Document 2jwyBwkQOV4aq1vwg6LBRYwVR
MID-MONTH REPORT
PROJECT TITLE: PERIOD ENDING: PERSONNEL: WRITTEN BY;
Aroclor Pollution- Study
October 15, 1970 I. Ransaw & A. Nelson
I, Ransaw
'
A scries of four 5 inch diameter columns (each packed to a bed depth of 5.5 feet with calgons filtrasorb 500 carbon) was placed on stream 10/2 at the Aroclor Sump. To-datc the unit has been operating with minimum difficulties at an average flow rate of 2 gpm/CtT (*xl000 cc/min.). The available test results indicate an Aroclor reduction in the range (600-2,000 ppb) in the influent to (NDA^lOppb) in the effluent of the first columns. Since there has been no indication of a break through in the fiist column, plans are now to increase the flow to 4 gpm/ft .
In a 4 day pilot run, initial concentrations of 40-150 ppb in the effluent of the new limestone pit were reduced to an essentially NDA upTpassing throu: a filter (4 inch diameter cube packed to 5.5 inch depth with carbon) at a flow of 100 cc/rnin. Tests are now being run under the same conditions utilizing srnd as the filtering media.
1, NDA - no detectable amount
Contact was made with a Monsanto Biodize on 10/5. Biodize has agreed to provide a 2300 gallon clarifier to be used both in a flocculation and a batch adsorption study. A sludge sample and a sample of the new limestone pit effluent have been sent to Denver Equipment Company for an evaluation of aolids removal by froth floatation. Pit effluent samples have also been sent to Betz's Waste Water Lab.for an evaluation of their different coagulants.
Ish Ransaw
HONS 036141