Under condition of initial tightness, packing compressed 20 (3) Under condition of Initial tightness, packing compressed 52*. ENCLOSURE (3)