Interoffice Communication
To J. H. McCulley, Jr.
From
P. L. Fetzer
Date September 11, 1974
Subject Ambient Air Analysis - Irene leading 8-25,26,28,29
The loading of the Irene was interrupted and stopped on August 26 by the Coast Guard as the safety certificate for the Irene had expired. Loading of the Irene resumed on August 28.
Complete monitoring was conducted on the Irene loading August 25,26,28, 29. This included Centuiy total hydrocarbon analysis and personnel dosimeter testing on all phases of the loading operation with one exception; testing around the flange removal prior to loading was not done. Four area grid surveys were attempted with occasional glass bomb sampling for laboratory analysis. Column mode operation of the Century instrument was done whenever a high total hydrocarbon reading was ob served.
Piping connected with the recoveiy unit aboard the Irene was notified so that their system could be operated in series with our unit. Supposedly, the vent from their system would pass through our recovery unit. High readings on the dock area, greater than 50 ppm, were observed the evening of August 23. The vent line valve on the dock was closed causing the ship to vent through their stock. It is believed that this caused the high readings on the dock area as the readings returned to normal, less than 20 ppm, when the valve was opened.
Pressure did not build on our recovery unit to the extent that our unit operated. Either the pressure did not build so that the unit could run or the unit was by-passed entirely and the gas was vented directly. Perhaps an engineer should be present at the next loading of the Irene to resolve this question.
The hydroquinone addition procedure may need more attention. High total hydrocarbon readings,^ 1.0$, were observed whenever the top ball valve was opened to add the next bag of hydroquinone. Reevaluation of our purging procedure should be made to determine if undesirable shortcuts are being taken.
The leak near the base of the dock in the nitrogen inductor vent line was repaired satisfactorily as no vinyl emission was found during the hydroquinone addition step as was experienced on earlier shipment.
VVC 000002284
PAGE 2 AMBIENT AIR ANALYSIS Considerable difficult was experienced during the sampling of the heels due to a lack of pressure on the tanks to force the material through the sample apparatus. A summary of the loading operation with all pertinent data is attached. P. L. Fetzer be CC: RDG, JAD
i
yVC 0000022B5
SUMMARY OF RESULTS IRENE LOADING AUGUST 25, 26, 28, 29
CONNECTING LIQUID and
VAPOR LINES REMOVING FLANGES HEEL SAMPLING
HYDROQUINONE ADDITION
LOADING OPERATION
Centuiy hydrocarbon readings remained below 15. Personnel dosimeter result verified the lack of vinyl emission as it was 0.41 ppm.
Not sampled.
Considerable difficulty was experienced in sampling due to a lack pressure on the tank. Century hydrocarbon readings were low during the sampling period. Leaking did occur around the nitrogen eductor vent hose connection, reaching 1000 ppm. Charcoal dosimeter result, 1.62 ppm, also indicated low exposure levels.
Centuiy hydrocarbon readings exceed 1.0# whenever the top ball valve was opened to add the next bag of hydroquinone. This occurs even after the middle chamber is partially evacuated vising the eductor system. Dosimeter result obtained during this operation was 3.11 ppm.
The piping associated with the ship's vent recovering unit was modified so that it would be possible to use it in series with our vent recovery unit. High total hydrocarbon readings were obtained on the dock area, up to 1000 ppm. The vent line was blocked at the dock side valve causing the ship to vent through their vent stack. It is believed that this caused the high readings on the dock near the ship. Dock personnel were exposed to vinyl emissions greater than 50 ppm as evidenced by the dosimeter result of 52.5 ppm. Once the valve was open the hydrocarbon readings dropped below 20 ppm and the personnel dosimeter results remained below 3.0 ppm for the remainder of the loading operation. Our vent recovery unit did not operate during the loading either due to low pressure on the vent line or being completely bypassed permitting the vinyl to vent directly to the atmosphere through the vent stack.
VVC 000002286
PAGE 2
SUMMARY OF RESULTS
FINISHED CARGO SAMPLING
HOSE DISCONNECTION
Century hydrocarbon readings Indicated some problem in disconnecting the sample cylinder as the reading reached 500 ppm at times. This emission was verified by the personnel dosimeter result of 28.8 ppm vinyl chloride. Other leaks were located around the top of- the cargo holes where the readings exceeded 300 ppm.
Century hydrocarbon readings reached 20 ppm during the vapor line disconnect and ranged between 20 and 1000 ppm for the liquid line disconnect aboard ship. Both the liquid line and flange insertion hydrocarbon readings remained below 30 ppm on dockside. Personnel dosimeter data for this operation showed 21.1 ppm VCM.
WC 000002287
JOB
Hose Connection Heel Sampling Hydroquinone Addition Loading
Finish Cargo Sampling Hose Disconnect and Flange Insertion
TABLE I
PERSONNEL EXPOSURE IRENE LOADING 8-25,26,28,29
POSITION
TIME INTERVAL HR.
Dockroan Shift Foreman Dockman Dockroan (A) Dockman (A) (1) Dockman (A) (2) Dockman (A) Dockman (A) Dockman (A) Dockroan (A) Dockroan (A) Dockman (A) Shift Foreman
0.42 1.82 1.98
2.42 2.50 3.58 2.17
1.63 2.43 2.35 3.05 1.80
1.33
Dockman
1.08
TWA PPM VCM FROM DOSIMETERS
0.41 1.62
3.11 0.25 0.13 52.53 0.54 15.02 1.42 0.02
1.64 2.85 28.77
* * *
* *(3) * * * *
21.12 *
* Protected with Fresh Air Equipment (A) Dock Shack
(1) Stopped loading on 8-26-74 for Coast Guard inspection of ship. (2) Resumed loading on 8-28-74
(3) Valve on the vent line was opened prior to this sampling.
000002288 VVC
TABLE *11
GRID RESULTS
(SEE ATTACHED PLOT FOR GRID POINTS LOCATIONS)
GRID POINT
Set T 8-26-74
Set II 8-28-74
Set III 8-29-74
Century
Century
Centuiy
Total
Glass
Total Glass
Total iGlass
Hydrocarbon Bomb
Hydrocarbon Bomb
Hydrocarbon Bomb
1 20 1.4 11
2 9-11
9
12 12
3 8-10
4 9-10
5
9 (A)
0.8
6
7
8
9 10
10-2000 8 8 8 8 8 7 9
12 12 15 70 * 18 10 10 10
3
11 9 10 12 9 10
13 9 12
14
14
70 *
9
15
25-150*
25 *
16
250 *
13
17 18 12
16 17 13
19
17-20
10
20 9 12
21 9 10
22 9 18 5 '
23 9 25
24 9
25
9
30 *
8
26 9 18
27 8
28 8
29 70 9 30
31 20 32 12
33 15 35 8
36 12 37 11
38 10 39 8 40 8
41 9 42 10 TR
43 10
44 8
46
7-110 *
22
SetIV 8-29-74
Century .
Total
Glass
Hydrocarbon Bomb
15 3.4 11
9 7 7 1.3
10-20 9 9 8 8 6 6 7 7 7 7 9
7-10 6 5 6
5
5 6
2.2 2.5 2.2
6 6
5 1.4 5 7 2.5
VVC 000002289
TABLE XI CONT
Wind Direction Wind Speed Cloud Cover Temperature
SEX.l
S SE 5 -------------
XX
S 5 Partly Cloudy 65-75F
5BE III
SW 5 Cloudy 65
set iv
SW 5-15 Partly Cloudy 80-90F
A Shut down loading for Coast Guard Inspection of the Irene. * Verified presence of VCM hy column mode operation of Century Hydrocarbon Analyzer.
we 000002290
RREfl 6RXD 50RVty PLOT W./W