Document 2q9m9LDGMmb5w96dmE6rDnBJL
4/1/75
Methods of Compliance
to the Permissible Exposure Limits OSHA Regulation 1910.93 q - Standard for Exposure to VC1
BFG Technical Center
OSHA regulation 1910.93q requires that employee exposures to vinyl chloride shall be controlled to l ppm or less of VC1 averaged over arty 8 hour period and that no employee shall be exposed to vinyl chloride at concentrations greater than 5 ppm averaged over any period not exceeding 15 minutes. If exposures are above this, feasible engineering and work practice controls shall immediately be used to reduce exposures to at or below the permissible exposure limits.
At the Technical Center we have on going programs in both the engineering and process departments. Written plans for these programs are attached and will be furnished upon request for examination and copying to authorized representatives of the assistant Secretary of Labor and the Director of OSHA. These plans will be updated at least every six months.
These plans will also be shown to employees who are exposed in excess of the permissible exposure limits to show them the steps being taken to reduce their exposure to within the permissible exposure limits.
LAB:jj
VCH OSHA Administrator
NGC 22829
AVON LAKE TEC NICAL CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT
SPECIAL OBJECTIVE
PROJECT
A. Engineering Protects
Divert VCM vapors now
Spot Ventilation
vented to room
Disperse exhausted vapors Bldg. 414 exhaust
ilgher in atmosphere
stack
Insure adequate 3ldg. ventilation
Building ventilation
a) B/414 E Emergency
norma 1
b) B/414 W "
c) B/414 S "
d) B/417
"
_____________________________________________________
Replace high emission
Replace present 15 9<
source pilot plant equipment.
polys with 55 HO liter polys
.
COMP DATE
PERSONNEL ASSIGNED
COST ENG TOTAL
REMARKS
8-1-75 Gary Wi1 son $5.0,000 Jim Ego
Hold
Gary WiIson Jim Ego
$33,000
7
12-75 12-75
?
Gary Wilson $75,000 Jim Ego
1977
Gary Wilson $150,000 Jim Ego
$150,000 Integral part of general building vent & exhaust stack. Estimate covers
design & installation of spot ventilation hoods & droDS. 75% comoleted. $120,000 Tie in all existing spot ventilation plus new spot
ventilation Into 30,000 CFM, 60* stack. { $50,000
already appropriated by Cleveland). Job started. Currently In hold by Cleve,
until gen.vent.has been resolved.________ $500,000 Replace present heatingventilation equipment with
new heaters emergency exhauster. Use spot ventilation where practical. Eliminate windows & repair all major air leaks in building. Emphasize good dir distribut Ion. Temporary
is completed. Permanent is started. Detail estimate almost complete. Hope to submit EA
in 2nd Quarter of 175. $600,000 Installation of two new 55
liter polys with blow down tanks and stripping and drying system. 10% complete Reactors on order._________ __
NGC 22830
t
AVON LAKE TECHNi AL CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT
SPECIAL OBJECTIVE Minimize regulated areas
PROJECT
Consolidate VCM using
laboratories a) construct analytic.
1 ab
COMP DATE
PERSONNEL ASSIGNED R. Cahill E-. Webber
COST
ENG TOTAL $50,000 $500,000
REMARKS
b) Move 3.1 liter pol B/4l4
c) Move general lab t
1 ab to B/414
HOLD
Gary Wi1 son $35,000
Reduce or eliminate environmental emissions
Same as above
Same as above Same as above
a O
K> NJ Jg
Eliminate employee exposure
Eliminate the use of buckets of solvents for oolv cleaning. Reduce VC1 in air
-
RD & RV discharge cot rol
al small polys bl larae oolvs
Design & construct a 'CM recovery system for ^ ;St process.
Design S- construct a VCM monomer disoosal svstem Spot ventilation exhaust.
1976 1976 1976 10-1-75
Install a safe sampl analyst s
station in B/414
10-1-75
Design & insta)last e solvent
cleaning system In B 414
12-75
Leak control
Contin.
Smi th
Glock Hubbard
Glock Hubbard Wilson Ego Frevoanq
Smi th
Smi th
Process & Maintenance
$50,000 $40,000 $30,000 $25,000
$ 2,000 $ 2,400
$115,000 $200,000
Providing 7 hay, air condi' tioned, non-explosion proolab & pilot plant for 3 55 6- 11 0 liter polys with associated equIpment. Block walls with insulatfoi Minimum air changes under normal operation, 30 air changes in emergency. Tie in to VCM, total hydrocarb on analyzer S- alarm.
Holding depending upon
expansion of lab facilitie & process bidg. vent desig Current lab levels have be greatIv reduced.
$160,000
$130,000
$100,000
$ 12,000 2C% complete $ 24,000 20% complete
Continuing
AVON LAKE TEC; JICAL CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT
SPECIAL OBJECTIVEPROJECT DATE
COMP
PERSONNEL
ASSIGNEDENGTOTALREMARKS.
COST
a. Install a Bendix GC Monitoring System
monitoring system In
B/4l4 for VC I ECH.
:>. Install a Bendix total
hydrocarbon monitoring
system in B/413 for
PVC laboratories
Space for analytical
Coordinate 8/414 Wes
groups
lab modifications
7-1-75 Forsythe
$6,400
$44,270
_ 1976R. Cahill$9,800$98,241
E. Webber
B. Process Projects Eliminate VCM exposure *hile sampling a reactor & subsequent weighing of sample.
1. Take sample in cl sed containers.
2. Wear respirators rubber gloves.
3. Weigh sample In w 11 ventilated hood
Eliminate VCM exposure l)New stainless steel ines
whiletransferring a
with sweeping bends ave
charge from poly to wash been Installed to ei mlnate
tank.
plugs and leaks.
" 2) If line plugs, w 1 use
impervious suits, ir
masks, rubber glo\ s >
rubber footwear wf le
_____unplugging 1 ine.
_______
Eliminate VCM exposure
Strip charge In wi h tank
while transferring resin to elImlnate resi< al
from wash tank to filter VCM.
box and transfer of wet
cake to containers.
Continuing F. ZIeber
Done
F. ZIeber
Continuing F. ZIeber
A poly done.
Sma 11
polymerizers
9-1-75.
F. ZIeber
0
0 0
Small polymerizers next. Must design and Install a stripping unit.
i ______________
2 Q O
K> K> oo
to
AVON LAKE TECHNIf ,L CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT
iPECIAL OBJECTIVE
PROJECT
COMP DATE
PERSONNEL ASSIGNED
COST ENG TOTAL
liiminate VCM exposure After blowing down cha je, /hile removing manhead boil out reactor with > iter
6/75
from reactor
and use a suction hose at
manhead while loosenin bolts. In addition atmosphere aar
manhead will be tested vi th an OVA meter while loo ihlng
bolts. If test shows V A present, boil out reac zr aqaIn.
Eliminate VCM exposure Properly strip charge n
6/1/75
vhile centrifuging and wash tank to eliminate traying resin from wash residual VCM.
tank.
Eliminate VCM exposure 1. Before entering a p
Vl/75
while cleaning reactors.
take OVA readings c the
interior. If above 5 ppro,
boi1 out agaIn.
2. When entering a pc y, wear an impervious uit
and air line mask, ead
covers, rubber gib' s &
rubber footwear.
____
FT Zfeber
F. Zieber F. Zieber
0
0 0
REMARKS V
/
2 o O
M
GO
l*>
t