It appears that it could be physically possible to get a paper mill
of 48" to 60" width and approximately 20 ton per day capacity into the Chicago
Gasket Plant. This could be put into Plant 2 using the same areas occupied by
our present wet machine operations and certain other space now under-utilized-
or occupied by operations we have already considered dropping, in connection .
with the proposed packaging program.
We could locate the paper machine along the south end of Plant 2.
The wet end would be on the south side of the present wet'machine area, the
dtyers, calender reel, and rewind where the asbestos drying oven is now. We
would use a special conveyor section to transfer the web overhead across the
main north-south entrance aisle to Plant 2, so we would not lose that access.
Finished coils would come off the line at the west end, near the lab.
The balance of the wet machine area would be used for stock
preparation, water recovery, and other accessory equipment for the wet end. It
might be possible to retain the steel unloading dock, but it is not probable there
would be any under-crane space for steel storage.
.. '
. ;; The east side of the second floor would be used for storage of
asbestos and other raw materials. This would be essentially the same area now
used for asbestos and refiberized scrap, plus the area now occ'"''1'^1 nnrnar. 500 VPD-15 8-0000712
'
fDANA-215
'
. To: R. M. Burns
June 25, 1968
Re: Paper Mill in Chicago Plant
2 - -
manufacture and Viciolene gasket blanking. This should give us space for a
reasonable asbestos and scrap inventory. Latex and asphalt storage could use
areas presently used for this purpose and some additional holes could be found
for more latex and liquid chemical storage tanks .
Finished materials would have to be stored in the present asbestos
warehouse. Unless we could create more first floor space by removing the rubber
making operation, we would be very tight for storage since this move would lose
the steel storage area we have been counting on in the wet machine space and
this steel would have to go into the asbestos warehouse or back to the garage.
The corbestos A and B presses would have to be relocated. Other
than that there would be no major relocations of active production facilities
involved in.this addition. We would very much limit ourselves for future expan
sion of any operations in Plant 2 .
'
Because of the inconvenient arrangements for receiving, handling,
storing and issuing materials made necessary by the arrangement of this building,
I would estimate the operating crew of this machine would need to be increased
by at least two men per shift over what it would be with an ideal installation.
This could result in an excess cost of up to $10 per ton of finished product.
' Installation of the machine and its associated equipment would be
more costly than in a new location, probably in the order of $100,000 to $150,000,
when making allowances for things available in Plant 2 which would have to be
provided in a new location. This excess cost would be caused: first, because
. **
`
we must tear out a lot before we can start putting in new; second, everything
VPD-158-0000713
June 25, 1968
To: R. M. Burns
,
Re: Paper Mill in Chicago Plant
-3-
must be fitted to available space, making design compromises necessary which
would run up the cost; and third, we would have to comply with Chicago city
codes which would impose some conditions we might not have to face in another
area.
It would be possible to get this equipment into Plant 1. One
advantage would be a one-floor operation with the attendant economies in
material handling. It would, however, use up about 40,000 sq. ft. of prime
first floor space. Most of this space is now occupied by Department 214 and
by metal storage, all of which must be on a ground floor and most of which
should be together for efficient operation. There is just not this kind of first
floor space available in these plants to relocate these operations into.
Plant 5 might be a possibility. It is long enough to take the
machine and use of the basement, first, and second floors for this operation
might be practical if we could make the necessary structural changes in the
building and if we needed the three top floors for something else. It would
probably not be economical otherwise, since the sale price of the building '
could make up a substantial part of the cost of a building specifically to house .
the wet machine..
.
If it is desirable or necessary to put the paper mill with an
existing Victor operation, my feeling is that the best move for the long run
would be to put it into an addition to the Robinson-plant. Robinson uses some
'.
quantity of the materials made on the paper machine now. If we are able to make
Victolex papers and if the projected growth in soft packings goes as planned, _ _
June 25, 1963
To: R. M. Burns
Re: Paper Mill in Chicago Plant
-4-
their percentage should increase. They are already in the materials business
and this would be a logical extension of it. The plant could use some additional
operations to help their overhead.
.
Today there is a shortage of male labor in Robinson, but this will
not necessarily apply two or three years from now. The refinery project will take
a lot of people during the construction period, but this will drop down very
radically when it goes into operation. Hopefully, some of the extra people who
will come into the area for the construction will want to remain if there is a
place to work.
The Robinson plant was designed to be substantially expanded
and there is ample land available to accommodate outside water storage and
settling ponds. Putting the paper operation there in a building addition designed
specifically for this purpose would enable us to get the best possible economy
and flexibility of operation, possible inclusion of equipment to make wet machine
products and improved potential for expansion into new products.
'
These same considerations would apply equally as well to a nqw
plant on the Elgin property, except that there we would be starting with raw
land, the initial cost would be higher, and unless planned as part of a long range
move of other operations might not be a practical operating move.