Document 2mn650g0yDVj6ar9Yq3aLYQr
iBDOO 169562
VCM TRAINING CLASS
Test';' 1978
J
7\ame
'/j'y.i//
Department
1. The VCM Standard sets limits for VCM exposure of / average and ,,^ ppm for any 15 minute period.
7i
.V -Jo -7 f'
Date ppm time-weighted-
Respiratory protection devices (gas mask, etc.) are required above:
/l A. 1 ppm
airline respirators, Scott Air Paks, C. 32 ppm
Jo5. Our Honeywell continuous monitors s'oouund an alarm when
o an area. A. 1 ppm
/
--' CeC--i.o/ppm^
, A4. All respirators are cleaned
C. 52 ppm
ppm is reached in
A. Weekly--.
B. .Monthly/,.- __ <^Gt--Dai 1
5. We monitor your VCM exposure to:
5 CAT. Minimi ze__v.ou-r--e-x-^o-sure--to--VGMB. Monitor.-our progress in reducing VCM concentrations in our plant rCT Both AH'* --Nei`th'er"Aor B
6. The VCM regulation does not apply to products made from PVC\
True
False
7. The three VCM regulated areas in our plant are:
A. Dr)' blend basement and Q.C. Lab. _> P -1 Builidng and Boiler House _J^A'CM Tank Farm, the two Large Reactor areas.
Our Plant Emergency Procedures are outlined in the:
A. Collective Bargaining Agreement JL "Make Safety a Habit" Booklet'
/c) J.?PVC Plant Safety and Health Manual
Do non-Conoco personnel have to sign Regulated Area Logs.before entering regulated areas?
Yes No
10. Cur plant is continuously monitored for VCM at 40 different-points 24 hours/day, vear-round.