Document 2kDzR2956xzdwpv9ZeRpegdg
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
REGION 1
NVIRONMAEGENBCYOS5 TPOONST, OFMFAIC E0 2SQ1U0AR9E-, 3S9U1IT2E
100
RONMENTA
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
Goyette's Inc
From:Damian Bednarz, Inspector
DAMIANDigitally DsAMiIgANn eBdED NbARyZ
Date: 2023.12.21 15:20:38
BEDNARZ -05'00 '
Thru:Anna Hatke, InspectorANNADigitally signeHAdTK E
by ANNA
To: File
HATKE
Date: 2023.12.21
15:33:23 -05'00 '
I. Facility Information
A. Facility Name:Goyette's Inc
B. Facility Location:1260 Shawmut Avenue
New Bedford, MA 02746
C. Facility Contacts: Jake Goyette, General Manager
508-441-0245, jake@goyetteautoparts.com
Tim Cusson, Vice President (Construction)
800-883-9100, timc@parallelproducts.com
D. NPDES ID No (s).: MAR053149 (MSGP)
MAR10042K (CGP)
II. Background Information
A. Date(s) of inspection: October 30, 2023
B. Weather Conditions: 55 F, Rain the morning of the inspection.
C. US EPA Representative(s):
Damian Bednarz, Inspector
Anna Hatke, Inspector
D. State / Local Representative(s):
NA
ED_019088A_00003973-00001
E. Federally Enforceable Requirements Covered During the Inspection:
National Pollutant Discharge Elimination System Construction General
Permit (CGP)
40 C.F.R. 122.26 Multi - Sector General Permit (MSGP)
40 CFR Part 112 Oil Pollution Prevention regulations.
F. Previous Enforcement Actions:
None known
III. Type and Purpose of Inspection
Evaluation
IV. Facility Description
According to public records, Goyette's Inc., doing business as Goyette's Auto Parts (the
" Facility " or " Site ") located at 1260 Shawmut Avenue in New Bedford, Massachusetts is
an auto salvager that receives salvage vehicles from primarily auctions for the reselling of
auto parts, including engines and other profitable parts. The Facility has an approximate
footprint of 7 acres, which includes a disassembly and storage garage and outdoor
crusher. The remainder of the property is utilized for the storage of processed vehicles.
V. Inspection
Damian Bednarz and Anna Hatke (" EPA Inspectors ") arrived at the facility at
approximately 11 AM. The inspection was unannounced and upon arrival, Mr. Bednarz
asked a mechanic in the garage to speak with a manager. EPA Inspectors were greeted by
Jake Goyette, general manager of Goyette's Inc.
A. Opening Conference
EPA Inspectors presented their credentials to Mr. Goyette and explained that the reason
for the visit was a routine evaluation. Mr. Bednarz asked general questions regarding the
business. Mr. Goyette explained that the business recycles auto parts for resale, and that
vehicles are primary procured from salvage auctions. Customers consist of private
consumers as well as the automotive repair business.
Mr. Goyette explained that the business operates from 8 AM to 5 PM and consists of
approximately 50 employees. The Facility has an environmental contractor, Relco
Consulting. When asked for industrial stormwater permit identification, Mr. Goyette was
unsure whether the Facility had such coverage.
In addition to the routine industrial activity conducted at Goyette's Inc, auto salvage, it
was later discovered during the inspection that a construction project was on - going at the
Site. The construction operation was wholly within the footprint of the property, to install
overhead solar panels as well as on - site electricity generation and energy storage
equipment. The extent of this construction can be seen from satellite imagery (slide 1 and
2).
2
ED_019088A_00003973-00002
Mr. Goyette agreed to facilitating a Facility walkaround with EPA Inspectors.
B. Facility Tour
Mr. Bednarz asked where vehicles are drained and disassembled. Mr. Goyette explained
that all engine pulling, wet disassembly, and draining occurs within the maintenance
garage (slide 6, 7). Gasoline from vehicles being processed is pumped and collected
within a mobile 125-gallon double walled tank (slide 5). This gasoline is reused on Site
by the business. Waste oil is collected in 275-gallon waste oil totes (slide 8) within the
maintenance garage. Approximately every 2 to 3 months, Western Oil Company collects
waste oil from the Facility. A portion of waste oil is used to fuel the Facility's waste oil
heater which is a double walled storage tank with a capacity of 250 gallons (slide 10, 11).
This waste oil heater is only in operation during cooler times of the year, and waste oil is
generally collected for off - site disposal during warmer months.
EPA inspectors observed within the maintenance garage, a wall of engine blocks on
pallets (slide 3).
EPA Inspectors and Mr. Goyette proceeded outside of the maintenance garage and
observed rims being stacked and sold (slide 12). Waste roll - off containers were in this
same area (slide 13). When asked about scrap waste that comes from the crusher, Mr.
Goyette stated that Spiegel's Recycling comes to collect aluminum and steel waste. Front
vehicle bumpers and axles with rotors are stacked outside on pallets in this outside area
(slide 14, 15). Due to the rain earlier on the day of the inspection, EPA Inspectors
observed pooling of stormwater in this area, and a visible channelized is present along the
perimeter of the Facility heading east (slide 16, 17). Mr. Goyette explained that due to
construction activities, this area was unlevelled and the loader at the Facility would
eventually add more gravel for the purpose of levelling this area. Pooling of stormwater
was observed in the vehicle inventory area (slide 23) as well as the Facility's northern
property boundary (slides 24-26). EPA Inspectors observed a downed silt fence along the
northern property boundary (slide 19-21).
In the northwestern quadrant of the Facility, EPA Inspectors observed stockpiling of
unstabilized sediment (slide 27) that was actively being used for construction activities. A
loader was working these materials and aiding with pouring cement footings. When EPA
Inspectors asked about the work being done, Mr. Goyette summarized that Parallel
Products Solar Energy had recently installed solar panels on roof stanchions and were
now installing on - Site batteries that would store the newly created energy and supply the
grid.
EPA Inspectors approached the construction activity and asked to speak with the
operator. Mr. Tim Cusson, vice president of Parallel Products Solar Energy, accompanied
EPA Inspectors to facilitate a walkthrough of the ongoing construction activity. Mr.
Bednarz asked whether the construction operation was permitted under EPA's
Construction General Permit (" CGP "). Mr. Cusson explained that the activity is
permitted, and that work began in late 2022. EPA Inspectors observed intact silt fencing
along the edge of this activity (slides 28-30). EPA Inspectors also observed a pump in
3
ED_019088A_00003973-00003
operation, with a blue hose, collecting water from a hole in the ground leading north
outside of the Facility (slides 31-33). Mr. Cusson explained that one of the final stages of
the project was to install two batteries and converters.
EPA Inspectors regrouped with Mr. Goyette to finish the last area of the Facility walk
through, the crushing operation (slide 34). The uncovered crusher (slide 35) is positioned
just north of the maintenance garage and approximately 30 vehicles were staged around it
(slides 35, 36). Mr. Bednarz asked about the frequency of crushing that occurs at the
Facility. Mr. Goyette explained that the Facility crushes approximately 30-50 cars every
week. Crushed vehicles, referred to as " pancakes ", are piled onto trucks typically the day
they are crushed if not one day later, and each truck carries anywhere from 15-20
pancakes.
EPA inspectors also observed several totes in this area (slides 37, 38). Mr. Bednarz asked
about the purpose of these totes. Mr. Goyette explained that some contain antifreeze, and
others are empty for the purpose of eventually being used to store waste oil. Mr. Bednarz
explained that containers that are intended for oil storage, even in an empty state, would
still be applicable to Oil Pollution Prevention regulations, 40 CFR Part 112, and that the
Facility would require a plan if storage is above a threshold of 1,320 gallons.
C. Records Review
No records were reviewed prior to or during this inspection, considering that it was
unknown to Mr. Goyette or EPA Inspectors whether the Facility was permitted under the
MSGP.
D. Closing Conference
Mr. Bednarz expressed concerns with the management of aboveground oil storage
containers observed during the inspection, and informed Mr. Goyette of the need to
implement a Spill Prevention Control and Countermeasure (" SPCC ") Plan should total
aboveground storage of petroleum products be above 1,320 gallons.
Mr. Bednarz explained that an inspection report, along with photos taken the day of the
inspection, would be sent to him within 70 days of the inspection.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
4
ED_019088A_00003973-00004