Document 2q0ojNOqkj3nJO6vopR99Ld9p
| CYANAMID
d?
Request For Capital Expendltures/Retfrements
REPORTING CLASSIFICATION
C-1
DATE APPROVED
6/22/83
JOB ORDER NO.
PP-5858
DIV.SION OR COMPANY
SUMMARY OF AMOUNTS
f
^olyraer.. Products__________'
JCATIITN
j .o . c o n t r
DESCRIPTION
ESTIMATED p r o j e c t c o s t
LOCAL CURRENCY
U.S. DOLLARS
`ns
Chicago Plant________________09 7 Install liners in dry white mill
d is ma n t l e me n t e x p e n s e
TRANSFER e q u ip me n t GROSS AMOUNT FOR APPROVAL
LESS TRANSFER EQUIPMENT
RGna
1
L.gsfe'
OR TRADE-IN
NET CASH REQUIRED (g o f - 30271
-------------- 8608--1
RETIREMENT DATA
COST DISMANTLEMENT LESS SALVAGE
AMOUNT
2000 . 500
TOTAL - CHARGE RESERVE
2500
DESCRIPTION AND REASONS REQUIRED
ECONOMICS as called for in General Procedure Memo#3
Attachment C (Attach calculations)
ECONOMICS PERIOD
NET SALES NAT (P RO Ft T/SAVINGS) TOTAL INVESTMENT
V* ROI (o n t o t a l in v e s t .) INTERNAL RATE OF RETURN PAYOUT OF NEW FIXED CAPITAL
REV.# t
[2 !:. 3
4
. . :5;
6
7'
REVISION DETAIL (g r o s s a mo u n t ?)
DATE
AMOUNT
CUM*; AUTHORIZATION
Funds of .
_______________________________________________________________. ......,,_______ 8608
ate requested to install new liners in "the dry white.(carbonateT^mill.
i.
JUH 9 i.08?
NA 30Q6 REV. 5 -7 7 5.77
PP=5858 6/22/83 Page 2 of 5
PROPOSED WORK & COST
Funds of ___________________________.__________________________________.
_______
are requested to install new liners in the dry white (carbonate)
mill.
\
8608
PRESENT SITUATION
PPG Industries, a major customer with potential annual sales of Ml.5 pounds has changed their specification with reguard to oil absorp tion and dispersion of our Cyastab #40.
After the Cyastab #40, a basic lead carbonate is manufactured and dried, it is milled in a C-E Raymond #50 Imp Mill. This mill was built in 1926, and has never been relined. The mill was inspected by C-E Raymond and found to be in need of new liners and hammers. The hammers have been since installed.
We are currently only partially approved as a supplier, since our
product is only borderline acceptable to the customer. We are
attacking this problem on two fronts; one in the laboratory to de-
velope a chemical means for controling oil absorption and-^paxticai
size, two in the plant by upgrading our carbonate mill.
^
We cannot guarantee that the mill liners will resolve the problems, but it is sound business logic to maintain process equipment at peak efficiency.
JUSTIFICATION
By not being able to meet the customers new specifications, the plant is loosing an estimated Ml.5 pounds of Cyastab #40 sales.
Hammond Lead, a competitor, meets their new specifications. Their product has some other undesirable effects, and therefore is not completely acceptable to PPG. This customer will soon be accept ing bids to supply 100% of their needs.
N14628.01
CYWI 25-0007277
CO M M ERCIAL FACTORS
h tn w vo rt c co fu cn co CTcS
H- fD 1--i I--1 rt tn "* rt n O r fD 3 iQ O C 01 O' pi 0 h0 ft
S ff
u.>
a-o\
io
IV
M M it=>
>fc>
cn vo
03
to
to cn cn
O H) pj H-
f-S H O' tn 0 rt 3 CD 03 rt fD CD
H M rt vo fD' co H CO
PP-5858 6/22/83 Page 3 of 5
i-3 3" Htn o H Q. (!) H in
v*eoa
i-i
rt
cn
to Cn
co
ir< O' in
cn
--tt1in
I-1 Co -c/>
V
l-1
ft)
3
rt
tr c Dj vQ n>
rt
Hi O
03
vo
K <n
fu
i-i
vQ
H-
3
3
H 3 cn O O 3 cn fD
I
CO
7K'
-u>
O
tn
(D CD Cn
tn
rt
3 cr H-
H-
N
(D H tn
O tn
Hi
O H* o s; tn
oP
CYWI 25-0007278
PP-5858 6/22/83 Page 4 of 5
DETAILS OF PROPOSAL
A complete set of new liners will be purchased from C.E. Raymond and installed by plant maintenance personnel.
PRODUCTION FACTORS
This proposal will improve product quality by improving the products grind and therefore improving its dispersion properties.
CONTINGENT FUTURE COMMITMENTS
This proposal will not require additional funds to complete. Further testing will be done by laboratory personnel to reduce oil absorption.
ALTERNATIVES CONSIDERED
Do nothing---------- This would result in the loss of 1..5M pounds
of basic lead carbonate sales . We would also not be able to bid
on PPG 1984 business requirements.
___ -
Purchase from other manufactures and repackage for resale---------- -- This is not possible, since no present manufacture completely meets the customers new specifications.
Replace present mill with a new mill-- rejected as too expensive, and long lead time required.
RISKS
No operating risk are involved.
CONCISE SUMMARY
Reline the present carbonate mill to enable the plant to meet the customers new specifications and regain a estimated Ml.5 pounds in sales.
CYWI 25-0007279
M pf*NTC#> GOP- S02 REV. 7/82 uifc 7/82
DETAIL SHEET
SHEET NO.
JOB ORDER NO.
COMPANY
AMERICAN CYANAMID
ITEM OR
CODE HO.
DESCRIPTION
Mill liner and parts
Mill bearing
3 Shipping 4 , Dismantlement
5, Tax
LOCATION
CHICAGO
Eq u ip me n t OR
MATERIALS
PP-5858 6/22/82 -Page 5 of 5 May 18,1983
ENG. MECH.
SVC.
5440 950 250 500 368
7508
1000
100
1000
100
6540 950 250 500 368
8608
DISMANTLEMENT MILL LINER
ACQUI SIT I ON
DATE
VALUE
1971
2;000 EST
DISPOSITION SCRAP
CYWI 25-0007280