Winterization ofParathion Department for production of Methyl in cold weather is progressing well. Project is 70-75% complete at .month's end. Expect completion of all but "turn-around" work by Dec, 20.
General Offices
D. Banna* (5) C. F. Luecke*/
R. E. Howard W. R. Richard* J. R. Savage* J. A, Stephens*
Preliminary.economic,studies completed on Residue Recycle . and - sulfur Settling schemes for_inproved PCT yield and sulfur removal.
Further lab studies are in progress prior to pilot plant proposal early in 1972.
Premise prepared for expansion and upgrading of Plasticizer Blending and shipping facilities. Project in preparation for additional tankage, loading docks and truck scales.
AFE 3887 - Recycle PNP Waste Water - ($20.7M N.F.C., $1.1 M Expense) sayings> $8.QM B,T. and inproved pollution control, and AFE 3889 -- Improve Ventilation of Niran Emergency Generators ($2.2M N.F.C,, $0.4M Expense) - both were forwarded.for approval.
The automatic . steam controller on No,, 1_ Intermediate Still_ con tinues to show a 3.5% reduction in cycle time and a 2% increase in yield per batch. A process analysis revealed major causes of plugged condensers. The automatic features of the steam con troller sure being expanded to reduce the effect of these factors. Changes are being made In the chlorinater to. permit automatic full-batch nitrogen .sparging.
PRSD is currently evaluating the improved Methyl PCT process described in Ag Research Progress Report 2104 (1). Primary, emphasis is directed toward developing thermal stability data.
Polyphenyls
J-306
%
TheSantowax,Q storage tank project. (AFE .3853) was approved,in
October (NFQ - $42M). All CED drawings -pertaining to the tank
installation were received and.reviewed,by Production, Maintenance <
and.TSD. Additional drafting will be made .by TSD. The tank wiiL
arrive by mid-December and project .installed durir-
1972.
COMPANY CONFIDENTIAL INFORMATION
DSW 551562
"This document contains confidential information which is the property of Monsanto Company. - Only those portions oMhe-dacumentifejevaui
to a duly authorized individual's need to know may be exerpted for him. The report must not be sent outside the
STLCOPCB4089979
2.
The cumene injection AFE has been delayed to March 1972 due to decreased need for Polyphenyl production. Justification now hinges on elimination of Acetone as a pro moter and source of acetic acid corrosion, plus a source of oxygen bearing compounds which are highly toxic upon chlorination. Report No. 1 - 109-1175 on use of the Partek Liqua-Blaster was issued. Maintenance will initiate an AFE to purchase a 6,000 psi unit for cleaning fouled heat exchangers. TSD will perfect a method for measuring the effect of high pressure water cleaning of the Polyphenyl Tubular Unit before they are put on stream. The Standby Propane Fuel System was successfully started up on November 10 after replacement of the defective vaporizer tube bundle by the vendor. Some minor items are yet to be completed, such as construction of a permanent test flare. However, the unit has logged over 100 hours of actual plant operation since the year's first gas curtailment on November 23. HB-40 A PR&D study to.develop hydrogenation rate data for WCM at pressures above the currently employed 300 psi has been completed. A report will be issued by 12-6-71. Pollution Control The E.P.A. questionnaire (deadline December 1) was completed and submitted to the Washington office November 30. Approximately 14 samples were analyzed for PCB content for the Nitro, W, Va. plant.on samples from the calcium M.-H.A. department. Quality Control The plant quality score was 91.7, up 0.8 from October, with a YTD score of 86=8. November was third successive month showing improvement. Niran had a perfect score for the second successive month.
/dp
C " - j DSW 551563
STLCOPCB4089980
PLANT LABORATORIES ANALYTICAL AND QUALITY CONTROL - S. 0. Kemp
Complaint Report
Quality None
YTD Complaints/100 Shipments 0.275 Target 0.20
1970 Manpower/Sample 1971 YTD Manpower/Sample
0.60 0.40
1970 $/Manhour 1971 YTD $/Manhour
16.50 8.53
3.
DSW 551564 STLCOPCB4089981
1971 DISTRIBUTION OF TIME BY TECHNICAL SERVICE
c<G "3
X<DI ft
am
<fV-tl
><a1 a
c 33
HJ3
<3
ft
W<D
oUP z>o
u p<D
EXISTING PRODUCT
70
TECHNOLOGY IMPROVEMENT
NEW PRODUCT EVALUATIONS 60
MAJOR PROJECT SUPPORT 50
PROCESS CONTROL IMPROVEMENT
40
PROJECT DESIGN
PROCESS MAINTENANCE
TECHNOLOGY AND TECHNICAL SUPPORT
TECHNICAL MANPOWER
PLANT IMPROVEMENT PROGRAM
REAL ESTATE MANAGEMENT
DSW 551565 STLCOPCB4089982
MID-MONTH REPORT PR&D LABORATORY \ ANNISTON PLANT
PROJECT TITLE: PERIOD ENDING CHEMIST:
Methyl PCT Residue November 15, 1971 G. L. Arnett
PR&D progress report issued 11/5/71 -- Report No. 5, Job No. 446-603.
G. L. Arnett /dp
0SNN 55^566
STLCOPCB4089983
MID-MONTH REPORT PR&D LABORATORY
ANNISTON PLANT
PROJECT TITLE: Therminol OM-16
PERIOD ENDING: November 15, 1971
CHEMIST:
G. L. Arnett
Therminol OM-16 replaced PCB based Therminol in the solid Aroclor system 10-8-71. After one month's use (11-8-71) the viscosity only increased slightly fr,om 46.5 SUS @ 210F to 48.5 SUS. Due to the viscosity of OM-16, some operating problems have occurred due to colder weather; however, overall the OM-16 has been satis factory as a Therminol replacement in this system.
G. L. Arnett /dp
DSW 551567 STLCOPCB4089984
MID-MONTH REPORT PR&D LABORATORY
ANNISTON PLANT
PROJECT TITLE: WCM Optimization Studies
PERIOD ENDING: November 15, 1971
CHEMIST:
I. Ransaw
WCM is currently manufactured by hydrogenating Santowax Q to
approximately 40%. This hydrogenation time is approximately
3 times that required for HB-40. From a production stand
point, it is highly desirable to reduce the WCM cycle time.
Hydrogenation studies of Santowax Q in the lab indicate that
a considerable part of the reaction time is used in getting
from 30% to 40% hydrogenation level. Hence the cycle time
could be significantly reduced by reducing the hydrogenation
level provided the product quality is retained. To this end,
Santowax Q samples containing 2%, 10.2% and 15% terphenyl ,
respectively, were each hydrogenated to a 30%, 35% and 38%
level for subsequent application testing. Santowax Q samples
containing 2% terphenyl showed signs of crystallization at
the 30% and 35% Hlevels.
-
Reaction rate curves for Santowax Q hydrogenation were developed at 300 psi and 500 psi H? pressure. These data were developed by hydrogenated samples of Santowaw Q at both 300'psi (control) and 500 psi pressure with catalyst charge and all other conditions held constant. These results are plotted in Graphs 1 and 2 as reaction time versus the refractive index of the hydrogenated mass. In previous work done by Anniston PR&D, the actual hydrogen uptake was determined as a function of the refractive index of the hydrogenated mass; hence an actual reaction rate curve could be plotted from the data if
necessary. Graph 1 represents the average of 4 runs while Graph 2 represents the average of 3 runs. Results indicate that a 90 minute reaction time is required to hydrogenate Santowax Q to a 1.5700 R.I. at 300 psi, while only 37 minutes is required at 500 psi. Plans are now to hydrogenate plant Santowax Q at 700 and 900 psi.
I. Ransaw /dp Att
DSW 551568
STLCOPCB4089985
ND. 3 4 D -2 0 L D1ETZQEN GRAPH PAPER
2D X 2D PER IN C H
STLCOPCB4089986
STLCOPCB4089987
NO. 3 4 D -2 D L D IE TZG E N G RAPH PAPER 2C X 2Q PER IN C H
EUG ENE D lE T Z G E N CO MADE IN u - 5* A*