CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas
To: C. W. Harrison From: W. H, Meyer
WHM-69-77
June 22, 1977
Che mica 1 J. H. Frick G. D. Boyd J. Chervenka W. J. Derocher T. M. Dowdy H. A. Ducote K. G. Gallimore M. D. Harvey J. M. Hodges M. A. John B. C. Kerr C. W. Lee Dr. C. E. Loeffler Dr. R. P. Lowry W. W. Massey A. G. McGehee J. T. McMahon R. A. Mickelson J. M. Sawyer G. R. Scholz W. L. Sharp R. W. Swanbeck O. Towery J. L. Trumbley P. J. Volpe J. D. Walker
J. N. Gann J. W. Dunn J. M. Ramey Dr. J. C. Trebellas J. E. Sanborn
W. H. Tuke F. B. McAndrews Dr. F. Zitomer
- Bay City - Clear Lake - New York - New York - Bayport
Terminal - Pampa - Summit - Summit
Plastics J. L. Merian A. C. Abshier C. A. Amond W. C. Beyer R. L. Bunkley E. Munoz C. S. Schmaltz
CCCTC W. E. Heinz Dr. C. C. Hobbs W. J. Humphrey W. T. McNair Dr. D. R. Napier Dr. L. Starr W. E. Taylor --^Central Files (2)
003043
File: 716.0
CELANESE CHEMICAL COMPANY Chemcel Plant Bishop, Texas
To: C. W. Harrison From: W. H. Meyer
WHM-69-77
June 22, 1977
Laboratory Department Summary May, 1 977
The Bishop Plant Laboratory activities during May are attached. Section I contains a summary of the Analytical Croup activities with a table of analytical statistics. Section II contains a Quality Assurance Summary and a table listing shipments, quality waivers, quality com plaints and sample shipping statistics. Section HI describes the status of Special Problems Group projects by Unit Chemist assignment. A table listing the priorities, justifications and estimated completion dates of cur rent Special Problems projects is also included in Section HI.
WHM/jm Attached Report
003044
WHM-69-77
-2- June 22, 1977
I. ANALYTICAL CROUP
Competitive Evaluations
TMP - Samples of TMP product from Mitsubishi and Chiba Koei were received and analyzed during May. A report has been issued.
Polyol
PE - Special analytical and routine coverage of the carbon treatment of PE product has confirmed the dramatic improvement in PE natural color. Both Technical grade and Pure grade PE runs employing carbon treat ment have been at <5 natural color levels (5% solution) 100% of the time.
1.3-BG - Overtime analytical coverage was provided the Unit on three occasions* during the month for Unit upsets. Purity levels and odor were the problem areas.
Paraform
Methyl Formcel - Customer complaints (American Cyanamid) have prompted extensive analytical work on two areas of concern: difference of assay between laboratories, and investigations into lowering and/or eliminating present levels of methylal in our Methyl Formcel. To date, re standardizations, recalibrations, etc., have not revealed any assay problems at this location. Extra analysis has been provided for moni toring of methylal make in Formcel reactors, and G.C. columns have been provided for Special Problems section studies.
Utilities - BOD
Rainwater Runoff (Sumps) - Analyses were provided for studies of possible correlation between unit method "Quick" COD, instrument COD and TOC, to determine a rapid release method for rain and/or unit sump discharges. No good correlations were found. Present rules are that the units can release up to a 60ppm maximum TOC.
Effluent Ponds - Samples of water (inflow) from test holes drilled in the effluent pond area were checked for COD and chlorides. Results were
003045
WHM-69-77
-3- June 22, 1977
published in JHH-05-77. Chloride results indicate that salt-water was encountered at approximately 30-feet depth.
BOD Outfall Reuse - Special analyses were provided for the project of using BOD Unit outfall water in place of raw river-water as the diluent for BOD Unit feed streams. Base case data and actual plant raw data were collected before BOD Unit upsets stopped the program.
Oxo - n-PrOH
n-PrOH - Analyses of various tanks and towers were provided for a Propanol Unit material balance run. .The generated figures were used for carbon accountability and Unit accounting purposes.
MO Units
MO-I - Extra analyses were provided for a Unit rate run on May 10, 1977. Feed streams and product storage were analyzed before and after the run to aid in accounting. This Unit startup, after its long down-time, nec essitated extra analytical coverage to resolve iron and color problems in startup product.
MO-U1 and IV - Demineralized water "polishing" systems were installed in lines feeding these two units, necessitating various water analyses on inlet and outlet basis. The polishing beds are monitored each time they are started up or changed, and again each time the resin requires regen eration.
Erratic stabilizer levels in MO-1V product intended for shipment, have caused extra monitoring of stabilizer at the inventory point. Levels have varied from 6 - 35ppm and back.
General
Identification and initial distribution project for Capital equipment (Plastics versus Chemical) use in the Laboratory, was finished. A letter was issued, co-authored AGM-18-77, AGS-19-77.
Review of Laboratory and Section objectives was finished May 18, 1977.
All summer help is on-board this month. Mauro Castro is assigned to the Chemical Analytical section, and Randall Shafer to the Instrument Ana lytical section.
003046
WHM-69-77
-4- June 22, 1977
Safety Team iaapectioa of the Laboratory facility was completed on May 23, 1977. Approximately 25 A VO and/or EWO's have been written to alleviate problem areas. These will be followed closely to completion.
Analytical Statistics
Sample C ount
Chemical Section Instrument Section
Total
May
4,430 2.256
6,686
May
Previous
Y- T -D Y- T-D
25,002 11.642
36,644
20,096 12*592
30,688
Technician Overtime: Chemical Instrument
Total
40 98
138
403 2 76 411 228
814 574
003047
WHM-69-77
-5- June 22, 1977
II. QUALITY ASSURANCE
Formed - Approximately 60, 000 gallons of Methyl Formcel (55%) were contaminated with Butyl Formcel. Analysis showed approxi mately 10% butyl alcohol. No market was found, so the material is being burned. Approximately 24, 000 gallons of Butyl Formcel analyzed 3% methanol. This product will be blended off to normal levels with current production.
The American Cyanamid problem continues. To assist the customer, we are now reporting the methylal content, the pH at room temperature, and the loading temperature of each shipment to American Cyanamid.
PE - During the month, duplicate samples were taken from three PE Tech lots for an exchange analysis program with Reighhold Chemicals, Inc., Tuscaloosa, Alabama. The analyses performed were for the phthalic color, and the hot and cold sulfuric color. A set of the duplicate samples has been forwarded to Reichhold, along with our results.
Paraformaldehyde - As the result of a recent complaint from Weyerhauser (Seattle, Washington), a 2-pound sample of freshly ground Paraform fine powder has been sent to them at the request of NYQA. Recently, Weyer hauser complained that the fine powder reactivity was different. In an effort to supply their needs for powder at least 30 days old. Dr. J. C. Trebellas has set up the inventory control at the Haslett Warehouse, Oak land, California.
DA A - The current inventory of DAA has a color of 8-10 (spec is 25). The color seems to be holding at this 8-10 level. Production finished product is <5.
F orma lde hyde - Blending operations have been very good during the month. Only two blends have been missed, and one blend for Plastics Mfg. (low acid <0. 003) caused a 9-hour delay for two truck shipments to Plasts Mfg. , Dallas. One of the two trucks feas the Plastics Mfg. Co. CPU trailer, which was delayed by approval of the customer.
Propyl Acetate to Celriver - Mr. Jack Scott reported that a customer,
Atlantic Solvents, serviced out of Celriver with propyl acetate produced
here, reported a high value of butyl acetate. We do not have a specifica
tion for butyl acetate in 96% propyl acetate. Celriver shipped Atlantic
Solvents out of Celx 11286 (shipped to Celriver March 28, 1977). This car
was analyzed at the Bishop Laboratory, and was found to contain 0.20%
butyl acetate. A second car, Celx 11201, shipped to Celriver April 29,
contained 0. 06% butyl acetate. The tank truck was returned to Celriver
and replaced with material from Celx 11201.
v,^'
003048
WHM-69-77
-6- June 22, 1977
Sample Shipping and Quality Assurance Statistics
Sample Shipping
Dome Stic Expo rt P l'a s t i c s Other
Total
M av
116 9 7
58
190
May Y-T-D
559 44 40
666
1,309
Previous Y-T-D
524 79 80
111
794
Shipments (Number of Orders) Delayed Due to Quality Quality Waivers Quality Complaints Quality Complaints Accepted
767
4,253
3,835
2 13 16
5 15 8
6 26 8
1 10 7
Note: See attached copies of Quality Complaints and Delayed Shipments due to quality or quality waiver.
003049
0
WHM-69-77
-7- Jua* 22, 1977
C o m m e n t!
C o m u la i n t
Tank Car T a n k .T ra ile r
S olida
V* Z--
x n
!
S!
i
o U
>
* u 1 8.
a
z o
J
I 0m w e =>
*
e
co O
* ^1 X
o* o1
2 n
0 0
8
1
M>d e
<
X *>3%
O
Sg cio*- - O3 N. 5v -
I S 2-2
* z* S V-a -
!
a
E
a
?
iS f
u' 06h <U E e
*8
g J |
Z ** flO 4
e
t4t X0
:< 1 5^a >S 0a -og
iW
a
c r
x1
oe r~
nO 1
ITVJ ^M
**> (M
N* *g NW
X
H 51
< x3
O
Id
^ * <2 o -o.
|
(a
g Eid o u* "> Ad
*txn
0 'm
>d
X
Ad 2
g
E Iod
S=i
>*d x Ad
*vn
xIM
<M 0
** X
55 l
23
(0
" ta JS 2
uI
e U o
g
faE e Ad
Og
Ut <
*3*
Ad
&
o9a
o Id
a
2-
43 *
0
X .
<9
i"
o
^* b o A **
II
H s* Z
is
uo
S"S
"0 *M
II C
it
d
h!
Si o4
g
o
Id
oe -o
U s 73
Ad Md C Id
3*
ou
ta *>
u
-C "22
--Aed
S*--
Q,
< 7S3'
P ro d u ct
C m lo m t r / P la n t
D a te
Xo
X N
003050
id a h ig h e r >n sp e c (0 . 3
ipec - 0. 30,
iroved by J
O rd e r fir s t loaded into
C elx 13226. S olid p a rticle s
present. M a te ria l was f il
tered into C elx 13202. 2 days delay.
VHM-69-77
-8- Juu 22, 1977
>* *
Z4ft -jOso
9i2y fa >
8 = . U 3 *
oa .<oV woa ofa 2 u.
O -(M
** 0e- *d.
in8 N0
3 ao
5 4
fa 0
U
X*>*
4O4>. ^^-5 4--Scfa
<aa.{>2-
fa
O Oy .0e0
0 TJ ft
-a jm
4 -?
*^ >0 4
0 My 4 O -t* ** 4 o *r ,2 4
it (5
I
* SL
4 i fj r . .
ji g-0
s -i l>z
-S2ewr Huo e
*>*
>4
2if
W*
D e la y e d
C elx 13203 (20M )
Ifa
>
1
0>* >
4' *
-
a
0
Q
_>
e *
3 a
I Io dv *u -a M(M --*
3
Q
j6t HM --3 fl c
-I
X^ 0
0o
>*
0*
55 -3S
u
s(MO
Nfn
O
B* 4
ff*a, 0rrL. --ea
U OS
54> X o e
4
0
as
> *
3 0 u
e
4
E
a
JB
* >
*&o* o
H
0OhS
_T* M** 52
JuSi
"3o j
4
<
* Q
z*-35 zo
*foi
Sheboygan. W ise.
P lastics Eng. Co.
52% HCHO
5 /1 6 /7 7 -
5 /1 8 /7 7
003051
WHM-69-77
-9- June 22, 1977
in. SPECIAL PROBLEMS GROUP
Methanol Oxidation, Formaldehyde Blending A. J. Branecky
MO Efficiency Improvement with Trace Amounts of Halogenated Hydrocarbons - Wide variations in the effect of up to 30ppm methylene bromide were observed during injection into a test bank of reactors in MO-IH. Throughout the testing, very poor accountability for the methylene bromide was experienced, with detect able amounts of bromide in the reactor products only rarely observed. Some corrosion of the copper inserts above the catalyst bed was observed in a reactor taken off-line. Catalyst samples and copper insert scale samples have been submitted to CCCTC for Br~ analysis.
The methylene bromide test results, to date, will be documented in a status report.
Tentative plans are to test other compounds for their effect on reaction efficiency (namely, methylene chloride and boron trifluoride, or hydrogen fluoride).
MO Catalyst Reuse - A demineralized water washed bed has been taken off line in MO-IV after it demonstrated the life of a new catalyst charge at new catalyst efficiency. A status report will be issued. Work continues.
MS-II Crude to MO - A meeting was held to discuss plant testing of feeding crude methanol to MO. Some piping modifications in the MS Area will be necessary, along with a filter for particulate iron. Plans are to complete modifications by the end of June, and begin testing in July.
MO - New Catalyst Screening - Status unchanged.
Blending Unit Problems - Low capacity in the blending units was traced to extreme fouling of the resin beds due to lack of backwashing. Large amounts of black gelatinous material (AJB-18-76) and resin fines were removed with methanol treatment. Such treatment should not be neces sary if proper backwashing is performed daily. It is reemphasized that the important backwash step should not be eliminated from the anion regen eration procedure.
003052
WHM-69-77
-10-
June 22, 1977
Pentaerythritol, Weak Formaldehyde H. H. Thigpen. G. R. Stasney
PE Efficiency - PE Unit efficiencies in May were lower than any pre vious month this year.
YTD through April, 1977 May, 1977 YTD through May, 1977 Stretch Objectives
Efficiency Based On
A cetaldehyde F ormaldehyde
75.2
71.0
70.8
68.1
74.2
70.4
73. 0
71. 0
The primary causes of the low efficiencies in May were mechanical problems, which forced several shutdowns and startups, problems with the "B" crystallizer vacuum jets, and foaming in the "B" crystal lizer. All of these problems were corrected.
The foaming in the "B" crystallizer probably occurred because the car bon bed removed the small amount of diethylene glycol dilaurate antifoam agent, which is added to the formaldehyde (HCHO) stripper columns in PE and TMP to control foaming. Some of the antifoam apparently was passing through to the "B" crystallizer, but is now removed by the carbon bed. We began (on May 23) adding the above antifoam agent to the "B" dissolve tank at a concentration of about 2ppm, which completely eliminated the foaming problem.
"A" evaporator gravity is now being controlled between. 1. 190 and 1.200 (as routinely determined in the Unit). This is our recommended range, based on recent lab studies, which should give maximum efficiencies when coupled with an "A" crystallizer final temperature of 70 F.
Some progress has been made in the Unit toward improved stripping of HCHO in T-286 during the recent Pure run (May 18-June 7). The T-286 residue was stripped to about 0. 1% HCHO rather than the previous typ ical of 0.2% + HCHO. There appears to have been an improvement in efficiencies, particularly based on HCHO. This improvement will be quantified in the future as we continue efforts to reduce HCHO in T-286 residue. T-286 is loaded out (near the flood point) during Pure runs, at high rates, which makes it very difficult to improve stripping without flooding the column. In continuing efforts, we will consider re ducing or eliminating reflux, raising the feed point and preheating the feed.
003053
WHM-69-77
-11-
June 22, 1977
No progress was made toward aa improved formal hydrolysis, nor on a reaction system study to indicate whether more cooling of the reac tants would be justified by improved efficiencies. These studies will be made as priorities permit.
PE Color - The carbon bed was put on line May 3 (HHT-11-77, DLS25-77, BPH-50-77). Color of the PE product and the filtrate (BML) continues to be below our detectable limit through June 3. It now appears that an economical bed life (carbon cost) will be obtained. The carbon bed has already allowed us to strip T-286 better to im prove efficiency, and to raise the pH of T-286 feed (reactor product) from 5. 1-5.2 to 5. 8-6. 0. The higher pH will reduce our acetic acid ( or formic acid) use by 30-40%. We will continue to monitor the performance of the carbon bed.
High Water During Tech Runs - Problems with "off-spec" and border line product with respect to water content during the recent (April 19May 18) Tech run were caused by higher than normal moisture left in the "B" filter cake. This overloaded the dryer. Data indicate that while producing Tech at high rates (9. 5gpm AcH feed), the "B" cake must contain <l6wt. % HzO in order to meet the moisture spec of 0. 3wt. %. The "B" cake moisture during the recent run was 16-I8wt. % most of the time. Speeding up the belt made some improvement, but not enough. The filter belt was changed with no improvement. One possibility is that the quality of currently purchased filter belts is not as good as in the past. It is obvious that the capacity of the dryer is approached during Tech runs at high rates. A report will be issued.
PE Fines - No additional lab work. We have apparently done everything possible to control fines (material passing through a 200 mesh screen) without significant expenditures of manpower and money. We have made some improvement. However, there are still significant amounts of fines in both bag shipments (3-4%) and bulk shipments (5-6%). The final status report (in preparation) will update the situation and propose solu tions to the problem. The next step (if justified) will be to determine the most economical solution and to implement it.
Lower Sulfate in PE AML - Virginia Chemical requires 0. 5wt. % or less sodium sulfate in the AML sodium formate (dry basis) in order to avoid a processing step to remove sulfate. We typically have about 3% sodium sulfate (dry basis) during Pure runs and 0. 5-1.0wt. % during Tech runs. A plant test in 1976 indicated that the <0. 5wt. % target can be reached during Pure runs (the worst case) if we raise the digestor temperature from 210F to 240F, but product color may have increased.
003054
WHM-69-77
-12-
Jane 22, 1977
An attempt to raise the temperature (and pressure) again in late May (with the carbon bed present to remove color), failed because of leaks in a corroded line and problems with the pressure and temperature control system. A new pipe is being fabricated and the control systems put into working order. Late in June, at the end of the current Tech run, the piping will be changed out and we will operate routinely at a high hydrolysis temperature (240a-250*F) to minimize sulfuric acid require ments and, thus, reduce the sulfate content of AML. There is a very high probability that we will meet the <0. 5wt.% target.
Methanol Synthesis _______ F. R. Dow______
Fuel Gas Quality - The process analyzer for total sulfur in plant natural gas (coalescer outlet) is showing 4-5ppm total sulfur with symmetrical cycles indicating 6-8ppm sulfur. The cycles of high concentration can be seen each 3 1/2 hours 20 minutes. These cycles were monitored for approximately 5 days.
During the investigation period, each supplier was monitored, and it was determined that Channel Gas contained the highest sulfur concentration, followed by Houston Natural Gas and Exxon. On May 17, 1977, Channel Gas contained approximately 5ppm total sulfur with cycles above 6ppm, and on May 18, 1977, Houston Natural Gas contained approximately 1. 5ppm with cycles to 2. 7ppm. On May 19, 1977, Exxon had the lowest sulfur concentration of the three suppliers (lppm0.2). The Exxon natural gas did not show cycles of higher concentrations. The entire monitoring period for the Exxon gas was stable at the lppm level.
Current investigations are directed toward verification of the total sul fur values by use of the Laboratory sulfur analyzer.
MS-II Analytical Support - A report was issued containing the analysis of the upper and lower draw-offs from T-280, so that a potential sale value versus fuel value may be estimated.
Esters, Methylal, Paraform, Formcels R. G. Hilbrich
Paraform Material Balance - Progress on this project is delayed, due to lack of fulltime Process Engineering coverage on the Paraform Unit.
003055
WHM-69-77
-13-
Juae 22, 1977
Paraform, Formcels and Eater Unit Analytical Manual - No progress was made due to priorities.
Alternate n-Butyl Acetate Process - No progress was made due to priorities.
Paraform. Formcels, Unit Support - The Laboratory is attempting to reduce or eliminate methylal as a by-product in Methyl Formcel. This attempt is due to recent quality complaints from American Cyanamid, Wallingford, Connecticut. Shipments have been running . 6-.8wt.% methylal.
Numerous Methyl Formcel Unit reactor batches were monitored for methylal concentration during formaldehyde addition and reactor cooking. Methyl Formcel batches prepared in the Laboratory have also been monitored for methylal concentration. Results indicate that, in the Unit, methylal is made during both formaldehyde addition and reactor cooking.
A plant trial is being planned to add sodium hydroxide to the methanol in the reactor before formaldehyde addition. This is to increase the pH and retard methylal build. Results will be reported.
Oxo, i-Butanol, i-Propanol ________ A. J. Bacon
Oxo Reactor Accountability/Stability - Work proceeded to add water to the reactor in an attempt to stop foaming. Lab work had shown that small amounts of water (approximately 0. 5%) stopped the foam. Dis tilled water was produced by the Tech Center and shipped over in a tank truck. It was added to the reactor through the rhodium addition vessel at a rate of approximately 1. 5gal. /min. No foam reduction was observed. The concentration of water in the catalyst only increased by approximately 0. 1%. The added water was stripped out with the pro duct as soon as it was added. (The crude product was approximately 3% water at approximately 45gal. /min.)
The effect of particulate matter on foaming was investigated. Solution that was vacuum filtered at ambient temperature through a 2 micron filter did not foam, but this was undoubtedly due to gas stripping by the vacuum. A pressure filtration apparatus was set up and catalyst was again filtered. This time, no decrease in foaming tendencies were ob served. It was concluded that particulate matter >2 microns did not cause foaming.
WHM-69-77
-14-
June 22, 1977
T-229 Aldol - No work done due to priorities.
Oxo, Butanol. Propanol Support 1. Samples of C02 from S. E. C. Corp. and Chemetron were analyzed as possible girdler feed to increase BuH production. No halide (<0. 3ppm), sulfur (<0. Ippm) or hydrocarbons (<50ppm) were found. Probably C02 from either supplier is O. K.
2. Samples of rhodium fines from the reactor were sent to the Tech Center for x-ray analysis. Iron was found to be a major component (8% by Bishop Lab analysis).
3. Ten gallons of catalyst were sent to P. G. P. Industries for rhodium recovery trials.
Trimethylolpropane _______ D. W. Harris______ _
TMP Unit Support - The Unit was down most of the month for scheduled maintenance and cleaning. Problems with operation of the finishing column on startup, which resulted in low assay (98.2wt. % TMP) and high water content (0.04wt. fo), were corrected by Operations.
A joint report (with H. H. Thigpen) was issued (DWH-08-77, HHT-10-77) recommending reinstigation of development work on differential MeOH process analyzers for control of caustic addition to the PE and TMP reactors.
TMP Unit Analytical Methods - Work continues as time permits.
V-747 Residue Hydrolysis - Status unchanged.
Sartomer Color Problem - Crystallization from ethyl acetate is the only purification method discovered to date, which will improve the quality of our TMP to meet Sartomer's specs. Emphasis is being placed on generating sufficient crystallization data for a preliminary process de sign and economics. A report outlining all work done on this project will be written after crystallization work has been completed.
1,3-Butylene Glycol J. W. Hermann
1,3-BG Carbon Accountability - A joint report with Process Engineering (D. LeBlanc) on the plant trial and estimated cost of the program has been submitted to Process Engineering for publication.
003057
WHM-69-77
-15-
Juae 22, 1977
1.3-BG Efficiency - No progress was made due to time devoted to Unit support.
1.3-BG Unit Analytical Manual - A rough draft of a revised methods manual has been written. A final draft will be submitted for publi cation as soon as possible.
1.3-BG Unit Support - Laboratory work was begun to reduce foaming in the acetaldehyde recovery column (T-135). Initial results confirm that water concentration of feed is directly related to foaming. Future work will attempt to identify the cause of high-foaming during Unit upsets. Anti-foaming agents will also be tested. Initial literature research found that Dow Corning Anti-foam A was initially recom mended and used in T-135 until 1975, when use of diethylene glycol dilaurate was begun. Studies will also be made to reduce steam usage in the Unit and to reduce effects of T-135 upsets. Use of vapor sidestream product from T-135 to feed hydrogenation reactors will be explored.
Problems during May with T-135 operation were determined to be caused by high water in feed. Water levels of >30% were found in T-135 feed on June 6. Normal water levels range between 10% and 15%. High water produced extremely high foaming in T-135. The water level was decreased by reducing water flow to the acetaldehyde scrubber (T-220). A program will be developed to monitor water content of T-135 feed daily, and a letter will be published.
The Unit experienced problems with high 2-ethyl-l, 3-butylene glycol (2-Et-BG) production during the week of May 16. Apparent cause was a severe over-aldoling on May 14 due to mechanical failure. An aldol reactor acid quench system would have been capable of minimizing effects of the upset. Both heavy ends recycle (T-227 residue) and light ends re cycle (T-227 distillate) were discontinued to bring 1,3-BG product to 99. 50% assay. A letter describing the upset has been submitted for publication.
Alternate TMP Purification System - Work is pending receipt of additional needed equipment.
Utilities, Raw Materials, BOD M, F. Brady
Purchase Specifications Update - No progress was made due to priorities.
003058
WHM-69-77
-16-
June 22, 1977
Demineralizer Support - The following problems were encountered with the demine ralizer:
1. High sodium leakage from polisher.
2. Polisher resin contained mixture of approximately 50% SAC resin.
3. SAC was missing 70ft3 of resin. Upper laterals and header were bent.
4. Polisher acid inlet flange gasket was blown.
5. Sodium analyzer had a bad control board.
The Laboratory assisted Operations and Process Engineering in re solving these problems.
A block flow regeneration was attempted on the SAC bed. Considerable trouble was encountered in maintaining flows and acid concentrations during the trial. Permanent piping and flow regulators have been re quested for future attempts at block flow regeneration.
The MO-III and MO-IV demineralizer guard beds (T-230 and V-46) were set up for service. The Laboratory assisted Operations in putting these vessels into service.
Utilities Support - Work continues.
The Laboratory was represented at a presentation and tour of the DuPont Ingleside Plant, on reverse osmosis. The Coal Study Team is looking at reverse osmosis at a possible alternative to our present water treat ment system.
BOD Support - A plant trial run was started on Friday, May 13, 1977, to test recycling of BOD outfall water. Base case data was gathered until Monday, May 23, 1977, when the outfall recycle water addition to the equalization basin was started. Recycle water addition continued (batch-wise) until Monday, June 6, 1977.
The BOD Unit began to get upset toward the end of May. By Monday, June 6, the Unit was in a badly upset condition. Operations desired to end the recycle to get the Unit out of the upset.
There is inconclusive evidence as to the cause of the upset. Laboratory data show that the TSS and VSS in the equalization basin stayed within
003059
WHM-69-77
-17-
June 22, 1977
the base case range until the last week when it went slightly higher. On June 6, the VSS and TSS of the clarifier outfall were quite high.
The Laboratory agreed with Operations that the recycle should be stopped until the Unit could recover from the upset. The Laboratory believes that the recycle did not start the upset, and that a new trial is needed.
Waste Heat Recovery of T-205 Overhead - No progress was made due to priorities.
BOD Unit Analytical Methods Manual - No progress was made due to priorities.
Anaerobic Pilot Testing of Chemcel Waste Streams - The CCCTC determined that at the concen tration (80ppm) of HMDA that would be fed to an anaerobic unit, no reaction of HMDA with formaldehyde would occur. At much higher concentrations (>200ppm) a reaction would form a precipitate.
It was desired to run the Anaerobic Unit at design of 16, OOOppm COD feed for three weeks. It was decided to spike the samples to bring the COD to 16,000. The CCCTC would analyze for concentrations of these components: formaldehyde, methanol, butanol, trioxane and 1,3-dioxolane. The sample would be spiked to bring these components to their average concentration during the period December 20, 1976 to March 14, 1977. This would give a COD of 11, 500ppm COD. The remaining components should bring the COD to 16,000.. If not, the sample would be further spiked with methanol until 16, 000 COD was achieved.
It was not necessary to spike the first two weeks' samples. The first week had 16, 300 COD and the second was 28, 000 COD.
The Anaerobic Unit is running fine. Sampling continues.
Addition of Betz Neutrameen to the Plant Steam System - Work restarted on this project with the hope of beginning addition of Neutrameen on June 13. Samples were started and more base case data gathered. Work continues.
Elimination of Lamella Underflow - Preliminary work has been done to familiarize the Unit Chemist with operation of the Lamella separator. Work continues.
003060
WHM-69-77
-18-
June 22, 1977
Evaluation of IRA-94 and Ionac AFP-329 for Formaldehyde Service - No progress was made due to priorities.
Water Treatment Analytical Sampling and Testing Update - No progress was made due to priorities.
Identification of all Waste Streams - All streams have been identified in the Chemical Company. Identification of streams in the Plastics Company remains to be completed. Project is delayed until meetings can be arranged with the Plastics Company.
1.3-BG Unit Support - Backup support for BG was provided while the Unit Chemist was on vacation. A problem occurred with low BG assay and high acetal in the finished product. The Laboratory suggested break ing the T-227 overhead recycle and adding more catalyst. These measures were followed and the product came back on specification in three days.
OSHA Monitoring J. M. Jackson
Paraform Area - The following samples were taken for benzene exposure during hand dumping of benzene-contaminated trioxane.
1. Control Room 2. Unit Laboratory 3. V-5 Melt Tank 4. Operator Helpers These samples have been analyzed and results issued.
Main Laboratory Plastics Section - Technician peak exposure to benzene was obtained during the 2-hour handling of routine trioxane-benzene samples from the Plastics Company. Results are reported in the benzene status report.
Chemical Section - The Laboratory janitor was resampled for benzene exposure while disposing of trioxane-benzene samples for the Plastics Company.
Chemical Company unit laboratories equipped with Karl Fisher appa ratus have been evaluated for benzene exposure. Data will be reported.
Plastics Company - Eight-hour time weighted averate, area and pers-
sonnel samples were taken in Trioxane-I and Trioxane-II areas, and
of Plastics Company Maintenance personnel working in these areas.
Results are reported in the benzene status report.
003061
WHM-69-77
-19-
Juae 22, 1977
Diacetoae Alcohol ______ A. R. Hancock
DA A Unit Support - The DAA Unit suffered low efficiencies during portions of May (90% versus 92% plan efficiency). To determine where the losses were, several sets of vent samples were taken on T-285 and T-294 vacuum jets. The analysis of the first set of samples showed high total carbons (TC): T-285, 3. 3%TC; T-294, 14.5%TC. The condensers for both T-285 and T-294 vacuum jets were vibrated with pneumatic air vibrators. Analysis of T-285 and T-294 jet vent samples after the air vibration showed lower total carbons for T-294 (approximately 8. 8%TC). High TC was also found in T-295 residue (3. 5% versus <1. 5% for normal conditions). The base temperature of T-295 was raised and caustic was added to raise the pH above 12.0. With the base temperature raised and the pH above 12. 0 the possibility of acetone in T-295 residue was remote. The 295 residue TC dropped to 1.0%.
DAA Laboratory Study - No progress was made due to priorities.
DAA Daily Carbon Accountability - A plant trial of the daily loss account ability procedure outlined in RML-15, JMJ-19-76, was conducted for 5 days in May. Carbon accountability for the trial varied from 97-102%. A report estimating the cost of implementing the procedure and the re sults of the trial will be issued.
Component Analysis of T-285 and T-294 Jet Vent Samples - As requested by Process Engineering component analysis of T-285 and T-294 jet vent samples were run. Pro cess Engineering is exploring the possibility of recovering T-285 and T-294 jet exhausts to increase unit efficiency. A report will be issued by Process Engineering.
Improved Utilization of Yield Accounting Efficiency Data B . C. Kerr
The daily efficiency reported by Yield Accounting for each of the operating units provides an important measure of the performance of Operations. A report is in preparation which shows that the data, as reported by Yield Accounting, can be used to provide a clearer understanding of unit opera tions. The report will compare the daily report data with 3-day and 5-day moving averages; cumulative performance versus standard efficiency; and, finally, it will illustrate the advantages of using a control chart type pre sentation as an accurate guide to long term unit operations.
003062
WHM-69-77
-20-
June 22, 1977
Misce llaaeous
Dave Harris attended Professional Employees Learning Laboratory at Columbia Lakes.
Gary Boyd and Ron Hilbrich made a customer service call on Methyl Formed to American Cyanamid in Wallingford, Connecticut.
Jim Jackson attended the American Industrial Hygiene Conference.
003063
C u rre n t S p e c ia l P ro b le m s P ro je c ts
ro Establish A1 liers and Imprc
Quality
avings
Capacity ncrease
WHM-69-77
2iod W
UQ4(c04ga0o84)
>. 5
-r
<2 ^
*43033440 o3O
prO' hVVQ 1*4a401.
rrO*-.' 3>s
44
-21-
r-- flN
tiO*--'
<M4030341l*0
faM
tao01
June 22, 1977
030 u44c03*3444
wrOd' p3dfc **3n*
MrO-l' fa3>j.
U44O03333*H430 U443O*30334340-
p4
4*s0fo4l4j M4a34-l
Cm40i(asc>f4dO40a41o
Vgs U4<4* 4e4 >I
<d44
2
eiidj * Ca3a/1
c4e0>>u)* <00"4 *cye300d
tt CeP>3/1* c4id/4i
t0ct0 c34>/*i C4i0d/41
2c-4IiIn4dd4o44 u00gM>4 --h4<C044d S (<X2^
awa303* ....*0y33
2t33044
3a>3*
jc
44
uvo
^3B
dcoSfa,n-fjc4i aof:j-
U 3c44
>*h3
30 <04034 y30 43*20344 2
vc30yO*3033wq0* 0P3s34
a3 ^*.3
k8 -jSS ^;a ^oy N-1
2
a40uf4a. -H <M <NJ -- rsi M4 Ml M* Ml m3 m3
4a3 JgV=
XU>. 4)
PtVQdi
3
/\
8. 2H
\! Q
01
o00wn IXfa
`fccU0>Oy30SjCv>i!L* 3<H*O0gS_c03w;*3,Ta'*gdOVoO3,,>033s>;*
SO S5*dBo 2
.40eee040 Co>O4 m4<a>44d* U4c4d 20 O2
01 C34D) a44
fas
(d u4<4d 0 2
0
O2
20
0 V403(44 . utNC"1OH4 2
40aH4 'M4y0of04a1'
44
<.4y30ytfS4K u W&
C40a3fa/4a1 D43H4 W
(X
J <w2p3*43; 01 ^C4<343/4d41 0M hO4
c4a03*4 u
T0> h00^3On3C
w
Swk
3
a0339>
(X
01 !i w3>
s h 1i
003064
C u rre n t S p e c ia l P ro b le m s P ro je c ts
WHM-69-77
0 (*
*4hAS4mfoa.*)* Q<3soO--**. wS
o U
00 c4 pe34 C44 0 U
9
e C 0 a3
<fa* cq
0 VM 0
U
-*4 0
OVM
fa
0
3
a 0 0
44
"5 a
0
2
>.
+0
3 0
p--*
(X
O4t4'
*0 0 i3 &O0> 2
a <fa090 >
<0
co
M 0
*4 V
4(0*
2
? 0 tf JU
9 9
x0
40
s04 0 0) Q
Ao u Ji 00
JS &
o
U
4)
U
oaa*
e <0 0
3m
44 cn
u e
*1tu0f
0
3
0
0 U (0
IX 3
0 2
; HH I CO
Sh <O(*4040
2 (0
PH
r
00 O'
0e0
0
*e0 (0
s3
0
J03
u
t O z
9
0C
00
00 9 00
a
c
H
o*4
> 0
CO
0
a0au <cc00
0 CO
3H 0
2
.
-P0 -N
August
June 1
Ju ly 1
22
r*
ffs
0
*cP0>
P-0tt
3 P4
3 o
u
-a
(0
O 0
,S9 >4 0 ,4 *s o
0
3
c
0
0 3
<44 0
(4 (Q 0 **
44 -4
0 U0
o 0
04) *0o0 (S *
0 a 0
3 0
0 0> <^
2a
l-HH
^4 P00
BO
<0 3
00
*4f40 00
O
o
a
0 0 00
3
0
44 0
0
u fl -
8 0 4H4H 0 2
m0^
n(X B0 -C
*0 *00
>
00
-4 W 02 ss
0 O5J
2
0 0
P0 OJ
June 22, 1977
fP* 0c0 3
* 3
0 0
_ >4'
>s 4)
CO
*
tx -
22 H g.
0a m^
: .2
2U *0 C0 MX
9
9
4) p4
0
3 CQ <Q*0 u0 0 0 4<4-4 0 2
"0 ^0
<sO'
*4 A0 B 40a4 C0O
9 0
3
P0
03 CQ <40
0
u0 0 0 444 0 2
<M
O
0u 0
CQ
Q 44
4h0 Oa
0o 0*4
(X
D >4 0
40X40 00 fO<0 C4Q4
Os
-3 CO
00
0 o u
0
so3X1
Su 0 (*04 (0
(X
0
44
0
44
0u
W* *O"0
9
J5 040
>S 4000 00 , 0
0!
3. 3
32 -
44 3 O oo
0
i 0 40*40 ^+00*
tn 3.
*2 &< <044 (f0c 0
<, u 0 u44 0 0 0
O
x 8< -.
, Butanol
(4
O a a 3 CO O
'O
3
P-0
<;
o0ah
03 Pa0
(X
* eg
o <M i.<VJ H
0
<M3
1u0 h a
s0
f-0
0d3
,Oh X u 0
>0 0
0oau. w3
2
5-5 Dl
0 u h 0 s0 u44
4(-4* e
X0
D 22
X 2 H
H0uH 3
00 3
<;
003065
WHM-69-77
-23-
June 22, 1977
S 3id
tQ 2c id 0
454 a
a fl. H
o
. C o"1 c -a id a cx ? U
ft
Xc h 'S o#
cu
d o d s
9
u
V J3
S O
rr--
O'
bo e
i*d
3
SCt
oe
3U ->
O
> Q
tr-
O'
be
bo
r>- rr- rbo O' O'
e es
d
44
33
u a 0
*C,4
c o
e
w
C o
d3 m CO
hi u
"8
o
.afi
a
J3
UU
o
a
U
oV
a
a
o
Q QQ
4)
O d
id*
gd a.
o n
o
U
id 0
uU
< H
a
4)
hi
33
>-i
a d
W
o H
a
bo
dH > id co
a
bO
,d4 > id co
aa
a 4>
d4 d4 aa
33 00
"idd
hi
444)
id
(
44
id
aa
ou dd a
2>
3
2 205
2
id
d
444)
44
0d* dst
aa
aa
a
bo
d
a
a
d
44
> a co
a3 0
d
3 0
a
a
d|S a
3 0
a
aa bo d >d 44 a344 a0
co h-i
44 o
hi
4> a
V o d
a
a
c
a o d
a o U
a
a
o d
2d d
a*
05
a 4a4
d
44
aa
a
a
a 05
4a4
Sd0
aa
22
2
C u rre n t S p e c ia l P ro b le m s P ro je c ts
hi
o Ol
44
hi 04
s hi hi
aa JS S
O
d 0
4
a a
g44
w
c
o a
a
>
n
0
O' in
hi 1
0. >
3 d
a
sO o eg i H
eg eg eg
d
d
a
u
>
a
hi
a0
X
a
3
d
2a a
o hi
3 >
S
Sk u d
a
4H a
o
hi o aa 3
CO
a
3W
a
d
a
39
a44
a
a 0
0
0
1 co
d -0
9 co
0
r
0
1
> co
r> 2a
>. CO
O' a eg o
a3
C
a
d
o
sa
a
o
hi
o
a
a3
CO hi
hi o cu a.
3
[V * 4a
a
fch co
3
hi
oa.
Ca
0'S.
O d
44
a
2h3i
2%Pi
04
2H
a
a CO
a ^s4a
a
a
a
(4
ac4
g
a
Q
3a
CO
444
Q 3a
O
0
ac g f o
O' f*4
i
--a <C hi
a o
ac
<
3hi
a
>Q
WO
0
003066
C u rre n t S p e c ia l P ro b le m s P ro je c ts
J u s tific a tio r E n e rg y Savings W T T F O bjective W T T F O bjective E nsure Em ploye H e a lth and Safety OSHA C om plaian iase U n it C apacit
Steam Savings
WHM-69-77
404
<0
3 Q 4)
00 c 44 4*40 MVl aa wg
0
U
rr**
*
cn
4) J3 0 O 0 Q
CD
0
_s 2V *004 4) CO 0c O0 ua a, x
w
0
2Q
00
5*
95 ca
44 08 4) 0 ! - 4
0
H
M>l. u
0
cu
rO'
--4
44 CD 3 BO 3 <$
3
0
0 08
0
b fa
0
u
0 44
CD S* CO
<0 8J
44
CO
0 u 3 3. 0 03
44 >>
4 3
s 0U .
4) 03
O
rrO' h
0
A
0 U V Q
(M
l'* P O*
4k
cn 44 08
3
BO
3
<5
CO 0 0 *34 0 3 P3 <44 0 0 O 3 0 3 0
44
3
.*4
0
2
404
'Ml
0.
5
*4
44 O
?s
0
0
4(-41
H cn
1a
5 2 >*
aw
0
0 Sk u -3 00 >0 0 JS Uh
0
-
0
h
44 0 0"H 0
2
N
44
W*0*3
0 *,
a, y
03 c
2 <4-4 Jj
00
03 >
44 0w
4tfaJ (0M
0 h %
0 --0 -3
2H
08 <4
.3 H
!*
-3
13
TL
p
3
40<#0U4444
*4*44 U
0a cn
0
0
x0u
*4 3 1
-24-
CO p-
rfs
O'
*
cn
tK >4 0 3 3
44 CD
3
BHO
<0
n <
0 0 0 030 CO 9 03
*44 0
0
u 3
a
40* . 0d0
0
2
p* . r*
3* 0*
k
PO u
0
A
0
U 01 Q
June 22, 1977
p-
p-
O'
BO 60
34 3
32
3M 030
44
3
2
O0
Lt
0
XI
pO' M0
* 0^
UO
0d
a
8> CO
0
0 s. U
0
CD 0 030 CD d 03
*44 0
0. u c
a
8)
40
d0 0
2
*c0 0 >S
y H-4
CD BO 030 >
cn
P0 000
4049 (d
2
*
0
03
0
49 08 .0 .A
I
0-0
3 0
\0 /
0
* 00
0
u*44
0
>4 0
s0
33
0 0
>4
c4n4
P 2* P
0
44
2
S g
0 0
Bfi 300 (4
0 s
c0
<0 * H
J vQm
P
0
>3
G
00
S
*"4
0*4
<0
O
00 8 O
2
O 3
sr
3 O
H g?
O00 44
44
0 3
44
>0 G Q* 2
<4 0U0 4000
0
00 ^ cn
40 c 0
OT O
U 'MdH
u 0 0 S
41*4 0a a
3 CO 4040 3 D < s
V 7
>s 44
'y
3
W44
M JO 0
u 434
03
4y4 Ou
0y
0
03
<
Su
404
3
O XI h
00
UO
0 A
>*
0 H
P <d
Q
<<
Q< Q
ji
003068
C u rre n t S p e c ia l P ro b le m s P ro je c ts
P ro je c t
C h e m is t P rio rity
J u s tific a tio n
Component A nalysis of T -285 and T -2 9 4 Jet Vent Sam ples
Hancock
Increase U nit E fficiency
!
-
. ..
E stim ated C o m p le tio n Date
June 15,1977
25
June 22, 1977
wmi-69-77