September 26, 1984
Nltro TCDD Remedial Work EPA Response
W. J. HcCarville G3WG
F. E. Kearney
E3NA
The attached document is Nitro's proposal response to Walter Lee, USEPA Region 3 request for a written description of Nitro's TCDD Remedial Work plan. The plant wants to send Monsanto's response as soon as possible. Your speedy review and reply will be appreciated.
C O N F E n * <*>*
subject
30.125/SF.1 n:o
C11956
fi1 fe- ( if'J. fi'
Monsanto
PQLYMCN PRODUCT! COWPKY Nitro. W att Viffitnia 25143 PtonB; f304) 755-3341
Date: 9/24/84
TRANSMITTAL PAGE
NUMBER OF PAGES BEING SENT; *_____ (Excluding transmittal page)
PLEASE CALL THE ABOVE INDIVIDUAL UPON RECEIPT FOR THEIR IMMEDIATE PICKUP.
C^-NFIDEMTIAL
SUBJECT TO PROTECTIVE ORDER,
MESSAGE FROM: TELEPHONE NUMBER:
RICK BALTZ
365
LOCATION:
NITRO
a unii et M e n t a M o Comean*
C11957
TCDD REMEDIAL WORK Monsanto Compan:^
Nitro, West Virginia
During the period from 1948 to 1969, Monsanto's Nitro plant manufactured 2,4,5-T which contained trace amounts of 2,3,7,8tetrachlorodibenzo-p-dioxin (TCDD). Sampling conducted during 1983 indicated the presence of TCDD at the plant. A statistical grid sampling program was then developed by Monsanto and Region III of the EPA. Over four hundred surface and subsurface soil samples and surface gravel samples were collected and analyzed for TCDD. The analytical data as well as quality assurance and quality control documentation were previously submitted to the EPA. The proposed remedial action consists of paving with asphalt in the areas where 2,4,5-T was manufactured, removal of soil from a small contaminated area, covering the area where a trash incinerator was located with crushed limestone, and providing a clay cap over the disposal site of the equipment from the 2,4,5-T production facilities.
Blocks H and I include the former 2,4,5-T production areas. Portions of these blocks will be graded to promote proper drainage, and additional crushed limestone will be added as necessary to provide a suitable base for paving. Both blocks will be paved with two inches of asphalt. The gravel area inside the dike walls for two storage tanks (block I) will be paved with four inches of concrete. A six-inch-thick concrete pad will be
C11958
poured at the southeast corner of Building
in block B to
handle truck traffic from a loading dock.
// The contaminated soil will be removed from a 120 foot by 60 foot
area where TCDD was detected inside the fence on the south edge
of the plant. This soil will be placed in the existing subgrade
containment basins formerly associated with three storage tanks.
The basins are located in the portion of block I which will be
paved.
The north area of the plant contained a trash incinerator when 2,4,5-T was manufactured at Nitro. An earthen dike will be .constructed along the property line .to, contain, all x u n o f f . The area will be graded to slope toward two new catch basins. Additional crushed limestone will be provided to ensure that the entire area is covered with a minimum thickness of three inches. Due to the immobility of TCDD in the soil, crushed limestone will provide an excellent barrier for employee protection.
Equipment from the former 2,4,5-T production facilities is buried at Monsanto's wastewater treatment plant. Groundwater monitoring wells were installed around the perimeter of the disposal area in 1983. No groundwater contamination has been detected in these wells. This project will'cover the area with a three-inch-thick clay cap. The area will then be covered with topsoil and seeded.
C11959
-3-
s
Monsanto has approved funding tor this project, which is currently scheduled for execution during the 1985 construction ^season. A bid package will be issued in February, 1985, and a contract will be awarded in March, 1985. Construction is tentatively scheduled to begin on May 1, 1985 and is expected to be completed within three months and no later than August 31, 1985. Actual construction time is difficult to estimate because the Nitro plant is built on the site of a World War I nitrocellulose plant and subsurface obstructions are often encountered. Detailed project drawings and construction specifications for the remedial action are available upon request.
9/84
C11960
T96T0
.h r u o*i.N h v t j i.oirf
> I I I I I II 1 II I
V C-zS/
P x Z o ~7Z
27
PCDDs are in progress. The carcinogenic pocencials of PCDFs have not been
studied.
2,3,7,8-TCDD is teratogenic in mice and hamsters. The threshold teratogenic dose in mice was estimated to be 0.1 meg per day (Smith et al, 1976). 2,3*78-TCDD has been shown to be fetotoxic in a wide variety of species, including primates. HCDD was teratogenic in rats at a dose of 100 raeg/kg per day (XARC* 1977) There is as yet no data on the fetotoxic potentials of PCDFs in animals.
The toxic effects of 2,3,7,8-TCDD in man are summarized in Table 7. The toxic effects most consistently observed in occupational studies are chloracne, liver dysfunction, neuropsychiatric disturbances, and abnormalities in porphyrin metabolism. Table 8 summarizes the findings of the morbidity studies of workers exposed to 2,3,7,8-TCDD to dace. The few follow-up studies which have been done show resolution of gross liver dysfunction and porphyrin abnormalities following removal from exposure. (Pazderova-Vijlupkova et al, 1981; Suskind, 1984).
Several of the occupational exposures occurred as the result of uncontrolled exothermic reactions during the production of trichlorophenol. A similar process accident at Seveso, Italy in 1976 resulted in widespread community exposure to 2,3,7,8-TCDD. Health effects included chloracne, primarily in children, and peripheral neuropathy in a small percent of chose exposed (Pocchiari et al, 1979).
The epidemiologic studies on the carcinogenecicy of TCDD are summarized in Table 9. While individual occupational mortality studies reveal no excess of cancer, the pooled data suggest an excess of soft tissue sarcoma (Honchar and Halperin, 1981)-