Document 2q9m9LDGMmb5w96dmE6rDnBJL

4/1/75 Methods of Compliance to the Permissible Exposure Limits OSHA Regulation 1910.93 q - Standard for Exposure to VC1 BFG Technical Center OSHA regulation 1910.93q requires that employee exposures to vinyl chloride shall be controlled to l ppm or less of VC1 averaged over arty 8 hour period and that no employee shall be exposed to vinyl chloride at concentrations greater than 5 ppm averaged over any period not exceeding 15 minutes. If exposures are above this, feasible engineering and work practice controls shall immediately be used to reduce exposures to at or below the permissible exposure limits. At the Technical Center we have on going programs in both the engineering and process departments. Written plans for these programs are attached and will be furnished upon request for examination and copying to authorized representatives of the assistant Secretary of Labor and the Director of OSHA. These plans will be updated at least every six months. These plans will also be shown to employees who are exposed in excess of the permissible exposure limits to show them the steps being taken to reduce their exposure to within the permissible exposure limits. LAB:jj VCH OSHA Administrator NGC 22829 AVON LAKE TEC NICAL CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT SPECIAL OBJECTIVE PROJECT A. Engineering Protects Divert VCM vapors now Spot Ventilation vented to room Disperse exhausted vapors Bldg. 414 exhaust ilgher in atmosphere stack Insure adequate 3ldg. ventilation Building ventilation a) B/414 E Emergency norma 1 b) B/414 W " c) B/414 S " d) B/417 " _____________________________________________________ Replace high emission Replace present 15 9< source pilot plant equipment. polys with 55 HO liter polys . COMP DATE PERSONNEL ASSIGNED COST ENG TOTAL REMARKS 8-1-75 Gary Wi1 son $5.0,000 Jim Ego Hold Gary WiIson Jim Ego $33,000 7 12-75 12-75 ? Gary Wilson $75,000 Jim Ego 1977 Gary Wilson $150,000 Jim Ego $150,000 Integral part of general building vent & exhaust stack. Estimate covers design & installation of spot ventilation hoods & droDS. 75% comoleted. $120,000 Tie in all existing spot ventilation plus new spot ventilation Into 30,000 CFM, 60* stack. { $50,000 already appropriated by Cleveland). Job started. Currently In hold by Cleve, until gen.vent.has been resolved.________ $500,000 Replace present heatingventilation equipment with new heaters emergency exhauster. Use spot ventilation where practical. Eliminate windows & repair all major air leaks in building. Emphasize good dir distribut Ion. Temporary is completed. Permanent is started. Detail estimate almost complete. Hope to submit EA in 2nd Quarter of 175. $600,000 Installation of two new 55 liter polys with blow down tanks and stripping and drying system. 10% complete Reactors on order._________ __ NGC 22830 t AVON LAKE TECHNi AL CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT SPECIAL OBJECTIVE Minimize regulated areas PROJECT Consolidate VCM using laboratories a) construct analytic. 1 ab COMP DATE PERSONNEL ASSIGNED R. Cahill E-. Webber COST ENG TOTAL $50,000 $500,000 REMARKS b) Move 3.1 liter pol B/4l4 c) Move general lab t 1 ab to B/414 HOLD Gary Wi1 son $35,000 Reduce or eliminate environmental emissions Same as above Same as above Same as above a O K> NJ Jg Eliminate employee exposure Eliminate the use of buckets of solvents for oolv cleaning. Reduce VC1 in air - RD & RV discharge cot rol al small polys bl larae oolvs Design & construct a 'CM recovery system for ^ ;St process. Design S- construct a VCM monomer disoosal svstem Spot ventilation exhaust. 1976 1976 1976 10-1-75 Install a safe sampl analyst s station in B/414 10-1-75 Design & insta)last e solvent cleaning system In B 414 12-75 Leak control Contin. Smi th Glock Hubbard Glock Hubbard Wilson Ego Frevoanq Smi th Smi th Process & Maintenance $50,000 $40,000 $30,000 $25,000 $ 2,000 $ 2,400 $115,000 $200,000 Providing 7 hay, air condi' tioned, non-explosion proolab & pilot plant for 3 55 6- 11 0 liter polys with associated equIpment. Block walls with insulatfoi Minimum air changes under normal operation, 30 air changes in emergency. Tie in to VCM, total hydrocarb on analyzer S- alarm. Holding depending upon expansion of lab facilitie & process bidg. vent desig Current lab levels have be greatIv reduced. $160,000 $130,000 $100,000 $ 12,000 2C% complete $ 24,000 20% complete Continuing AVON LAKE TEC; JICAL CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT SPECIAL OBJECTIVEPROJECT DATE COMP PERSONNEL ASSIGNEDENGTOTALREMARKS. COST a. Install a Bendix GC Monitoring System monitoring system In B/4l4 for VC I ECH. :>. Install a Bendix total hydrocarbon monitoring system in B/413 for PVC laboratories Space for analytical Coordinate 8/414 Wes groups lab modifications 7-1-75 Forsythe $6,400 $44,270 _ 1976R. Cahill$9,800$98,241 E. Webber B. Process Projects Eliminate VCM exposure *hile sampling a reactor & subsequent weighing of sample. 1. Take sample in cl sed containers. 2. Wear respirators rubber gloves. 3. Weigh sample In w 11 ventilated hood Eliminate VCM exposure l)New stainless steel ines whiletransferring a with sweeping bends ave charge from poly to wash been Installed to ei mlnate tank. plugs and leaks. " 2) If line plugs, w 1 use impervious suits, ir masks, rubber glo\ s > rubber footwear wf le _____unplugging 1 ine. _______ Eliminate VCM exposure Strip charge In wi h tank while transferring resin to elImlnate resi< al from wash tank to filter VCM. box and transfer of wet cake to containers. Continuing F. ZIeber Done F. ZIeber Continuing F. ZIeber A poly done. Sma 11 polymerizers 9-1-75. F. ZIeber 0 0 0 Small polymerizers next. Must design and Install a stripping unit. i ______________ 2 Q O K> K> oo to AVON LAKE TECHNIf ,L CENTER VCM EMISSIONS CONTROL REPORT STATUS REPORT iPECIAL OBJECTIVE PROJECT COMP DATE PERSONNEL ASSIGNED COST ENG TOTAL liiminate VCM exposure After blowing down cha je, /hile removing manhead boil out reactor with > iter 6/75 from reactor and use a suction hose at manhead while loosenin bolts. In addition atmosphere aar manhead will be tested vi th an OVA meter while loo ihlng bolts. If test shows V A present, boil out reac zr aqaIn. Eliminate VCM exposure Properly strip charge n 6/1/75 vhile centrifuging and wash tank to eliminate traying resin from wash residual VCM. tank. Eliminate VCM exposure 1. Before entering a p Vl/75 while cleaning reactors. take OVA readings c the interior. If above 5 ppro, boi1 out agaIn. 2. When entering a pc y, wear an impervious uit and air line mask, ead covers, rubber gib' s & rubber footwear. ____ FT Zfeber F. Zieber F. Zieber 0 0 0 REMARKS V / 2 o O M GO l*> t