Document 2qd7981LMEe0a0ZEbDgbR64MN
rpkt* e-7-m
Priced By----------------------------------------Approved By
DateJuly .3Q.- 1963 Joh_
McGraw Construction Company, Inc.
DETAIL ESTIMATE
Sheet No..
1 0 Bay Ext, to In-Proces-sing Warehouse rnnt no..
DESCRIPTION
MATERIAL
[
SUB
1
j CONTRACTORS
Earthwork Cone, and resteel Struct, steel - erection Struct, steel - material Miscellaneous steel Corrugated siding Metal building panels Trans 1. plastic panels Rolling steel doors Hollow metal doors Roofing and sheet metal Insulation Painting Storm sewers Air piping Plumbing and water supply Downspouts Insulation - piping Electrical work Heating Railroads
Direct Cost
None
-Engmsexarig Supervision Small tools Ins. and taxes Sales tax
----- 5%6% 3%
10.5,% 3%
-(all) (all) (L and M) (L) M
Fee
5%
320 yoo.OD TOTAL CONTRACT
2355. 17615. 10500.
40. 6280. 1995. 1055.
150.
200.
3505. 3490.
490. 400. 750. 300. 15105. 2115.
i !
1480. ; 27027.
4200. 91000. . 320.
8565. 14640.
2865.
240.
2600. 1340. 1955.
310. 340. 750. 300. 13983. 10280.
' 1775. 1 !i
1!
1|
!
;!
!
11410.
180.
i UUU, >9.3 7?
a,ri -- ----
/ ?., (r> 2 >
UUw
40$. t 3JAP Hr.
1
iJJDD.
13365.
ssasse.
I.X9.S8S --
13365.
PLAINTIFFS EXHIBIT
MGC-23
McGCon 2065
FORM E-7-M
Priced ByApproved ByDate-
McGraw Construction Company, Inc.
DETAIL ESTIMATE
_Job_ 10 Bav Extension - Warehouse_____
DESCRIPTION
Sheet No-
.Cont. No-
MATERIAL
SUB CONTRACTORS
Roofing and Sheet Metal Work
2 0 year roof
23861 s.f.
Flashing
Gravel stops
Gutters
Exp. joint
/ 5.6 Valley Sh< et Metal
Insulation 1" Ultralite
26,000 s.f. /-10
.200
260.
2600. 2600.
Corrugated Siding
net
Wainscote-18 ga. (3570s. f.) 3900 S. f.
net /.25 Siding - 20 ga. (21, 500 s. f.) 23, 800 s. f
.20/.20
Roofing - 18 ga. (net 4500s. f.) 5, 280 s.f.
.15/.25
Flashing
.223 l.f.
.50/.50'
Fasteners
30 M
/45.
Closure
225 l.f.
.10/.20
Metal Building Panels
Roof panels
23,900 s.f.
(Load and unload)
l.s.
.075/.60
Plastic Corr. Siding
Siding
5280 s.f.
Fasteners end 2 M
Fasteners side 2 M
Vinyl lap seal
1.3 M
.20/. 50 /45. /35. /50.
585. 4760.
795. 115.
25. 6280.
.1795. 200 1995.
1055.
1055.
975.
4760.
.1320. 110 1350.
50. 8565.
14340. 300.
14640.
2640. 90. 70. 65.
2865.
11410.
McGCon 2066
-ORM 5-7-M
Priced ByApproved By_ Date-
McGraw Construction Company, Inc.
DETAIL ESTIMATE
Job- 10 Ray Fxtension___ =___ Warehouse__
DESCRIPTION
LABOR
Sheet No____ 3
.Cont. No_
MATERIAL
BUB CONTRACTORS
Hollow Metal Doors & Hardware
Doors (31 x 7')
3 ea 50. /80.
150.
Structural Steel
Structural steel - erection 350 T 30. /12. Structural steel - material 350 T /260.
10500. -
10500.
Miscellaneous Steel Miscellaneous steel
800 1b. . 05/.4I
40.
Painting
Structural steel Piping Doors
350 T 9.00/3.50 1100 l.f. .30/. 10
3 1. s.
3150. 330. 25.
3505.
Earthwork
Excavation - mach. - hand
- Backfill Floor fill - 6" bank Site Excav. - mach. Site Backfill - mach. Disposal
1025 c.y. s.c/.50
200 c.y. 5. 00
900 c.y. 1.25/.7
460 c.y. .50/1.7
90Q c;y.
/.50
920 c.y.
/. 50
700 c.y.
/. 50
1000.
112 fy.
230.
-
2355*
240.
! i
4200. 91000. 95200.
320.
1225. 110. 5.
1340.
675. 805.
_ _
-
1480.
515.
450. 460. 350. 1775.
ft.
V,;ic-
.
vfi::.::-r.
*
'
McG Con 2067
FORM' E-7-M
Priced ByApproved ByDate-
ACCT. NO.
McGraw Construction Company, Inc.
H DETAIL ESTIMATE
Sheet No-
tk 10 Bav Ext, to In-Processing Warehouse .Cont. No-
DESCRIPTION
LABOR
MATERIAL
SUB CONTRACTORS
Concrete
Fdtn Cone.
3000# 400 c.y.
Forms -ffc^s.
3000 s.f.
- piers
2000 s.f.
- grade beams
6000 s.f.
Rein, steel
40. 000 lb.
Mesh 6x6 0/0
51. 300 s.f.
" 6x6 6/6
2, 250 s.f.
Chairs
Allowance
Anchor Bolts
110 ea
Floor Concrete 3500#
746 c.y.
Float finish
24,875 s.f.
Ex. jt. 1/2 x 6
500 l.f.
1/2 x 10 Punched 1/2 x 10
1. 000 l.f. 525 l.f.
Dowels and Caps
525 ea
Saw Cut - Contr. jt. & filler 810 l.f.
Curing
24. 875 s.f.
Floor bulkheads
1. 150 l.f.
4. /13.5i .55/.20 .55/.20 . 55/.20 .05/. 07 . 045/. 01 54 .045/.04
2. 15. 4. /13.5I .05/ . 01 .10/.10 . 10/.20 . 15 /. 25 .20/.30 .20/.20 .01/. 01 .25/.15
1600. 1650. 1100. 3300. 2000. 2300.
100.
-
220. 2985. 1245.
50. 100.
80. 110. 165. 250. 290.
Trowel pier tops
33 ea 2./-
70.
17615.
5400. 600. 400.
1200. 2800. 4230.
90. 300. 550. 10070. 250. 50. 200. 135. 160. 165. 250. 175.
!
27027.
-
ii l
McGCot^ 2068
FORM E-7-M
Priced By_l_ Approved By. Date
ACCT. NO.
McGraw Construction Company. Inc.
Z DETAIL ESTIMATE
Sheet No_
-Tnh 10 Bay Extension - In Process Warehousernnt No.
DESCRIPTION
LABOR
MATERIAL
5
BUS CONTRACTORS
Relocate 30" sewer
230
Relocate 21" sewer
50
Relocate 12" sewer
60
Add 15" sewer
250
Add manhole
1
Relocate manhole
1
M.H. Frames and covers 1
Misc. sewer fittings
10
6. /.25 2. /. 25 3. /2.5o 1/25/3.00 200. /300, 200/25 50/150 5. 122.50
I Excavation Machine Hand Sand fill Backfill
300 c.y. 150 c.y.
50 c.y. 250 c.y.
/. 60 500/ 1.12. , .50/.40
Concrete
'4 ; Resteel Forms
3.0 c.y. 6./12.50 225 lbs. .10/. 10
48s.f. 1./.30
.1380. 100 180. 310. .200 .200 50. 50.
750. 50.
125.
20 25 50
3490
60. 15. 150. 750. 300. 25. 150. 225.
.100 .100
40.
25. 15.
1955
180. 180.
McGCon 2069
FORM E-7-M
McGraw Construction Company, Inc.
. Priced By------------------------------------
DETAIL ESTIMATEApproved By------------------------------------
DateJuly 30. 1963 ins 10 Bay Extension - In Process Warehouse
rv.nt
Sheet No_
no_
DESCRIPTION
LABOR
MATERIAL
SUB
Downspouts
5
Heating Heaters Vents Gas piping 2 "
4 4 500
Air Piping
2" pipe 3/4" pipe
260 100
Water Piping Drinking Fountain 2" pipe
1 220
Pipe Insulation
150. /150
150. /2325 210/120 1.35/1.00
750.
600. 840. 675. 2115.
i ' 750. 1 j
9300. 480. 500.
10280.
i1 1i
1.50/1.00 1.00/.50
390. 100.
490.
100/166 1.35/.80
100. 300. 3880.
300.
260. 50.
310.
! | i j
1
165. 175.
11531. .
300.
iii
N '
- 4* ,> A .
McGCon
FQRM K-7-M
Priced By_ Approved By_
McGraw Construction Company. Inc.
DETAIL ESTIMATE
Sheet No-
^ Form E-7-M
Priced By.
Avpiovniii>
McGraw Construction Company, Inc. DETAIL ESTIMATE
Date...................................... Job..lO.Bay.Extfinsion..-.|n.Rrocess Warehouse,
Sheet No.... 8 . Cont. No..
DESCRIPTION
11 MATERIAL |j
[' SUB : CONTRACTORS
Electrical
Building Crane
12105. 00!j $2783.00j!
i: II 3000.00! 1200. 00i; ------------------!!------------------- !|
15, 105. 00|i 13, 983. 00|!
Expense: Reloc. overhead feeder incl. all hardware