t i Chevron BB 013630 Specification E-1000 Section II-A February 16, 1951 Page 1+ SECTION IIPROCESS SPECIFICATIONS A - GENERAL II-A-1.0 SCOPE - 1.01 This specification covers all process equipment for the catalytic section of a 11,500 BPOD modified Houdriflow catalytic cracking plant with mechanical catalyst elevators to be installed at the El Paso Refinery of the Standard Oil Company of Texas. Hydrocarbon processing equipment includes only the feed preheating furnace through the reactor. The feed preparation equipment, synthetic crude column, and gas recovery plant are not included. II-A-2.0 OBJECTIVE -- 2.01 The generaljobjective of this unit is to convert heavy ' straight run gas oil from West Texas crudes into high quality gasoline, a 03-0^ fraction, and a minimum of fuel oil components. II-A-3.0 DESIGN BASIS -- ' i 3.01 The catalytic cracking plant shall be designed for the following two cases: ' Case 1: 5750 BPOD fresh gas oil feed 5750 BPOD recycle 80.7 volume percent conversion (based on 365F at 90% gasoline) Coke deposition 8500 lbs/operating hour Case 2: 8300 BPCD fresh gas oil.feed 3200 BPOD recycle 71.9 volume percent conversion (based on 365F at 90^ gasoline) ' Coke deposition 8500 lbs/operating hour Feed stock inspections and approximate stock balances are shown in Table 1. . Coke deposit throughout the specification refers to actual coke laid down on the catalyst including allowance for actual hydrogen contained in the coke and in which sdlfur included injthe coke is expressed as equivalent carbdn. Chevron BB 013631 Specification E-IOOO Section II-A,B February 16, 1951 Page 5 < 3.02 The stock balance shown for Case 1 is based on the results of-pilot plant work by the Houdry Process Corporation, The stock balance for Case 2 is COMPANY'S estimate for this operation. CONTRACTOR shall state yields to be guaranteed for Case 1.' Yields for Case 2 need not be guaranteed, but unit shall be designed to operate for both Case 1 and Case 2. II-A-iwO PRODUCT SPECIFICATIONS 11.01 Specifications for light and heavy catalytically cracked gasolines are given in Table 2. II-A-5.0 FLEXIBILITY _ 5.01 Although design conditions are as specified herein, it is expected that the equipment offered try CONTRACTOR will have reasonable flexibility. If additional useful flexi bility can be provided at nominal cost (such as installing a larger pump), CONTRACTOR should so indicate, giving the approximate cost thereof. 5.02 In a unit of this type there may be items of equipment whose loads may change quite rapidly with changes in oper ating variables. (For example, steam generating systems for cooling catalyst in the kilns may be sensitive to the over-all heat balance of the unit.) It is expected that in such cases CONTRACTOR will exercise his judgment based on experience with previous plants to provide adequate equipment._ B - PLANT LIMIT CONDITIONS II-B-1,0 FEED STOCK 1.01 Combined fresh and recycle gas oil feed to the preheating furnace will be supplied by COMPANY at 500F. CONTRACTOR shall specify pressure required to get through furnace and into reactor. C - PROCESS INFORMATION AND GUARANTEES REQUIRED FROM CONTRACTOR H-C-1.0 INFORMATION CONTRACTOR shall supply the following information: Chevron BB 013632 Specification E-1000 Section II-B, C February 16, 1951 Page 6 1.01 Complete process flow diagram showing operating conditions, sizes of equipment, etc. In addition, a piping and instru ment diagram is required in accordance with Section1 V-A-7.01, 1.02 Complete heat and material summaries including quantity, temperature, pressures, enthalpy, and characteristics of all major streams and a summary of yields of all products. 1.03 Sizes, duties, capacities, pressure, and temperaturd ratings of all principal process equipment. 1.05 Presentation of comparative studies made to arrive at major design decisions. II-C-2.0 GUARANTEES CONTRACTOR shall guarantee the following: 2.01 Plant capacity and yields in the reaction mix from the reactor ofdebutanized gasolines, C3-0^ components, light and heavy catalytic gas oils, dry gas, and total C^iplus content. Octane numbers of gasolines, clear and wiiih 3 ml. of TEL. " 2.02 That the gasoline when recovered from reaction mix will meet specifications for gum and stability shewn on Table 2 without further treatment other than caustic washing, lead sulfide sweetening, and addition of inhibitor. 2.03 Coke burning capacity adequate to assure design yields and also a minimum coke burning capacity of 8500 lbs per operating hour. i 2.Oil Catalyst circulation and catalyst consumption to maintain equilibrium activity on which yield guarantees are based as well as makeup for mechanical losses. 2.05 Catalyst circulation rate and temperature suitable for maintaining heat balance on the unit and coke burning capacity of the kiln. 2.06 Normal dust"content of the regeneration gas vented to atmosphere. 2.07 Total utility cost using incremental unit costs shown on the Basic Design Data GT-E-U5h6. Chevron BB 013633 Details of*rfinal guarantee will be agreed upon by COMPANY and CONTRACTOR and will be set forth in a separate document of agreement. . TABLE I )-- EL PASO REFINERY EXPANSION PROGRAM Specification E-IOOQ Section II February 16, 1951 Page 7 PRELIMINARY CATALYTIC CRACKING STOCK BALANCE Source of Fresh Feed Feed Rates Case 1 Case 2 " Blend of heavy gas oils from Yates, Texas-New Mexico, and Porterville-Tunstill crudes , Fresh Feed, BPOD Recycle, BPOD : Fresh Feed Properties - Gravity, "API Viscosity, SSU at 130F Sulfur, Wt. % Distillation, F (Vacuum Assay) 10% 50% -- 90% - Recycle Gas Oil Properties Gravity, "API Viscosity, SSU at 130eF Distillation, F. (Vacuum Assay) 109S 30% 90% 5,750 5,750 22. u 211 1.34 lb2 B81 1,056 LU.O 55.1 4?o 590 710 8,300 3,200 26.0 69 1.25 575 810 1,025 13.0 37.0 500 625 710 Conversion - Vol, % 8O.7 71.9 Yield - Fresh Feed Basis Hydrogen Hydrogen Sulfide Methane Ethylene Ethane Propylene Propane wt. % tt ft 11 tt tt tt Isobutane Butylenes n-Butane . Vol. % tt tt 0.2 1.1 1.0 0.5 1.1 2.7 2.1 9-U 5.2 2.2 0.2 1.0 1.0 0.5 1.0 2.1+ 1.9 9.1+ lw8 2.2 Debut, Gasoline (365? Light Cat, Gas Oil at 99%) Vol. tt % Syn. Crude Tower Bottoms tt 59-7 12.0 7.3 Coke - Lbs./oper. hr. 8,500 51.1 21.2 6.9 8,500 TABLE 2 Specification E-1000 Section II February 16, 1951 Page 8 EL.PASO REFINERY EXPANSION PROGRAM SPECIFICATIONS REQUIRED FOR LIGHT AND HEAVY CATALYTIC CRACKED GASOLINES Required Specifications ASTM Dist. F. Max, 9<$ E.P. " - Copper Strip (ASTM D-130.30 except Run at 150F.) Stability Tests (l) Induction Period Hrs. (ASTM D-526-I46) Gum after 5 Nr. induction, mg. (ASTM D-381-i*6) Cu dish gum, mgs. (FSS 330*11) Color, Saybolt (ASTM D-I56-38) Octanes (PilotUnit Results) F-l Clear F-l +3 oc TEL F-2 Clear F-2 +3 ccTEL "7" _ - Light Gasoline 325 OK 6+ 12 max. 20 max. +12 min. 90.3 97.7 79.9 87.U Heavy Gasoline 365(2) OK 6+ 12 max. 20 max. +12 min. 89.8 97.1 79.7 86.8 Notes: (l) To be determined after caustic washing, PbS sweetening and addition of 3*0 cc TEL/Gal. and 30 Lbs. U.O.P. No. 5 inhibitor/lOOO Bbls. (2) Light and heavy gasolines to make 365"F. at 90$ when blended together,^ All inspections refer to whole gasoline of 3>5F. a* 9% point. Chevron BB 013635 III Chevron BB 013636 i SECTION III - PERFORMANCE OF WORK \ , --> .A....-.....D..E..S...IG...N..S. Section Ill-A February 16> 1951 Page 9 III-A-1.0 COMPiiNY REPRESENTATIVE 1*01 COMPANY will send a representative to CONTRACTOR'S design office to review and approve designs and specifications of process equipment or material to see that they conform to the proposal* COMPANY representative shall develop procedures for handling correspondence, approval of material, orders, equipment quotation analyses, approval of drawings, schedules, and other administrative or engineering aspects of work to the satisfaction of COMPANY. 1.02 Approval by COMPANY representative shall in no way relieve CONTRACTOR from sole responsibility for plant design and constructionr III-A-2.0 DRAWINGS, DESIGNS,-AND SPECIFICATIONS . 2*01 During the design and construction period, CONTRACTOR shall currently furnish COMPANY with four prints of each drawing and Engineering or Construction Specifications as completed. In addition, preliminary prints shall be furnished periodically as directed by COMPANY representative to inform COMPANY regarding work in progress. 2.02 After construction CONTRACTOR shall revise all drawings to agree with actual installation except that minor construction drawings such as piping spools, structural details, and small foundations need not be revised. ; 2.03 All process and engineering designs, drawings, and specifi cations which CONTRACTOR prepares or causes to be prepared hereunder shall become the property of COMPANY} and the originals thereof, together with copies of process and engineering designs, drawings, and specifications prepared and delivered to CONTRACTOR by COMPANY, shall be delivered to COMPANY upon completion of the payments provided in the contract, or upon termination of the contract. CONTRACTOR shall identify by a special stamp or legend those drawings prepared by CONTRACTOR covering special equipment on which CONTRACTOR or_party for whom CONTRACTOR is a representative holds Letters^Patent, and COMPANY agrees that these shall not be used directly or indirectly by COMPANY to reproduce the articles covered by such drawings, without prior approval of CONTRACTOR or party specified above.' ' Chevron BB 013637 ! _ Section ITI-A February 16, 1951 Page 10 2.OI4 All new drawings shall be prepared on COMPANY'S standard drawing- sheets; necessary sheets will be supplied by COMPANY. Drawing numbers shall be assigned from a block of numbers to be specified by COMPANY. CONTRACTOR'S exist ing drawings, if any, may be used, but COMPANY drawing numbers and title block shall be added. CONTRACTOR may use his own drawing numbers in addition to COMPANY numbers if he so desires. Drawings shall be indexed in accordance with COMPANY-practice. III-A-3.0 PROVISIONS FOR SPARE PARTS 3*01 Spare Parts Lists - Requests for quotations on such spare parts as may be reasonably required shall be included by CONTRACTOR in his requests for bids on equipment. These are to be priced separately from the equipment to which they pertain,; and are not to be included in the basic plant quotation. CONTRACTOR shall recommend which of: these spare parts should be ordered and what quantities should be stocked. 3*02 Consolidated Spare Parts Lists - Certain spare parts uch as tubes for heat exchangers, valves, instruments, motors, and ball bearings which are similar to items in common use in other portions of the Refinery, and which in general are not made directly by the supplier of the equipment conceraed, may be ordered by COMPANY as part of its own program of consolidated spare parts for the entire Refinery. | CON TRACTOR need not obtain quotations on these spares but shall make recommendations on quantities and specifications to COMPANY'S representative 3.03 Construction Spare Parts - Spare parts mentioned above for protection of operation will not include any construction spare parts deemed necessary by CONTRACTOR to provide; for possible breakage during construction* Such construction spares or extras are to be included in the contract price. Any remaining construction spare parts' not required during the construction period may be credited to the job at COMPANY'S option. III-A-li.O SCHEDULE OF DESIGN AND CONSTRUCTION ; U..01 Within three weeks after the award of the contract CONTRACTOR shall prepare a schedule indicating time in weeks after noti fication of award of contract the start and completion of all phases ofythe work including design, material ordering, construction, startup, acceptance tests, and preparation of plant recordsy maintenance material lists, and spare parts Chevron BB 013638 Section IIT-A, B February 16, 1951 Page 11 requisitions*^ Thereafter CONTRACTOR shall submit monthly progress reports covering engineering, drafting, material ordering, material delivery, and field construction work] reports should include a description of the month's work and should state the percent completion and expected final completion date of each phase of the work. ii.02 COMPANY desires that plant be completed and turned over to COMPANY by" May 1, 1952, for acceptance tests as covered in Section IH-D-1.0. III-A-5.0 LOCAL VENDERS ' 5.01 Where economical, COMPANY prefers that CONTRACTOR purchase from local suppliers and sub-contractors. COMPANY will supply a list of local venders to be included on bidding lists. CONTRACTOR'S purchases shall not necessarily be restricted to suppliers on this list. B - CONSTRUCTION, HI-B-1.0 GENERAL CONDITIONS 1.01 Work Space, Storage Area, Rail Spurs, and Access Roads A portion of the areas indicated on the attached plant layout will be available to CONTRACTOR for work space, and storage. Rail spurs and access roads are shown on the same diagram. Refer to COMPANY Drawing GT--29U8 for these areas. 1.02 Permanent refinery roads suitable for conveyance of heavy and large equipment will be provided by COMPANY prior; to start of construction. Access will be through the refinery construction gate. COMPANY will provide parking areas for CONTRACTOR'S- employees. I t. Construction Buildings - New sales buildings will be erected by others prior to the Plant construction period. These will consist of 2li,500 square feet of warehouse facilities, including lighting, heating, and plumbing facilities (see Drawing GT-29U8). The warehouse will be serviced by a rail road spur, oiled driveways and area lighting. A portion of these facilities will be turned over to the CONTRACTOR to satisfy his requirements for an office, small tools storage and small construction item storage. CONTRACTOR shall specify what his requirements will be during the construction period. It is contemplated that these facilities will serve for CONTRACTOR'S field office and warehousing facilities without , * further expense by CONTRACTOR exce1pt Chevron BB 013639 I Section ni-B February 16, 19$1 Page 12 ' ^vaoj. xux -etuuj. ULUiicU. internal partitions. The CONTRACTOR shall erect all other offices, warehouses, weldshops, toilets, change hooms7 and other facilities necessary for purposes of construction and located in the vicinity of the plant area. The CONTRACTOR shall remove all such buildings and facilities upon completion of the work. In his bid, CON TRACTOR shall specify the size, number, and type of any additional buildings he proposes to erect. 1.03 Sub-Contractors - COMPANY may choose to list acceptable sub-contractors to be included among bidders on sub-contracted work. In all instances sub-contractors shall be approved by COMPANY. l.Olj Concrete - Satisfactory ready-mix concrete is available locally. 1.05 Safety Orders - CONTRACTOR shall comply with all pertinent safety orders, and shall familiarize himself with COMPANY safety regulations. 1.06 Refinery Rules and Safety Precautions - CONTRACTOR shall take all reasonable precautions to protect the work, workmen and the public; and shall provide, where necessary, barriers, guards, temporary bridges, lights, and watchmen. Whehe work is done on COMPANY'S premises, all of COMPANY'S Safety rules shall be strictly observed and smoking shall be; limited to such locations and occasions as are specifically authorized by COMPANY. CONTRACTOR shall not, without prior written consent of COMPANY, perform or permit any work hereunder or in connection with this agreement while on the premisies of COMPANY which involves.a fire or explosion hazard, including welding, torch cutting, and disposal of debris by burhing. 1.07 COMPANY Construction Representative - COMPANY will maintain construction "representatives in the field to perform the following functionsi (a) Establish field liaison between CONTRACTOR and COMPANY (b) Review progress of construction (c) Inspect^facilities during construction (d) Represent COMPANY in matters pertaining to construction quality and accounting practices. 1.08 CONTRACTOR'S Construction Representative - CONTRACTOR;shall . maintain construction representatives in the field to perform the following functions! ' (a) Establish field liaison between CONTRACTOR and COMPANY (b; Represent CONTRACTOR in matters pertaining to construc tion quality and accounting practice, ;. j (c) Represent CONTRACTOR during startup and acceptance test -- ' Chevron BB -- .. 013640 _ Section, HI-B, C February 16, 15*51 Page 15 3.08 CONTRACTQRTshall arrange for welding tests in accordance with American Welding Society Standard Qualification Pro cedure B-3.0-lilT, dated .April .l^Ul. Welders shall be re quired to pass the tests before performing any operation during the construction of the project. COMPANY reserves the right to require additional tests during construction if there is doubt about the competence of the welders. 3.09 CONTRACTOR_shall check the type of packing and shall repack, if necessary, the stems of valves and shafts of pumps. 3.10 CONTRACTOR shall perform hydrostatic tests on all equipment and lines after erection, as designated on CONTRACTOR'S drawings and specifications. All hydrostatic tests will be witnessed by a COMPANY ^representative. CONTRACTOR shall furnish test pump and gage's' for use in hydrostatic testing. Refer to Section V-S for details of hydrostatic tests required. 3.11 CONTRACTOR shall correct all defects revealed by any test or inspection. Where the defect is due to negligence of CONTRACTOR,'the cost of correction shall be borne by CON TRACTOR and shall not be included in the "Cost of the Work" as defined in the Contract. j HI-B-h.O PURCHASE AND HANDLING OF MATERIALS AND EQUIPMENT U.01 CONTRACTOR shall purchase all material. It..02 CONTRACTOR shall supply the necessary expediting service. U.03 CONTRACTOR shall provide all transportation of materials and equipment including loading, unloading, and transportation to the site of the plant. j it.OU CONTRACTOR shall receive, unload, and tally all materials and equipment at the site of the plant. j lt.05 CONTRACTOR shall arrange for the prompt unloading of all materials received outside the allotted storage area, III-B-5.0 CLEANUP -- ! 5.01 Prior to completion of work CONTRACTOR shall remove all ' excess materials, debris, and construction waste from the plant construction and storage sites, and leave the plant in a neat and orderly condition. Disposal of materials, debris, and waste shall be in accordance with COMPANY instructions. C - START-UP III-C-1.0 ST1A1RT -UP -- !| 1.01 Upon completion of construction COMPANY will inspect the Plant for conformance to contract specifications with respect to mechanical design, safety, and physical aspects Chevron BB 013641 Section HI-0, D February 16, 1951. Page 16 ! as they pertain to operabilityi When the Plant meets these requirements COMPANY will so indicate by a written memorandum to CONTRACTOR. The acceptance of the workmanship and con struction constitutes agreement that COMPANY is willing to initiate processing operations in order to determine if . Plant fulfills CONTRACTOR'S warranties and guarantees, and shall in no way relieve CONTRACTOR of his obligations relative to warranties. Operation of the Plant prior to performance acceptance by COMPANY and while not making test runs shall be under the control ana direction of COMPANY, but shall be in accordance with a procedure to be agreed upon with CONTRACTOR and in the presence of CON TRACTOR'S representatives. Upon CONTRACTOR'S request, and at COMPANY'S convenience, COMPANY shall operate the Plant during such periods on the specified charge stock and under conditions as agreed upon so as to determine whether the Plant may fulfill the operating guarantees during a test run, or what adjustments, if any, might be necessary to enable the Plant to make a successful test run. 1.02 CONTRACTOR shall schedule work so that acceptance of the Plant as specified above will be accomplished on or prior to the date for completion of work as stated elsewhere. 1.03 CONTRACTOR shall maintain an adequate qualified engineering staff at the Plant during startup and for a periodof 30 operating ^gs^hereafter. "Startup" will be interpreted to be'in theHnitial introduction of oil into the Plant. This service shall be included in the contract'price. III-C-2.0 TRAINING OF OPERATORS 2.01 COMPANY may Require from the CONTRACTOR qualified personnel to assist in training operators. The expense of such services shall not be included in the contract price. D - ACCEPTANCE III-D-1.0 ACCEPTANCE TESTS I 1.01 After completion of construction, as defined above, and within operating days (not including shutdown time) after COMPANY has received CONTRACTOR'S written request for a test run, COMPANY shall commence a test run on the plant for the purpose of establishing the ability of the plant to meet the operating guarantees, and COMPANY shall notify CONTRACTOR in writing of the date of starting such test run. Chevron BB 013642 ; Chevron BB 013643 . - Seotion III-D February'16, 1951 Page 17 1.02 ' If the plant meets the operating guarantees on the first test rip, it shall forthwith be accepted in writing by COMPANY, but if it does not meet such operating guarantees then, during the 180 calendar day period immediately sub sequent to the date of the start of the first test run, or until a test run shall demonstrate the ability of the plant to meet the"operating guarantee, whichever shall first occur, COMPANY shall make the plant available to CONTRACTOR on 30 days written notice from CONTRACTOR for making such alterations and additions thereto as CONTRACTOR may desire to make to enable the plant to make a successful test run,* provided however that, if COMPANY elects not to shut down the plant for such alterations and additions as requested by CONTRACTOR, COMPANY shall negotiate a settlement with CONTRACTOR. - Acceptance by COMPANY after the test run shall not relieve CONTRACTOR of liability for failure of unit to run at design rates for a period of six months before the first cleaning shutdown. i The cost to CONTRACTOR of making such alterations and additions to plant as CONTRACTOR may desire to make in an attempt to enable the plant to meet guarantees shall be chargeable to COMPANY to the extent provided in the definitions of ''Cost of-the Work," as defined in the Contract. 1.03 All test runs shall be conducted under the conditions set forth in the guarantees and in accordance with CONTRACTOR'S instructions .and under the direction of CONTRACTOR'S engineers, such instructions to be in accordance with mutually accept able operating practices and conditions. A test runjshall comprise 15 consecutive days of operation of the plant and all data shall be averaged over this 15-day periodj provided that interruptions to a test run shall be allowed asjfollows: (a) Interruptions to a test run for minor alteratiohs or repairs shall be allowed, not to exceed 2h hours each, and the time of the test run period shall be extended by the time of such interruptions. (b) If the interruptions are caused by failure of charging stock, utility supply or other conditions beyond reason ' able control, and do not exceed 5 days, the test run shall proceed promptly after allowing a reasonable periodjfor leveling out of conditions. The sumiof normal operating periods before, between and after such interruptions shall be considered as the required test period when it totals 15 operating days. (c) Periods^_of unstable operation beyond CONTRACTOR'S reason able control shall not exceed 5 operating days during a test run. Section III-R SUiF16'1951 " E - WARRANTY HI-E-1.0 PROCESS GllAPANIEBS- It is the intent of COMPANY, under this specification, to purchase a unit that will operate at design rates for periods of at least six months without shutdown. In recognition of this principle CONTRACTOR shall guarantee (in addition to the guarantees itemized in Section II): -- 1.01 That the unit will operate at design feed rate and yield, as specified in Section II, for periods of at least six months. CONTRACTOR shall not, however, be liable for failure to run six months except where such failure can be shown to result from design deficiencies. 1.02 That the furnace will not limit the operation of the unit. CONTRACTOR shall be liable for necessary corrections; where unsatisfactory operation of the furnace can be demonstrated to be due tcT flame impingement, poor distribution either of fluids in the tubes or heat density or other design factors. -- 1.03 That the product streams will be delivered to the plot limits at pressures and at temperatures specified on the Basic Design Data. 1.0U That the utilities consumed will not exceed and utilities produced will not be less than the quantities shown bn EF-2UU submitted with the CONTRACTOR'S proposal in Response to the request for bids. ; HI-E-2.0 MECHANICAL GUARANTEE j 2.01 CONTRACTOR shall guarantee the plant free of defects; In design, materials, equipment, or workmanship for a pjeriod of one year after acceptance by COMPANY in accordance with paragraph III-C-1.01. Any equipment or materials found to be defective as evidenced by mechanical failure, excessive vibration, or excessive erosion within the period of one year's operation shall be replaced (including installation) at the mutual convenience of COMPANY and CONTRACTOR by CONTRACTOR and at CONTRACTOR'S expense with equipment that is satisfactory for one year's operation. Chevron BB 013644 , 2.02 CONTRACTOR'S liability by reason of defective materials, operating equipment or workmanship shall be limited ;to the obligation to repair or replace such defective materials, operating equipment or work to the extent provided herein including installation, and there shall be no liability 'unless CONIRaCTOR is notified and given an opportunity to - inspect and repair or replace such defective materials, operating equipment or work. , Section III-E, F February 16, 1951 Page 19 2,03 CONTIUiC^OR shall endeavor to obtain, mechanical guarantees from vendors for periods of one year after initial operation of equipment.__ IH-E-3.0 DESIGN GUARANTEE ^ 3.01 The CONTRACTOR shall guarantee to accept full process; design and plant design responsibility. F - INFORMATION REQUIRED FROM CONTRACTOR m-F-1.0 INFORMATION required in bid 1.01 Indicate extent and organization of technical assistance to be furnished in accordance with paragraph III-C-1.03 above. ~ 1.02 Indicate daily fee for qualified personnel COMPANY may require in accordance with paragraph III-C-2.01 above, Chevron BB 013645 Chevron; BB 013646 | Section I7-A February 16, 1951 Page 20 SECTION IV - BASIS OF CONTRACT AND ACCOUNTING REQUIREMENTS --> A - BASIS OF CONTRACT IV-A-1.0 CHARGBS - 1.01 The purpose of this section of the specification is to present the general basis for CONTRACTOR?S proposal and to convey the general COMPANY intent. This section will be revised at a later date and the contents incorporated into the contract. 1.02 All charges shall be assigned to one of three categories. (a) Those charges which are fixed with the execution of the contract. These will be referred to herein as '`Lump-Sum Items." (b) Those charges which are fixed as to unit rate at the time of the execution of the contract, but on which an escalation will be allowed. These will be referred to herein as "Charges Subject to Escalation." (c) Those charges for which COMPANY will pay the cost at the time the purchase price is agreed upon. These will be referred to as "Cost Items." 1.03 Lump-Sum Items shall consist of: (a) CONTRACTOR'S Fee. This shall be CONTRACTOR'S (including his subcontractor's) entire compensation for profit, overhead, salaries and expenses of CONTRACTOR'S officers, executives and all members of CONTRACTOR'S off-jpb office forces for services normally incidental tb the administration of an engineering and construction project (including the time and expenses of members of cbNTRACTOR'S organization inspecting the work at the site> who are not engaged exclusively on the work for the entire job); said compensation shall include, without being limited to these items, the following: ! Cost of maintaining CONTRACTOR'S home office, attorneys' fees, premiums on any insurance CONTRACTOR may elect to carry covering legal and contractual obligations or any costs or payments made by CONTRACTOR in compli ance with the provisions of the liability provisions of the Contracti Such losses or damages shall be borne by CONTRACTOR. Chevron BB 013647 ! Section IF--A February 16, 1951 Page 21 No change or adjustment shall be made in this Fee on account of changes in costs or prices or conditions --of construction, unless it is agreed by both CONTRACTOR and COMPANY that a material change in the scope of the work has been made. Engineering and Drafting performed in CONTRACTOR'S offices~(or those of his subcontractor) or in the field. Engineering and Drafting is to be interpreted a3 to apply to all labor required to present complete con struction drawings and details to the field for fabrica tion and erection. This shall include all charges for overhead, State and Federal payroll taxes, and employees benefits. Supervision. This shall include adequate supervision during all phases of design, engineering and construction, including construction superintendent, and other field supervisors and engineers. Material purchasing, inspection, and expediting. This shall include all charges assignable to materials pur chasing, inspection and expediting required to meet the requirements of this specification and the schedule agreed to by CONTRACTOR and COMPANY. This shall include all charges for overhead, payroll taxes, employees benefits and payments to Workmen's Compensation Fund. Field office expense. This shall include the cost of erecting, or installing CONTRACTOR'S field office, including installation and rental of office furniture and equipment, typewriters, adding machines, etc., and purchase of office supplies in connection with this work. This shall also include charges for dis mantling at the completion of the project and the expense of leaving the area in an orderly fashion. This will include the wages and salaries of accountants, materials men, inspectors, etc., as required to properly conduct the work. There is to be no escalation on the wages of individuals of the field office staff. Subsistance and Travel Expense. This shall include all subsistance, travel allowances, expense and other benefits paid to any person on CONTRACTOR'S payroll, or on the payroll of his subcontractors or the expanses of any^person or persons to whom the CONTRACTOR may engage for services. ; Chevron BB 013648 ! Section IV-A February 16, l?5l Page 22 (g) Equipment Rental. This shall include charges for ' ^_cqnstruction equipment owned by CONTRACTOR or rented '"from others. This shall include the cost of moving it to the site, and return. The rental ''lump sum" shall Include the cost of all repair work, the costs of gasoline or other fuel, lubricants, operating labor and "down time" required to accomplish any repair work. (h) Tools Charge. This shall include the cost of all tools both recoverable and nonrecoverable, and shall include all consumable tools such as wire brushes, chisels, goggles, etc. (i) Permits, Licenses, etc. This shall include amounts paid by CONTRACTOR for all necessary permits, licenses, cost of process designs, process licenses, fees or deposits necessitated by the design or construction work and for premiums or insurance required or Occasioned by the work. (j) Construction Utilities. This shall include all power, lighting, water, fuel, etc., consumed by CONTRACTOR during the construction period. In addition, it shall include all charges for communications. (k) All other costs not clearly falling in paragraphs 1.0k ' and 1.05. 1.0U Charges Subject to Escalation shall consist of: (a) Direct Field Labor of individuals engaged exclusively in the work. The extent of escalation allowed shall be the difference between the hourly craft rate1 at the time of the performance of the direct field' labor and the hourly craft rate stated in the Contract. The man-hour requirement for direct field labor shall not be -escalated. .Therefore, the Contract will; include both "straight-time" manpower requirement and "Overtime" manpower requirement for all crafts. Craft rates are not to include overhead, profit, or any of those items listed in 1.02 (b). Rates in all cases shall include taxes and payments to the -Workmen's Compensation Fund as an addition. Craft Foremen will be considered to fall within the category of direct labor but the field office staff and field supervision will not. . Chevron BB 013649 Section T7-A, B February 16, lj?5i Page 23 1.05 Cost Items shall include: IV-A-2.0 (a) The cost of materials. This shall consist of the net amounts paid by CONTRACTOR to vendors of material purchased for the work herein. These amounts shall allow COMPANY all discounts for quantity purchases, immediate payment, or other discounts available to CONTRACTOR, and including any sales or use tax CONTRAC TOR is required to pay thereon. This shall include freight charges f.o.b. cars at plant site. INFORMATION TO BET SUBMITTED WITH PROPOSAL : 2.01 CONTRACTOR "shall itemize in detail his labor forecast for the entire job. This is to include straight-time and overtime required of each craftsman and fqreraan together with their hourly rate. This, then, after COMPANY review will become a part of the Contract, as outlined in para graph IV-A-1.03, and will be the basis on which escalation will be allowed. B - ACCOUNTING REQUIREMENTS IV-B-1.0 COST CONTROL 1.01 Accounting Records - CONTRACTOR shall maintain adequate accounting records during progress of the work to submit monthly cost control statements in conformity with the attached sample form EF-335 entitled "Expenditure Control Statement." Costs shall be broken down essentially!in accordance with the sample item list EF-29U attached. Final item lists will be supplied by COMPANY prior to accumulation of charges. The cost records shall be main tained in such form as to permit COMPANY'S investigation of all items in order to insure that they have been placed in the proper category. 1.02 CONTRACTOR shall provide all reasonable assistance and facilities for the conveniences of COMPANY representatives in checkingCONTRACTQR'S accounting procedures and in auditing CONTRACTOR'S records during the course of work and after its completion. 1.03 In addition to preparation of monthly cost control state-, ment called for in 1.01 above, CONTRACTOR shall estimate each month the amount of his billings to the COMPANY by month for the next three months. ,i Chevron BB 013650; H A IT I DESIGN <1 Chevron BB 013651 SECTION V -TLANT DESIGN REQUIREMENTS - ' A - GENERAL Section V-A February 16, 1951 Page 2k V-A-1.0 SCOPE This section covers COMPANY preferences and normal practices applying to the design and selection of equipment and facilities required in the plant. V-A-2.0 RESPONSIBILITY FOR DESIGN 2.01 CONTRACTOR shall be solely responsible for the adequacy of the design of all equipment and facilities required for the plant including but not limited to the following; (a) Adequacy to meet process specifications as described in Section II. (b) Conformance to applicable local and state codes and ordinances. Where more than one code and/or specifi cation applies, the most stringent provision shall govern. Codes and specifications listed hereunder are not: necessarily governing. (c) Conformance to requirements of the agreed specification. (d) Conformance to COMPANY'S Basic Engineering Design Data GT-E-U5U6. (e) Sound and economic engineering design for all portions of the plant. 2.02 CONTRACTOR shall not be responsible for the validity of process design data furnished by COMPANY. V-A-3.0 BCONOMIC CONSIDERATIONS ON SELECTION OF EQUIPMENT !' 3.01 Where operating, maintenance, or replacement savings! are possible by the economic selection of equipment or facilities, CONTRACTOR Shall provide equipment or facilities such that the final incremental cost will be paid out in two years or less by savings before taxes, except for specific equip ment requirements specified herein. 3.02- All items of major equipment (C through K) shall be selected after obtaining competitive bids. No item of major equip ment shall be purchased until approval has been indicated by COMPANY representative. Studies to justify- the choice of equipments shall be presented upon request of COMPANY " representative. Chevron BB 013652 Section V-A February 16, 1951 Page 25 V-A-iuO CODES AND DESIGN CONDITIONS PERTAINING TO OVER-ALL PLANT li.01 Codes and design conditions pertaining to the over-all plant are" skown oh Easic Design Data, attached. h.02 Designs for ^Earthquake Forces - Rigid structures (structures with a fundamental natural period of vibration less than O.li seconds) shall be designed to withstand a seismic force of 0.05 gravity. Flexible structures (structures with a funda mental natural period of vibration equal to or greater than O.h seconds) shall be designed to withstand dynamic lateral forces induced by seismic action. V-A-5.0 Plant Area - 5.01 Plant location will be as noted in attached General Layout Drawing GT-29L8 and Plot Plan GT-hShO. Note that Plot limit refers to the northern boundary of existing pipeway C and in general to the entire periphery of the process area. Plant limits refer to internal imaginary lines within the plot limits which show boundaries between individual plants (e.g., Catalytic Cracking Plant and Vacuum Flasher Unit). COMPANY will furnish plant area rough graded to an elevation of approximately 37hO ft. CONTRACTOR shall increase rough grade to a finish grade elevation as required for adequate plant drainage. CONTRACTOR shall provide the necessary fill material. 5.02 CONTRACTOR shall carry all process and utility lines to locations designated on the plot plan, GT-L5U0, and referred to in Section V-B-1.02, V-L-1.08, and V-L-501. Tie-ins at designated points shall be made by CONTRACTOR or COMPANY as specified in the aforementioned sections. 5.03 Plant layout shall be patterned after the general arrangement shown on Drawing GT-U5u0. Locations of equipment should not be scaled from this drawing. This drawing is intended only to indicate a general orientation and CONTRaCTOtl is not bound to it. Only the confines of the area are a firm requirement. V-A-6.0 PLANT RECORDS 6.01 Record Books - CONTRACTOR shall prepare six copies of Drawing Record (Photostat) book, six copies of Equipment Manual, and four copies of Inspection Record Book per instructions on Drawing GA-89559j '`Record Book Preparation Instructions for Domestic Refineries.n Record books shall be in COMPANY'S hands by. the time the plant is ready for operation and shall include drawings prepared by CONTRACTOR for use in construc ting the plant per GA-89559. ; Chevron BB 013653 Section V-A February 16, l?5l Page 26 6.02 Manufacturers 1 Drawings - CONTRACTOR should note require ments for manufacturers'1 ` drawings and data and shall be responsible for obtaining and including same in record books per Drawing GA-39559. API-ASME or ASMS Code certifi cates are required for all vessels, columns, exchangers, etc., built"to API-ASME or aSME Code specifications4 6.03 Safety Instruction Sheets - CONTRACTOR shall prepare Safety Instruction aieets on Forms Mfg. 600-1 through 600-6 per COMPANY Manufacturing Department Procedure No. 31. Safety InstructioirSheets shall be issued with Record Books before plant completion. 6.Ok MaintenanceilMaterial Lists - CONTRACTOR shall prepare Main tenance Material Lists for plant equipment on Form-G0-I|53. Completed form shall list all spare parts ordered, and all information -required for re-ordering. The listing shall be itemized by equipment under the same classifications used on COMPANY'S Item List. 6.0^ Equipment Inspection Record Forms - CONTRACTOR shall prepare the following inspection record forms for each unit of appropriate equipment for inclusion in the Inspection Record Booksi ;Z Title Equipment Inspection Record Tanks Form Mfg 336 Equipment Inspection Record -Tubular Heat Exchange Units Mfg 1321 Relief Valve Setting Table and Inspection ReportUg 353 Equipment Inspection Record - Motors Mfg :323 Equipment Inspection Record- General Mfg 325 Equipment Inspection Summary Mfg;328 Operating Record Mfg 330 Gage Point Location and Measurement Record Mfg;322 6.06 CONTRACTOR shall prepare the forms or drawings listed below (or CONTRACTOR'S own equivalent) and include copies;thereof in appropriate record books regardless of whether or not they are. used in construction: Chevron BB 013654 Section V-A February lb, 1951 Page 27 Title or Description Form No. Section Drawing Index Form - fill out and reproduce left side only to and including "Order No.'* Prepare separate index for Contractor^ and Suppliers' drawings EF-15U A Summary of Utility Requirements Equipment Inspection Schedule listing necessary type of inspec tion and frequency for safety in operation _ EF-2iid Mfg 369 A 1 A API-ASME Code Pressure Vessel Design EF-65 Sheets C or D Design Sheet~for Vertical Vessel Supports _ EF-66 C Design Data for Heat Transfer Equip EF-18 ment E Furnace Design Data Sheet EF-I9I4. F Pump Data Sheets below as applicablei Power Pumps Steam Pumps Centrifugal Pumps Rotary Pumps_ EF-12 EF-13 EF-153 EF-26d G G G G Centrifugal, Rotary, and Steam Pump Packing Schedule EF-69 G Steam Turbine Data Sheet EF-221 !o Motor Data Sheet EF-176 G Reference Data for Relief Valves EF-36 J Reference Data for Recording and Controlling Instruments EF-U2 J Reference Data for Pressure Gages, EF-U3 Temperature Points, and Gage Glasses J 0rific Plate Data Summary EF-53 J CQ List of Material and Schedule for EF-302 L 00 tOC-i1o0 Steam Traps (List of Material need not be filled out) Oo Insulation for Hot' Vessels(List EF-221}. N of Material need not be filled out) V-A-7,0 Section V-A February 16, 1?$1 - Page 28 ' Insulation of Hot Lines (List of Material need not be filled out). In .addition, diagrams or schedules shall be prepared showing type and thickness of insulation on each in sulated line. EF-222 Fireproofing Specification for Column and Vessel Skirts (Material order data need not be filled out) EF-168 Building Design Data EF-3^8 Painting Specification EF-68 ,N N R S Initial Field Hydrostatic Test EF-121 Specification; in addition, diagrams or schedules shall be prepared show ing pressure to which each line is tested. S Schedule of Lubricants and frequency of lubrication for all equipment re quiring lubrication -- S : 6.07 COMPANY will supply adequate copies of all of the above forms to CONTRACTOR as requested. One copy of each form is included in the appendix attached. INFORMATION DESIRED FROM CONTRACTOR 7.01 CONTRACTOR shall submit a preliminary Plot Plan and a Piping and Instrument Diagram with his bid. Chevron BB 013656 SECTION V -"PLANT DESIGN REQUIREMENTS ^ 3 - UTILITIES Specification E-1000 Section V-B February 16, 1951 Page 29 * ; V-B-1.0 GENERAL "T- 1.01 The plant -shall be set up for operation at design capacity during power outages and full capacity production of hOO psig saturated _steam shall be maintained. Common spares may be used for pumps provided that this leaves the unit operable during power outage. -B-2.0 Chevron BB 013657 1.0' Utilities produced or consumed by plant will be furnished or accepted by COMPANY at points designated on Drawing GT-h51+0 by the line L-L, and mentioned in this section, under the conditions tabulated on Basic Engineering Design Data, GT-E-hh6, or as described herein, 1.0 CONTRACTOR shall provide all necessary utility systems, including sewers and drains, within the plant area. COMPANY will connect utility lines to refinery systems at the line designated by L-L on Drawing GT-h5k0 In general the utility "lines will be located in the central portion of the pipeway designated "New Pipeway *D1n, SPECIFIC INSTRUCTIONS i 2.01 Steam - COMPANY will supply steam at plant limits at pressures and temperatures shown on Basic Design Data GT-E-1+5U6. COMPANY will accept high pressure saturated steam generated at i+00 psig. It will not be necessary to balance the nominal 30 psig system supply and demand. Deficiencies and Surplusesjwill be balanced between other plants. All normal pump and blower drivers shall be steam operated with motor spares except as noted in Section V-K-1.03 and V-K-l.Olu (a) The Kiln Air blower turbine shall be driven with a nominal 1+00 psig steam condensing. The catalystielevator drive turbine shall be driven with nominal 1+00 psig steam exhausting at 110 psig back pressure. Both of these drivers shall be designed to operate normally with 385 psig saturated steam. For startup thesd turbine drivers shall be designed to operate with hOO psig steam with 100F of superheat. See Section V-G5.02 for-information on alternate drivers to be included in CONTRACTORrS proposal* (b) Drivers under 75 horsepower shall operate on 110 psig steam exhausting at 30 psig back pressure. CONTRACTOR shall provide oil separators in exhaust lines from machinery which may discharge oil with the steam if this steam is to be discharged into the refinery system, either as steam or as condensate. | Specification E-1000 Section V-B February 16, 1951 . Page 30 Consideration shall be given to maximum production of U00 psig saturated steam by the catalytic cracking plant' with the balance at 120 psig. Note that these pressures are slightly higher than the supply pressures at the Plaht limits. 2.02 Condensate -^Condensate shall be handled at Plant tie-in line L-L as follows: (a) Badly contaminated condensate shall be dumped into the drainage system. (b) Condensate that may contain light hydrocarbon condensate shall be run into the cooling tower basin. (c) Clean condensate shall be collected in the low pressure treated'feedwater system. 2.03 Fuel - Fuel gas will be available for plant startup. Maximum utilization-of waste product gases shall be made in normal plant operation. A fuel oil standby system shall not be provided. __ 2.OI4. Electric Power - Service to the plant will be I4J4.O volt, 3 phase, 60 cycle. A 100 kw, I4I4.O volt turbogenerator furnished by COMPANY will be located adjacent to the plant area, and will be capable of handling all essential motor-operated valves, and-lighting loads during periods of power failure. 2.05 Water - CONTRACTOR shall provide drinking and sanitary service water connections at the plant tie-in line L-L 2.06 Cooling Water - COMPANY will provide fresh water for cooling at 75 psig at ground level at the plant tie-in line Lf-L and will accept returned cooling water at temperatures shown on Basic Design Data GT-E-U5U6. CONTRACTOR shall furnish a closed bearing cooling water system with heat exchange to Plant cooling water system and with at least; 25 percent excess cooling and circulating capacity above the immediate Plant requirements. [ 2.07 Feedwater - COMPANY will provide treated feedwater at U50 psig or at any pressure specified by CONTRACTOR. Water quality is suitable for generation of steam at pressures up to 4OO psig. 2.08 Air - COMPANY will provide filtered and dry instrument air and utility air at plant tie-in line L-L. Supply pressures' will be as indicated on Basic Design Data. 2.09 Drains and Sanitary Sewers - These systems are discussed in detail in Section V-S. V-B-3.0 V-B-iuO Spec!j. nation 3-1000 Section V-3 February 16, 1951 Page 31 FIRE SYSTEM/ _ _ I 3.01 COMPANY will provide fire fighting water at the plant tie-in line L-L at lf>0 psig. The main hydrant system will be ex ternal to the plant and will not be a part of this Specifi cation. CONTRACTOR shall provide fire fighting facilities from plant fire water system consisting of branch lines with hydrants with 1-1/2-inch gate type valves and hose boxes similar to Drawings GE~9?6l8 or GE-S99623. Fire system provided by CONTRACTOR shall be of such extent as to allow any point within the main pipe trenches, pump slabs and manifolds to be reached by at least two hose streams from hoses not over 100 ft long. CONTRACTOR shall furnish piping, hoses and racks. 3.02 CONTRACTOR shall provide steam hoses for fire fighting and plant cleanup, with hoses at least 30 and not over 50 ft long. Steam hose nozzles shall conform to Drawing (3C-79186. These hoses~shall be in addition to those covered try para graph 3.01, and shall be spaced to provide adequate1 coverage. Hoses shall be rated to withstand an operating pressure of 150 psig steam. UTILITY CONDITIONS AND COSTS h.01 Utility conditions and costs are shown on Basic Engineering Design Data GT-E-U5d6. V-B-5.0 INFORMATION REQUIRED FROM CONTRACTOR 5.01 CONTRACTOR shall submit with his bid a tabulation of utilities produced and consumed, similsr to COMPANY'S form E^-2itU. Such tabulation shall include requirements during start-up, normal operation, and power outage. Steam required for start-up will be furnished by COMPANY boiler capacity. 5.02 CONTRACTORTshall specifically state steam producing capacity of the kiln cooling coils at all stages of catalyst activity. 5.03 CONTRACTOR shall submit power requirement for lighting loads and essential motor-operated valves to be supplied'by auxiliary turbogenerator in the event of power failure. (See Section V-B-2.0U) :. *vrT*f` Chevron BB 013659 Specification E-1000 Section V-C February 16* 1951 Page 32 SECT--IOj-N---V-----'P...L..A..N...T....D..E..S..I.G...N. REQ.U..I.R..E..M...E..N..T..S. C - PRESSURE VESSELS C-1.0 GENERAL INSTRUCTIONS 1.01 Scope - This section applies to equipment classified as pressure vessels, drums or tanks. ; 1.02 Codes - Pressure vessels shall be designed and fabricated in accordance with the latest edition of the API-ASME Unfired Pressure Vessel Code, unless legal requirements dictate the use of the ASME Code. 1.03 Lateral Loads - Vessels shall be designed to withstand the wind and earthquake loading in accordance with Basic' Design Data. l.Od Minimum Thickness of Shell and Heads - Minimum total; thickness of any shell or head shall be 1/k inch. 1.05 Internals - It is desired that replaceable internal parts of all vessels and tanks be designed for the maximum; economical operating life, based on corrosion rates and erosion! rates established^by CONTRACTOR. Where it is impracticable to design for a life of 10 years or longer, CONTRACTOR shall state the expected life of the various elements based on his previous experience. No part of any equipment shall have an expected serviceable life (without major repair) of less than 1-1/2 years. 1.06 Design Temperature and Pressure - It is preferred that the design pressure be set at a minimum of 15 percent higher than the maximum operating pressures encountered under any operating case, startup, or shutdown condition. In no case shall the design pressure be less than 20 psig or less than the hydrostatic head when the vessel is full of liquid, whichever is the greater. The design temperature shall be set at an amount higher than the maximum metal operating temperature commensurate with good engineering practice, but not less than 25F above the maximum metal operating temperature.^ All columns and pressure vessels shall!be checked for vacuum stability and the design limits shall be recorded bn the Design Data (see paragraph 2.02).; For vessels in vacuum service, external reinforcing rings are preferred tplinternal reinforcing rings. Chevron BB 013660 Specification E-1000 Section V-C February 16. 1951 Page 33 V-C-2.0 1.07 Nozzles - It is preferred that all connections to vessels be lapged j?r "stub weld*' type with a minimum nozzle size of 2 inch. However, smaller screwed bosses per Drawing GB-78876, or equal, may be employed for instrument piping, gauge glass, and vent connections, but in no case shall the size be smaller than 3/h inch. Nozzles construction and attachment shall be in accordance with GB-68801. 1.08 Flange Facing - Flange facing and rating shall conform to the latest"edition of the API-ASME Unfired Pressure Vessel Code except the use of small tongue and groove facing is required inJLLeu of ring joint and the use of raised face flanges shall be limited to temperatures below U50F except for large flue gas, air, and catalyst lines. Small tongue and groove lacing shall be used on all 300-pound flanges in LPG service. Groove facing shall be on vessel. 1.09 Internal Piping (a) Internal pipe turns may be miters or welding elbows. (b) Carbon-steel piping shall be as followsj --Size Minimum Schedule 2~ " 3" - 12 Over 12 w 160 80 1/2" wall or plate , 1.10 Vacuum Relief - When emptying contents or during stemming out, partial_vacuum may occur in a vessel. To safeguard the vessel (not otherwise designed) against this possibility, a suitable automatic relief device shall be provided* DESIGN STANDARDS - 2.01 Specifications - It is preferred that all unlined and alloy- lined welded~carbon steel pressure vessels conform to COMPANYfS Specifications i*30 and 1+31, or equal, respectively. These have been written to apply to shop-fabricated vessels. If any sections conflict with good field fabricating practice, CONTRACTOR should so advise. ; 2.02 Standard Data Sheet - The design computations for pressure vessels and vertical vessel supports may be made on COMPANY forms EF-65 suid EF-66. Note that forms EF-65 and EF--66, or equal, are required for plant records per Plant Design Requirements ^Section V-A. Chevron BB 013661 Specification E-1000 Section V-C February 16, 1951 Page 3h V-C-3.0 2.03 Manholes and Handholes - The following are normal COMPANY practides regarding manholes and handholes. (a) Means of access shall be provided on vessels if re quired for operation or maintenance. (b) In cases where handholes are adequate, eight-inch and four-inch are preferred in that order. (c) Manholes shall be in accordance with COMPANY Drawing GB-87280. In general 18-inch I.D. manholes shall be used. Vessels shall have 2ii-inch I.D. or larger man holes where removal of internal parts or installation of internal staging may be necessary for purposes of inspection or working on internals or lining. (d) Steps or rungs shall be provided to reach corrosion gage points. (e) Flanged-in type elliptical boiler manways shall! not be used on process vessels. 2.Oli Corrosion Gage Points - Corrosion gage points per Drawing GE-31902 shall be installed in at least 2 locations in each vessel. Locations shall be selected where severest corrosion is expected.- These may be installed in shop or field, but location will be subject to approval of COMPANY representative. CONTRACTOR Shall make initial gage point measurements and shall enter them on Mfg 322. MATERIAL SPECIFICATIONS 3.01 The materials for vessels are listed below: Material (a) Hot Catalyst Section Internal insulation sheathing $%. Cr-Mo i --- > c c Internal liquid feed pipe and nozzle _5 Cr-Mo J^ype 1|10 Sleeve around internal feed pipe and Type iilO steel nozzle Slide valve, catalyst chute, inter- Type 502S: steel * nals (above reactor section head in contact with hot catalyst) Catalyst slide valve stem Type 30ii steel * High Silicon 5% Cr-Mo steel, such as Sicromo 5S and Croloy 5 Si. Chevron BB 013662 Specification E-1000 Section V-C February 16, 1951 Page 35 Material (b) R1eacto_r- Section Linings(except bottom head) Catalyst chute (below reactor sec Type UlO steel Type UlO steel tion top head) Catalyst orifice Catalyst feed pipes _ Upper._and lower discharging channels Bottom~head of reactor section Catalyst distribution pipes (through bottom head of reactor section) . Stellited type UlO steel Type UlO steel Type UlO steel Carbon steel Schedule 80 carbon steel (c) Steam Ihirge Section Carbon steel (d) Upper Kiln Section Top Head Catalyst distribution pipes Sheathing (over soft insulation) Refractory tile Air inlet channels and grating Cooling coils Cooling coil sleeves Cooling coil tube supports Sheathing (over shell insulation around cooling coils) Bottom head Carbon steel Schedule 80 carbon steel Type 502S steel Vamon tile or equal Type 502S steel 1-1/U Cr - 0.5 Mo steel Type 502S:steel 25-12 Cr-Ni steel Type UlO steel . Carbon steel (e) Lower Kiln Section Refractory tile Air inlet channels and grating Catalyst" withdrawal cone structure Varnon tile or equal. Type 502S steel 2-1/2 Cr 4 1 Mo steel (f) Catalyst System Select material on basis of structural design i Type UlO steel for lining should have 0.06$ carbon maximum and 05& Molybdenum minimum -- ; Chevron BB 013663 Specification E-1000 Section V-C February 16, 1951 Page 36 V-C-1.0 3.02 A preliminary review of drawings of the Houdry Process Corporation in the series of HF-600 to HF-660 has revealed certain material inadequacies. The following items represent additional material requirements over those shown on their preliminary drawings; (a) Baffle^pT^es at gas outlet and air inlet of kiln shall be 1-6 chrome type 502S. (b) The outer pipes of the upper air inlet system shall be schedule 10. . --(c) The pipes through the purge tube sheet shall be^ schedule 80 (d) The price differential for fabricating the pancake cooling coils which are intended to be '`spare11 or "overdesign" (see V-C-1.09) of l-l/l Cr 0.5 Mo 6.75 Si and 5 Cr-Si (type 502S) shall be presented. (e) The liquid feed piping within the reactor shall be 5 Cr Mo (type 110). (f) Screwed couplings shall be avoided on the liquid feed line within the reactor. (g) The inner tubes of the upper air inlet caps shall be 5/l6 carbon steel or 3/l6 type 502S. (h) All major load carrying or pressure containing welds in alloy shall be made with rod of generally similar composition to the plate material. Except for l-l/l chrome steel, all welds in chrome alloys shall be made by preheating and stress relieving. Austentic 25-20 . Cr-Ni weld rod shall be used to join chrome alloys in the form of light sheet materials such as the channels and clips in the disengaging section. SPECIFIC REQUIREMENTS !` 24.01 The reactor and kiln shall be designed as an integral struc ture with the reactor mounted above the kiln. 1.02 All catalyst handling, storage, and makeup facilities, includ ing a fines storage hopper shall be provided. Provisions shall be made for separate storage of fresh and hot catalyst. Storage capacity shall be sized as follows; Chevron BB 013664 Specification E-1000 Section V-C February 16, 1951 Page 37 V-C-5.0 (a) Fresh catalyst storage - sized to hold 50 tons of fresh catalyst. (b) Hot catalyst storage - sized to hold the entire catalyst capacity of the operating unit, (c) Fines storage hopper - sized to hold at least 15 tons of fines production. li.03 The unit shall be designed to operate with either S-R clay or synthetic bead catalyst. U.Oit The reactor shall have provision for a bed depth twice as great as required for design conditions with equilibrium catalyst activity. lt.05 The reactor"shall be designed for operation up to a temper ature of 925F. This applies only to the reactor and shall not influence design of the balance of the unit. it.06 The seal leg-between the upper hopper and the reactor shall be designed^to permit a reactor operating pressure Itipsi greater than the maximum normal reactor operating pressure. CONTRACTOR shall state if this results in appreciable in creased costor delay in completion of designs. U*07 CONTRACTOR shall design the reactor for pressure of 7 psig at the reactor outlet connection for reaction mix to the synthetic crude column. it.08 The kiln shall contain three burning zones. The first two burning zones shall be followed by cooling zones consisting of cooling coil sections. it.09 The cooling zones shall contain at least three coils 'in addition to those shown to be required by the calculations for operation at design conditions. At least one of'the extra coils shall be in each cooling zone (see V-C-3.02 (d)). INFORMATION REQUIRED FROM CONTRACTOR 5.01 The following information is required: j (a) Which vessels will be designed and built in accordance with API-ASME Code? (b) Which units will be stress relieved or radio-graphed? Chevron BB 013665 Specific ation E-1000 Section V-C February 16, 1951 Page 33 (c) State-design pressure and temperature for each vessel, (d) State plate thickness and corrosion allowance for each vessel. In the case of vessels of varying diameter, state complete design data (pressure, plate thickness, corrosion allowance) for each diameter. Also state circumferential and longitudinal bending stresses at . the junction of cone and cylinder. 5.02 ' State recommended specifications for any interior insulation that is proposed. Include operating temperatures of plant equipment requiring this insulation. If monolithic lining is proposed, state the additional cost of suspended tile lining of Varnon quality, or equal. 5.03 Details of any corrosion resistant lining method proposed. 5.0U Drawings oJTintemal construction of major process equipment. Chevron BB 013666 SECTION V -'PLANT DESIGN REQUIREMENTS ' E - -HEAT EXCHANGERS Section V-E February 16, 1951 Page 39 V-E-1.0 GENERAL INSTRUCTIONS 1.01 Scope - This section applies to all units of heat transfer equipment, i_r 1*02 Codes - All waste heat boilers and other steam generating units shall bomply with the latest edition of the ASME Boiler Code-insofar as it is applicable and shall comply with local safety orders. All other units of heat exchange equipment shall comply with the latest edition of the API- ASME Unfired Pressure Vessel Code insofar as applicable. All unfired heat exchangers in which steam is generated, such as tar steam generators, shall comply with the latest edition of the ASME Boiler Code. So-called double pipe exchangers and heat exchange units fabricated from pipe will be acceptable without conformity to the API-ASME Unfired Pressure Vessel Code but they shall conform to the requirements of the ASA Code for pressure piping. 1.03 Fouling Allowance - It is desired that CONTRACTOR furnish equipment with fouling allowances such that at least one year's operating time without cleaning both from a heat transfer and~pressure drop standpoint will result unless multiple unit! are provided to allow cleaning in service. Exceptions will be made in the case of exchangers handling cracking furnace residuum or comparable stocks. Fouling allowances given in the latest edition of Standards of 'Tubular Exchanger Manufacturer's Association are considered minimum acceptable. CONTRACTOR shall make greater allowance for fouling in services in which he believes it advisable. l.Oli Design Pressure and Temperature - In general, the design pressure and temperature limitations for heat transfer equipment shall be compatible with the design of adjacent equipment. Further, these design limits shall conform to manufacturers'1 standards insofar as possible. The design temperature shall .be set at an amount higher than the1 maximum metal operating temperature commensurate with good engineering practice, but in no case less than 25F above the maximum metal temperature. For shell arid tube units, including reboilers, it is preferred that the design pres sure be selected 15 percent higher than the maximum pressure obtainable under any operating case, startup, or shutoff. In general the design pressure shall not be less than! 50 psig. Chevron BB 013667 V-E-2.0 Section V-E February 16, 1951 Page IiO 1.05 Tube Size, Gage and Length - Tube size, gage, and length shall be in accordance with Basic Design Data. 1-inch O.D. 11 BWG minimum wall, or l-l/2-inch O.D. 12 BWG minimum wall tubes will be acceptable for unusual services. 1.06 Nozzles ancTBosses - Connections 2-inch and larger shall be flanged nozzles. Where tongue and groove flanges are required, the groove facing shall be on the exchanger. Connections 1-1/2-inch and smaller shall be screwed bosses. The minimum size connection shall be 3A-inch. Exceptions will be made in the case of double pipe units. Vent and drain bosses shall be provided on all channels and shells except where instrument bosses or nozzles can be used for that purpose. 1.07 Spare Gaskets - Two complete sets of spare gaskets shall be furnished with each exchanger. 1.08 Test Equipment - CONTRACTOR shall advise COMPANY of number and size of test jigs and/or test rings required, CCMPANY will advise what test equipment is desired. Cost of; test equipment shall not be included in the bid. DESIGN STANDARDS - 2.01 Specification - All shell and tube equipment shall conform to COMPANY*S Specification 391* or equal, and all units of other types shall conform to Specification 391, or qqual, as far as applicable. Specification 391 is not to be inter preted to exclude fixed tube sheet construction. ! 2.02 Cooling Wated- Limitations - Cooling water temperature and maximum allowable exchanger water outlet temperature shall be per Basic Design Data. Means shall be provided to prevent fixed gases which may be evolved from the water from blanketing the tubes. One method of accomplishing this is to maintain a positive pressure of 10 psig at the water outlet of all coolers and condensers. 2.03 Tube Layout - Rectangular pitch with l/ii-inch cleaning lanes shall be used in kettle-type reboilers, steam gener ators with tar or slurry on the shell side, heavy bottom streams, or other shell streams where excessive fouling and frequent_ external cleaning of the bundle is anticipated or expected/to be a problem. Triangular pitch may b;e used only in the case of steam or fresh water on the shell side. Where a unit is proposed with the shell cover attached permanently to the shell, tubes must be arranged on ^square pitch layout in order that the bundles may be hydrostatically tested. - - ! Chevron BB 013668 Section V- February 16, 1951 Page I4.I 2.0ii Centering Device - Dowel pins or a suitable centering device shall be provided for proper alignment of the floating head with the floating head tube sheet in the case of floating head_exchangers with more than two tube passes. 2.05 Clamp Ring Construction - "Clamp-Ring" construction of floating heads is acceptable if dowel pins are provided. 2.06 Shell Baffles - Longitudinal baffles should be avoided ' ' except in those cases where decided economics can be, realized by their usd. For services where shell side fouling is expected, consideration shall be given to half-moon side to side cross flow baffles. For these services "Disc and Donut" and orifice baffles shall be avoided. 2.07 Tube Sheets - The minimum tube sheet thickness shall be linch. ' 2.08 Extended Surface Units - Extended surface type equipment is acceptable for nonfouling stocks only. 2.09 Arrangement of Units - When multiple units are proposed and where a choice lies between parallel and series instal lation with "only a small difference in investment, parallel units are pflferred. 2.10 By-passing -^Where two or more heat exchange services are in series, (i.e., feed bottoms and feed overhead) byipasses shall be provided around each bank of exchangers performing one service. Valving around each exchanger in a single service is not necessarily required. Exchangers shall not be oversized because of this requirement. 2.11 Air Cooled Units - Air cooled equipment is acceptable where it can be justified on an over-all project basis. 2.12 ' Provision for Blinding - A jack screw attachment shall be provided to permit gasket replacement and blinding between units of shell and tube exchangers which are directly flanged together or connected by a short straight piping spool. The jack should be attached to one or both feet of the exchanger, as required. 2.13 Provisions for Testing - All units shall be designed so that they can be completely tested in the field. 2.1ii Standardization - It is preferred that heat exchange units of the same type of construction (i.e. all shell and!tube) shall be selected to afford a maximum of interchangeability consistent with economic design. Tube size and length shall be standardized for each type of unit (shell and tube, re boilers, etc.). Chevron BB 013669 V-E-3.0 V-E-U.O Section V--E February 16, 1951 Page k2 2.15 Corrosion Allowance - Steel shells, channels, tube sheets, floating heads, and baffles shall be provided with 1/10 inch corrosion allowance unless otherwise specified. Nonferroub tube sheets and floating heads require no corrosion allowance. MATERIAL " 3.01 Specification - Materials for heat transfer equipment shall conform to Specification 391 for shell and tube exchangers and all other equipment where applicable with the exceptions noted below.~ 3.02 Cooling Water Service 1) Materials in contact with fresh cooling water shall be as follows j a) Tubes - Admiralty (any inhibited Admiralty) except 'in units where the presence of ammonia is anticipated because of injection or process production. Admiralty shall not be used where stock temperatures exceed 330F. Where ammonia is present 70-30 Cu-Ni con taining 0.25-0*60$ iron shall be used, Cu-Ni tubes shall not be used at stock temperatures above 500F, b) TubeTSheets - Naval rolled brass tube sheets shall be used with Admiralty tubes. 70-30 Cu-Ni tbbe ' sheets shall be used with Cu-Ni tubes. c) Channel Sections and Floating Heads - Steel or cast iron. Cast iron is to be avoided where thermal shock is a possibility. INFORMATION REQUIRED FROM CONTRACTOR (a) Which bundles weigh more than 10,000 pounds? ; (b) Which bundles are interchangeable? (c) List materials for major exchanger parts by groups of units in similar services. (d) Which units will be provided with by-pass and block valves to allow removal of the unit from service without a shutdown? (e) Which units are not floating head type construction? (f) Which units will be stress relieved? (g) Where clad shells or channels are proposed, details of the cladding at the gasket surfaces of the body flanges shall be presented.1 (h) Complete summary of heat exchange equipment is required with the proposal_tabulating all the pertinent design data, includ ing fouling allowance provided. Chevron BB 013670 SECTION V - PLANT DESIGN REQUIREMENTS F - FURNACES J ~: Section V-F February 16, 1951 Page U3 V-F-1.0 V-F-2.0 GENERAL INSTRUCTIONS 1.01 Scope - This^section covers direct-fired tube-still type heaters and, as far as applicable, other types of 'auxiliary heaters. ~ DESIGN CONDITIONS~ 2.01 Design of tube-still heaters shall be based on over-all economic considerations. There is no general preference for either horizontal or vertical types to the exclusion of the other. Although it may not be economical under present conditions, consideration shall be given to air preheaters or steam generators and the design made in a manner such that these may be added in the future with a minimum of modification. It is not the intent to penalize unduly those designs in which such economizing features would be impossible to include. In these cases the exception will be indicated in the proposal. : 2.02 Self-supporting steel stacks shall be used. Minimum height shall be at least 120 ft high. Unlined steel stacks shall have a corrosion allowance of 1/8 inch. Each stack shall be equipped with a painter's trolley. 2.03 No stream of--fluid passing through the furnace shall be divided into two or more smaller streams or "passes'1 if two phases are present in the tubes at the proposed division point in the furnace. 2.0I4 If the fluid enters the furnace in more than one coil or "pass", each coil shall be provided with a globe throttle valve downstream of orifice flanges. (Flow recorders are not to be provided for this installation.) Globe valves shall have stem stops so that flow cannot be completely shut off. = 2.05 Means shall "be provided to maintain any steel in stack, flues or tube assemblies which are in contact with sulfur laden flue gases at a minimum temperature of 350F to fore stall sulfur^corrosion. ,. 2.06 Forced or induced draft fans may be used in these heaters if economical. If used they shall be designed to operate without mechanical difficulty at a stack temperature of at Chevron BB 013671 Section V-F February 16, 1951 Page itit least 250F-higher than the furnace manufacturer specified for 25$ overload. No fan furnished shall have a critical speed pondition below 125$ of maximum operating speed. Prior to leaving the supplier's plant, the fan shall be run for one~hour at 10$ over design speed. Fans shall be designed tcO>penate continuously at a capacity 25$ greater and a pressure of 56$ greater than the normal requirement. In addition the fans shall be capable of a "test block" performance ~of 20$ greater capacity and pressure than the 25$ overload condition. V-F-3.0 BURNERS -- 3.01 Heaters shall have gas burners. If a floor-fired furnace is proposed the burners shall be accessible from below without excavation. 3.02 Burners shall be so located and of such a type that the flame will not impinge upon the tubes. V-F-ii.O FURNACE MATERIALS Ii.Ol Headers in hydrocarbon service shall be either mule Oar (Key 1900) or screw lock (Key 7000) or equal. Cap seats shall be of-the long taper type to provide maximum cprrosion allowance. ^Holding members and screws shall be forged from AISI I4.IU0 steel conforming to COMPANY'S Specifications 203 and 510, or-equal. it .02 All tube sheets shall be insulated with Quigley Insulag, or equivalent, on the hot side. It.03 Tube supports shall be 25-12 Cr-Ni steel in the radihnt section, conforming to ASTM Specification A297 Type HH. iwOit Alloy steel castings shall conform to COMPANY'S Specification No. 11 or 12, as applicable, or equivalent. 1 it.05 End and convection bank supports shall be High Chromium cast iron (Pyrocast or equal). V-F-5.0 REFRACTORY AND INSULATION 5*01 Suspended type walls are preferred. Suspended wall is defined as any wall whose refractory is supported individually or in groups by structural steel. 5.02 Refractory materials shall be of first quality high duty . fire brick and fire clay. Chevron BB 013672 V-F-6.0 Section V-F February 16, 19.51 - Page ii5 5.03 The burner port material shall be of "super duty'1 fire clay refractory, or equivalent. 5.011 Air-set mortars shall be employed. 5.05 Alloy wire mesh shall be used for holding breeching and stack linings in place. 5.06 Furnace ancfstack floors shall be ventilated and insulated to prevent temperatures in the concrete foundation from exceeding 500F. 5.07 The furnace walls shall be insulated and sealed against air infiltration. MISCELLANEOUS 6.01 Header compartment doors shall have positive locking devices. 6.02 All radiant tubes shall be visible for their entire length through peepholes. 6.03 Permanent steam snuffing connections shall be provided into all header compartments and steam-out connections shall be provided into each firebox. , 6.011 Steam-out connections shall be provided for each furnace pass. , 6.05 Location of-furnace skin point thermocouples shall be recom mended by CONTRACTOR and shall have protection tubes per Drawing GB-7968ii, or equal. 6.06 Access and explosion doors shall be provided for safety and maintenance. - 1 6.07 Plug racks shall be provided and shall be located near the headers that they serve and shall be so designed that, positive identification of the plugs is possible. 6.08 Tube layout shall provide for mechanical cleaning. 6.09 Furnace shall-have connections for steam-air decoking; with effluent lines to breeching, air connections shall be provided forfoperation of turbine tube cleaners. 6.10 Breeching shall be above-grade and be provided with drain connections. r , Chevron BB 013673 V-F-7.0 Section V-F February 16, 1951 Page k6 INFORMATION REQUIRED FROM CONTRACTOR 7.01 The following information is required from CONTRACTOR: J (a) How is the unit passed? (b) Type and manufacturer of burners. (c) Tube material and size. <d) Method of tube cleaning and expected losses. (e) Tube thickness broken down into minimum thickness and corrosion allowances. :' (f) Type of refractory,, (g) Type Of insulation. (h) Type and material of headers. (i) Tube support hanger material. (j) Tube sheet material. 00 Type of stack. (1) How many skin point pyrometer connections are provided? (m) How many permanent thermocouple wells are provided? (n) CONTRACTOR shall furnish the following details con cerning the inert gas generator and/or air heater, if any: (1) Complete description of unit to be furnished with drawings of a typical unit showing principal features and important details. ' (2) Any codes applicable to these units. (3) Design pressure and temperature. , (h) Materials of construction, including type of lining. (5) Type and extent of automatic controls. (o) CONTRACTOR shall furnish a pressure and temperature profile^for each heater offered. (p) Heat absorption rates in both radiant and convection sections. (q) Thermal efficiency of furnace; flue gas temperatures to and^from the convection section. (r) Monetary difference between horizontal and vertical type fired heaters. Chevron BB 013674 SPECIAL PROVISIONS I -Jl''----------------------- . F - FURNACES Specification E-1000 Section V-F February 16, 1951 Page 47 v-F-8,0 specific material_requirements 8.01 Heater tubes should be selected to give a minimum life of 10 years. The following corrosion rates-should be used for selecting materials and corrosion allowances. op Temperature Carbon Steel Inches Penetration Per Year 2-1/4 Cr 4-6 Cr 6-8 Cr 0.5 Mo 0.5 Mo 0.5 Cr 8-10 Cr 1 Mo Type 304S 500 0.02 0.6T 55o 0.025 0.02 0.01 i 600 0.04 0.025 0.015 0.01 650 0.13 0.07 0.04 0.03 0.02 700 0.22 0.11 0.07 0.04 0.035 75o 0.35 018T 0.11 0.07 o.o5 800 0.5 0.25- 0.18 0.11 0.07 0.02 850 0.35 0.25 0.18 0.09 6.02 900 0.35 0.25 0.11 0.02 V-F-9.0 8.02 Headers shall be provided on both ends . Header materials shall correspond to the following tube materials{ Tube^Material Header Material Carbon Steel 2-1/4 Or 1/2 Mo Carbon Steel (2-1/4 Cr 1/2 Mo (5 Cr 1/2 Mo 5 Cr 1/2 Mo) 7 Cr 1/2 Mo) 9 Cr 1 Mo ) 304 9 Cr 1 Mo 18-8 Cr-Ni Cb 1 SPECIFIC REQUIREMENTS 9.01 CONTRACTOR shall submit a summary with his proposal tabulat ing all pertinent design data. ' Chevron BB 013675! Specification E-1000 Section V-F : February 16, 1951 Page U8 9.02 CONTRACTOR shall inform COMPANY of the cost of a fresh catalyst preheater. The preheater shall be arranged for utilizing varying combinations of hot flue gas from the kiln and cold air from blowers to maintain desired temper atures in fresh catalyst preheater. After being informed of the cost COMPANY will decide whether fresh catalyst preheater will be included in unit. In any case provision shall be made in the layout for future addition of this unit. 9.03 The preheating furnace shall be designed so that it will be capable of operation with a top transfer temperature of 800F, which is 100F greater than that actually required for operation, for Case 1 listed in Section II-A-3.01. COMPANY requires the furnace to be designed for a minimum of six months * operation, at design feed rate, between shutdowns. -- 90h An air heater-shall be provided for start-up to bring the circulating'.catalyst up to operating temperature. 9.05 The kiln stack shall extend at least 15 ft above the highest operating "Dlatform of the Reactor-Kiln Support structu) re. Chevron BB 013676 SECTION V PLANT DESIGN REQUIREMENTS , G - TUMPS AND TURBINES Section V-G February 16, l?5l Page k9 V-G-1.0 GENERAL instructions 1.01 Scope - This section applies to all liquid pumps and steam drivers for process or utilities. 1.02 Selection of Type of Pump - The type of pump to be used for any given service shall be determined from design and economic considerations. There is no blanket preference for centri fugal pumps or reciprocating pumps to the exclusion of the other type. -Steam and motor driver selection is discussed in the specific instructions of Section V-B. 1.03 Inspection During Fabrication - All centrifugal pumps! shall be inspected during fabrication except pumps of small size and standard construction for very mild or non-critical services. Reciprocating pumps of large size or of special construction shall be inspected. Turbines shall be inspected, except that small size standby turbines (less than l5bhp) need not be inspected. l.Oh Witnessed Performance Tests - Witnessed performance tests shall be made on all process pumps and on pumps for other critical services. Witnessed performance tests are not required for steam turbines. Testing of turbines normally consists of witnessing the manufacturer's routine tests to set the speedjjovemor, the overspeed trip governor, gpd a check of the operation of the lubrication system if !the turbine has a forced lubrication system. ; 1.05 Hydrostatic Testing - All pump cases shall be hydrostatically tested. Centrifugal pumps shall be tested to 1-1/2 times the equivalent maximum cold working pressure, or the factor listed below times the maximum working pressure at the oper ating temperature. The maximum working pressure is the maximum suction pressure plus the shutoff differential pres sure developed by the pump with the maximum impeller pimping water at 10$ over rated speed. s Chevron BB 013677 V-G-2.0 Section V-G February- 16, 1951 - Page 50 Hydrostatic Test Factor Operating Temperature Carbon Steel or 12% Chrome Steel h-6% Cr Steel or 16-8% Cr Sfeel 0-650F 700F 750f 800F : ^ : 1.5 1.6 1.8 2.1 1.5 1.5 1.5 1.6 The test pressure for reciprocating and rotary pumps shall be 1-1/2 times the manufacturer's maximum allowable working pressure. ^ DESIGN STANDARDS 2.01 General Specifications for Pumps and Turbines - The following general specifications or equal shall apply to pumps and turbines: -- E-511 E-9U7 MS-1110 E-U58 E-iiOii Centrifugal Pumps , Vertical Sump Pumps Reciprocating Pumps - Direct-Acting Steam-Driven and Power-Driven Rotary Pumps Steam Turbines 2.02 Pump Location - Pumps shall generally be located outdoors. 2.03 Cradle-Mounted, Close-Coupled, and Centerline-Mounted Centrifugal Pumps - Centrifugal process pumps shall be of the separately coupled type rather than the close-coupled design having an integral pump and motor shaft, except for small water pumps. : Single-stage ..centrifugal pumps handling stock over 30QF and multistage pumps handling stock over 200F shall be centerline mounted. 2.Oil Lubrication of Centrifugal Pumps - It is preferred that horizontal centrifugal pumps be oil lubricated. Vertical pumps may be either oil or grease lubricated. ! 2.05 Bearing Closures - Centrifugal pumps installed out-of-doors shall be provided with labyrinth slinger bearing housing closures and spring loaded oil seals (Garlock standard "KlozuresH, or equal) on all bearing housing. Spring loaded seals are not "required on pumps handling cold water. , Chevron BB 013678 Section V-G February 16, 1951 Page 51 2.06 Cooling Jackets - Stuffing boxes shall be water jacketed ift (a) ,,The liquid temperature is 300F or greater. (b) The suction pressure is 250 psig or greater (applies only to centrifugal pumpsj jacket is not necessary with mechanical seals). (c) The vapor pressure of the fluid pumped is 10 psia or greater. Centrifugal pump bearing housings shall be water jacketed for stock temperature over 350F. 1 The coolant for stuffing box and bearing housing jackets and gland quenching shall be fresh water. . 2.07 Glands - Glands for centrifugal hydrocarbon pumps shall be of the cowl type, tapped for connection of a water qqench line. Glands shall be of the split type. Glands on hydro carbon pumps shall be made with completely enclosed bolt holes. Slotted holes open at one end are not acceptable. Where practicable, studs are preferred to swing bolts for securing glands. Glands for centrifugal pumps handling inflammable liquids shall be tapped for connection to, a water quench line. ^ 2.08 Wearing Ring -Clearances - The wearing ring clearances' of centrifugal process pumps shall be in accordance with the table below, -Performance curves, guaranteed efficiency, and selection" of drivers shall be made on the basis of the performance jwith the actual clearance rather than on manu facturer's standard price book curves. Clearance for Cold Service (to 350F) Wearing Ring Diameter- 2 _ ha 6*' 8" 12" 16" Diametral Clearance _____ Inches 0.015 0.018 0,021 0.02k 0.030 0.036 The above clearances shall be increased by the amounts indicated for"the following conditions* , (a) Temperature greater than 350F shall be increased .005" per 100F (b) Services requiring case and impeller wearing ring of same material which tends to gall (18-8, Monel, etc.) shall be increased .005" Chevron BB 013679 Section V-G February 16, 1951 Page 52 2.09 Shaft Sleeves - Shaft sleeves shall be long enough to extend past the gland on centrifugal pumps to enable operators to determine whether leakage along the shaft is through ;the packing or between the sleeve and the shaft. 2.10 Dynamic Balance of Impellers - Impellers of centrifugal pumps shall be dynaKLcally balanced according to the following schedule j -- (a) All multistage pumps ; (b) All pumps 1700 rpm and above having impellers 6'1; in diameter or more (c) All pumps operating at 3500 rpm and above 2.11 Mechanical Shaft Seals - Mechanical shaft seals are acceptable for centrifugal or rotary pumps for services where they offer definite advantages over soft packing. No general preference for or against their use is implied. Where practicable, single seals are preferred to double seals, 2.12 Lubrication of Steam Pumps - Direct-acting steam pumps shall be provided with mechanical lubricators of the Manzelj or McCord type or equal for steam cylinder lubrication. Multiple feeds and compartments shall be provided if the liquid end packing requires lubrication. 2.13 Turbine Governors - On turbines over 100 horsepower, orifice or oil-relay "type governors are acceptable, 2.lii Sentinel Relief Valves - All turbines shall be provided with sentinel relief valves set to sound at 10 psi below the maxi mum allowable back pressure of the turbine. 2.15 Standard Auxiliary Equipment for Centrifugal and Rotary Pumps All centrifugal and rotary pumps shall normally be provided with the following auxiliary equipment; (a) Baseplates of the drain-lip type. The material may be either cast iron or steel. Up to 200 horsepower pump baseplates shall be extended for mounting drivers. Over 200' horsepower the baseplates for pumps and drivers may be separate. (b) Flexible shaft couplings. Flexible shaft couplings shall be of the gear type, Fast, Waldron, Poole or equal.. Under one-horsepower other types of coupling are accept able. -- (c) Coupling guards to completely enclose all moving shafts. In general, guards on horizontal pumps shall be provided in confonnance with Drawing GE-K-99519. Chevron BB 013680 V-G-3.0 Section V-G February 16, 1951 Page 53 (d) Lubricators. All pumps and drivers not equipped with forced ^Lubrication shall be provided with U-ounbe or --laLrgerlconstant level lubricators of the Alvor or Trico type or equal. 2.16 Flange Ratings - The rating and facing of all flanges shall T3e" in accordance with the instructions of Plant Design Requirements~V-L. aSA 125# C.I. flanges are not acceptable on centrifugal pumps handling hydrocarbons. 2.17 Lantern Rings - Lantern rings shall be provided in all pumps that operateTunder one of the following conditions; (a) If pumpjtakes suction at subatmospheric pressure (lantern ring for sealing fluid) or (b) on reciprocating pumps if liquid handled is propane or lighter (lantern ring for lubricant introduction). 2018 Pump Vents aid Drains - Vents from pumps handling hydrocarbon stocks above the flash point shall be run in closed piping to a safe place of disposal (to vessel or relief line or other point depending upon situation). Pumps taking suction at pressures lower than atmospheric shall be vented to a line or vessel under a pressure as low or lower than the pump suction. InJgeneral this shall be to the vessel from which the pump is taking suction. Pump case drains may be run to nearest drain ditch sewer inlet or pipe trench, or bther place of safe disposal' de pending on the nature of the liquid. When separate drains and vents, orTpumps in nonhazardous service, are run to a common header, it shall be arranged so that liquid flow from each pump is visible to the operator. 2.15 Throat Bushings - Renewable type throat bushings in centri fugal process pumps shall be locked to prevent their blowing out in the event of a gland failure. Throat bushings:locked only by being pressed in from the low pressure side of the stuffing box are not acceptable. Throat bushings made in the form of flat washers need not be retained provided the diametral clearance between the shaft sleeve and the opening in the pump casing does not exceed 1/32 inch. MATERIAL STANDARDS - ; 3.01 . Pump Case Material - All pumps in process areas shall[have steel cases if they (a) operate with liquid temperatures over 350F, or (b) operate at pressures over 350 psig'or (c) handle light hydrocarbons - butane or lighter, or(d) have an unusual fire hazard connected with them. Other pumps may have cast iron cases. Chevron BB 01368) Section V-G February 16, 1951 Page Sk 3.02 Gland Material - Glands for hydrocarbon pumps shall be steel. Centrifugal pump glands shall be bronze-lined or bronzebushed., 3.03 Shaft Sleeve~Material - Process pumps not equipped with mechanical shaft seals shall have replaceable shaft sleeves; sleeves for continuously operating process pumps shall be faced with either Stellite No. 1 or Colmonoy. Bronze sleeves may be used for low pressure water service. Integral hardened stainless steel shafts may be used where economical on small pumps. 3.0U Irim and Internals (Wear Rings and Throat Bushings or Cylinders and Pistons'! (a) Centrifugal process pump wear rings shall in general be of the following materials: (1) Low temperature - to 250F (non-corrosive) Carbon steel impeller ring Cast iron (or Ni-C.I.) case ring (2) Moderate temperature - 250F to 500F (or corrosive service) 11-13 Cr hardened impeller ring) 11-13 Or hardened case ring ) 300 Bhn minimum. Minimum hardness difference 50 Bhn (3) High temperature - (over 500F) or high pressure (over 300 psi) carbon steel stellited impeller ring 11-13 Or hardened case ring (U) Slurry pump (high temperature) 11-13 Or stellited and grooved impeller ring 11-13 Or stellited (no groove) case ring (b) Cast iron or bronze trim is acceptable in reciprocating process pumps unless alloy steel is necessary to resist corrosion or for high temperature. (c) Bronze trim may be used in fresh water pumps. (d) 18-8 chrome-nickel .stainless steel trim shall be used in salt water pumps. Chevron BB 013682 : V-G-ii.O Section V-G February 16, 1951 Page 55 3.05 Impellers - past iron impellers may be used up to l|00oF. Between hOOF and 550F impellers shall be carbon steel. Above.50F, 11-13$ chrome alloy steel impellers shall be used. In all salt water pumps 18-8 Cr-Ni impellers shall be used. INFORMATION REQUIRED FROM CONTRACTOR li.01 The following information shall be furnished for all pumps and turbines: (a) Service^ (b) Normal Driver (c) Spare Driver (d) Normal Horsepower Required (e) Horsepower Rating of Driver (f) Speed ^ (g) Steam Condition, Supply and Exhaust (h) Water Rate (i) Percent of Time Operating Chevron BB 013683 SECTION V - SPECIAL PROVISIONS 6 - PUMPS AND TURBINES Specification E-IOOO Section V-G February 16, l?5l Page 56 V-G-5.0 SPECIFIC REQUIREMENTS 5.01 The kiln circulating water pump shall be centrifugal pump driven by a 110/30 psig turbine. This service shall be spared. ^ 5.02 CONTRACTOR shall submit price and water rate for the follow ing alternate-drivers for the Kiln Air Blower. (a) Turbine'Thriven with 15 psig saturated steam condensing. Turbine-shall deliver full power when operating on 10 psig-saturated steam. (b) Turbine'driven with mixed 15 psig and 1;00 psig steam condensing (with low pressure end designed to be able to use 10,000#/hr of 15 psig steam at all times)* 5.03 Reliable turbine drivers are required for the Kiln air blower and the catalyst elevator. Turbines offered by CONTRACTOR on his proposal shall be subject to COMPANY acceptance. COMPANY experience shows that the following points should be considered_in specifying turbines for these services. (a) Turbines shall be suitable for operating continuously withoutra spare for periods of from 6 to 12 months. (b) Turbines'shall have collar thrust bearings and sleeve radial bearings. (c) Turbines-shall have non-sparicing linkage on the over speed trip. (d) Turbine shaft at the gland shall be so designed that it will .be continually operable in a corrosive atmosphere. If CONTRACTOR furnishes turbine drivers that do not meet the above requirements, he shall so state in his proposal. Chevron BB 013684 SECTION V - PLANT DESIGN REQUIREMENTS _ , J - INSTRUMENTS Section V-J February 16, 1951 Page 57 V-J-1.0 GENERAL INSTRUCTIONS 1.01 Scope - This specification shall be applicable to all instru ments and component parts of instrument installations. 1.02 Standardization of Parts - Normal COMPANY practice is to standardize on instruments performing a similar function, within a plant (i.e. flow instruments), but to select instruments and controls on the basis of design and price for the several control functions required. All instruments need not be of the same manufacture. 1.03 Safety Relief Valve Selection - it is preferred that relief valve selection be in accordance with the April 19U8 Uni versity of Michigan Engineering Research Institute Bulletin Number 31 entitled MThe Design and Construction of Pressure Relieving Systems," using the Stroop-Maker formula for calculating fire loads. Relief valves shall be provided on the cold side of exchangers and coolers as necessary to relieve liquid or vapor in case of closed block valves. Relief valves shall be Crosby or Consolidated. loOL Piping and Valves - Instrument piping and valves shall be per Plant Design Specification Section V-L except where modified herein. ' ' 1.05 Utility Instruments - Instruments adequate for measuring all utilities consumed or generated by the plant shall be furnished. See Basic Design Data GT-E-ii5U6. 1.06 Use of Alarms - Alarms shall be provided as necessary to protect plant_operation and major process equipment. Normal COMPANY practice is to provide alarms in services such as, but not limited to, the following; (a) Steam drum high and low level (b) Reflux drum high and low level where overflow or loss of level would be hazardous (c) Power failure ! (d) Compressor suction knockout pot level and automatic compressor shutdown (e) Furnace Teed line flow alarm where failure of flow endangers furnace (f) High temperature on furnace top transfer lines (g) Cooling Water (cooling tower circulation and engine _ jacket Water circulation) ' (h) Instrument air pressure _ Chevron BB 013685 V-J-2.0 Section V-J February 16, 1951 Page 58 Alarms shall Hoe installed so as to allow testing without interference with plant operation, 1.07 Transmission - Pneumatic transmission shall be used wherever possible in preference to electrical transmission. 1.08 Sample Connections - Circulating sample connections shall be provided as necessary to maintain process control. Samples shall generally be withdrawn upstream of control valves (or pressure side of pump) and circulated to a point down stream of control valves (or suction side of pump). Samples must be cooled. DESIGN STANDARDS -- 2.01 Control Valves - It is preferred that minimum body size be 3A inch, that cast iron valves 8 inches and smaller have 250-pound flanges minimum rating, that valves operating above itOOF have air-fin cooled packing glands, that valves 2 inches and larger have flanged body connections, and that valves l-l/2-inches and smaller have screwed body connections. 2.02 Pressure Gages - Pressure gages with screwed or snap rings and metal cases are preferred. Bronze Bourdon tubes shall be used on steam, water and other non-inflammable fluids not corrosive to bronze, and at working pressures below 600 psig. Steel tubes shall be used in all hydrocarbon services andffor all other services over 600 psig. On service above 1000 psi, cases shall be equipped with blow out discs and shatter-proof cover glasses. Field-mounted and board-mounted gages shall be six inch diameter. 2.03 Liquid Level Instruments - All level instruments shall be of the type which can be isolated from the vessel to which they are attached without disturbing the normal functioning of the vessel. 2,Oil Gage Glasses - All gage glasses in process service shall be either through-vision or reflex type with steel chambers and covers as manufactured by Jergusen or equal. Gage glasses shall be mounted on separate vessel connections from level instruments. 2.05 Seal Pots - Seal pots shall be used wherever necessary for proper operation of instrument lines or to minimize corrosion, or clogging. 2.06 Instrument Housing - Instruments located outdoors shall be suitably protected for year-around operation. Chevron BB 013686 V-J-3.0 V-J-i|oO Section V-J February 16, 1951 Page 59 2.07 By-Pass Valves - All control valves shall be provided with globe valve~by-pass and gate (plug valve in the case of LPG-seivice) block valves so that the control valve may be removed from service without shutdown. 2.08 Orifice Flanges - Orifice flanges shall be in accordance with Drawing GB-99507, or equal. Throat taps shall be used on lines 6 inches and larger in diameter. 2.09 Flushing -.Where clogging of instruments is anticipated, consideration shall be given to continuous flushing with Hills-McCanna pumps, or equivalent. 2.10 Thermowells - All thermowells in process streams and salt water shall be 18-8 Cr-Ni or better as the process demands. CONTROL ROOM INSTRUMENTS 3.01 All instruments and alarms that should be under the continual observance of the plant operators shall be board mounted. Steel panels are preferred. 3.02 Instruments l)n the panel shall be arranged in sequence of plant flow,TM 3.03 All instruments located on the control board shall be flushmounted. 3.011 Extra panel_jpace shall be provided for at least six instru ments and three alarms. 3.05 A means shall be provided to maintain a nonhazardous atmos phere around all sparking instruments. Where economical explosion-proof instruments shall be used, 3.06 No hydrocarbon lines shall be carried into the control house. 3.07 Alarms shall be located on an annunciator panel. Panalarm Products, Inc., Series itOO, plug-in annunciator cabinets, or equivalent, are acceptable. COMPANY representative shall give approval before purchase. Provision shall be made for three future alarms. INFORMATION REQUIRED FROM CONTRACTOR ' il.Ol Materials and Trim - Include information on the type of materials and trim for control valves, relief valves, thermo wells and primary flow measuring elements for each general service condition. Chevron BB 013687 SPECIAL PROVISIONS J - INSTRUMENTS Specification E-1000 Section V-J February 16, 1951 Page 60 V-J-5.0 SPECIFIC REQUIREMENTS 5*01 Control Room'Ihstruments - CONTRACTOR shall state number and kind of board-mounted instruments to be installed in Gas Recovery Section Control House (see Section V-R), 5.02 Instrument Piping - Instrument transmission lines from the process equipment to the control house shall be furnished and installed by CONTRACTOR. It is preferred that trans mission lines be placed in instrument troughs and parallel lines in the plant area insofar as is practicable. The tie-ins from utility lines to board-mounted instruments shall be by CONTRACTOR. Chevron BB 013688 Specification E-1000 Section V-K February 16, 1951 Page 6l SECTION V - PLANT DESIGN REQUIHBMEMTS K - MECHANICAL EQUIPMENT V-K-1.0 GENERAL " 1.01 Scope - This section applies to all mechanical equipment except pumps and drivers. 1.02 Turbines - The provisions of Section V-G shall apply to all turbines, whether used as drivers for pumps, or for other purposes. 1.03 Mechanical Elevator - Catalyst shall be circulated through the reactor kiln section by a mechanical elevator with a rated capacity of 500 tons/hr. The elevator shall be suit able for handling catalyst at 1100F. The hot catalyst elevator shall be as manufactured by the Jeffrey Manufacturing Company of Columbus, Ohio. The general arrangement, materials and construction shall be similar to the elevators being furnished for Richmond Thermofor Catalytic Cracking Units, 1951 Alterations. Catalyst elevator drive shall be a steam turbine operating from 1*00 psig to 120 psig and shall not be spared. Elevator drive bearings and shaft shall be provided with a inert gas or steam seal. The following elevator spare parts shall be provided by CONTRACTOR. Item Quantity Description 1 1 Complete set of chain for one elevator 2 1 Complete headshaft with traction wheels and rims 3 1 Complete set ohain attachments h 1_ Complete set miscellaneous bolts and nuts 5 20 Chain keepers 6 1 Complete set guide wear plates 7 20 Buckets 8 1 Pair bearing liners 9 1 Pair foot shaft bearings 10 1 Bull gear 11 -1 Bull pinion 12 1 Complete set of gears and pinions for low speed reducer 13 1 High speed right angle gear redncer 1U 1 Fluid coupling 15 "1 Back-stop assembly 16 1 Brake assembly Chevron BB 013689 _ ' Specification E-1000 Section V-K February 16, 19$1 Page 62 l.Oii Blower - The kiln air blower shall be driven by a turbine operating on UOO psig steam condensing. This service shall not'-be' spared. Blower and turbine shall be furnished with ' an integrally mounted turbine-driven auxiliary lubricating oil pump. The air blower shall be guaranteed to supply sufficient air for combustion of 8,500 lbs/operating hours of coke at normal kiln operating conditions. It is desired that the blower also be capable of providing an air supply of approximately 20$ in excess of that guaranteed (see V-K-3.07). V-K-2.0 V-K-3.0 1.05 Passenger and Freight Elevator - A combination passengerfreight elevator shall service the main structure. The elevator shall have approximately I4.0 square feet of platform and a design capacity of 1*000 pounds at 300-350 feet per minute. Control shall be by full automatic push button system. Landings shall be provided at least at alternate working levels on the structure. DUST DISCHARGE AND NOISE LEVEL 2.01 Maximum Allowable Discharge - Not more than 1*00 grains of particles with diameters of 10 microns or larger shall be discharged to the atmosphere per thousand standard cubic feet of flue"gas. 2.02 Equipment Noise Level - All equipment in the plant shall be provided with mufflers or vibration dampeners where neces sary to reduce the noise to a level which will not interfere with efficient operation of the plant. INFORMATION REQUIRED FROM CONTRACTOR 3.01 CONTRACTOR shall furnish information as requested below where equipment of the types listed is to be provided in the Plant. 3.02 Complete description of all air compressors or blowers to include: ~ (a) 3ype of__unit, horsepower, and speed (b) Method of lubrication (c) Type ofzjcapacity control, if required (d) Type of"bearing seals to prevent entrance of dust and moisture 3.03 Description of all cyclones, electric precipitators, or other dust separating apparatus to include: (a) Type ofjunit and location in plant (b) Approximate size and quantity of dust particles (note guarantee requirements in Section II-C-2,06) expected in cleaned air (c^ Expected^ service life (d) Applicable codes in any Chevron BB 013690 Specification E-1000 Section V~K February 16, Page 63 3 .Oil Description of combination passenger-freight elevator to include: -- (a) Type oT unit (b) Sizes ^capacity, and speed (c) Location of landings 3.05 Description of silencing equipment, if any, to includes (a) Type oilunit and location in plant (b) Maximum intensity of sound in decibels at ten feet 3.06 Description of any other item of mechanical equipment to be provided"in plant whose value is in excess of $5,000 and which has not been covered elsewhere in this specification. 3.07 CONTRACTOR shall furnish the following information in his proposal regarding the renozzling (addition of hand valves) to utilize the maximum potential power of the kiln air blower turbine. (a) Maximum~quantity of air available from the Kiln air Blower (expressed as a percentage of the normal design rate).__ (b) Additional cost of renozzling per hand valve (c) Number of hand valves to be added (d) Maximum turbine power available CONTRACTOR shall note that the maximum allowable speed of the blower may limit the increase in capacity. Also that the blower manufacturer shall be required to guarantee the blower capacity only for the normal design rate. Chevron BB 013691 SECTION V -~PLANT DESIGN REQUIREMENTS ,,i L - PIPING -- Section V-L February 16, 1951 Page 6U V-L-1.0 GENERAL INSTRUCTIONS 1.01 Scope - This section applies to all process and utility piping. 1.02 Codes - Piping shall comply with the applicable ASA Standards and the ASA Code for Pressure Piping. Flange ratings shall conform to the-American War Standard, ASA B-16e5-1943, except that small tongue and groove facing shall be used in lieu of ring joint and may be rated equal to ring joint. Feedwater and outlet piping at steam generators shall meet the require ments of the ASME Boiler Code insofar as applicable. Tongue and groove flanges on the API-ASME Code vessels shall be rated equal to raised face per ASA B-16e5-1943. 1.03 Identification - Piping shall be suitably identified by stencillin after insulating and painting. See Plant Deeigi Specification Section V-S. 1.04 Steam-out - All process piping shall have sufficient flexibility and be provided with connections to permit steaming out. Steam out connection-shall consist of one-inch boss, nipple, steel valve, and steel plug. It is normal COMPANY practice to steam test equipment-and lines in hydrocarbon service. Therefore, consideration shall be given to the flexibility of all process lines even in LPG service. Consequently, process lines shall be designed for~the temperatures reached during steam-out. Special consideration shall bd given to the flexibility of pump suction lines. 1.05 Weather Conditions - All lines shall be designed for yeararound operation or shutdown. . 1.06 Vents and Drains - Permanent provision shall be made to vent high points and drain low points in all lines. Pockets shall be minimized. Connection shall be steel boss, nipple, valve, and steel plug,-- Alloy boss, nipple, valve, and plug shall be used for alloy piping. 1.07 Line Sizing - Lines and valves shall be of an economic size. In general, pump^ discharge valves may be the same size as pump outlets; control valve by-pass should have the same capacity as the control valve; size of block valves at control valves should be basedJon allowable pressure loss. Usually they will be the same size^as the control valve. Chevron BB 0^3692. Section V-L February 16, 1951 Page 65 1.08 Plot Limit Tie-Ins - Piping tie-ins at plot limits shall be made by COMPANY. CONTRACTOR shall terminate every process line at plot limits with steel block valve. Other lines shall be terminated with appropriate valves. 1.09 Access - All valves shall be readily operable from permanent walks and platforms. Chain wheels and extension handles are permissible. _Steam valves shall not be installed with stems pointing down. 1.10 Blinding - Piping shall be sufficiently flexible to provide for the insertion of blinds; spectacle blinds shall be provided to block offiall major lines and pieces of equipment. Spectacle blinds shall be provided at all plot limit block valves. 1.11 Buried Lines - The use of underground piping shall be limited to water and "drainage lines. 1.12 Pipe Trenches and Overhead Lines - In general it is desired that all major process lines be carried in concrete-lined pipe trenches, see-Section V-S-4.01. Where a run of pipe connects two elevated pieces of equipment and the horizontal run is not long compared with the vertical runs required to reach pipe trench elevation, the line may be carried overhead. In addition, it is not desired to require piping to be in trenches where such a routing would be unnecessarily awkward or costly. For example, piping from a reflux drum to a nearby pump may often be most easily carried overhead. However, general use of overhead pipeways shall beiavoided. All lines crossing the plot limits shall be in concrete-lined pipe trenches unless specific design considerations make such location impractical, as in the case of drains. 1.13 Steam Traps - All steam lines shall be suitably trapped to keep lines free of condensate and to protect operating equipment. Steam traps shall be installed per Drawing GB-L-99596, or equal. Steam traps shall discharge to a closed condensate system. 1.14 Pump Suction Screens - Conical screens shall be provided for all pumps forst'artrup except that flat screens may be used where installation or removal of a conical screen would be particularly difficult. 1.15 Expansion - It~is preferred that expansion be taken care of by flexibility in piping. Expansion joints may be used in relief lines, or where space limitations make their use necessary. 1.16 Bleeders - Bleeders shall be provided above all valves in steam lines where water may be trapped if valve is closed during plant operation or shutdown. Chevron BB 013693 Section V-L February 16, 1S51 Page 6b 1.17 Relief Piping - Block valves are not required upstream or down stream of relief valves. If block valves are provided means shall be included for locking them in the open position. By passed ' around relief valves shall be provided only where neces sary to vent equipment or permit steaming out, 1.18 Steam Lines td Drivers - Steam lines to pumps and turbines shall be equipped with a gate valve at the header and a globe valve near the driver. A steam trap or drain connection should nor mally be provided at the low spot between these valves. One block valve shall be provided in the exhaust line. Small by passes shall be provided around control valves on standby steam turbines equipped with automatic starters, 1.19 Column and Vessel Blocks - Block valves shall be provided adjacent to all liquid connections on columns, vessels, and tanks. - V-L-2.0 DESIGN STANDARDS " 2.01 All piping designs shall conform to Drawing GT-2848, Classifi cation Sheet for Refinery Piping, except as noted herein. 2.02 Fabricated steel piping shall be in accordance with COMPANY Specifications 351, 352 or 353 as applicable, or equivalent. V-L-3.0 MATERIAL STANDARDS - 3.01 All materials shall conform to GT-2848, Classification Sheet for Refinery Piping, except as modified herein. Alloy steel cast ings shall conform to COMPANY'S Specification No. 11 or 12, as applicable, or^equivalent. 3.02 Pipe - All process pipe 18 inches and under shall be seamless, and all pipe 1-1/2 inch and smaller shall be Schedule 80. Cement-lined steel pipe need not be seamless and drinking water lines shall be galvanized Schedule 40 welded or seamless. Pipe ' smaller than 3/4 inch shall not be used in process piping or in connections thereto, except that instrument leads shall not be smaller than 3/4 inch except for orifice taps. l-l/4, 2-l/2, and 5-inch piping is not acceptable. Bosses shall be in accor dance with Drawings GD-L-31368 or GB-78876, or equal. 3.03 Pipe Joints ' (a) Welded construction in all sizes is preferred for all in stallations and is required in all process lines 2 inch and larger. Flanges shall be used only at connections and where required for blinding and inspection. Removable spools shall be provided where necessary for maintenance. Chevron BB 013694 Section V-L February 16. 1951 Page 6T (b) threaded connections l-l/2 inch and smaller shall be made up without pipe dope and seal welded as follows: (1) LPG or other corrosive chemical or hazardous services. Seal weld all joints except in small meter manifolds. (2) Gas^pvolatile (vapor pressure 10 psig or greater), other hydrocarbons over 100 psig or 350F, and steam over 400F. (3) A11J"joints from process equipment to the first valve shall be seal welded if failure of the joint would permit uncontrolled flow or create a hazard. This will include seal welding pressure side of valve. (c) In sizes l-l/2 inch and smaller, socket weld fittings and valves are preferred to screwed fittings if the installed cost is no more than the screwed fittings required by GT-2848. 3.04 Valves, Fittings and Flanges (a) Steel valves, fittings and flanges shall be used according to the following schedule: / (1) All^process piping in plant area. (2) To and including the first valve on all tanks and other vessels if failure would create a hazard or result in excessive loss. . (3) Steam piping over 250 psig or 450F, but below 600 psig. (4) Remotely controlled emergency valves or valves in other locations where it is essential that equipment be operable during a fire. (5) Fuel Oil and fuel gas lines. (6) Main steam headers and the first valve to steam branch headers. (7) As required for tie-ins. (8) Water lines above frost line except that brass valves are permitted on small lines such as pump gland cool ing =lines. Chevron BB 013695 Section V-L February 16, 1951 Page 68 (b) Valve Stems (1) Rising stem outside screw and yoke valves shall be ... / used in sizes 2 inch and larger for refinery services. (See 3.05). (2) For valves under 2 inch, inside screw,rising stem are preferred, except that outside screw and yoke with stainless steel or monel stem may be used, (3) Stainless steel valve stems only shall be used in hot oil-service or where sulfur corrosion is known to occur. Monel may be used as well as stainless steel in mild temperature oil and gas service. Brass stems and handwheel bushings shall not be used in oil or gas^service, or where melting of a stem during a fire would result in an additional hazard, 3.05 Plug Valves -^The following limitations shall apply to the use of plug valves: (a) In general, plug valves shall not be used in lines where valves are operated infrequently, except that plug valves shall be used in place of gate valves in all LPG service. (b) All plug^ valves 6 inch and larger shall be gear-operated. (c) Plug valves shall be equipped with screwed bonnets or a minimum _of four bonnet bolts. (d) All plug valves shall be of the lubricated type. Where "Hyperseal,, plug valves are required, no substitutes will be accepted. Positive shutoff lubricant screw shall be provided for all plug cooks per Drawing GC-14296, (e) Multiport-plug valves are preferred for backwash Connections in heat exchanger salt water service. 3.06 Underground Piping - Steel pipe installed underground shall be protected from^soil corrosion with a single wrapped coating con sisting of an asphaltic primer, one flood coat of asphalt, and 15# asbestos base pipe line felt. Piping under concrete shall be protected with Somastic Pipe Coating. 3.07 Flange and Valve Guards - Lead guards shall be provided for flanges and valves in caustic, acid, or hazardous chemical service per Drawing GB-88595, or equal. Chevron BB 013696 Section V-L February 16, 1951 Page 6? V-L-4.0 INFORMATION REQUIRED FROM CONTRACTORS 4.01 Materials - Advise -where alloy steel will be used in lines and valve bodies. 4.02 Remote-Ope rated Valves - Where are remote-operated valves used and how are they actuated? 4.03 Tracing - Which lines will be traced? Chevron BB 013697 SPECIAL PROVISIONS L - PIPING Specification E-1000 Section V-L February 16, 1951 Page 70 V-L-5.0 SPECIFIC REQUIREMENTS 5.01 Special Tie-ins - Process piping tie-ins at tie-in line L-L (see plot plarTDwg. GT-4540) shall be made by COMPANY. CONTRACTOR shall furnishband install piping and supports for Vapor line from Reactor to Synthetic Crude Column. CONTRACTOR shall con nect line to Column flange, located at an elevation of approxi mately 25 ft above grade. 5.02 Special Material Standards (a) Furnace top transfer line to Reactor - Type 347 steel 0>) Vapor line - Reactor to Synthetic Crude Distillation Column - Type 347 steel (c) Expansion bellows - Type 347 321 316 (a) Valve in furnace top transfer line - 5% Cr Mo with 11-13$ Cr trim 5.03 Stress Relieving - All austenitic type welded piping shall be stress relieved at 1500-1550F for 2 hours per inch of thickness, but not less than 2 hours. 5.04 Catalyst Piping - Lines carrying catalyst shall be designed for the longest life economically feasible. At certain points where erosion is known to be particularly severe and localized, a minimum estimated operating life of l-l/2 years shall be pro vided. Where practicable, design shall provide for points of severe wear being sectionalized for economical maintenance, by means of flanged units, wear plates, etc. . * If type 347 steel is nob available, the following alloys may be substi tuted in this order of preference: Type 321 Type 304 (extra low carbon) Type 304 Chevron BB 013698 SECTION V - PLANT DESIGN REQUIREMENTS ' ' " M - STRUCTURES Section V-M February 16, 1951 Page 71 V-M-1.0 GENERAL 1.01 Scope - This section applies to all steel, concrete and timber structures except buildings. Design and construction shall comply to the._. Uniform Building Code, latest edition, where applicable. 1.02 Safety - Norinll COMPANY practice in layout of platforms, walk ways, ladders, and stairs is shown on the attached drawings, GB-M1Z+074. GB-143^7, and GB-14348. 1.03 Access -Platforms and stairs shall be provided for all points which must be serviced or reached once each 8-hour shift. All other points which require less frequent access during opera tion or for maintenance purposes shall be provided with plat forms and ladders or stairs. In addition, access between levels of main structures or buildings shall be by stairs. 1.04 Maintenance Platforms - Maintenance platforms and ladders shall be provided for reaching any manhole, valve (or valve operating chain or extension), safety valve, removable head, cover, channel-head, or instrument point. Platforms shall be provided around top flange of vertical reboilers. The width of platforms in front of manholes shall be not less than 36 inches while platforms at horizontal heat exchange equipment shall extend a suitable distance beyond the faces of the covers to permit access during both operation and maintenance. In addition, platforms shall provide space for rigging of tackle for pulling bundles but not for workinr on bundles above grade elevation, 'Nhere practical, it is preferred that heat exchangers be located at grade elevation for ease of access and maintenance. In case of stacks of large exchangers where the upper unit _is too high for convenient access, CONTRACTOR shall provide permanent supports for temporary timber staging for servicing the upper unit. Maintenance platforms shall be designed to carry all equipment live loads which can be placed on them by fixed davits or monorails, with the exception of tube bundles. Chevron {3B 013699 2.-ZT-4 <4 1 Chevron BB 013700 Section V-M February 16, 1951 Page 72 1.05 Slide Pole Escaped- Where slide pole escapes are provied they shall be located "bn the windward side with respect to prevailing winds. The slide pole shall be installed with drops of not over 25 feet. Alternate poles shall be offset four feet from one another, snd~the clearance radius around each pole shall be two feet. Slide poles shall be four inch, Schedule ipO steel pipe, sandblasted and painted. If the slide poles are located on the edge of the structure, safety cages shall be provided. " 1.06 Davits and Monorails - Davits or monorails shall be provided for handling equipment parts weighing in excess of 100 pounds and subject to cleaning and repair. Typical equipment parts to be handled include (l) the elements (channel, channel cover and shell cover) of elevated tubular equipment, (2) hydraulically operated slide and motor valves and relief valves, (3) housings and rotors of turbo-blowers. Pumps in general will not he provided with such facilities, however, this assumes adequate access roads for the travel of a cranecar or equal. All_monorails shall have permanently mounted trolleys with plain self-aligning roller bearings except that for capacities of"three tons or greater the trolleys shall be gear operated, CONTRACTOR shall provide hoists, sufficient in number and capacity, to service any lift, but not all lifts of the same magnitude simultaneously. Two basic types of hoists are required: (1) chain-operated for lifts of 10 feet for loads of two tons or less and for lifts of 3 feet for all loads exceeding two tons. (2) Air or eleotric hoists for all higher lifts than .those specified above. One hoist and trolley shall serve in the removal of the elements from elevated horizontally-mounted exchangers. In general davits, hoists and monorails should not be designed to handle the erqhfmgaV bundle, Normal uuMPAffl practice is to use portable hoists and cranes for lifting and lowering bundles, 1.07 Platform Floorings^and Trench Coverings (a) CONTRACTOR shall use checkered plate for the following: (1) Low walks over trenches (2) Pedestrian bridges (3) Trench coverings, where coverings are necessary (k) Ojopratinjp platforms . (5) Maintenance platforms (6) Walkways over tanks or machinery (b) Fabricated grating (welded or riveted) shall be used for (l) BridgesIcjirryinr vehicular traffic over pipeways (2) Maintenance platforms subject to heavy loads Chevron BB 013701 Section V-M February 16, 1951 Page 73 1.08 Services "on Structures - Service air and steam connections shall be located ^within 25 feet of every level of structures and columns. There shall be at least four air connections at ' each furnace, located for ease of maintenance operations. Water connections" shall be located for convenient washdown and maintenance ATse, V-M-2.0 DESIGN STANDARDS 2,01 Drawings - CONTRACTOR may use the following standard drawings: GB-MlijOyii - Walkways, Stiles, Short Stairs and Bents GB-li+3U7 - Guide Sheet No. 1 for Layout of Platforms GB-lii|8 - Guide-Sheet No. 2 for Layout of Platforms V-M-5.0 INFORMATION REQUIRED FR0M~CONTRACTOR 3.01 Advise of any equipment which will not be provided with plat forms and ladders Jor access. Chevron BB 013702 Specification E-1000 Section V-M February 16, 1951 Page 7ii SECTION V - SPECIAL PROVISIONS M - STRUCTURES V-M-luO SPECIFIC REQUIREMENTS " it.01 Catalyst Storage, Makeup and Disposal - CONTRACTOR shall provide facilities for moving catalyst from trucks at base of main structure to catalyst storage bins. (See Section V-C-it.02) In addition, CONTRACTOR shall provide facilities for loading on trucks spent catalyst from fines storage for removal from plant (see Section V-C-it.02). U.02 Catalyst Hoists-1 CONTRACTOR shall provide handling facilities for the unloading, storage and makeup of catalyst. CONTRAC TOR shall show details of operation in his proposal. it.03 Slide Poles - Slide poles shall be furnished for the Catalytic Cracking Unit structure per Section V-M-1.03. Chevron BB 013703 SECTION V -'PLANT DESIGN REQUIREMENTS N - EMULATION AND FIREPROOFING Section V-N February 16, l?5l Page 75 V-N-1.0 V-N-2.0 GENERAL INSTRUCTIONS 1.01 Scope - This section covers the insulation and fireproofing of all equipment,- vessels, piping, and structures. Insulation shall be furnished for personnel safety, stability of oper ation, and reduction of heat losses as amplified below; fireproofing shall be furnished to minimize structural failure of key members in event of a fire. 1.02 Insulation for Safety of Personnel - Insulation or protective shields shall be -furnished and installed for hazardous sur faces. See also BAsic Design Data. 1.03 Insulation for Operating Stability - Adequate insulation shall be furnished" and installed for all piping and equipment wherever lack of insulation would result in unstable operations or make continued^operations unduly difficult. l.Olr Insulation for Heat Savings - Piping and equipment shall be insulated against heat losses in accord with economic justifi cation as defined elsewhere. 1.05 Fireproofing for Structural Protection - Structural members and skirts directly supporting hydrocarbon vessels, columns, reactors, or regenerators shall be fireproofed on all sides up to the point offload application. All other structural members shall be fireproofed at least 20 feet above-grade if their failure during a fire could be expected to cause rupture of any hydrocarbon line, vessel, etc. Secondary bracing members and supports for elevated walkways, stairs and platforms need_not be fireproofed. Pipe supports included in the above description shall be fireproofed except for the topTflange of the horizontal member. DESIGN AND MATERIAL STANDARDS 2.01 Standard Details of Insulation - It is preferred that insula tion material and. application be in accordance with specifi cations and details on forms EF-222 (Insulation for Hot Lines) ' and EF-22U (Insulation for Hot Vessels), or equal. Insulation in exposed locations subject to physical damage shall be protected with 22-gauge sheet metal covering. Chrome nickel alloy clips and bands shall be used for all insulation. Chevron BB 013704 V-NV3.0 Section V-N February 16, l^pl Page 76 ' 2.02 Standard-Peiails" of Fireproofing - All fireproofing shall be concrete, and it is preferred that fireproofing materials and application jqe in accordance with details on form EF-168 (for skirts of columns and vessels) and Drawing GE-33336 (for structural members), or equal. Concrete fireproofing shall be so applied (high density, surface treated, or admixed) as to minimize spalling or cracking. To save weight imposed on the supporting structures, a light weight concrete may be used. INFORMATION REQUIRED FROM CONTRACTOR 3.01 Materials - Advise what major insulation materials (not including items each as wrappings, tie wires, etc.) will be furnished for the followings ` (a) Piping insulation below 212F (b) Piping insulation 212F to 600F (c) Piping insulation above 600F (d) Insulation weathercoat above 175F (e) Vessel insulation below 500F (f) Vessel insulation 500F to 600F (g) Vessel insulation above 600F (h) Type of weatherproofing for fireproofing material Chevron BB 013705 ,, ) _ .. SECTION V - PLANT DESIGN REQUIREMENTS ? - ELECTRIC POWER AND LIGHTING Section V-P February 16, 1951 Page 77 Y-P- 1.0 GENERAL 1.01 CONTRACTOR shall design all power and lighting facilities in conformance with the requirements of the National Electrical Code, or other applicable code and in accordance with the provisions ofjthis specification. 1.02 CONTRACTOR shall determine the classification as to hazard of all areas within the plant limits in accordance with the designations set forth in the NEC. All areas shall be designated as Jlivision 1 (hazardous) or Division 2 (infre quently hazardous) for Class 1, Group D atmosphere or shall be designated npn-hazardous. Classification will be subject to COMPANY approval. Normal COMPANY practices beyond the provisions of_-the code in the designation of areas ares (a) Spaces approximately 25-ft horizontally surrounding, 10 ft above, and to grade below any point where leakage of volatile hydrocarbons (flashpoint less than 100F) is likely to occur at any time without definite failure of any part such as leakage in pump packing shall be considered_as if they were Division 1. (b) Spaces in the immediate vicinity of a point where spillage jof a volatile hydrocarbon would result only after failure of some part such as a flange gasket shall be considered as if they were Division 2. (c) In addition to the normal practices included in (a) and (b) above,"'COMPANY'S Recommended Practice No. 1, Siectionof Electrical Equipment for Hazardous Locations, is included in the Appendix as a guide for CONTRACTOR. 1.03 CONTRACTOR shall furnish electrical facilities suitable for use in areas as designated and in conformance with the . provisions outlined herein. Chevron BB 013706 Section t_p February 16, 1951 Page 78 V-P-2.0 ELECTRICAL MATERIAL AND EQUIPMENT 2.01 All electricaLinaterial shall have Underwriter's Laboratories approval for the services in which it is used and shall bear the label or shall be listed in the Underwriter's Laboratories List of Electrical Equipment, If the material is of such size or rating /that the Underwriter's Laboratories is unable to test it, it shall be built in accordance with their standards. InTsddition all electrical material shall be furnished in accordance with Basic Design Data GT-E-i^i^S. 2.02 All above-ground_conduits shall be rigid steel, either gal vanized or "Sherardized". Underground conduits shall be hot-dipped galvanized steel or fiber. Fiber underground ' conduits shall be encased in red colored concrete envelopes providing a minimum coverage of three inches. Underground hot-dipped galvanized steel conduit shall either be encased in red colored concrete or laid bare per Basic Design Data. Where conduits dross roads or are otherwise subject to loads, they shall be adequately protected to minimize the effect of uneven settlement. 2.03 "'ire for underground iiiiO-volt motor and control circuits,, lighting circuits, and other low voltage circuits shall be of the 600-volt classification and shall be TW or better. If the underground installation is in a refinery where the wire is subject to contact with hydrocarbons, machine tool wire, type TW, good for 80C in air shall be used. Rubber insulated wire may be used-aboveground for dry locations where it is appreciably cheaper than TW or where the size is greater than permitted by the NEC for TW wire. Lead covered wire may be required .in someinstallations. Refer to Basic Design Data GT-E-45ip. 2.0b Explosion-proof^conduit fittings shall be used in Class 1, Division 1 areas. Condulet type fittings shall be used in Class 1 Division ^ areas unless corrosive liquids or gases may be present,Iif which case explosion-proof fittings shall be used. ~ . 2.05 Underground conduit runs shall be adequately designated by markers similar to details on Drawing GB-P-876OI, Conduits located below pavements or below the floor of a building shall be marked per details "D" and "E" of above drawing by impressing arrows in the concrete or by installing concrete ' inserts in the pavement. Chevron BB 013707 2.06 Section V-P February 16, 1951 Page 79 ^ Underground oonduits shall be sealed with a Crouse-Hinds type EYS condulet orJequal at the point where they enter or leave the ground. IfLTiber conduit is used, transfer should be made to steel in a horizontal run before the conduit leaves the ground. 7 2.07 Nameplates similar to those shown on Drawing CC-J88609 shall be supplied on_all push button stations, circuit breakers, motor starters,' transformers, lighting panels, welding out lets, and other control devices. All panel boards and switch boards shall have nameplates giving appropriate designation and voltage, phases, and frequency. V-P-3.0 ELECTRIC POWER AND MOTORS 3.01 All motors shalL be designed and built in accordance with the latest NEMA standards and shall conform to Basio Engineering Design Data. Motors are preferred with built-in thermal protection. 3.02 COMPANY prefers'that motor starters be installed indoors in standard NEMA Type 1 enclosures and in control oenters similar to Cutler-Hammer "Unitrol" or equivalent. Control centers shall be used where the group of starters and cirouit breakers require two or more vertical sections. Provide spare spaces in_the control center for additional control equipment, if itTdoes not require an additional vertioal section. If it is not practicable to locate the control center indoors.-jind installation shall be in a non-hazardous area, a weatherproof, NEMA Type 3. control center may be in stalled. For smaller groups standard combination type en closures with circuit breaker disoonneots may be used. If CONTRACTOR finds it necessary to mount motor starters (in individual enclosures) outdoors, NEMA Type U shall be used for nonhazardous areas and NEMA Type 7 for hazardous ares. At COMPANY'S option NEMA Type 8 (oil-filled) starters may be required in somej locations if specified in the Basic Design Data, InductiorTtype or temperature compensated overload relays are preferred for outdoor installations. All panels shall be designed and located so that additions can be easily made. If reliability of operation warrants, two motors on the same service (driver and its spare) may be supplied from separate power sources and inter-connections provided so that either motor may operate from either source of power. 3.03 All 2300 or higher voltage control shall be located in non hazardous areas7~ CONTRACTOR shall base his estimate on 50 M7A "Metal-clad" equipment* It will be necessary to have the tripping relays coordinated with system equipment throughout the plant/ Provisions of this section may be modified in the Basic Design Data, or at a later date. Chevron BB 013708 j- Section V-P February 16, 1951 Page 82 1+.06 Control Board Lighting - Fixtures used for lighting the vertical surface of control boards shall provide even illumi nation over^the surface of the board without glare. The fixture should be located to prevent reflection of the bright light source -from the glass face of the instrument. Mounting direct fluorescent or incandescent fixtures in a row about two feet from the face of the board and about two feet above the top of the board has proven to be a satisfactory method of illumination.' Fixtures with directional reflectors or lenses can be used to advantage to direct most of the light on to the surface of the control board. Supplementary lighting should be provided for desks in the same room. ii.07 Clearance Lights Structures, -towers, and other equipment shall be equipped with airplane clearance lights in accordance with existing govern ment regulations. V-P-5.0 LIGHTNING PROTECTION V-P-6.0 5.01 Adequate means shall be provided for lightning protection'of power lines and equipment. INFORMATION REQUIRBDJROM CONTRACTOR 6.01 The following information is required with proposal; (a) Type of conduit for underground service (b) Type of wire (c) Approximate location and type of motor controls (d) What equipment will operate at 2300 or higher voltage (e) Indicate general plan of conduit runs regarding under ground and aboveground installation 1 (f) Simplified'one-line diagram of power supply to drivers and lighting transformers. Chevron BB 013711 ) ' SECTION V - PLANT DESIGN REQUIREMENTS Q - FOUNDATIONS Section V-Q February 16, ipSi Page 83 V-Q-1.0 V-Q-2.0 V-Q-3.0 V-Q-ii.O GENERAL - 1.01 Scope - This section applies to all foundations including building foundations. 1.02 General Conditions -- Allowable soil bearing pressures are given in the Basic Design Data. 1.03 Spread Footings - Spread footings shall be used for all foundations. DESIGN STANDARDS 2.01 CONTRACTOR may use the following standard drawings and forms; GE-83167 -- Design Guide Sheet for Romp Slabs E-5l6 - Fabrication of Reinforcing Steel E-850 - Placing and Curing Concrete E-851 -- Concrete Proportioning and Mixing 2.02 Top of foundations and pump slabs shall be no less than 6 inches above grade and at minimum height to give good piping layout7bbth with respect to economy and appearance. MATERIAL STANDARDS 3.01 Concrete - If-ready-mixed concrete is used, it shall conform to ASTM Specification C-Ji;, latest edition. Design strength shall be 2500 psi at 28 days and 1-1/2 inch maximum aggregate size, It-inch maximum slump, 3.02 Reinforcing Steel - Shall conform to ASTM Specification - A-305-U9, Structural Grade, Deformed Bars. INFORMATION REQUIRED FROM CONTRACTOR I*. 01 Strength Control - What procedure of inspection and testing will be followed^ to insure that concrete as placed meets the design strength,. Chevron BB 013712 Specification E-1000 .Section V-R February 16, 1951 Page 8U SECTION V - PLANT DESIGN REQUIREMENTS R ?:BUILDINGS GENERAL INSTRUCTIONS 1.01 Instrument Control House - Provision for mounting control instruments far.the Catalytic Cracking Plant will be made in the Gas Recovery Section Control House. This control house will be furnished by others. Chevron BB 013713 ,,_ / -=-- SECTION V - PLANT DESIC3I REQUIREMENTS S - MISCELLANEOUS ITEMS Section V-S February 16, 1951 Page - 85 V-S-1.0 V-S-2.0 GENERAL ^ This section applies to"miscellaneous items which because of their nature are not included in other classifications. SANITARY SEWERS AND OILY DRAINS ' 2.01 General Instructions (a) CONTRACTOR shall provide separate sanitary sewer and oily water drain systems within the plant area and shall provide for storm water or area drainage to pipe trenches. The drain and sewer systems shall be con nected to Refinery system at line L-L by CONTRACTOR, Gas seal catch basins per Drawing GB-S13870, or equal, shall be used at plant limits for connection to the Refinery system. The sanitary^sewer shall be connected to the sewer line downstream of any gas seal catch basin. (b) No sewer or drain shall be less than' U-inch diameter although 6-inch minimum diameter is preferred. Drain inlets shall be of the type shown in Detail J, Drawing GB-13990, or equal. Drains shall be adequately vented to protect the seal with due regard to vapor hazards ' from the vents. Sewers and drains shall be sufficiently deep to protect pipe from crushing. (c) At junctions of main drain headers within the Plant, a gas seal type catch basin equal to Drawing GB-13870 shall be provided. (d) Plugged cleanout connections which can be reached without excavation shall be installed to permit cleaning any sewer or drain which cannot be otherwise reached by rod type cleaning equipment. (e) Design of piping shall take into consideration the character of the soils at the site and the possibility of settlement of the lines. Rafts and saddles, if re quired to support bell and spigot pipe, shall conform to COMPANY Drawing GB-S99617. Chevron BB 013714 V-S-3.0 Section VS February 16, l5l Pape - 86 j (f) Drains shall, be sized to allow for a maximum of 1200 gpm of fire-fighting water drain-off from any drainage area withizfthe plant, or for a maximum rain water run off from theT plant area based on the greatest storm intensity expected in a 10-year period (1-1/2 inches per hour - see Basic Design Data), whichever is the greater. (g) Backfill over buried lines shall be constructed so that the backfill will not serve as a passageway for gases. Pulverized clay will be acceptable in place of quarry screenings. 2.02 Material Standards (a) All material shall be new and of a type suitable to resist corrosive action of sewage. (b) Pipe shall conform to the latest ASTM specification for the type used. . (c) Pipe under buildings, structures, or where otherwise inaccessibleshall be extra heavy cast iron or standard weight steelTpipe if suitable for the intended service. Where steelTpipe is used it shall be protected from soil corrosion. (See Section V-L-3.06) Connections to structures which may be expected to settle more or less than the surrounding area shall be flexible enough to prevent breakage. PAVING AND BRIDGES 3.01 General Instructions . (a) Concrete paving shall be installed on surfaces subject to spillage if hydrocarbons and in areas subject to heavy load concentrations during maintenance operations. Asphaltic paving may be used elsewhere. Minimum accept able paving thickness shall be 3U of asphaltic concrete on plant roadways and two inches for other areas. Minimum concrete paving thickness shall be four inches with 6" x 6" by 10 gage welded steel mesh reinforcing. Bottom and sides of pipe trenches shall be concrete. (b) Prior to paving entire area with concrete and asphalt as specified_in paragraph V-S-3.01(a), the entire area, after filling, shall be graded and low spots eliminated to permit run-off of water. Chevron BB 013715 Section V-S February 16j l?5l Page - 87 V-S-I4..0 (c) Subgrade under paved areas shall be well-compacted. Three inches" of base rock shall be placed over sub grade for plant access roads and two inches of base rock shall :bre placed for areas in which paving is to be provided. 3.02 Design Standards~ (a) Asphaltic paying shall conform to the applicable con struction specification of the Asphalt Institute. (b) Vehicular bridges over pipeways shall have welded or riveted steel grating decks. (c) Bridges shay, be designed for H-20 highway loading plus 10$ impact, or 75 tons deadweight (plus 10$ impact) of-50-ton capacity Manitowoc Crawler Crane. COMPANY Drawing GA-9S5U9 may be used as applicable. PIPE TRENCHES -- U.01 Pipe trenches shall be of concrete construction. 11.02 The design of theZtrench shall provide adequate clearance for removal of piping. it.03 Spacing of lines in trenches shall not be less than shown on Drawing 31323._ The bottom elevation of lines shall be at least ten inches above the high point of the trench bottom. it.Oit Trench bottom shall slope to drain gutters which in turn drain to sealed cartch basins. This slope shall be 2$ except in cases where this would cause excessive elevation changes. In these cases it shall be 1-1/2$. li.05 Concrete firestops shall be built across all trenches at intervals of approximately fifty feet, and shall serve in those locations as pipe sleepers. In locating firestops consideration shall be given to segregation of individual plant areas as operating areas. I4..O6 Trench covers, where used, shall be in accordance with Section V-M. -- ii.07 Approximately twenty-five percent of total pipe trench width shall be left unoccupied in each trench for future lines. Chevron BB 013716 Section V-S February 16, i?5l Page - 88 V-S-5,0 V-S-6.0 V-S-7.0 PAINTING _ 501 General Instructions (a) All equipment, except insulated equipment, insulation, and concrete or stucco buildings, shall be painted with two prime coats and two finish coats. Insulation shall be painted with one coat. Concrete or stucco buildings shall be painted with two coats. Insulated equipment if sheet steel covered, shall be painted with a primer and two coats. (b) Exterior and interior paint color shall conform to color schemer to be furnished at a later date. 5.02 Material Standards (a) Paint materials and surface preparation shall conform to COMPANY Specification Form EF-68, or equal, and shall be compounded by the manufacturer specifically for the type of surface to which they are to be applied. Zinc chromate meeting COMPANY Specification No. 809 shall be used as a primer. (b) Application And reduction of paints shall be in accordance with manufacturer's recommendations. (c) Identification of pipe lines, pumps, turbines, motors, vessels, columns and other equipment shall be clear and-legible_and shall be painted using stencils with letters as Targe as is practicable. Lines are normally identified where they connect to equipment, at cross walks, and at plot limits. FIRST AID STATIONS, SHOWERS, AND EYEWASH 6.01 First aid stations, fire blankets, and similar equipment will be provided by COMPANY and installed by CONTRACTOR. 6.02 CONTRACTOR shall provide safety showers and eye baths as necessary. DRINKING FACILITIES d 7.01 General Instructions - Adequate drinking fountains shall be installed. Chevron BB 013717 V-S-8.0 V-S-9.0 t MINTENANCE TOOLS Section V-S February 16, lOJJl Page - 89 8.01 All special tools and equipment required for maintenance of the plant shall be furnished by CONTRACTOR. This will not apply to standard tools and equipment which COMPANY will furnish. Items to be furnished by CONTRACTOR shall include: ^ (a) Special tube rolling tools. (b) Special tools for furnace, if any. (c) Heists required for maintenance (see Section V-M-1,06) (a) One set of~ifll special tools to service pumps, com pressors, or other mechanical equipment. CONTRACTOR will provide COMPANY with list of special tools he proposed toyfurnish. COMPANY will review list and advise which tools are available in Refinery. CONTRAC TOR shall delete such tools and credit cost of job. HYDROSTATIC TESTING 9.01 Scope - All refinery equipment and lines, except sewers and drains, which are to be subjected in service to internal or external pressure, shall be hydrostatically tested except items specifically excluded per paragraph 9.08. Hydrostatic testing shall belwitnessed by COMPANY representative. 9.02 Time of Test - Tests shall be applied after erection and before equipmentiis insulated or initially placed in service. Welded joints shall be exposed during test. 9.03 Test Pressures -"The following general specifications for test pressures shall apply. (a) Lines - The normal test pressure for piping is 1-1/2 times the adjusted cold pressure rating of the valves, fittings, ^pansion joints, or other limiting elements on the liner, such ratings being defined in Section V-L. (b) Other Equipment - The normal test pressure for refinery equipment shall be 1-1/2 times the equivalent cold maximum allowable pressure based on total thickness including corrosion allowance. (c) In general,_EF-121 outlines hydrostatic test pressures and procedures that shall be followed. 9.04 Test Media - All -lines and other equipment shall be hydro statically tested with fresh water furnished by COMPANY except air, water, and steam lines operating at pressures below 150 psig which may be tested with their respective fluids at their Operating pressures only. Chevron BB 013718 Section V-S February 16, 195'1 Page - 90 9.0$ Inspection and-Hammer Test - During testing, the pressure shall be built up slowly and held for a sufficient length of time to permit a thorough examination for leaks. Lines shall be hammeritested while under pressure in accordance with procedure .outlined in paragraph 630 (c) of the Code for Pressure Piping, ASA, B-31.1-19U2. 9.06 Correction of Defects - All defects, as found, shall be corrected to the satisfaction of COMPANY representative. The tests shall:be repeated after each repair. 9.07 Testing of Associated Equipment - All small connections (drains and bleeders, material and sample connections, level and gauge glass^connections, and thermometer and pyrometer wells) shall be"in place during testing and shall be subjected to the test pressures out to the first valve of the connection,. When testing level control connections the float chamber shall also be subjected to the test pressure. 9.08 Equipment to be ^Excluded from Field Test - Pumps, turbines, relief valves, displacement meters, and gauges, shall not be subjected to field hydrostatic tests, but should be blinded off during test. Control valves shall be field tested only to tljeir allowable pressure rating and shall be blinded off during test of the line. Air motors need not be field tested. 9.09 General Procedure - All high points in equipment tested shall be vented so that all air will be displaced from the system while it is being filled with the testing medium. All hot lines shall be tested before applying insulation. Buried lines shall be tested before backfilling. All coated lines shall be tested before covering joints. 9ol0 Completion of Te_its - At the completion of a test, the equipment shall _be drained promptly and thoroughly. Expansion joints of 18-8 Cr-Ni shall be removed from the line, and thoroughly dried to prevent stress corrosion cracking. They shall not be reinstalled until shortly before starting the unit. Alloy steel furnace tubes shall be washed with fresh water after testing, and be blown dry with air. 9.11 Special Tests and Exceptions - With the approval of COMPANY representative special tests and exceptions (such as air tests to avoid water in the system, reduced pressures, proof tests, etc.) majr be applied in lieu of tests in accordance with this Section V-S-9. 9.12 Disposal of Test Water - CONTRACTOR shall provide all fa cilities for disposal of test water. Chevron BB 013719 --i SECTION V - PLANT-DESIGN REQUIREMENTS T - CHEMICALS Section V-T February 16, 1951 Page - 93 V-T-1.0 CHEMICALS r 1.01 Chemicals Required - CONTRACTOR shall specify in his proposal all chemicals required for starting operation of the plant and for a period"of 60 days following the completion of initial startup period. COMPANY will furnish required chemicals and catalyst. Chevron BB 013721