Document 2qJV3eGjvyGLkRx3RMpBe5j55
MMBB-0006756
MN
CB*
Subject
RESEARCH LABS. 236-7743 February 16, 1976 Possible Substitutes for Asbestos
Tq EAST PITTSBURGH LRA-Devl Engrg
Mr. P. R. Heller, Mgr.
f
i i
i
t I
!
cc: R E Fox, Res. Dir.,
ustry Products, Research Labs.
1 *
i Russ Fox, ResearcHjDirector for Industry Products, sent me the attached letter for information. As far as I know, we have no program either for the \mcarta Division or LRA to find a substitute for asbestos laminates. If the problem is as urgent as indicated in the attached letter, it would be.desirable to establish such a program as
soon as possible. Please let me know your thoughts on this subject.
i
.t \ / ` C/ l : I `
l George W. Wiener
Research Director Power Systems
Attch.
i
I 03114784
v=3
*'
EAST PITTSBURGH - LRA Mr. H. Elliot :
..
f:r*: Hnmpton-Micarta 422-6320
(bte January 26, 1976 SiAjcci Asbestos---
44141-AA. AB. AJ
cc: cc: cc: cc: y/cci
East Pittsburgh/LRA
- Mr. J. Botts
East Pitcsburgh/LRA
- Mr. R. Sexton
East Pittsburgh/LRA
- Mr. S. E. Kriss
Pittsburgh/Chatham Center - Mr. W. A. Hice
West Mifflin Headquarters - Mr. E. G. Bittner
Confirming our discussion of January 22, 1976.
The more restrictive law governing exposure to asbestos fibers becomes effective July* 1, 1976. This will reduce the permitted exposure from 5 fibers per cub*ic centimeter to 2 fibers per cubic centimeter. There is a proposed standard which, if incremented, will reduce the exposure level to 0.5 fibers per cubic centimeteq.
I do not believe that Hamptcr. car. ccet the requirements effective in
July and it is. my understanding that LRA would have great difficulty and
probably could not reasonably comply. If we both could comply, I have
no assurance chat our raw material, supply will be continued and your
Division has received contracts which specifically prohibit the use of
asbestos.
r
Other divisions use asbestos laminates but the corporate impact is by far more pronounced in your slot-wedge application. Since the asbestos problem effects several divisions, Mr. Bittner has requested corporate sponsorship of a R & D program to eliminate its use.
Potential substitute reinforcing materials are available and perhaps some existing laminates would be satisfactory. I believe the major problem at this time is the ability to determine the exact characteristics
required of a substitute material. 4*
R & D could be most helpful in determining required parameters, testing and identifying potential replacement materials but we cannot wait to see if a R & D program will be established. Messrs. Botts and Sexton are
generating a set of characteristics which they feel are critical- LRA and Micarta will evaluate as best we can to determine desirable limits on these parameters and to evaluate candidates.
$
V.
03114785
MH8B-0&06757
HUBB-0006758
I
East Pittsburgh/LRA - Mr. H. Elliot j rage 2 - January 26, 1976
Me must be prepared to begin using a substitute material by July 1, 1976. Obviously, we must generate as much onfidencc as possible to substitute a new material with little, if any, pplication testing or life testing.
I don't believe we can over-emphasiz the urgency or critical nature of this situation.
. c&
A. Harrington, General Manager
M1CARTA Division
*
i
i
03114786